CN209326954U - A kind of breaker operation mechanism running-in test system - Google Patents

A kind of breaker operation mechanism running-in test system Download PDF

Info

Publication number
CN209326954U
CN209326954U CN201920010758.1U CN201920010758U CN209326954U CN 209326954 U CN209326954 U CN 209326954U CN 201920010758 U CN201920010758 U CN 201920010758U CN 209326954 U CN209326954 U CN 209326954U
Authority
CN
China
Prior art keywords
relay
separating brake
branch
test
normally opened
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920010758.1U
Other languages
Chinese (zh)
Inventor
董亚军
高洁
葛谜霞
李向征
杜磊
李勇跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HENAN HUASHENG LONGYUAN ELECTRIC CO Ltd
Original Assignee
HENAN HUASHENG LONGYUAN ELECTRIC CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HENAN HUASHENG LONGYUAN ELECTRIC CO Ltd filed Critical HENAN HUASHENG LONGYUAN ELECTRIC CO Ltd
Priority to CN201920010758.1U priority Critical patent/CN209326954U/en
Application granted granted Critical
Publication of CN209326954U publication Critical patent/CN209326954U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The utility model provides a kind of breaker operation mechanism running-in test system, its wiring is simple and convenient, it does not need manually to carry out manual divide-shut brake operation, only need to be arranged the delay time of opening time relay and closing time relay, it presses and starts switch the adjustment cyclic test that breaker operation mechanism can be realized, terminate until merging cyclic test, save running-in test time and manpower and material resources, the person that facilitates debugging efforts, improves the efficiency of running-in test.

Description

A kind of breaker operation mechanism running-in test system
Technical field
The utility model belongs to breaker running-in test technical field, in particular to a kind of breaker operation mechanism adjustment examination Check system.
Background technique
Breaker is the switch main product that field is pressed in distribution system power equipment, is widely used in electric power, industrial and mineral, builds It builds etc. in the protection and control unit of the medium-voltage distribution equipment of industries.Engineering requires breaker should be able to after coming into operation in practice Thousands of divide-shut brakes are afforded, this will depend on whether breaker operation mechanism running-in characteristic meets the requirements, actuating Mechanism is one of the critical component for guaranteeing breaker quality, and the guarantee of the performances such as reliable switching on and off and its mechanical life takes Certainly in the quality of operating mechanism.Breaker is required to carry out operating mechanism running-in test before being assembled into finished product, to verify its behaviour Whether running-in characteristic and route, the mated condition of mechanism components of motivation structure are reasonable.Every breaker needs to carry out adjustment examination For the number tested at 300 times or more, traditional breaker operation mechanism running-in test is by the way of man-made chamber, by special Tuner is responsible for each test of switching on and off, therefore the running-in test number required for completing can give debugging efforts person Greatly troublesome and inconvenience is brought, and also will cause and take a lot of work, is time-consuming, the efficiency of running-in test is reduced, can not achieve breaker Automatic cycle, the automatic control function of operating mechanism running-in test.
Utility model content
The purpose of this utility model is to provide a kind of breaker operation mechanism running-in test systems, for solving existing skill Breaker operation mechanism running-in test complexity problem not easy to operate in art.
To achieve the above object, the utility model provides a kind of breaker operation mechanism running-in test system, including electricity Resource loop, separating brake control loop, separating brake timing control loop, combined floodgate timing control loop and test loop;The separating brake control String is equipped with separating brake relay coil in circuit;The combined floodgate timing control loop includes the first combined floodgate timing controlled branch and second Combined floodgate timing controlled branch, string is equipped with the first normally opened contact and the conjunction of separating brake relay in the first combined floodgate timing controlled branch Lock time relay coil, string is equipped with the first normally opened contact of closing time relay in the second combined floodgate timing controlled branch And closing relay coil;When string is equipped with the first normally opened contact and separating brake of closing relay in the separating brake timing control loop Between relay coil;The test loop includes separating brake test branch and the test branch that closes a floodgate, and the separating brake test branch road is gone here and there The second normally opened contact equipped with separating brake relay, the test branch road string that closes a floodgate are equipped with the second normally opened contact of closing coil.
The breaker operation mechanism running-in test system of the utility model, wiring is simple and convenient, does not need manually to carry out hand Dynamic breaking-closing operating, it is only necessary to the delay time of opening time relay and closing time relay be set, press and start switch The adjustment cyclic test that breaker operation mechanism can be realized terminates until merging cyclic test, saves the running-in test time And manpower and material resources, the person that facilitates debugging efforts, improve the efficiency of running-in test.
In order to facilitate the record to breaker closing separating brake number, string is equipped with and starts switch in the separating brake control loop, Pilot system further includes counting circuit, and the counting circuit includes counting branch and tally control branch, the counting branch packet Include counting relay, tally control branch road string be equipped with the counting relay coil and closing time relay the Two normally opened contacts.It after counter completes primary count, presses and starts switch again, carry out second and count, counted until reaching The setting number of device, breaker operation mechanism running-in test system will stop, and realize breaker operation mechanism running-in test The automatic control of number.
It is described to start switch both ends simultaneously in order to make separating brake control loop still in energized state when starting switch disconnection Connection is connected with the first normally opened contact of opening time relay;When the first normally opened contact of separating brake relay disconnects, in order to make First combined floodgate timing controlled branch is parallel with combined floodgate still in energized state, the first normally opened contact both ends of the separating brake relay First normally opened contact of the time relay;When the first normally opened contact of separating brake relay disconnects, in order to make separating brake timing controlled Still in energized state, the first normally opened contact both ends of the separating brake relay are connected in parallel to the of the lock time relay in circuit Two normally opened contacts.
It is described to start switch and separating brake relay in order to cut off entire pilot system after completing primary count The end of incoming cables of first normally opened contact being connected in parallel a little is also connected with the normally-closed contact of counting relay.
In order to realize interlocking function, the first combined floodgate timing controlled branch road string is equipped with the normally closed touching of separating brake relay Point, separating brake timing controlled branch road string are equipped with the normally-closed contact of closing relay.
In order to meet the needs of different brackets breaker is to voltage, the electric power loop both ends are connected in parallel to a voltage Adjuster, the voltage regulator are connect by the first branch with the test loop, and the voltage regulator passes through second Road is connect with the test loop;String is equipped with the first changer contact in the first branch, and the second branch is equipped with Rectifier bridge and the second changer contact.
Detailed description of the invention
Fig. 1 is the electrical schematic diagram of the breaker operation mechanism running-in test system of the utility model.
Specific embodiment
Specific embodiment of the present utility model is further described with reference to the accompanying drawing:
The utility model provides a kind of breaker operation mechanism running-in test system, including the control of electric power loop, separating brake Circuit, separating brake timing control loop, combined floodgate timing control loop and test loop;String is equipped with separating brake relay in separating brake control loop Device coil;Combined floodgate timing control loop includes the first combined floodgate timing controlled branch and the second combined floodgate timing controlled branch, and first closes String is equipped with the first normally opened contact and closing time relay coil of separating brake relay in lock timing controlled branch, and second, which closes a floodgate, determines When controlling brancher in string be equipped with closing time relay the first normally opened contact and separating brake relay coil;Separating brake timing controlled is returned String is equipped with the first normally opened contact and opening time relay coil of closing relay in road;Test loop includes separating brake test branch Road and the test branch that closes a floodgate, separating brake test the second normally opened contact that branch road string is equipped with separating brake relay, test branch of closing a floodgate road String is equipped with the second normally opened contact of closing coil, and the of the second normally opened contact of separating brake relay and breaker operation mechanism coil The connection of one input port, the second normally opened contact of closing relay and the second input port of breaker operation mechanism coil connect It connects.
Further, in order to realize that the running-in test system of breaker operation mechanism is automatically stopped and is adapted to inhomogeneity The breaker operation mechanism running-in test system of the breaker operation mechanism of type power supply, the utility model is also correspondingly arranged on Counting circuit and power supply conversing circuits.
Specifically, as shown in Figure 1, control electric power loop includes miniature circuit breaker KK, miniature circuit breaker KK as control The master switch of power supply is connected with control power supply, and miniature circuit breaker KK includes normally opened contact 1,2 and normally opened contact 3,4.
String is equipped with and starts switch and separating brake relay coil 1ZJ in separating brake control loop, the present embodiment start switch for The both ends manual actuation of button FA, manual actuation of button FA are connected in parallel to the first normally opened contact 2SJ1 of closing time relay; The end of incoming cables of first normally opened contact of manual actuation of button FA and separating brake relay being connected in parallel a little is also connected with counting relay The normally-closed contact JS1 of device.
Combined floodgate timing control loop includes the first combined floodgate timing controlled branch and the second combined floodgate timing controlled branch, and first closes Lock timing controlled branch includes the first normally opened contact 1ZJ1 and closing time relay for the separating brake relay being sequentially connected in series Coil 1SJ, the first both ends normally opened contact 1ZJ1 of separating brake relay are parallel with the first normally opened contact of closing time relay 1SJ1, the first combined floodgate timing controlled branch road string are equipped with the normally-closed contact 2ZJ1 of separating brake relay;Second combined floodgate timing controlled branch String is equipped with the first normally opened contact 1SJ2 and separating brake relay coil 2ZJ of closing time relay in road.
String is equipped with the first normally opened contact 2ZJ2 and opening time relay of closing relay in separating brake timing control loop Coil 2SJ, the first both ends normally opened contact 2ZJ2 of closing relay are connected in parallel to the second normally opened touching of opening time relay Point 2SJ2;Separating brake timing controlled branch road string is equipped with the normally-closed contact 1ZJ2 of closing relay.
Counting circuit includes counting branch and tally control branch, and counting branch includes counting relay JS, tally control Branch road string is equipped with the coil JS2 of counting relay and the second normally opened contact 1SJ3 of closing time relay.
Electric power loop both ends are connected in parallel to a voltage regulator, and voltage regulator passes through the first branch and test loop Connection, voltage regulator are connect by second branch with test loop;The first branch be equipped with the first changer contact ZK1, ZK2, second branch are equipped with rectifier bridge and second changer contact ZK3, ZK4.
Above-mentioned separating brake control loop, combined floodgate timing control loop, separating brake timing control loop, counting circuit etc. be in order to The breaking-closing operating of breaker operation mechanism is realized, in addition, being also provided with separating brake test branch and the conjunction of breaker operation mechanism Brake test branch.Separating brake tests the second normally opened contact 1ZJ3 that branch road string is equipped with separating brake relay, and test branch of closing a floodgate road is gone here and there The second normally opened contact 2ZJ3 equipped with closing coil, the second normally opened contact and the breaker operation mechanism coil of separating brake relay First input port connection, the second normally opened contact of closing relay and the second input port of breaker operation mechanism coil connect It connects.
The working principle of the running-in test system of the breaker operation mechanism of the present embodiment are as follows: press manual actuation of button FA, separating brake relay coil 1ZJ obtain it is electric, when unclamping manual actuation of button FA, separating brake relay coil 1ZJ again can power loss, but It is the effect due to the first normally opened contact 2SJ1 of opening time relay, even if manual actuation of button FA is unclamped, due to separating brake Branch where first normally opened contact 2SJ1 of the time relay is constantly in energized state, it will makes separating brake relay coil 1ZJ always it is electric, at this time corresponding separating brake relay the second normally opened contact 1ZJ3 closure, breaker operation mechanism separating brake examination Branch conducting is tested, separating brake running-in test is carried out to breaker operation mechanism.Since string is equipped with combined floodgate in separating brake timing control loop The normally-closed contact 1ZJ2 of relay, when separating brake relay coil 1ZJ obtains electric, the normally-closed contact 1ZJ2 of separating brake relay is disconnected, Make separating brake timing control loop akinesia, ensure that the safety of breaker operation mechanism running-in test system.
Then separating brake relay the first normally opened contact 1ZJ1 closure, closing time relay coil 1SJ obtain it is electric, at this point, If the first normally opened contact 1ZJ1 of separating brake relay is disconnected due to failure cause, first due to closing time relay is normal Open the self-locking of contact, can make opening time relay coil 1SJ always it is electric, the first of corresponding closing time relay Normally opened contact 1SJ2 closure, obtains separating brake relay coil 2ZJ electric, then the second normally opened contact 2ZJ3 of separating brake relay is closed It closes, the combined floodgate test branch conducting of breaker operation mechanism carries out combined floodgate running-in test to breaker operation mechanism.
At this point, closing time relay coil 1SJ power loss is divided if closing time relay delay time reaches setting value First normally opened contact 1ZJ1 of lock relay is disconnected, separating brake relay coil 1ZJ power loss, the second normally opened contact of separating brake relay 1ZJ3 is disconnected, and the separating brake running-in test of the operating mechanism of breaker terminates.
The first normally opened contact 2ZJ2 closure of closing relay simultaneously, makes opening time relay coil 2SJ obtain electric, separating brake Second normally opened contact 2SJ2 of the time relay is closed, due to the self-locking work of the second normally opened contact 2SJ2 of opening time relay With, make opening time relay coil 2SJ always it is electric, until opening time relay reaches the delay time of setting, separating brake Second normally opened contact 2ZJ3 of time relay coil 2SJ power loss, separating brake relay is disconnected, the combined floodgate of the operating mechanism of breaker Running-in test terminates.Simultaneously because string is equipped with the normally-closed contact 2ZJ1 of separating brake relay in the first combined floodgate timing controlled branch, when When closing relay coil 1ZJ obtains electric, the normally-closed contact 1ZJ2 of closing relay is disconnected, and be can be carried out sub-switching operation not, is prevented It separating brake and closes a floodgate while carrying out, ensure that the safety of breaker operation mechanism running-in test system.
During carrying out divide-shut brake running-in test, the number of divide-shut brake running-in test can also be counted, such as The number that breaker operation mechanism divide-shut brake running-in test has been determined before fruit test, then need to only be arranged circuit-breaker switching on-off The number of running-in test, after reaching breaker actuating running-in test number, running-in test is automatically stopped.As shown in Figure 1, adjustment The counting process of test number (TN) are as follows: if separating brake of every progress and closing operation count once, if combined floodgate running-in test It is carrying out, the second normally opened contact 2SJ3 closure of opening time relay, counter coil JS2 obtains electric, corresponding counter Normally opened contact JS closure, the normally-closed contact of counter disconnect JS1 and disconnect, and count primary.Then manual actuation of button progress is pressed Second of counting, repetitive cycling carry out divide-shut brake running-in test, the test number (TN) until reaching setting.
Electric power loop both ends are also connected in parallel to voltage regulator AT, can be according to the big minor adjustment of breaker operation mechanism Device required voltage exports a certain size alternating voltage to breaker actuating machine when changer contact ZK1, ZK2 closure Structure coil is grasped by the DC voltage that rectifier bridge exports a certain size to breaker when changer contact ZK3, ZK4 closure Dynamic actuator coil, regulative mode is flexible, is adapted to the development need of breaker.
Specific embodiment is presented above, but the utility model is not limited to embodiment described above.This The basic ideas of utility model are above-mentioned basic scheme, for those of ordinary skill in the art, according to the present utility model Introduction, the model, formula, parameter for designing various modifications do not need to spend creative work.The utility model is not being departed from Principle and spirit in the case where the guarantor of the utility model is still fallen within to variation, modification, replacement and the deformation that embodiment carries out It protects in range.

Claims (6)

1. a kind of breaker operation mechanism running-in test system, which is characterized in that including electric power loop, separating brake control loop, divide Lock timing control loop, combined floodgate timing control loop and test loop;String is equipped with separating brake relay in the separating brake control loop Coil;The combined floodgate timing control loop includes the first combined floodgate timing controlled branch and the second combined floodgate timing controlled branch, described String is equipped with the first normally opened contact and closing time relay coil of separating brake relay in first combined floodgate timing controlled branch, described String is equipped with the first normally opened contact and closing relay coil of closing time relay in second combined floodgate timing controlled branch;It is described String is equipped with the first normally opened contact and opening time relay coil of closing relay in separating brake timing control loop;The test Circuit includes separating brake test branch and combined floodgate tests branch, and separating brake test branch road string second equipped with separating brake relay is normal Contact is opened, the test branch road string that closes a floodgate is equipped with the second normally opened contact of closing coil.
2. breaker operation mechanism running-in test system according to claim 1, which is characterized in that the separating brake controls back String is equipped with and starts switch in road, and pilot system further includes counting circuit, and the counting circuit includes counting branch and tally control Branch, the counting branch includes counting relay, and tally control branch road string is equipped with the coil of the counting relay And the second normally opened contact of closing time relay.
3. breaker operation mechanism running-in test system according to claim 2, which is characterized in that described to start switch two End is connected in parallel to the first normally opened contact of opening time relay;First normally opened contact both ends of the separating brake relay are in parallel There is the first normally opened contact of closing time relay;First normally opened contact both ends of the separating brake relay are connected in parallel to combined floodgate Second normally opened contact of the time relay.
4. breaker operation mechanism running-in test system according to claim 2 or 3, which is characterized in that the starting is opened Close the normally-closed contact that counting relay is also connected with the end of incoming cables of the first normally opened contact of separating brake relay being connected in parallel a little.
5. breaker operation mechanism running-in test system according to claim 4, which is characterized in that described first, which closes a floodgate, determines When controlling brancher on string be equipped with the normally-closed contact of separating brake relay, separating brake timing controlled branch road string is equipped with closing relay Normally-closed contact.
6. breaker operation mechanism running-in test system according to claim 1, which is characterized in that the electric power loop two End is connected in parallel to a voltage regulator, and the voltage regulator is connect by the first branch with the test loop, described Voltage regulator is connect by second branch with the test loop;String is equipped with the first change-over switch and touches in the first branch Point, the second branch are equipped with rectifier bridge and the second changer contact.
CN201920010758.1U 2019-01-04 2019-01-04 A kind of breaker operation mechanism running-in test system Active CN209326954U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920010758.1U CN209326954U (en) 2019-01-04 2019-01-04 A kind of breaker operation mechanism running-in test system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920010758.1U CN209326954U (en) 2019-01-04 2019-01-04 A kind of breaker operation mechanism running-in test system

Publications (1)

Publication Number Publication Date
CN209326954U true CN209326954U (en) 2019-08-30

Family

ID=67730567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920010758.1U Active CN209326954U (en) 2019-01-04 2019-01-04 A kind of breaker operation mechanism running-in test system

Country Status (1)

Country Link
CN (1) CN209326954U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110544605A (en) * 2019-09-27 2019-12-06 戴顿(重庆)高压开关有限公司 Vacuum circuit breaker running-in device and method for running-in by adopting same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110544605A (en) * 2019-09-27 2019-12-06 戴顿(重庆)高压开关有限公司 Vacuum circuit breaker running-in device and method for running-in by adopting same

Similar Documents

Publication Publication Date Title
CN109507576B (en) Detection apparatus for be used for mechanical type direct current breaker performance of opening and shutting
CN202353172U (en) Three-phase power supply automatic reclosure protector
CN210835157U (en) Circuit breaker on-off fault detection circuit
CN109494776A (en) The grid-connected bidirectional converter of energy-storage system and off-network double mode operation method
CN109534111A (en) A kind of elevator safety control system and method
CN110954766B (en) Voltage and current type feeder automatic testing method
CN209326954U (en) A kind of breaker operation mechanism running-in test system
CN104090191B (en) A kind of loading test device for converter and method
CN106291141B (en) Automatic phase sequence identification device for three-phase power supply on construction site
CN206020544U (en) Job site three-phase power supply phase sequence automatic identification equipment
CN109188263A (en) High voltage isolator alternating current-direct current voltage regulation power supply test operation secondary circuit system
CN208506206U (en) A kind of test device of circuit-breaker switching on-off time
CN203927005U (en) Electric valve control circuit and the electric operated valve instrument that comprises this circuit
CN208385984U (en) PT hand car interlock circuit, PT hand car and metering cabinet
CN201655679U (en) Low-voltage contactor delay circuit device
CN202931210U (en) Power supply unit for testing of electric locomotive
CN201178332Y (en) Self-throwing test apparatus for standby power source
CN202404165U (en) Comprehensive protection test stand for motor
CN204116553U (en) The instantaneous pick-up unit of breaker of plastic casing
CN208420975U (en) Dual power supply switching equipment testing auxiliary device
CN208401756U (en) A kind of frequency conversion control circuit reducing frequency converter failure rate
CN206756997U (en) A kind of intelligence takes control breaker device for testing functions
CN108666920B (en) PT handcart interlocking circuit, PT handcart and metering cabinet
CN105929281A (en) Backup power automatic switching check all-in-one machine
CN205509644U (en) Diesel generating set is as reserve high voltage power supply's power supply system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant