CN208899516U - Insert-type steel pipe concrete column installing mechanism - Google Patents

Insert-type steel pipe concrete column installing mechanism Download PDF

Info

Publication number
CN208899516U
CN208899516U CN201821369858.5U CN201821369858U CN208899516U CN 208899516 U CN208899516 U CN 208899516U CN 201821369858 U CN201821369858 U CN 201821369858U CN 208899516 U CN208899516 U CN 208899516U
Authority
CN
China
Prior art keywords
cylinder
steel pipe
insert
concrete column
type steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821369858.5U
Other languages
Chinese (zh)
Inventor
杭前根
李夏
卞红年
孙信龙
孙萌萌
魏军
郑文兵
杨雅岚
周强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Ming Hui Construction Co Ltd
Original Assignee
Nanjing Ming Hui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Ming Hui Construction Co Ltd filed Critical Nanjing Ming Hui Construction Co Ltd
Priority to CN201821369858.5U priority Critical patent/CN208899516U/en
Application granted granted Critical
Publication of CN208899516U publication Critical patent/CN208899516U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model relates to technical field of civil engineering, more particularly to insert-type steel pipe concrete column installing mechanism, including rim of a cup basis and cylinder, cylinder is inserted into the rim of a cup basis, it is formed between cylinder and rim of a cup basis and pours gap, rim of a cup basis top is equipped with limit and shelves plate, and limit is shelved plate covering and poured above gap described.The utility model has the advantages that the utility model shelves plate in the limit that annular is arranged at the top of rim of a cup basis, the stability during erection of steel pipe column can be improved.

Description

Insert-type steel pipe concrete column installing mechanism
Technical field
The utility model relates to technical field of civil engineering, and in particular to insert-type steel pipe concrete column installing mechanism.
Background technique
With the rapid development of economic construction of China, concrete filled steel tube is because it is from heavy and light, excellent earthquake resistance, construction The advantages such as speed is fast, are widely used in recent years in the large spans such as airport, stadiums, exhibition room engineering and skyscraper.Insertion After the lifting of formula steel column is in place, operating personnel cannot be introduced into bottom of a cup and construct, therefore steel column foot can not install nut fastening admittedly Fixed, steel column foot above section is in movable state.
Holding clamp is set in rim of a cup base position when traditional construction, then guarantees the stabilization of steel pipe column by cable wind rope Property, it is constructed when steel tube concrete column assembly using safety climbing ladder, which can improve steel core concrete column to a certain extent The construction efficiency of installation, but the contact surface of snap-gauge and steel pipe column is smaller, assembly easily leads to steel pipe positional shift, undoubtedly will increase The process of later period straightening, while the extensive work time can also be consumed using the safety climbing ladder of reassembling type.
In consideration of it, in order to improve the problems such as traditional insert-type steel tubing string construction method of installation is not good enough, long in time limit, it would be highly desirable to invent A kind of simple and effective insert-type steel pipe concrete column installing mechanism improves insert-type steel tubing string construction quality and construction efficiency.
Utility model content
Purpose of the utility model is to solve the above problems, provide a kind of insert-type steel pipe concrete column fitting machine Structure.
In order to reach above-mentioned purpose of utility model, the utility model uses following technical scheme:
A kind of insert-type steel pipe concrete column installing mechanism, including rim of a cup basis and cylinder, cylinder are inserted into the rim of a cup base It in plinth, is formed between cylinder and rim of a cup basis and pours gap, rim of a cup basis top is equipped with limit and shelves plate, and plate is shelved in limit Inside is connected on the cylinder, and limit is shelved plate covering and poured above gap described.
It further include protection mechanism, protection mechanism is fixedly connected with the cylinder.The protection mechanism includes cable wind rope jam plate And cable wind rope, cable wind rope jam plate level are interspersed on the cylinder, fixed otic placode is arranged in the both ends of the cable wind rope jam plate, described Cable wind rope is fixedly connected with the fixed otic placode.
Preferably, the protection mechanism further includes cable wind rope fixing terminal, the bottom end of the cable wind rope and the cable wind rope Fixing terminal is fixedly connected.
It preferably, further include safety climbing ladder, safety climbing ladder is equipped with anchor ear fastening clamp apparatus, and the safety climbing ladder passes through anchor ear Fastening clamp apparatus is connect with the cylinder.
Preferably, the bottom of the safety climbing ladder is equipped with operating platform, and the operating platform is for driving the safety to climb Ladder is slided along the cylinder.
Preferably, cylinder lateral wall exhibition formula after setting shelves bracket, and rear exhibition formula shelves bracket and is located at the peace The top of full ladder.
Preferably, the operating platform and rear exhibition formula shelve and are equipped with ring combed locking bar between bracket, operating platform and rear exhibition Formula is shelved bracket and is fixedly connected by ring combed locking bar.
Preferably, joint filling board is equipped between the ring combed locking bar and the cylinder.
Preferably, the cylinder is equipped with concrete pouring hole.
Compared with prior art, beneficial effect is the utility model:
(1) the utility model shelves plate in the limit that annular is arranged at the top of rim of a cup basis, and erection of steel pipe column mistake can be improved Stability in journey.
(2) it in a preferred scheme, is connected between safety climbing ladder and cylinder using hood type, and is arranged in bottom and slides The operating platform of lift-type can be improved the safety of safety climbing ladder, while move up safety climbing ladder by operating platform, can mention High construction efficiency.
(3) in a preferred scheme, operating platform that the safety climbing ladder of the utility model hood type passes through sliding formula Formula bracket position is opened up after moving to, rear exhibition formula bracket and the operating platform of sliding formula are fixed by ring combed locking bar, and in gap Joint filling board is placed, construction efficiency and working security can be improved.
Detailed description of the invention
Fig. 1 is the utility model insert-type steel pipe concrete column installation system schematic diagram;
Fig. 2 is anchor ear safety type ladder position view;
Fig. 3 is ring combed locking bar position view;
Fig. 4 is joint filling steel plate structure schematic diagram.
In figure: 1- rim of a cup basis, 2- cylinder, 3- pour gap, and 4-, which is limited, shelves plate, 5- cable wind rope jam plate, 6- cable wind rope, 7- fixes otic placode, 8- cable wind rope fixing terminal, 9- safety climbing ladder, 10- anchor ear fastening clamp apparatus, and 11- operating platform opens up formula after 12- Shelve bracket, 13- ring combed locking bar, 14- joint filling board, 15- concrete pouring hole.
Specific embodiment
Below in conjunction with the attached drawing in the embodiments of the present invention, to the technical scheme in the embodiment of the utility model into Row clearly and completely describes, it is clear that described embodiment is only a part of the embodiment of the utility model, rather than complete The embodiment in portion.Based on the embodiments of the present invention, those of ordinary skill in the art are not before making creative work Every other embodiment obtained is put, is fallen within the protection scope of the utility model.
The present embodiment is as shown in Figures 1 to 4, a kind of insert-type steel pipe concrete column installing mechanism, including basic 1 He of rim of a cup Cylinder 2, it is highly 1200mm that 1 diameter of rim of a cup basis, which is 1000mm, and cylinder 2 is steel core concrete column 3, diameter 600mm, column Body 2 is equipped with concrete pouring hole 15.Cylinder 2 is inserted into the rim of a cup basis 1, is formed and is poured between cylinder 2 and rim of a cup basis 1 Gap 3,1 top of rim of a cup basis are equipped with limit and shelve plate 4, are interim snap-gauge, limit shelve be connected on the inside of plate it is described On cylinder, it can be removed after construction, to shelve plate 4 be annulus shape steel plate cross-sectional width is 150mm for limit, with a thickness of 10mm, limit are shelved the covering of plate 4 and are poured above gap 3 described.Limit shelve plate 4 can be improved it is steady in 2 installation process of cylinder It is qualitative.It pours the progress second coagulation soil of gap 3 to pour, secondary casting concrete is high strength and no shrinting C40 pea gravel concreten.
It further include protection mechanism, protection mechanism is fixedly connected with the cylinder 2.
Specifically, the protection mechanism includes cable wind rope jam plate 5 and cable wind rope 6, the diameter of cable wind rope 6 is 9.3mm, in east A piece cable wind rope 6 is respectively set on southern northwest four direction.5 level of cable wind rope jam plate is interspersed on the cylinder 2, cable wind rope Jam plate 5 is fixed on cylinder in the form of anchor ear, cable wind rope jam plate 5 with a thickness of 5mm, be to be made with steel plate, width For 100mm.Fixed otic placode 7, the cable wind rope 6 and the fixed company of the fixed otic placode 7 is arranged in the both ends of the cable wind rope jam plate 5 It connects.
The protection mechanism further includes cable wind rope fixing terminal 8, and cable wind rope fixing terminal 8 fixes on the ground, the cable The bottom end of wind rope 6 is fixedly connected with the cable wind rope fixing terminal 8.
The present embodiment further includes safety climbing ladder 9, and safety climbing ladder 9 is equipped with anchor ear fastening clamp apparatus 10, and the safety climbing ladder 9 is logical Anchor ear fastening clamp apparatus 10 is crossed to connect with the cylinder 2.
The bottom of the safety climbing ladder 9 is equipped with operating platform 11, and the operating platform 11 is for driving the safety climbing ladder 9 It is slided along the cylinder 2, preformed hole on operating platform 11.
2 lateral wall of cylinder exhibition formula after setting shelves bracket 12, and rear exhibition formula shelves bracket 12 and is located at the safety The top of ladder 9.Exhibition formula shelves bracket 12 equipped with location hole afterwards.
The operating platform 11 and rear exhibition formula, which are shelved, is equipped with ring combed locking bar 13 between bracket 12, operating platform 11 is with peace When exhibition formula shelves 12 position of bracket after full ladder 9 slides to upwards, rear exhibition formula shelves the bracket expansion of bracket 12, operating platform 11 with Exhibition formula is shelved bracket 12 and is fixedly connected by ring combed locking bar 13 afterwards.
There is gap between the ring combed locking bar 13 and the cylinder 2, joint filling board 14 is inserted in the gap.Joint filling board 14 be the curved plate composition that two pieces of sections are L-type.
The utility model shelves plate 4 in the limit that annular is arranged at the top of rim of a cup basis, and steel pipe cylinder can be improved and installed Stability in journey.It is connected between safety climbing ladder 9 and cylinder 2 using hood type, and the operating platform of sliding formula is set in bottom 11, the safety of safety climbing ladder 9 can be improved, while move up safety climbing ladder 9 by operating platform 11, construction effect can be improved Rate.
The safety climbing ladder 9 of the utility model hood type opens up formula bracket 12 after moving to by the operating platform 11 of sliding formula It sets, the operating platform 11 of rear exhibition formula bracket 12 and sliding formula is fixed by ring combed locking bar 13, and joint filling board is placed in gap 14, construction efficiency and working security can be improved.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (8)

1. insert-type steel pipe concrete column installing mechanism, which is characterized in that including rim of a cup basic (1) and cylinder (2), cylinder (2) It is inserted into the rim of a cup basic (1), is formed and poured gap (3) between cylinder (2) and rim of a cup basic (1), the rim of a cup is basic (1) Top is equipped with limit and shelves plate (4), and limit is shelved to be connected on the cylinder (2) on the inside of plate (4), and plate (4) covering is shelved in limit It is poured above gap (3) described;
It further include protection mechanism, protection mechanism is fixedly connected with the cylinder (2), and the protection mechanism includes cable wind rope jam plate (5) it is interspersed on the cylinder (2) with cable wind rope (6), cable wind rope jam plate (5) level, the both ends of the cable wind rope jam plate (5) are set It sets fixed otic placode (7), the cable wind rope (6) is fixedly connected with the fixed otic placode (7).
2. insert-type steel pipe concrete column installing mechanism according to claim 1, which is characterized in that the protection mechanism is also Including cable wind rope fixing terminal (8), the bottom end of the cable wind rope (6) is fixedly connected with the cable wind rope fixing terminal (8).
3. insert-type steel pipe concrete column installing mechanism according to claim 1, which is characterized in that further include safety climbing ladder (9), safety climbing ladder (9) is equipped with anchor ear fastening clamp apparatus (10), and the safety climbing ladder (9) passes through anchor ear fastening clamp apparatus (10) and institute State cylinder (2) connection.
4. insert-type steel pipe concrete column installing mechanism according to claim 3, which is characterized in that the safety climbing ladder (9) bottom is equipped with operating platform (11), and the operating platform (11) is for driving the safety climbing ladder (9) along the cylinder (2) it slides.
5. insert-type steel pipe concrete column installing mechanism according to claim 4, which is characterized in that the cylinder (2) is outside Side wall ring winding postpones exhibition formula and shelves bracket (12), and rear exhibition formula shelves the top that bracket (12) are located at the safety climbing ladder (9).
6. insert-type steel pipe concrete column installing mechanism according to claim 5, which is characterized in that the operating platform (11) it shelves with rear exhibition formula and is equipped with ring combed locking bar (13) between bracket (12), operating platform (11) and rear exhibition formula shelve bracket (12) it is fixedly connected by ring combed locking bar (13).
7. insert-type steel pipe concrete column installing mechanism according to claim 6, which is characterized in that the ring combed locking bar (13) joint filling board (14) are equipped between the cylinder (2).
8. insert-type steel pipe concrete column installing mechanism according to claim 1, which is characterized in that on the cylinder (2) Equipped with concrete pouring hole (15).
CN201821369858.5U 2018-08-24 2018-08-24 Insert-type steel pipe concrete column installing mechanism Active CN208899516U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821369858.5U CN208899516U (en) 2018-08-24 2018-08-24 Insert-type steel pipe concrete column installing mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821369858.5U CN208899516U (en) 2018-08-24 2018-08-24 Insert-type steel pipe concrete column installing mechanism

Publications (1)

Publication Number Publication Date
CN208899516U true CN208899516U (en) 2019-05-24

Family

ID=66570017

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821369858.5U Active CN208899516U (en) 2018-08-24 2018-08-24 Insert-type steel pipe concrete column installing mechanism

Country Status (1)

Country Link
CN (1) CN208899516U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173038A (en) * 2019-06-11 2019-08-27 中庚汇建设发展有限公司 A kind of steel construction assembled architecture and its assembly method
CN112746749A (en) * 2020-12-31 2021-05-04 中建科工集团有限公司 Rapid construction method for cup-mouth inverted-insertion column
CN115354755A (en) * 2022-08-10 2022-11-18 广州电力设计院有限公司 Connecting structure and connecting method of foundation and upright post

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173038A (en) * 2019-06-11 2019-08-27 中庚汇建设发展有限公司 A kind of steel construction assembled architecture and its assembly method
CN110173038B (en) * 2019-06-11 2021-02-23 中庚汇建设发展有限公司 Steel structure assembly type building and assembly method thereof
CN112746749A (en) * 2020-12-31 2021-05-04 中建科工集团有限公司 Rapid construction method for cup-mouth inverted-insertion column
CN115354755A (en) * 2022-08-10 2022-11-18 广州电力设计院有限公司 Connecting structure and connecting method of foundation and upright post

Similar Documents

Publication Publication Date Title
CN208899516U (en) Insert-type steel pipe concrete column installing mechanism
CN106988229A (en) A kind of hybrid structure of arch and beam continuous rigid frame bridge button hangs branch convolution constructing device and method
CN207194619U (en) A kind of assembled regeneration concrete enclosure wall
CN204753628U (en) Guider that hangs down is transferred to contrary way of doing things steel -pipe column that can have enough to meet need
CN102733608B (en) Construction method for spray head layer of granulation tower
CN102383371B (en) Overpass concrete outside-hanged cantilever type flower bed and construction method thereof
CN208379831U (en) A kind of pseudo-classic architecture external wall structure
CN113756320B (en) Method for hoisting low-clearance and ultra-long reinforcement cage section by section into holes under high-voltage line
CN111350187A (en) Template system suitable for large-diameter manual hole digging annular foundation pile and construction method
CN210263929U (en) A preformed hole template for building civil engineering
CN103434933B (en) Large member hoisting in-position device and in-position method
CN104452601B (en) Bridge floor tapping pipe bush mould and using method
CN202416156U (en) Concrete external-mounted cantilever type parterre of flyover
CN207775717U (en) Highway bridge construction prestressed anchor
CN206903062U (en) A kind of open tubular column with fore-set
CN104878775A (en) Turnable top-down method steel pipe column verticality adjusting guide device and construction method thereof
CN204356658U (en) Bridge floor tapping pipe bush mould
CN209799529U (en) communication tower prefabricated base convenient for wiring
CN207512968U (en) A kind of splicing node of steel plate combined shear wall
CN210947661U (en) Installation device of socket type overhanging scaffold
CN113756554A (en) Construction platform and construction method for cast-in-place reinforced concrete support cantilever scaffold
CN107675892A (en) A kind of glass curtain wall monorail hoisting structure
CN206219080U (en) A kind of tower crane
CN207538506U (en) The independent supporting rack of efficient construction of precast floorslab
CN107419670A (en) Hybrid structure of arch and beam formula continuous rigid frame bridge winds up walking cradle construction device and method