CN206644952U - A kind of concrete prefabricated heavy stone of Navigation Mark - Google Patents

A kind of concrete prefabricated heavy stone of Navigation Mark Download PDF

Info

Publication number
CN206644952U
CN206644952U CN201720335221.3U CN201720335221U CN206644952U CN 206644952 U CN206644952 U CN 206644952U CN 201720335221 U CN201720335221 U CN 201720335221U CN 206644952 U CN206644952 U CN 206644952U
Authority
CN
China
Prior art keywords
heavy stone
utility
model
stone body
conical points
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720335221.3U
Other languages
Chinese (zh)
Inventor
曾颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Shiqiang environmental protection new material technology Co., Ltd
Original Assignee
ANHUI ZHUCHENG ENVIRONMENTAL PROTECTION ENERGY-SAVING NEW BUILDING MATERIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI ZHUCHENG ENVIRONMENTAL PROTECTION ENERGY-SAVING NEW BUILDING MATERIAL Co Ltd filed Critical ANHUI ZHUCHENG ENVIRONMENTAL PROTECTION ENERGY-SAVING NEW BUILDING MATERIAL Co Ltd
Priority to CN201720335221.3U priority Critical patent/CN206644952U/en
Application granted granted Critical
Publication of CN206644952U publication Critical patent/CN206644952U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

It the utility model is related to a kind of cement prefabricated component, and in particular to a kind of concrete prefabricated heavy stone of Navigation Mark.The heavy stone of prior art is simple solid structure, is easily subjected to displacement in river course.The utility model provides a kind of concrete prefabricated heavy stone of Navigation Mark, it is characterised in that:Including heavy stone body and conical points foot, anchor chain retainer ring, described anchor chain retainer ring is arranged on the top of heavy stone body, and described conical points are evenly distributed on heavy stone body bottom portion and the edge of bottom enough;The overall structure that described heavy stone body and conical points is formed in one enough.The utility model will not be subjected to displacement in river course, and relative to prior art, the utility model weight is light under square one, so the utility model is easily portable and launched.

Description

A kind of concrete prefabricated heavy stone of Navigation Mark
Technical field
It the utility model is related to a kind of cement prefabricated component, and in particular to a kind of concrete prefabricated heavy stone of Navigation Mark.
Background technology
Navigation mark is the abbreviation of aids to navigation, and index shows the mark of direction along ng a path, boundary and obstruction, including crossing mark, edge Shore beacon, beacon, transit leading mark, head and stern leading marks, lateral marks, separate channel mark, position indicating mark, flood mark and bridge mark etc..It is to aid in Guide the artificial target of ship's navigation, positioning and sign obstruction with representing warning.
Navigation mark is made up of heavy stone, anchor chain, floating drum, lamp bracket, and cat face is connected to heavy stone and floating drum.Heavy stone uses prefabricated water mostly Clod(Also there is cast iron casting), bottom indents, 3 ~ 12 tons are typically weighed about, is sunken in the mud in river course, so not easily shifted, it is ensured that on The floating drum in face will not drift(Unless anchor chain is broken).
Existing heavy stone uses the pre-cast concrete block of some simple structures mostly, using process it occur frequently that navigation mark has upwards The phenomenon of skew, because navigation mark position is offset, it can become twisted often over a period of time later original straight navigation mark line Turn round.
The reason for these navigation marks are offset is that this skew has a spy because heavy stone shifts in the presence of current Point, exactly heavy stone can sail against the current.This right two parts reason of phenomenon causes:
(1)Referring to accompanying drawing 1, according to bernoulli principle, i.e.,:Kinetic energy+gravitional force+pressure potential=constant.It is the most famous Inference be:During contour flowing, flow velocity is big, and pressure is with regard to small.Current pass through stone 10 at a high speed in the front upper place of stone 10 in accompanying drawing 1 The flow velocity of current at anterior position 7 is much higher than the water velocity at the rear position 8 of stone 10, therefore at anterior position 7 Pressure is less than the pressure at rear position 8, and pressure differential causes stone 10 to be sailed against the current;
(2)Referring to accompanying drawing 1, stone 10 is pressed on the sediment deposit 9 in riverbed, and the silt in the front of stone 10 can be by the water of high speed Stream is taken away, and the pit of a crescent, effect of the stone 10 in gravity and above-mentioned difference force can be formed in the front of stone 10 Under can turn forward, displacement forward occurs.
In the prior art in order to avoid heavy stone drift is moved, using the method for big weight stone, the big current difference of stone weight is led The transportation of the pressure difference of cause is limited.
Utility model content
The purpose of this utility model is to provide a kind of Navigation Mark concrete prefabricated heavy stone, to solve above-mentioned background technology In the problem of mentioning.
To achieve the above object, the utility model provides following technical scheme:A kind of concrete prefabricated heavy stone of Navigation Mark, Including heavy stone body and conical points foot, anchor chain retainer ring, described anchor chain retainer ring is arranged on the top of heavy stone body, institute The conical points stated are evenly distributed on heavy stone body bottom portion and the edge of bottom enough;Described heavy stone body and conical points foot The overall structure being formed in one.
Behind the utility model input river course, its conical points can penetrate the silt layer in riverbed enough, the cone in insertion riverbed depths Under the obstruction of shape point foot, pressure difference will not cause the utility model displacement caused by the current difference before and after the utility model.
Preferably, 25 °~45 ° are skimmed outside the setting angle of the conical points foot on bottom margin position.Therefore flowing water is in this reality The position of the zap pit formed with new front will not it is cross-domain before the conical points skimmed press close to heavy stone body enough and cause gravity unbalance Youngster tilts;Other fulcrum force of the present utility model is on conical points foot, even if heavy stone body nearby has the phenomenon of silt underwashing Also its stress balance will not be destroyed;Moreover, heavy stone body nearby have silt underwashing fall after conical points can be pressurized enough sinking, more Will not occurred level to displacement.
Preferably, the stone body upper surface that sinks also is provided with twice fluid ditch.Front and rear pressure difference of the prior art is because flow velocity Difference causes, and because heavy stone body front end faces flowing water directly, flowing water is high in the flow velocity of front-end surface, because the stop of heavy stone body is made With one side that heavy stone body facing away from flowing water can form a fluid dead band, and the speed of current is very slow, therefore front and rear current difference It is larger.When the utility model is put into river course, make the direction of fluid ditch along the direction of current.Heavy stone body can so be reduced The scope in the dead band of rear end, the flow velocity of heavy stone body rear end current is improved, reduce the current difference before and after heavy stone body, and then reduce Front and rear pressure difference.
The advantages of the utility model, is as follows:
(1)It will not be subjected to displacement in bottom of river channel;
(2)Prior art is in order to avoid being subjected to displacement, using big heavy stone, heavy stone weight that the utility model uses It is small, transport and lay and be more convenient.
Brief description of the drawings
Fig. 1 is the schematic diagram that stone countercurrently moves in river course in the prior art;
Fig. 2 is the utility model structure diagram;
Fig. 3 is the diagrammatic cross-section that the utility model sinks to river bed.
Embodiment
The technical scheme of this patent is described in more detail with reference to embodiment.
2 and accompanying drawing 3 referring to the drawings, a kind of concrete prefabricated heavy stone of Navigation Mark, including heavy stone body 1 and conical points Foot 2, anchor chain retainer ring 4, described anchor chain retainer ring 4 are arranged on the top of heavy stone body 1, uniform point of described conical points foot 2 Cloth is on the edge of the heavy bottom of stone body 1 and bottom;Described heavy stone body 1 and conical points foot 2 is formed in one whole Body structure.
Referring to the drawings 3, after the utility model puts into river course, its conical points foot 2 can penetrate the silt layer in riverbed 5, insert Under the obstruction of the conical points foot 2 of the depths of riverbed 5, pressure difference caused by the current difference before and after the utility model will not cause this practicality new Type displacement.
2 and accompanying drawing 3 referring to the drawings, it is preferred that the conical points on bottom margin position, skim outside 2 setting angle 25 °~ 45°.Therefore the position of zap pit that flowing water is formed in front of the present utility model will not it is cross-domain before the conical points skimmed enough 2 press close to it is heavy Stone body 1 causes the unbalance youngster of gravity to tilt;Other fulcrum force of the present utility model is on conical points foot 2, even if heavy stone body 1 The phenomenon for nearby having silt underwashing will not also destroy its stress balance;Moreover, heavy stone body 1 nearby has silt underwashing to be bored after falling Shape point foot 2 can be pressurized sinking, more will not occurred level to displacement.
Front and rear pressure difference of the prior art is because current difference causes, and because the heavy front end of stone body 1 faces flowing water directly, flowing water exists The flow velocity of front-end surface is high, and due to the barrier effect of heavy stone body 1, one side that heavy stone body 1 facing away from flowing water can form one Fluid dead band, the speed of current is very slow, therefore front and rear current difference is larger.Preferably, the heavy upper surface of stone body 1 is also provided with twice Fluid ditch 3;When the utility model is put into river course, make the direction of fluid ditch 3 along the direction of current.Heavy stone can so be reduced The scope in the dead band of the rear end of body 1, the flow velocity of the heavy rear end current of stone body 1 is improved, reduces the current difference before and after heavy stone body 1, And then pressure difference before and after reducing.
The better embodiment of this patent is explained in detail above, but this patent is not limited to above-mentioned embodiment party Formula, can also be on the premise of this patent objective not be departed from one skilled in the relevant art's possessed knowledge Make a variety of changes.It is it should be appreciated that all new in this practicality using other specific embodiments of New Scheme based on this Within the protection domain of type.

Claims (3)

  1. A kind of 1. concrete prefabricated heavy stone of Navigation Mark, it is characterised in that:It is solid including heavy stone body and conical points foot, anchor chain Determine ring, described anchor chain retainer ring is arranged on the top of heavy stone body, and described conical points are evenly distributed on heavy stone body bottom enough On the edge of portion and bottom;The overall structure that described heavy stone body and conical points is formed in one enough.
  2. A kind of 2. concrete prefabricated heavy stone of Navigation Mark according to claim 1, it is characterised in that:On bottom margin position Conical points foot setting angle outside skim 25 °~45 °.
  3. A kind of 3. concrete prefabricated heavy stone of Navigation Mark according to claim 1, it is characterised in that:Described heavy stone body Upper surface is also provided with twice fluid ditch.
CN201720335221.3U 2017-03-31 2017-03-31 A kind of concrete prefabricated heavy stone of Navigation Mark Expired - Fee Related CN206644952U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720335221.3U CN206644952U (en) 2017-03-31 2017-03-31 A kind of concrete prefabricated heavy stone of Navigation Mark

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720335221.3U CN206644952U (en) 2017-03-31 2017-03-31 A kind of concrete prefabricated heavy stone of Navigation Mark

Publications (1)

Publication Number Publication Date
CN206644952U true CN206644952U (en) 2017-11-17

Family

ID=60274615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720335221.3U Expired - Fee Related CN206644952U (en) 2017-03-31 2017-03-31 A kind of concrete prefabricated heavy stone of Navigation Mark

Country Status (1)

Country Link
CN (1) CN206644952U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112960066A (en) * 2020-09-18 2021-06-15 中国海洋大学 Intelligent middle-latitude large buoy observation system and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112960066A (en) * 2020-09-18 2021-06-15 中国海洋大学 Intelligent middle-latitude large buoy observation system and method

Similar Documents

Publication Publication Date Title
CN101748744B (en) Asynchronous sinking construction method for large bridge foundation separation type steel cofferdam
CN108797372A (en) A kind of construction method for deep water shallow overburden steel trestle
CN206644952U (en) A kind of concrete prefabricated heavy stone of Navigation Mark
CN108797631A (en) A kind of more negative well bore pressure bucket anemometer tower foundation scour protection methods of jacket
CN103614988A (en) Flexible scour-preventing protective cushion and construction method thereof
Kask et al. Geological setting of areas endangered by waves generated by fast ferries in Tallinn Bay.
CN107587497B (en) A method of improving hydraulic reclamation flatness
CN109723029A (en) A kind of semi open type blowing-filling sludge beach and its make beach method
CN216041278U (en) Novel pile foundation scour prevention structure
TWI652202B (en) The deep-sea anchoring device for gravity and anchor composite with decelerating wing
CN203654239U (en) Spherical stereoscopic permeable frame
CN102121240A (en) Mobile adjustable river self-flowing silt scouring guide plate
CN203890953U (en) Spur dike structure located on pebble sand conveying belt
CN203890949U (en) Submerged dike structure suitable for mountain river
CN209037785U (en) A kind of heavy stone
CN1206425C (en) Apparatus for stirring silt by stirring and floating and flowing carrying mud to dredge watercourse
CN108951530A (en) It is a kind of navigation diversion works except spiral shell design
CN1069371C (en) Construction method for confferdam and dyke-dam
CN218322885U (en) Offshore wind turbine composite cylinder foundation anti-scouring configuration device
CN216999884U (en) Protection device for be used for weakening local scour of pier foundation
CN114351568B (en) Ecological diversion pier structure for long-span wading bridge
CN116812079B (en) Floating sign fixing device
CN217174575U (en) Eco-friendly dam
CN206337541U (en) A kind of riverbed silt retention, the device for promoting alluvial protection against erosion
Stevenson The principles and practice of canal and river engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200826

Address after: 231200 Anhui Zhucheng environmental protection and energy saving building materials Co., Ltd., Jingliu Road, Huagang Town, Feixi County, Hefei City, Anhui Province

Patentee after: Anhui Shiqiang environmental protection new material technology Co., Ltd

Address before: 231241, Anhui County, Hefei province Feixi County town of granite Industrial Agglomeration

Patentee before: ANHUI ZHUCHENG GREEN ENERGY NEW BUILDING MATERIALS Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171117

Termination date: 20200331