CN209816894U CN201920412815.9U CN201920412815U CN209816894U CN 209816894 U CN209816894 U CN 209816894U CN 201920412815 U CN201920412815 U CN 201920412815U CN 209816894 U CN209816894 U CN 209816894U
Authority
CN
China
Prior art keywords
steel
hoop
staple bolt
thick bamboo
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920412815.9U
Other languages
Chinese (zh)
Inventor
王安文
吴曼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201920412815.9U priority Critical patent/CN209816894U/en
Application granted granted Critical
Publication of CN209816894U publication Critical patent/CN209816894U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model provides a staple bolt formula platform that is used for steel casing box to go up to disperse to piece together, it installs a staple bolt to lie in the position above the construction water level on the section of thick bamboo is protected to pile foundation construction steel in every aquatic, every staple bolt includes two semicircular hoop boards, every both sides of embracing hoop board are equipped with respectively one with the parallel staple bolt connecting plate in staple bolt axle center, connecting plate top welding one with staple bolt connecting plate vertically backup pad, set up a worker's steel bearing beam between the staple bolt on the two steel protect sections of thick bamboo, the both ends of worker's steel bearing beam support respectively in the backup pad of two staple bolts, pass through bolted connection between the lower flange board of worker's steel bearing beam and the staple bolt backup pad. The utility model discloses do not need the on-the-spot welding, the installation is fast, and it is convenient to dismantle, and the material circulated use after the dismantlement has reduced the material extravagant.

Description

Hoop type platform for water loose splicing of steel pouring jacket
Technical Field
The utility model relates to a construction is assembled to steel jacket case that bridge aquatic construction was used, concretely relates to staple bolt formula supporting platform that is used for steel jacket case to piece together on water.
Background
The construction of the underwater bearing platform usually adopts a steel sleeve box, and the underwater installation construction of the steel sleeve box has two methods, namely, the whole processing of a factory is finished, and the installation is in place through a large-scale floating crane; under the condition that the integral installation cannot be realized under the influence of navigation conditions and objective factors, the method can adopt factory block processing, and the field is scattered to be spliced into a whole and then is transferred to be installed.
The on-site steel casing box is characterized in that after pile foundation construction is finished, a pile foundation construction steel casing is utilized to set up a supporting platform for loose assembly above a construction water level, and then the steel casing box is transferred to a set elevation through a transfer system arranged on the steel casing. The existing steel sleeve box assembly platform needs to be provided with holes on each steel casing, the I-shaped steel bearing beams transversely penetrate through the holes on the same row of steel casings and are welded with the steel casings, the I-shaped steel bearing beams are used as supporting platforms, although the I-shaped steel bearing beams are well stressed, manual cutting and welding operation in water is needed, the construction difficulty is high, and labor and time are consumed; when the platform is dismantled, the welded part needs to be cut, the reuse of the steel casing and the bearing beam is influenced, and the material waste is caused.
Disclosure of Invention
An object of the utility model is to provide a do not need welding and cutting, installation to dismantle convenient fast and do benefit to the steel bushing box that the material used once more and piece together supporting platform on water.
The technical scheme of the invention is as follows:
the utility model provides a staple bolt formula platform that is used for steel jacket case to piece together on water, the platform supports on the pile foundation construction steel protects a section of thick bamboo in water, the steel protects a section of thick bamboo and is equipped with two rows at least, and every row is many, its characterized in that: a hoop is arranged on each steel casing above the construction water level, each hoop comprises two semicircular hoop plates, two sides of each hoop plate are respectively provided with a hoop connecting plate parallel to the axle center of the hoop, the top of each hoop connecting plate is welded with a supporting plate vertical to the hoop connecting plate, two semicircular hoop plates are buckled and tightly clasped on the steel casing, and the two hoop connecting plates which are opposite are connected by hoop bolts; an I-steel bearing beam is erected between the hoops on the two adjacent steel protecting cylinders in each row of steel protecting cylinders, two ends of the I-steel bearing beam are respectively supported on the supporting plates of the two hoops, and the lower flange plate of the I-steel bearing beam is connected with the hoop supporting plates through bolts.
The utility model discloses a staple bolt is fixed on pile foundation construction steel protects a section of thick bamboo, and the little bracket of support on the steel protects a section of thick bamboo welds in advance when processing steel protects a section of thick bamboo, and the shaped steel spandrel girder supports on the staple bolt and fixed through the backup pad on bolt and the staple bolt, and the platform is set up on-the-spot and is not needed the welding, and the installation is fast, and it is convenient to dismantle, and the material circulated use after the dismantlement has reduced the material extravagant.
Drawings
FIG. 1 is a schematic side view of the present invention;
fig. 2 is a schematic plan view of the hoop used in the present invention;
FIG. 3 is a schematic diagram of a side view structure of the hoop;
fig. 4 is a structural schematic diagram of a welding auxiliary support small corbel on the steel casing.
Detailed Description
As shown in fig. 1, the utility model discloses utilize aquatic pile foundation construction steel to protect a section of thick bamboo as supporting, aquatic pile foundation construction steel protects a section of thick bamboo and is equipped with two row at least usually, and every row is many. And a hoop 2 is arranged above the construction water level on each steel casing 1.
The structure of staple bolt is as shown in fig. 2, fig. 3, every staple bolt includes two semicircular staple bolt boards 21, the both sides of every staple bolt board are equipped with one respectively and hold the staple bolt connecting plate 22 parallel with the staple bolt axle center, every staple bolt connecting plate 22 top welding one with staple bolt connecting plate vertically backup pad 23, two semicircular staple bolt boards are buckled tightly on a steel protects a section of thick bamboo, and connect two relative staple bolt connecting plates with staple bolt 24, the staple bolt connecting plate on the staple bolt forms a bracket column structure with the backup pad after the staple bolt is installed.
An I-steel bearing beam 3 is erected between the anchor ears 2 on the two adjacent steel protective cylinders 1 in each row of steel protective cylinders, two ends of the I-steel bearing beam 3 are respectively supported on the supporting plates 23 of the two anchor ears 2, and the lower flange plate of the I-steel bearing beam 3 is connected with the anchor ear supporting plates through bolts 4.
As shown in fig. 1 and 2, the utility model discloses during the specific implementation, set up one row of screw 25 in advance on backup pad 23 on the staple bolt, also set up one row of corresponding screw respectively in the flange board both sides at 3 both ends of worker's steel bearing beam, during the installation bearing beam, can be fixed the bearing beam with 3 both ends of bearing beam and the direct bolt 4 connection for the screw of staple bolt backup pad 23, accomplish the platform and set up.
As shown in fig. 1, fig. 3, and fig. 4, in order to ensure that the hoop 2 is reliably fixed on the steel casing 1 and has sufficient supporting force, in the specific implementation, a plurality of auxiliary support corbels 5 may be welded to the hoop mounting position on the steel casing 1 in an annular manner in advance, and a plurality of through holes 26 corresponding to the auxiliary support corbels on the steel casing are provided in advance on two hoop plates of the hoop, and after the hoop 2 is mounted on the steel casing 1, each auxiliary support corbel 5 passes through one through hole 26 on the hoop.
As a specific implementation mode, a plurality of auxiliary supporting small corbels 5 are arranged on the steel casing 1 in 4 groups at equal intervals in the axial direction, each group is arranged in two rows along the steel casing in the axial direction, and each row is provided with 3 equal intervals.
During the concrete implementation, every auxiliary stay calf 5 can adopt the steel sheet to cut into the rectangle steel billet and weld on steel protects a section of thick bamboo 1, and the through-hole 26 on the staple bolt is seted up into the rectangle hole that just can hold auxiliary stay calf.

Claims (4)

1. The utility model provides a staple bolt formula platform that is used for steel jacket case to piece together on water, the platform supports on the pile foundation construction steel protects a section of thick bamboo in water, the steel protects a section of thick bamboo and is equipped with two rows at least, and every row is many, its characterized in that: a hoop is arranged on each steel casing above the construction water level, each hoop comprises two semicircular hoop plates, two sides of each hoop plate are respectively provided with a hoop connecting plate parallel to the axle center of the hoop, the top of each hoop connecting plate is welded with a supporting plate vertical to the hoop connecting plate, two semicircular hoop plates are buckled and tightly clasped on the steel casing, and the two hoop connecting plates which are opposite are connected by hoop bolts; an I-steel bearing beam is erected between the hoops on the two adjacent steel protecting cylinders in each row of steel protecting cylinders, two ends of the I-steel bearing beam are respectively supported on the supporting plates of the two hoops, and the lower flange plate of the I-steel bearing beam is connected with the hoop supporting plates through bolts.
2. The hoop type platform for the aquatic assembly of the steel pouring jacket according to claim 1, wherein: hoop mounted position hoop welding has a plurality of auxiliary stay calf legs in advance on the steel protects a section of thick bamboo, set up a plurality of through-holes that correspond with the auxiliary stay calf leg position on the steel protects a section of thick bamboo in advance on two hooping plates of staple bolt, the staple bolt is installed on the steel protects a back, and every auxiliary stay calf leg passes a through-hole on the staple bolt.
3. The hoop type platform for the aquatic assembly of the steel pouring jacket according to claim 2, wherein: a plurality of auxiliary stay corbels set up 4 groups to the hoop equidistance on the steel protects a section of thick bamboo, and every group sets up two along the steel protects a section of thick bamboo axial, and every equidistance that is listed as sets up 3.
4. The hoop type platform for the aquatic assembly of the steel pouring jacket according to claim 2, wherein: the auxiliary support small corbel is a rectangular steel block cut by a steel plate, and the through holes in the hoop are rectangular holes capable of just accommodating the auxiliary support small corbels.
CN201920412815.9U 2019-03-28 2019-03-28 Hoop type platform for water loose splicing of steel pouring jacket Active CN209816894U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920412815.9U CN209816894U (en) 2019-03-28 2019-03-28 Hoop type platform for water loose splicing of steel pouring jacket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920412815.9U CN209816894U (en) 2019-03-28 2019-03-28 Hoop type platform for water loose splicing of steel pouring jacket

Publications (1)

Publication Number Publication Date
CN209816894U true CN209816894U (en) 2019-12-20

Family

ID=68877655

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920412815.9U Active CN209816894U (en) 2019-03-28 2019-03-28 Hoop type platform for water loose splicing of steel pouring jacket

Country Status (1)

Country Link
CN (1) CN209816894U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152496A (en) * 2021-04-17 2021-07-23 中交路桥建设有限公司 Water sealing sleeve box for underwater welding of bracket on steel casing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152496A (en) * 2021-04-17 2021-07-23 中交路桥建设有限公司 Water sealing sleeve box for underwater welding of bracket on steel casing
CN113152496B (en) * 2021-04-17 2024-04-26 中交路桥建设有限公司 Water sealing sleeve box for underwater welding of bracket on steel casing

Similar Documents

Publication Publication Date Title
CN103741832A (en) Building column-truncating, replacing and seismic-isolating support construction method and supporting device
CN210758420U (en) Device for pre-embedding and positioning main ribs of splicing surface
KR101026012B1 (en) Bridge deck dismantling method by means of united pulling jack and pier
CN209816894U (en) Hoop type platform for water loose splicing of steel pouring jacket
CN112411348A (en) Construction trestle
CN211774554U (en) Reinforced steel structure bearing beam structure for building
KR101744437B1 (en) Construction method of temporary bridge using camber
KR101825587B1 (en) Temporary prestress deck for steel bridge.
KR102085928B1 (en) Temporary bridge with end corner member and construction method therefor
CN209816678U (en) Annular bracket for being installed at top of steel pipe pile
CN217651804U (en) Device for improving steel support stability by utilizing concrete support
CN113737661B (en) Construction method for steel-concrete combined section of tower base of cable-stayed bridge
CN106400677A (en) Box type steel bridge pier with earthquake damage capable of being fast restored in situ
CN103174300B (en) Viscous damper installation construction method
CN110630035A (en) Steel column supporting structure for bottom of reinforced concrete floor beam
CN110644510B (en) Construction method of pier steel cofferdam
JP4700980B2 (en) How to replace the Gangway Tower
CN211201112U (en) Sectional steel tower mounted assembly type construction platform
CN211689927U (en) Operating platform device for construction in bridge tower
CN218911136U (en) Bridge panel cantilever cast-in-situ supporting system structure
CN215762042U (en) Ladder stand structure of offshore wind power bearing platform foundation
CN220013409U (en) Synchronous protection platform for temporary stay bars and tower beams of cable-stayed bridge tower
CN219586745U (en) Foundation pit supporting device
CN217352388U (en) Pile foundation drilling platform capable of being used for steel hanging box assembling construction
KR20040028221A (en) Support construction for slab of prestressed concrete beam of bridge