CN215254462U - Building climbing frame lifting synchronizer - Google Patents

Building climbing frame lifting synchronizer Download PDF

Info

Publication number
CN215254462U
CN215254462U CN202121065158.9U CN202121065158U CN215254462U CN 215254462 U CN215254462 U CN 215254462U CN 202121065158 U CN202121065158 U CN 202121065158U CN 215254462 U CN215254462 U CN 215254462U
Authority
CN
China
Prior art keywords
lifting
climbing frame
gear
seat
frame body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202121065158.9U
Other languages
Chinese (zh)
Inventor
周拔群
黄书舟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN202121065158.9U priority Critical patent/CN215254462U/en
Application granted granted Critical
Publication of CN215254462U publication Critical patent/CN215254462U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a building climbing frame lifting synchronizer, which relates to the technical field of building climbing frames and consists of a climbing frame body, a lifting mechanism and a lifting mechanism; the lifting mechanism comprises a lifting seat, a sliding mechanism is arranged between the lifting seat and the climbing frame body, a hanging seat is arranged below one end of the lifting seat, an electric hoist is fixedly connected onto the hanging seat, and a hook is arranged at the bottom of the electric hoist; the lifting mechanism is positioned at one end of the lifting seat, which is far away from the hanging seat, the lifting mechanism comprises a limiting sleeve, the limiting sleeve is fixedly connected with the lifting seat, the middle part of the limiting sleeve is rotatably connected with a right-angle gear through a rotating rod, one side of the right-angle gear is provided with a plurality of gear rods which are connected end to end, the right-angle gear is meshed with the gear rods, and the gear rods are provided with connecting devices; the utility model discloses need not to carry out a lot of dismantlement installation to electric block, save the amount of labour, improve work efficiency.

Description

Building climbing frame lifting synchronizer
Technical Field
The utility model relates to a frame technical field is climbed to the building, and more specifically says, relates to a frame promotes synchronizer is climbed to building.
Background
The climbing frame is also called a lifting frame and can be divided into several main types such as hydraulic type, electric type, manual pull type and the like according to the power source; the scaffold is a novel scaffold system developed in recent years, is mainly applied to high-rise shear wall type floors, and can ascend or descend upwards along buildings;
this system makes the scaffold technology completely improved: firstly, the frame does not need to be turned over; secondly, avoided the dismouting process of scaffold (once assemble the back and used to the construction all the time and finish), and do not receive the restriction of building height, very big manpower and material of having saved to also have great improvement to traditional scaffold at safe angle, have development advantage in high-rise building extremely, but building creeper still can have certain problem when using at present:
at present, climb every last layer of frame and need once dismantle the installation with electric block, extravagant a large amount of labour influences work efficiency.
SUMMERY OF THE UTILITY MODEL
Aiming at the problems in the prior art, the utility model aims to provide a building climbing frame lifting synchronizer; the utility model discloses need not to carry out a lot of dismantlement installation to electric block, save the amount of labour, improve work efficiency.
In order to solve the above problem, the utility model adopts the following technical scheme:
a building climbing frame lifting synchronizer is composed of a climbing frame body, a lifting mechanism and a lifting mechanism;
the climbing frame comprises a climbing frame body, and is characterized in that lifting mechanisms are arranged on two sides in the climbing frame body, each lifting mechanism comprises a lifting seat, a sliding mechanism is arranged between each lifting seat and the climbing frame body, a hanging seat is arranged below one end of each lifting seat, an electric hoist is fixedly connected onto each hanging seat, and a hook is arranged at the bottom of each electric hoist;
furthermore, the lifting seat is used for limiting and supporting the electric hoist, so that the electric hoist can lift the climbing frame body, the sliding mechanism is used for limiting and connecting the lifting seat and the climbing frame body, the lifting seat can limit and set the climbing frame body, the hanging seat is used for fixing the position of the electric hoist, and the hook is used for connecting the electric hoist and the climbing frame body;
the lifting mechanism is positioned at one end, far away from the hanging seat, of the lifting seat, the lifting mechanism comprises a limiting sleeve, the limiting sleeve is fixedly connected with the lifting seat, the middle of the limiting sleeve is rotatably connected with a right-angle gear through a rotating rod, one side of the right-angle gear is provided with a plurality of gear rods which are connected end to end, the right-angle gear is meshed with the gear rods, and the gear rods are provided with connecting devices;
further, be used for carrying out spacing support to promoting seat and right angle gear through the stop collar that sets up, be used for making right angle gear can rotate in the inside of stop collar through the bull stick, through the meshing connection between right angle gear and the gear pole, right angle gear can make right angle gear slide from top to bottom along the gear pole direction when rotating.
As a preferred scheme of the utility model, the coasting mechanism includes the spout, the spout has all been opened to the both sides of climbing the frame body, promote the seat and be located the equal spacing swing joint in inside that corresponds the spout and have the pulley, spacing sliding connection between pulley and the spout.
As a preferred scheme of the utility model, the bottom fixedly connected with of climbing the frame body is hung and is buckled, the couple with hang and detain between for dismantling the setting.
As a preferred scheme of the utility model, the slide has all been opened to the both sides of gear pole, the opening part of stop collar is located inside the slide of gear pole both sides, spacing sliding connection between stop collar and the slide.
As a preferred scheme of the utility model, the outside of stop collar is located the position that corresponds the bull stick and is provided with elevator motor, fixed connection between elevator motor's output and the bull stick.
As a preferred scheme of the utility model, connecting device includes the draw-in groove, the draw-in groove has all been opened at the top of gear pole, the equal fixedly connected with buckle in bottom of gear pole, for dismantling the setting between draw-in groove and the buckle.
As a preferred scheme of the utility model, the gear pole is located the slide and keeps away from one side of stop collar and opens there is the fixed orifices, the stop collar is located one side of keeping away from the lifting seat and opens there is spacing hole.
Compared with the prior art, the utility model has the advantages of:
(1) in the prior art, the electric hoist needs to be disassembled and assembled once every layer of the climbing frame body, so that a large amount of labor is wasted, and the working efficiency is influenced; the utility model discloses a, the output through elevator motor drives the bull stick and rotates, drive right angle gear through the bull stick and rotate, make the meshing be connected between right angle gear and the gear pole, make right angle gear drive the stop collar along the gear pole direction and slide from top to bottom along the slide, drive the lifting seat through the stop collar and slide from top to bottom, drive electric block through the lifting seat and slide from top to bottom, control the regulation to electric block's height, wherein through the detachable setting between draw-in groove and the buckle, can dismantle the gear pole that lies in right angle gear below and install in right angle gear's top, and set up a plurality of gear poles simultaneously, can make electric block go up and carry out once again the dismantlement with the gear pole after a plurality of floors, reduce the amount of manual labor, promote work efficiency;
(2) the utility model discloses in, control electric block drives the couple rebound, through the couple with hang and carry out fixed connection between detaining, make hang and detain and drive and climb a body and carry out the position promotion, need not to carry out a lot of dismantlement installation to electric block, save the amount of labour, improve work efficiency.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the lifting mechanism of the present invention;
fig. 3 is a schematic structural view of the slide mechanism of the present invention;
fig. 4 is an enlarged schematic structural view of a point a in fig. 1 according to the present invention;
fig. 5 is a schematic structural diagram of the connecting device of the present invention.
The reference numbers in the figures illustrate:
1. a climbing frame body; 2. a lifting mechanism; 21. a lifting seat; 22. a coasting mechanism; 221. a chute; 222. a pulley; 23. hanging a seat; 24. an electric hoist; 25. hooking; 26. hanging and buckling; 3. a lifting mechanism; 31. a limiting sleeve; 311. a limiting hole; 32. a rotating rod; 33. a right angle gear; 34. a gear lever; 341. a fixing hole; 35. a slideway; 36. a lifting motor; 4. a connecting device; 41. a card slot; 42. and (5) buckling.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention based on the embodiments of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like are to be understood in a broad sense, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Examples
As shown in fig. 1-5, a building climbing frame lifting synchronizer is composed of a climbing frame body 1, a lifting mechanism 2 and a lifting mechanism 3;
the lifting mechanism 2 is arranged on two sides of the interior of the climbing frame body 1, the lifting mechanism 2 comprises a lifting seat 21, a sliding mechanism 22 is arranged between the lifting seat 21 and the climbing frame body 1, a hanging seat 23 is arranged below one end of the lifting seat 21, an electric hoist 24 is fixedly connected to the hanging seat 23, and a hook 25 is arranged at the bottom of the electric hoist 24;
furthermore, the lifting seat 21 is used for limiting and supporting the electric hoist 24, so that the electric hoist 24 can lift the climbing frame body 1, the sliding mechanism 22 is used for limiting and connecting the lifting seat 21 and the climbing frame body 1, the lifting seat 21 can limit and set the climbing frame body 1, the hanging seat 23 is used for fixing the position of the electric hoist 24, and the hook 25 is used for connecting the electric hoist 24 and the climbing frame body 1;
the lifting mechanism 3 is positioned at one end of the lifting seat 21 far away from the hanging seat 23, the lifting mechanism 3 comprises a limiting sleeve 31, the limiting sleeve 31 is fixedly connected with the lifting seat 21, the middle part of the limiting sleeve 31 is rotatably connected with a right-angle gear 33 through a rotating rod 32, one side of the right-angle gear 33 is provided with a plurality of gear rods 34 which are connected end to end, the right-angle gear 33 is in meshing connection with the gear rods 34, and the gear rods 34 are all provided with connecting devices 4;
further, the limiting sleeve 31 is arranged for limiting and supporting the lifting seat 21 and the right-angle gear 33, the rotating rod 32 is used for enabling the right-angle gear 33 to rotate inside the limiting sleeve 31, and the right-angle gear 33 and the gear rod 34 are meshed and connected, so that the right-angle gear 33 can slide up and down along the direction of the gear rod 34 when rotating.
Specifically, referring to fig. 3, the sliding mechanism 22 includes a sliding groove 221, the sliding grooves 221 are formed on both sides of the climbing frame body 1, the lifting seat 21 is movably connected with a pulley 222 in a limited manner inside the corresponding sliding groove 221, and the pulley 222 is connected with the sliding groove 221 in a limited manner in a sliding manner.
In a further embodiment: through the limited sliding connection between the sliding groove 221 and the pulley 222, the lifting seat 21 can limit the climbing frame body 1, so that the climbing frame body 1 can ascend according to a certain track.
Specifically, referring to fig. 4, the bottom of the climbing frame body 1 is fixedly connected with a hanging buckle 26, and the hook 25 and the hanging buckle 26 are detachably disposed.
In a further embodiment: hang through the setting detain 26 be used for being connected couple 25 with climbing frame body 1, make electric block 24 can carry out the position through couple 25 with hang detain 26 and promote climbing frame body 1, wherein couple 25 with hang and detain for dismantling the setting between 26, when carrying out the position to electric block 24 and promote, can dismantle couple 25 with hanging detain 26.
Specifically, referring to fig. 2, both sides of the gear rod 34 are provided with slideways 35, the opening of the position-limiting sleeve 31 is located inside the slideways 35 on both sides of the gear rod 34, and the position-limiting sleeve 31 is connected with the slideways 35 in a position-limiting sliding manner.
In a further embodiment: through spacing sliding connection between stop collar 31 and the slide 35, can make gear pole 34 carry out spacing support to stop collar 31, through meshing connection between gear pole 34 and the right angle gear 33, make right angle gear 33 when not rotating, can not the landing between stop collar 31 and the gear pole 34.
Specifically, referring to fig. 2, a lifting motor 36 is disposed outside the position of the limiting sleeve 31 corresponding to the rotating rod 32, and an output end of the lifting motor 36 is fixedly connected to the rotating rod 32.
In a further embodiment: the lifting motor 36 is started, and the lifting motor 36 can select different models according to actual conditions, for example, the model is 3GN150K, and the output end of the lifting motor 36 drives the rotating rod 32 to rotate.
Specifically, referring to fig. 5, the connecting device 4 includes a slot 41, the top of the gear rod 34 is provided with the slot 41, the bottom of the gear rod 34 is fixedly connected with a buckle 42, and the slot 41 and the buckle 42 are detachably disposed.
In a further embodiment: carry out the joint between draw-in groove 41 and the buckle 42 through setting up, can make two or more gear pole 34 carry out fixed connection, increase right angle gear 33's rise height, through the setting of can dismantling between draw-in groove 41 and the buckle 42, can dismantle and install the top at right angle gear 33 with gear pole 34 that is located right angle gear 33 below.
Specifically, referring to fig. 2, a fixing hole 341 is formed on one side of the gear rod 34, which is located on the slide rail 35 and away from the position-limiting sleeve 31, and a position-limiting hole 311 is formed on one side of the position-limiting sleeve 31, which is located on the side away from the lifting seat 21.
In a further embodiment: fixing hole 341 through setting up is used for carrying out position fixing with gear pole 34 through bolt and building wall body, and spacing hole 311 through setting up is used for carrying out position fixing with stop collar 31 through bolt and building wall body, makes stop collar 31 carry out the outrigger to electric block 24, increases stability.
The utility model discloses a theory of operation and use flow: when the building climbing frame lifting synchronizer is used, the lifting motor 36 is started, the output end of the lifting motor 36 drives the rotating rod 32 to rotate, the rotating rod 32 drives the right-angle gear 33 to rotate, the right-angle gear 33 is meshed with the gear rod 34 to be connected, the right-angle gear 33 drives the limiting sleeve 31 to slide up and down along the slide way 35 along the direction of the gear rod 34, the limiting sleeve 31 drives the lifting seat 21 to slide up and down, the lifting seat 21 drives the electric hoist 24 to slide up and down, the height of the electric hoist 24 is controlled and adjusted, wherein the gear rod 34 positioned below the right-angle gear 33 can be detached and installed above the right-angle gear 33 through the detachable arrangement between the clamping groove 41 and the clamping buckle 42, and a plurality of gear rods 34 are arranged simultaneously, so that the gear rod 34 can be detached once after the electric hoist 24 ascends a plurality of floors, the labor amount is reduced, and the working efficiency is improved;
starting the electric hoist 24, enabling the electric hoist 24 to drive the hook 25 to move upwards, and enabling the hook 26 to drive the climbing frame body 1 to lift the position through the fixed connection between the hook 25 and the hanging buckle 26; the utility model discloses need not to carry out a lot of dismantlement installation to electric block 24, save the amount of labour, improve work efficiency.
The above description is only the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art can substitute or change the technical solution and the improvement concept of the present invention within the technical scope disclosed in the present invention.

Claims (7)

1. A building climbing frame lifting synchronizer is characterized by comprising:
the climbing frame comprises a climbing frame body (1), wherein lifting mechanisms (2) are arranged on two sides in the climbing frame body (1), each lifting mechanism (2) comprises a lifting seat (21), a sliding mechanism (22) is arranged between each lifting seat (21) and the climbing frame body (1), a hanging seat (23) is arranged below one end of each lifting seat (21), an electric hoist (24) is fixedly connected onto each hanging seat (23), and a hook (25) is arranged at the bottom of each electric hoist (24);
elevating system (3), be located promote seat (21) and keep away from the one end of hanging seat (23), elevating system (3) include stop collar (31), fixed connection between stop collar (31) and promotion seat (21), the middle part of stop collar (31) is rotated through bull stick (32) and is connected with right angle gear (33), one side of right angle gear (33) is provided with a plurality of end to end's gear pole (34), the meshing is connected between right angle gear (33) and gear pole (34), all be provided with connecting device (4) on gear pole (34).
2. The building climbing frame lifting synchronizer according to claim 1, wherein: the sliding mechanism (22) comprises sliding grooves (221), the sliding grooves (221) are formed in the two sides of the climbing frame body (1), pulleys (222) are movably connected to the lifting seat (21) in a limiting mode in the corresponding sliding grooves (221), and the pulleys (222) are connected with the sliding grooves (221) in a limiting mode in a sliding mode.
3. The building climbing frame lifting synchronizer according to claim 1, wherein: climb the bottom fixedly connected with of frame body (1) and hang knot (26), for dismantling the setting between couple (25) and the knot (26).
4. The building climbing frame lifting synchronizer according to claim 1, wherein: slide (35) have all been opened to the both sides of gear pole (34), the opening part of stop collar (31) is located inside slide (35) of gear pole (34) both sides, spacing sliding connection between stop collar (31) and slide (35).
5. The building climbing frame lifting synchronizer according to claim 1, wherein: the outside of stop collar (31) is located the position that corresponds bull stick (32) and is provided with elevator motor (36), fixed connection between elevator motor's (36) output and bull stick (32).
6. The building climbing frame lifting synchronizer according to claim 1, wherein: connecting device (4) include draw-in groove (41), draw-in groove (41) have all been opened at the top of gear pole (34), the equal fixedly connected with buckle (42) in bottom of gear pole (34), be for dismantling the setting between draw-in groove (41) and buckle (42).
7. The building climbing frame lifting synchronizer according to claim 1, wherein: the gear rod (34) is located one side of the slide way (35) far away from the limiting sleeve (31) and is provided with a fixing hole (341), and the limiting sleeve (31) is located one side far away from the lifting seat (21) and is provided with a limiting hole (311).
CN202121065158.9U 2021-05-18 2021-05-18 Building climbing frame lifting synchronizer Expired - Fee Related CN215254462U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121065158.9U CN215254462U (en) 2021-05-18 2021-05-18 Building climbing frame lifting synchronizer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121065158.9U CN215254462U (en) 2021-05-18 2021-05-18 Building climbing frame lifting synchronizer

Publications (1)

Publication Number Publication Date
CN215254462U true CN215254462U (en) 2021-12-21

Family

ID=79456478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121065158.9U Expired - Fee Related CN215254462U (en) 2021-05-18 2021-05-18 Building climbing frame lifting synchronizer

Country Status (1)

Country Link
CN (1) CN215254462U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114427291A (en) * 2022-02-12 2022-05-03 陈青腾 Connecting device for hydraulic jack and climbing frame climbing guide rail
CN116201347A (en) * 2023-05-06 2023-06-02 山西建投晋南建筑产业有限公司 Assembled building lifting support frame

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114427291A (en) * 2022-02-12 2022-05-03 陈青腾 Connecting device for hydraulic jack and climbing frame climbing guide rail
CN116201347A (en) * 2023-05-06 2023-06-02 山西建投晋南建筑产业有限公司 Assembled building lifting support frame
CN116201347B (en) * 2023-05-06 2023-07-04 山西建投晋南建筑产业有限公司 Assembled building lifting support frame

Similar Documents

Publication Publication Date Title
CN215254462U (en) Building climbing frame lifting synchronizer
CN112240095A (en) Lifting hanging basket for building exterior wall decoration
CN108149914B (en) Forward and backward rotation simultaneous lifting system and method for all-steel attached lifting scaffold
CN111943061A (en) Auxiliary installation lifting device for high-rise air conditioner outdoor unit
CN220723384U (en) Supporting and adjusting mechanism for tower crane wall-attached supporting platform
JP2006299559A (en) Self climbing scaffold and self climbing method by use of it
CN210563301U (en) Concrete pouring workbench for house construction
CN115215230A (en) Prefabricated part hoisting construction control device and construction method thereof
CN215974712U (en) Device for lifting concrete pouring guide pipe of underground continuous wall
CN214195431U (en) Wall whitewashes device for architectural decoration
CN214243550U (en) Assembled hoisting accessory for building
CN113955636A (en) Hoisting equipment for assembly type building construction
CN218665305U (en) Adjustable engineering hanging basket
CN210117915U (en) Single-floor climbing frame and climbing system
CN219259344U (en) Drilling bored concrete pile steel reinforcement cage hangs puts device
CN219909937U (en) Climbing formwork body
CN111648583A (en) Walkway platform of tower crane connected with all-steel attached lifting scaffold
CN218375120U (en) Liftable operating platform for triangular inclined strut of elevator shaft
CN215368610U (en) Building external climbing type building construction operation platform
CN212863872U (en) Double-rail device for installing curtain wall
CN208039734U (en) Elevator shaft platform
CN212105007U (en) Novel semi-automatic plastering device
CN219950303U (en) Prefabricated component hangs and gets device
CN110396933B (en) Formwork erecting device and method for bridge construction
CN220434239U (en) Portable movable freely adjusts vertical height's lifting and pouring car

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211221