CN217205420U - Construction device for glass curtain wall of high-rise building - Google Patents

Construction device for glass curtain wall of high-rise building Download PDF

Info

Publication number
CN217205420U
CN217205420U CN202220222224.7U CN202220222224U CN217205420U CN 217205420 U CN217205420 U CN 217205420U CN 202220222224 U CN202220222224 U CN 202220222224U CN 217205420 U CN217205420 U CN 217205420U
Authority
CN
China
Prior art keywords
curtain wall
glass curtain
electric control
control column
automatically controlled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220222224.7U
Other languages
Chinese (zh)
Inventor
吕晓冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220222224.7U priority Critical patent/CN217205420U/en
Application granted granted Critical
Publication of CN217205420U publication Critical patent/CN217205420U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model relates to the technical field of buildings and discloses a construction device for a glass curtain wall of a high-rise building, which comprises a hanging basket, wherein the middle part of the inner cavity of the hanging basket is provided with an electric control column, the bottom of the electric control column is provided with a pedal, the middle part of the inner cavity of the electric control column is provided with a motor, the top of the electric control column is provided with a first switch, and the bottom of the electric control column is provided with a cross rod; this high-rise building glass curtain wall's construction equipment, cooperation through automatically controlled telescopic link structure and splint structure is used, in operation, glass curtain wall places back in the recess, utilize glass curtain wall gravity to press down starting switch two, make automatically controlled telescopic link to placing a rear side shrink, cooperation splint press from both sides tight fixed glass curtain wall, remove to the suitable position after glass curtain wall, press down switch one, make automatically controlled axle counter-clockwise turning, make splint no longer press from both sides tight glass curtain wall, the installation of the glass curtain wall of being convenient for, compare in artifical lift, staff's working strength has not only been reduced, the outdoor danger of lifting glass curtain wall has been reduced simultaneously.

Description

Construction device for glass curtain wall of high-rise building
Technical Field
The utility model relates to a building technical field specifically is a high-rise building glass curtain wall's construction equipment.
Background
When installation glass curtain wall, because the majority uses glass curtain wall's building height higher, and glass curtain wall uses the place and mostly is the building side to when installing glass curtain wall, need construction worker to use hanging flower basket cooperation installation, when can traditional hanging flower basket uses, need artifical supplementary installation curtain, greatly increased workman's manipulation strength, and have certain danger.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a high-rise building glass curtain wall's construction equipment possesses and lifts glass curtain wall in the building outside high efficiency, and reduces glass curtain wall and lifts the dangerous advantage of in-process again, has solved general engineering and has adopted the manual work to lift glass curtain wall, extravagant more manpower resources and have great dangerous problem.
(II) technical scheme
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a high-rise building glass curtain wall's construction equipment, includes the hanging flower basket, and the middle part of hanging flower basket inner chamber is provided with automatically controlled post, and the bottom of automatically controlled post is provided with the footboard, and the middle part of automatically controlled post inner chamber is provided with the motor, and the top of automatically controlled post is provided with switch one, and the bottom of automatically controlled post is provided with the horizontal pole, and the spout has been seted up at the top of horizontal pole, and the top of horizontal pole is provided with places the piece.
Preferably, the bottom of placing the piece is provided with the slider, the bottom fixed mounting of placing the piece inner chamber has automatically controlled telescopic link, the front end fixed mounting of automatically controlled telescopic link has automatically controlled axle, the top movable mounting of automatically controlled axle has splint, the top of placing the piece is seted up flutedly, the bottom fixed mounting of recess inner chamber has switch two, the shape size of slider and the shape size phase-match of spout inner chamber, switch two passes through electric wire and automatically controlled telescopic link electric connection, thereby after glass curtain wall put into the recess, press starting switch two, make switch two control automatically controlled telescopic link shrink backward and press from both sides tight glass curtain wall.
Preferably, the number of placing the piece has a plurality ofly to utilize a plurality ofly to place the piece, effectively clamping glass curtain wall avoids because glass curtain wall is great and takes place the accident when the clamping.
Preferably, the footboard passes through electric wire and automatically controlled post electric connection to the during operation, trample the footboard once, utilize the automatically controlled post of footboard control to rise automatically to this drives the glass curtain wall on horizontal pole and the horizontal pole and rises, rises to suitable position after when glass curtain wall, presses the footboard once more, stops to rise with this automatically controlled post of control.
Preferably, the first switch is electrically connected with the electric control shaft through an electric wire, and the electric control shaft is fixedly installed with the clamping plate, so that after the first switch is pressed to be started, the electric control shaft is controlled to rotate anticlockwise, the clamping plate is driven to rotate anticlockwise, and the clamping plate does not clamp the glass curtain wall any more.
(III) advantageous effects
Compared with the prior art, the utility model provides a construction equipment of high-rise building glass curtain wall possesses following beneficial effect:
1. this high-rise building glass curtain wall's construction equipment uses through the cooperation of automatically controlled post structure and footboard structure, when outdoor installation glass curtain wall, through placing glass curtain wall on the piece of placing at the horizontal pole top back, steps on the pressure footboard for automatically, rise when glass curtain wall rises after suitable height, step on the pressure footboard once more, make automatically controlled post automatic stop, whole process is simple convenient, has greatly improved staff's working strength.
2. This high-rise building glass curtain wall's construction equipment, cooperation through automatically controlled telescopic link structure and splint structure is used, in operation, glass curtain wall places back in the recess, utilize glass curtain wall gravity to press down starting switch two, make automatically controlled telescopic link to placing a rear side shrink, cooperation splint press from both sides tight fixed glass curtain wall, remove to the suitable position after glass curtain wall, press down switch one, make automatically controlled axle counter-clockwise turning, make splint no longer press from both sides tight glass curtain wall, the installation of the glass curtain wall of being convenient for, compare in artifical lift, staff's working strength has not only been reduced, the outdoor danger of lifting glass curtain wall has been reduced simultaneously.
Drawings
Fig. 1 is a schematic front view of the overall structure of the present invention;
FIG. 2 is a schematic view of the back of the overall structure of the present invention;
FIG. 3 is a schematic view of the placement block structure of the present invention before operation;
FIG. 4 is a schematic view of the structure of the placing block after the placing block is placed in the glass curtain wall of the present invention;
fig. 5 is a schematic view of the structure of the placing block after the glass curtain wall of the utility model is installed.
In the figure: 1. a hanging basket; 2. an electrical control column; 3. a pedal; 4. a motor; 5. a first switch; 6. a cross bar; 7. a chute; 8. placing the blocks; 801. a slider; 802. an electric control telescopic rod; 803. an electric control shaft; 804. a splint; 805. a groove; 806. and a second switch.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, a construction device for a glass curtain wall of a high-rise building comprises a hanging basket 1, an electric control column 2 is arranged in the middle of an inner cavity of the hanging basket 1, a pedal 3 is arranged at the bottom of the electric control column 2, the pedal 3 is electrically connected with the electric control column 2 through an electric wire, so that when the construction device works, the pedal 3 is stepped once, the electric control column 2 is controlled to automatically ascend by the pedal 3, a cross rod 6 and a glass curtain wall on the cross rod 6 are driven to ascend, the pedal 3 is pressed again after the glass curtain wall ascends to a proper position, the electric control column 2 is controlled to stop ascending, a motor 4 is arranged in the middle of the inner cavity of the electric control column 2, a switch I5 is arranged at the top of the electric control column 2, the cross rod 6 is arranged at the bottom of the electric control column 2, a chute 7 is arranged at the top of the cross rod 6, a placing block 8 is arranged at the top of the cross rod 6, a slide block 801 is arranged at the bottom of the placing block 8, an electric control telescopic rod 802 is fixedly arranged at the bottom of the inner cavity of the placing block 8, the front end of the electric control telescopic rod 802 is fixedly provided with an electric control shaft 803, the top of the electric control shaft 803 is movably provided with a clamping plate 804, the top of the placing block 8 is provided with a groove 805, the bottom of the inner cavity of the groove 805 is fixedly provided with a second switch 806, the shape and the size of the sliding block 801 are matched with the shape and the size of the inner cavity of the sliding chute 7, the second switch 806 is electrically connected with the electric control telescopic rod 802 through an electric wire, so that after the glass curtain wall is placed into the groove 805, the second switch 806 is pressed to start the second switch 806, the electric control telescopic rod 802 is controlled to contract backwards to clamp the glass curtain wall, a plurality of placing blocks 8 are arranged, a plurality of placing blocks 8 are utilized to effectively clamp the glass curtain wall, accidents caused by the larger glass curtain wall during clamping are avoided, the first switch 5 is electrically connected with the electric control shaft 803 through an electric wire, the electric control shaft 803 and the clamping plate 804 are fixedly arranged, so that after the first switch 5 is pressed and started, the electric control shaft 803 to rotate anticlockwise, thereby driving the clamping plate 804 to rotate counterclockwise, so that the clamping plate 804 no longer clamps the glass curtain wall.
The working principle is as follows: when the glass curtain wall hanging basket works, firstly, a glass curtain wall needing to be installed is carried into the hanging basket 1, then the hanging basket 1 is lifted until the hanging basket 1 moves to the place where the glass curtain wall needs to be installed, during installation, the position of the placing block 8 in the chute 7 at the top of the cross rod 6 is reasonably adjusted, then, the glass curtain wall is manually moved into the groove 805 formed in the top of the placing block 8, after the glass curtain wall is placed at the top of the placing block 8, the glass curtain wall starts according to the requirement of the second switch 806 at the bottom of the groove 805, the second switch 806 is controlled to move backwards, the electric control telescopic rod 802 is matched with the clamping plate 804 which is originally in the top vertical state, and the glass curtain wall is clamped by the clamping plate 804;
then, the pedal 3 at the bottom of the electric control column 2 is manually stepped to enable the electric control column 2 and the cross rod 6 to automatically move upwards to drive the glass curtain wall to move upwards, when the glass curtain wall moves to a position needing to be installed, the pedal 3 is stepped again to enable the pedal 3 to control the electric control column 2 to stop moving, then the glass curtain wall is manually supported to enable the glass curtain wall to be aligned to the installation position, then the switch I5 at the top of the electric control column 2 is manually pressed, the electric control shaft 803 is controlled to rotate anticlockwise by the switch I5, and therefore the clamping plate 804 is driven to rotate anticlockwise, the clamping plate 804 does not clamp and fix the glass curtain wall, and the glass curtain wall is convenient to install;
after the glass curtain wall leaves and places piece 8, switch two 806 does not receive the glass curtain wall to press, and switch two 806 automatic closing moved up this moment and closed for automatically controlled telescopic link 802 moves forward, steps on simultaneously and presses footboard 3 once more, makes automatically controlled post 2 move down automatically, and presses switch one 5 once more, makes automatically controlled axle 803 clockwise turning of switch one 5 control, drives splint 804 clockwise turning recovery normal position simultaneously, the installation of the next glass curtain wall of being convenient for, whole process circulation is reciprocal.
To sum up, this high-rise building glass curtain wall's construction equipment compares in traditional artifical lift installation glass curtain wall, and this device not only need not artifical the lift, has greatly reduced staff's working strength, and the machine installation has not only reduced the operation danger simultaneously, has improved work efficiency moreover.
It should be noted that, in this document, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a high-rise building glass curtain wall's construction equipment, includes hanging flower basket (1), its characterized in that: the middle part of the inner cavity of the hanging basket (1) is provided with an electric control column (2), the bottom of the electric control column (2) is provided with a pedal (3), the middle part of the inner cavity of the electric control column (2) is provided with a motor (4), the top of the electric control column (2) is provided with a first switch (5), the bottom of the electric control column (2) is provided with a cross rod (6), the top of the cross rod (6) is provided with a chute (7), and the top of the cross rod (6) is provided with a placing block (8).
2. The construction equipment of the glass curtain wall of the high-rise building according to claim 1, characterized in that: the bottom of placing piece (8) is provided with slider (801), the bottom fixed mounting who places piece (8) inner chamber has automatically controlled telescopic link (802), the front end fixed mounting of automatically controlled telescopic link (802) has automatically controlled axle (803), the top movable mounting of automatically controlled axle (803) has splint (804), the top of placing piece (8) is seted up fluted (805), the bottom fixed mounting of recess (805) inner chamber has switch two (806), the shape size of slider (801) and the shape size phase-match of spout (7) inner chamber, switch two (806) are through electric wire and automatically controlled telescopic link (802) electric connection.
3. The construction equipment of the glass curtain wall of the high-rise building according to claim 1, characterized in that: the number of the placing blocks (8) is multiple.
4. The construction equipment of the glass curtain wall of the high-rise building according to claim 1, characterized in that: the pedal (3) is electrically connected with the electric control column (2) through an electric wire.
5. The construction equipment of the glass curtain wall of the high-rise building according to claim 2, characterized in that: the first switch (5) is electrically connected with the electric control shaft (803) through an electric wire, and the electric control shaft (803) and the clamping plate (804) are fixedly installed.
CN202220222224.7U 2022-01-27 2022-01-27 Construction device for glass curtain wall of high-rise building Active CN217205420U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220222224.7U CN217205420U (en) 2022-01-27 2022-01-27 Construction device for glass curtain wall of high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220222224.7U CN217205420U (en) 2022-01-27 2022-01-27 Construction device for glass curtain wall of high-rise building

Publications (1)

Publication Number Publication Date
CN217205420U true CN217205420U (en) 2022-08-16

Family

ID=82793798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220222224.7U Active CN217205420U (en) 2022-01-27 2022-01-27 Construction device for glass curtain wall of high-rise building

Country Status (1)

Country Link
CN (1) CN217205420U (en)

Similar Documents

Publication Publication Date Title
CN217205420U (en) Construction device for glass curtain wall of high-rise building
CN205519331U (en) Two ware sideboard upper plate devices in quick automatic air conditioner
CN216389402U (en) Photovoltaic module tetrafluoro cloth erection equipment
CN114086780B (en) Assembled building construction strutting arrangement
CN214771900U (en) Car panel beating mould overhauls uses upset platform
CN210848746U (en) Steel grating press welder
CN204287701U (en) Camera positioning system of automatic certificate handling machine
CN210099891U (en) Attached smelting tool of TV set lamp strip
CN219771531U (en) Lifting appliance for processing aluminum profile
CN215978409U (en) Climb frame and prevent weighing down and prevent toppling and attach wall support device
CN213894321U (en) Clamping mechanism for assembling aluminum shell magnet
CN210021431U (en) Automatic turning device of people's air defense absorber
CN216688308U (en) Vacuum coating machine is height-adjustable's elevating gear for appearance spare
CN216504896U (en) Nail pulling mechanism of nail pulling machine
CN111283403A (en) A auxiliary device is used in installation of aluminum alloy floor spring door for glass curtain wall construction
CN211035101U (en) Heated board promotes sign indicating number board device
CN214498451U (en) Fragment of brick promotes sits thick liquid device
CN216105799U (en) Building concrete hoisting device
CN110978364A (en) Automatic heating type fireproof plate shaping equipment and production process thereof
CN220440095U (en) Automatic branching mechanism for plug manufacturing
CN217622380U (en) Hydrogel dressing tabletting equipment
CN219469561U (en) Automatic lifting device for base tray of tubular hot pressing furnace
CN216587767U (en) Glass curtain wall construction device based on BIM technical unit
CN217812266U (en) Automatic lifting device for climbing frame
CN217485906U (en) Automatic terminal die casting machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant