CN210659209U CN201921200643.5U CN201921200643U CN210659209U CN 210659209 U CN210659209 U CN 210659209U CN 201921200643 U CN201921200643 U CN 201921200643U CN 210659209 U CN210659209 U CN 210659209U
Authority
CN
China
Prior art keywords
mounting plate
self
snap ring
hole
scaffold pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921200643.5U
Other languages
Chinese (zh)
Inventor
祁新建
刘佳
赵宏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Tianjin Electric Power Construction Co ltd
Original Assignee
China Energy Engineering Group Tianjin Electric Power Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Tianjin Electric Power Construction Co ltd filed Critical China Energy Engineering Group Tianjin Electric Power Construction Co ltd
Priority to CN201921200643.5U priority Critical patent/CN210659209U/en
Application granted granted Critical
Publication of CN210659209U publication Critical patent/CN210659209U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model relates to a self-control scaffold pipe snap ring fastener, including the mounting panel, its characterized in that, be equipped with a plurality of through-holes that correspond about on the mounting panel one, go up the vertical pole of U cast card with through-hole two correspond the setting, the threaded rod of U cast card passes down and corresponds through-hole one the threaded rod of going up U cast card passes and corresponds two do not overlap of through-hole has fastening nut. The utility model discloses simple structure, reasonable in design, the preparation is swift, through setting up the mounting panel that ann's antiskid riser and lower antiskid riser, goes up U cast card, lower U cast card, cooperation fastening nut, under the condition of forbidding to use the iron wire to consolidate and connect the scaffold pipe, has solved the scaffold pipe effectively and can not fix the problem on the equipment of preceding package wall, the utility model discloses can reuse, fix the scaffold pipe on the equipment of preceding package wall, for the welding operation has created favorable and must condition, and then has satisfied construction welding operation requirement.

Description

Self-control scaffold pipe snap ring fastener
Technical Field
The utility model relates to a scaffold pipe connecting piece technical field especially relates to a self-control scaffold pipe snap ring fastener.
Background
Scaffolds are required to be erected in the butt welding operation of the boiler front wrapping wall header, and the scaffolds are working platforms erected for ensuring that each construction process is smoothly carried out. In the scaffold fixing scaffold pipe operation, the conventional method is to use iron wires for connection and reinforcement, but the iron wires are forbidden to be used for reinforcement and connection of the scaffold pipes in some areas, so that the scaffold pipes cannot be fixed on equipment of a front wrapping wall, and further the construction welding operation requirements cannot be met.
Disclosure of Invention
The utility model aims at solving the defects of the prior art and providing a self-made scaffold tube snap ring fastener.
The utility model discloses a realize above-mentioned purpose, adopt following technical scheme:
a self-made scaffold tube snap ring fastener comprises a mounting plate and is characterized in that a plurality of left and right corresponding through holes I are formed in the mounting plate, a plurality of lower U-shaped clamps which are parallel front and back are arranged below the mounting plate, vertical rods of the lower U-shaped clamps are arranged corresponding to the through holes I, horizontal lower anti-skid vertical plates are fixedly connected to the front and back sides of the lower surface of the mounting plate correspondingly, a plurality of front and back corresponding through holes II are formed in the mounting plate, a plurality of upper U-shaped clamps which are parallel left and right are arranged above the mounting plate, the vertical rods of the upper U-shaped clamps are arranged corresponding to the through holes II, upper anti-skid vertical plates which are perpendicular to the lower anti-skid vertical plates are fixedly connected to the left and right sides of the upper surface of the mounting plate correspondingly, crescent grooves are formed in the upper anti-skid vertical plates and the lower anti-skid vertical plates, and threaded rods of the lower U-, and the threaded rod of the lower U-shaped pipe clamp penetrates through the corresponding first through hole, and the threaded rod of the upper U-shaped pipe clamp penetrates through the corresponding second through hole and is respectively sleeved with a fastening nut.
The mounting plate is a square iron plate with the side length of 150 mm.
The thickness of the mounting plate is 5 mm.
The inner diameters of the first through hole and the second through hole are both 10 mm.
The surfaces of the lower U-tube-shaped clamp and the upper U-tube-shaped clamp are both provided with a zinc coating.
The utility model has the advantages that: the utility model discloses simple structure, reasonable in design, the preparation is swift, through setting up the mounting panel that ann's antiskid riser and lower antiskid riser, goes up U cast card, lower U cast card, cooperation fastening nut, under the condition of forbidding to use the iron wire to consolidate and connect the scaffold pipe, has solved the scaffold pipe effectively and can not fix the problem on the equipment of preceding package wall, the utility model discloses can reuse, fix the scaffold pipe on the equipment of preceding package wall, for the welding operation has created favorable and must condition, and then has satisfied construction welding operation requirement.
Drawings
FIG. 1 is a schematic view of the structure of the present invention;
FIG. 2 is a schematic structural view of a mounting plate of the present invention;
in the figure: 1-mounting a plate; 11-a first through hole; 12-a second through hole; 2-fastening a nut; 3-lower anti-skid vertical plates; 4-lower U-tube type card; 5-installing a U-tube type card; 6-installing an anti-skid vertical plate;
the following detailed description will be made in conjunction with embodiments of the present invention with reference to the accompanying drawings.
Detailed Description
The invention will be further explained with reference to the following figures and examples:
as shown in the figures, the self-made scaffold tube snap ring fastener comprises a mounting plate 1 and is characterized in that a plurality of through holes I11 corresponding to the left and the right are arranged on the mounting plate 1, a plurality of lower U-shaped clamps 4 parallel to the front and the back are arranged below the mounting plate 1, vertical rods of the lower U-shaped clamps 4 are arranged corresponding to the through holes I11, horizontal lower anti-skid vertical plates 3 are fixedly connected to the front and the back of the lower surface of the mounting plate 1 correspondingly, a plurality of through holes II 12 corresponding to the front and the back are arranged on the mounting plate 1, a plurality of upper U-shaped clamps 5 parallel to the left and the right are arranged above the mounting plate 1 correspondingly, vertical rods of the upper U-shaped clamps 5 are arranged corresponding to the through holes II 12, upper anti-skid vertical plates 6 vertical to the lower anti-skid vertical plates 3 are fixedly connected to the left and the right of the upper surface of the mounting plate 1 correspondingly, crescent grooves are, the lower U-shaped pipe clamp 4 and the vertical rod of the upper U-shaped pipe clamp 5 are threaded rods, the threaded rods of the lower U-shaped pipe clamp 4 penetrate through the corresponding first through holes 11, the threaded rods of the upper U-shaped pipe clamp 5 penetrate through the corresponding second through holes 12, and the fastening nuts 2 are sleeved on the threaded rods respectively.
The mounting plate 1 is a square iron plate with the side length of 150 mm.
The thickness of the mounting plate 1 is 5 mm.
The inner diameters of the first through hole 11 and the second through hole 12 are both 10 mm.
The surfaces of the lower U-tube type card 4 and the upper U-tube type card 5 are both provided with a zinc coating.
The utility model discloses during the use, to treat that fixed scaffold pipe places on the last antiskid riser 6 on mounting panel 1, operating personnel through last U cast card 5 cooperation fastening nut 2 to scaffold pipe fastening, will treat that another scaffold pipe of fixing is placed on lower antiskid riser 3 on mounting panel 1, fasten scaffold pipe through lower U cast card 4 cooperation fastening nut 2, realized that the mutually perpendicular's scaffold pipe that will treat to fix carries out the pipe wall and fixes, under the condition of forbidding to use the iron wire to consolidate and connect scaffold pipe, solved effectively that scaffold pipe can not fix the problem on the equipment of preceding package wall, the utility model discloses ability reuse, fix scaffold pipe in the front on the equipment of package wall, created profitable and must condition for the welding operation, and then satisfied construction welding operation requirement, the utility model discloses simple structure, reasonable in design, the preparation is swift.
The present invention has been described above with reference to the accompanying drawings, and it is obvious that the present invention is not limited by the above embodiments, and various improvements made by the method concept and technical solution of the present invention or directly applied to other occasions without improvement are all within the protection scope of the present invention.

Claims (5)

1. The self-made scaffold tube snap ring fastener comprises a mounting plate (1) and is characterized in that a plurality of first through holes (11) corresponding to each other in the left and right directions are formed in the mounting plate (1), a plurality of lower U-shaped clamps (4) parallel to each other in the front and back directions are arranged below the mounting plate (1), vertical rods of the lower U-shaped clamps (4) are arranged corresponding to the first through holes (11), horizontal lower anti-skidding vertical plates (3) are fixedly connected to the front and back sides of the lower surface of the mounting plate (1) correspondingly, a plurality of second through holes (12) corresponding to each other in the front and back directions are formed in the mounting plate (1), a plurality of upper U-shaped clamps (5) parallel to each other in the left and right directions are arranged above the mounting plate (1), the vertical rods of the upper U-shaped clamps (5) are arranged corresponding to the second through holes (12), and upper anti-skidding vertical plates (6) perpendicular to the lower anti-skidding vertical plates, go up anti-skidding riser (6) with all be equipped with the recess of crescent on the anti-skidding riser (3) down, U cast card (4) down with be the threaded rod on the vertical pole of last U cast card (5), the threaded rod of lower U cast card (4) passes and corresponds through-hole one (11) go up the threaded rod of U cast card (5) and pass corresponding through-hole two (12) overlap respectively and have fastening nut (2).
2. The self-made scaffold pipe snap ring fastener according to claim 1, wherein the mounting plate (1) is a square iron plate with a side length of 150 mm.
3. The self-made scaffold tube snap ring fastener according to claim 1, wherein the thickness of the mounting plate (1) is 5 mm.
4. The self-made scaffold tube snap ring fastener according to claim 1, wherein the inner diameters of the first through hole (11) and the second through hole (12) are both 10 mm.
5. The self-made scaffold pipe snap ring fastener according to claim 1, wherein the surfaces of the lower U-tube type clip (4) and the upper U-tube type clip (5) are provided with zinc plating layers.
CN201921200643.5U 2019-07-29 2019-07-29 Self-control scaffold pipe snap ring fastener Expired - Fee Related CN210659209U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921200643.5U CN210659209U (en) 2019-07-29 2019-07-29 Self-control scaffold pipe snap ring fastener

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921200643.5U CN210659209U (en) 2019-07-29 2019-07-29 Self-control scaffold pipe snap ring fastener

Publications (1)

Publication Number Publication Date
CN210659209U true CN210659209U (en) 2020-06-02

Family

ID=70817464

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921200643.5U Expired - Fee Related CN210659209U (en) 2019-07-29 2019-07-29 Self-control scaffold pipe snap ring fastener

Country Status (1)

Country Link
CN (1) CN210659209U (en)

Similar Documents

Publication Publication Date Title
CN203799586U (en) Signboard mounting support for power transmission line steel tube tower
CN201786008U (en) Automatic follow-up unloading platform for outer climb frame
CN210659209U (en) Self-control scaffold pipe snap ring fastener
CN205294630U (en) I -steel clamping frock
CN206942160U (en) Steel bar truss floor support plate lifting device
CN217555572U (en) Combined type hoisting device for I-shaped steel beam
CN205472340U (en) People's passageway on instrument formula tower crane
CN202031309U (en) Suspending operation platform for structural concrete constructions
CN212249129U (en) Protective net fixing rod for attached lifting scaffold
CN205829059U (en) A kind of locking device and cable termination tower operating platform
CN207414659U (en) A kind of mold for being used to make cable bearer
CN207377096U (en) Overlength large girder scaffold building structure
CN213738323U (en) Standard knot with movable platform on upper portion and tower crane
CN205908008U (en) Dish knot formula scaffold external safety net coupling assembling of frame external corner and external safety net device
CN219546456U (en) Steel bar hoisting system
CN215810203U (en) Kiln crown combined brick convenient to carry/disassemble and assemble
CN108487733A (en) A kind of main promotion crossbeam of steel structure structure
CN219464406U (en) Calabash couple anticreep hook frock
CN213806524U (en) Protective net frame for scaffold
CN215048235U (en) Balance arm with hanging type walking platform
CN212984578U (en) Novel high altitude steel construction installation work is supplementary device
CN220599141U (en) Novel lower hoisting point component
CN215048012U (en) Detachable movable clamp for large I-shaped structural part
CN212507333U (en) Light drainage building templates
CN217079759U (en) Transporting tool for transporting roof panels

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200602