CN206309294U - Small-displacement horizontal well dragging fracturing string - Google Patents

Small-displacement horizontal well dragging fracturing string Download PDF

Info

Publication number
CN206309294U
CN206309294U CN201621313653.6U CN201621313653U CN206309294U CN 206309294 U CN206309294 U CN 206309294U CN 201621313653 U CN201621313653 U CN 201621313653U CN 206309294 U CN206309294 U CN 206309294U
Authority
CN
China
Prior art keywords
horizontal well
packer
oil pipe
fracturing
tubing string
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621313653.6U
Other languages
Chinese (zh)
Inventor
刘忠能
任勇
蒙鑫
何华
冯长青
赵粉霞
李旭梅
张丽娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201621313653.6U priority Critical patent/CN206309294U/en
Application granted granted Critical
Publication of CN206309294U publication Critical patent/CN206309294U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model belongs to the technical field of oil field horizontal well oil pipe adds sand staged fracturing and reforms transform, specifically provide a small discharge capacity horizontal well drags fracturing string, including oil pipe, its characterized in that: small discharge capacity horizontal well drags fracturing string still including locating the safety joint of oil pipe lower extreme in proper order, going up packer, throttle sand blaster and bottom packer, safety joint and last packer, go up packer and throttle sand blaster all connect through the oil pipe short circuit, satisfy horizontal well repeated transformation small discharge capacity fracturing demand, easy operation, construction safety can realize dragging the fracturing simultaneously, and is efficient.

Description

A kind of small displacement horizontal well drag fracturing tubing string
Technical field
The utility model belongs to oilfield horizontal well oil pipe plus sand staged fracturing renovation technique field, and in particular to a kind of float Amount horizontal well drag fracturing tubing string.
Background technology
At present, the repetition transformation of Changqing oilfields low permeability oil field horizontal well is main using double envelope single deck tape-recorder dragging tubing string segmentation pressures Split.Compared to other techniques, such tubing string card sealing section substantially, can eliminate as much as the influence for closing on interval, correctional effect compared with It is good.
In conventional double envelope single deck tape-recorder drag fracturing tubing strings, the setting of upper packer, deblocking process are more complicated, or even needs Pitching, the operation such as build the pressure.For the reservoir reconstruction of small displacement, conventional tubing string efficiency is low, and operation is relative complex, and easily bit freezing.
Utility model content
The purpose of this utility model is to provide a kind of small displacement horizontal well drag fracturing tubing string, and optimization tool combination meets Horizontal well repeats transformation small displacement pressure break demand, simple to operate, construction safety, while drag fracturing, efficiency high can be realized.
Therefore, the utility model provides a kind of small displacement horizontal well drag fracturing tubing string, including oil pipe, the small displacement Horizontal well drag fracturing tubing string also includes being sequentially arranged in the safety joint of oil pipe lower end, upper packer, throttling sanding machine and bottom Packer, the safety joint and upper packer, upper packer and throttling sanding machine are connected by oil pipe short circuit.
Described upper packer is K344 packers.
Described upper packer produces chock pressure difference to set by the sanding machine that throttles.
The throttling sanding machine is used to throttle and connects reservoir reconstruction section.
Described bottom packer is Y211 mechanical anchor packers.
The beneficial effects of the utility model:This small displacement horizontal well drag fracturing tubing string that the utility model is provided, bag Include oil pipe, the small displacement horizontal well drag fracturing tubing string also include being sequentially arranged in the safety joint of oil pipe lower end, upper packer, Throttling sanding machine and bottom packer, the safety joint and upper packer, upper packer and throttling sanding machine pass through oil pipe Short circuit is connected.The small displacement horizontal well drag fracturing tubing string upper packer is set by the chock pressure difference that the sanding machine that throttles is produced, It is not required to operation bidirectional, tubing string is integrally unsealed conveniently, and pressure break passage is unimpeded always, it is not necessary to which pitching such as builds the pressure at the process, and tubing string is especially Suitable for horizontal well small displacement multistage fracturing reform, efficiency of construction is high, bit freezing risk is small.
Brief description of the drawings
The utility model is described in further details below with reference to accompanying drawing.
Fig. 1 is small displacement horizontal well drag fracturing tubular column structure schematic diagram.
Description of reference numerals:1st, oil pipe;2nd, safety joint;3rd, tubing nipple;4th, K344 packers;5th, throttle sanding machine; 6th, Y211 mechanical anchors packer.
Specific embodiment
Embodiment 1:
As shown in figure 1, a kind of small displacement horizontal well drag fracturing tubing string, including oil pipe 1, the small displacement horizontal well dragging Fracturing string also includes being sequentially arranged in the safety joint 2 of oil pipe lower end, upper packer 4, throttling sanding machine 5 and bottom packer 6, The safety joint 2 and upper packer 4, upper packer 4 and throttling sanding machine 5 are connected by oil pipe short circuit 3;Described upper envelope Every device 4 be K344 packers;Described bottom packer 6 is Y211 mechanical anchor packers.Compared with conventional fracturing string, should Tubular column structure is simple, easy to operate, and by directly above carrying whole time tubing string of deblocking, dragging tubing string is constructed, and efficiency high, risk are small.
Embodiment 2:
As shown in figure 1, on the basis of embodiment 1, described upper packer 4 produces throttling pressure by the sanding machine 5 that throttles Difference sets, and the throttling sanding machine 5 is used to throttle and connects reservoir reconstruction section;Pressure break passage is unimpeded always, it is not necessary to which pitching is suppressed Pressure sets up pressure break passage;Tubing string operational discharge capacity is limited, and the tubing string is particularly suited for horizontal well small displacement multistage fracturing reform.
Operation principle of the present utility model is:
First, formation testing team completes through wash well operations as requested, under enter fracturing string, order is entered under tubing string is specific for Fig. 1 It is shown:Y211 mechanical anchors packer 6, throttling sanding machine 5, oil pipe short circuit 3, K344 packers 4, tubing nipple 3, safety joint 2nd, oil pipe 1.
Under enter during, it is necessary to accurate measurement and in detail record oil pipe 1 and downhole tool length, it is ensured that the position of sanding machine 5 Specking position consistency is designed with least significant end, both errors should be less than 0.5m, should otherwise adjust tool location;Then, put-on and delegated Y211 packers 6 are set, fracture well head is sat, starts Frac unit, small displacement direct circulation is implanted sequentially displacement fluid, improved discharge capacity and sit Envelope K344 packers 4, the load fluid of predetermined concentration is injected from the direct circulation of oil pipe 1, and through throttling, sanding machine 5 enters old eyelet, importing Reservoir, opens and splits, extends crack, completes this section of pressing crack construction.
After first paragraph pressure break terminates, according to pressure condition upper lifting pipe post or backwash, deblocking K344 packers 4 control discharge capacity One hole volume of reacting cycle well-flushing is carried out, when returning fluid's body is without sand grains, well head, upper lifting pipe post deblocking Y211 machines are unloaded in termination of pumping Tool anchoring packer 6, upper lifting pipe post to next transformation section.
Repeat above step, until the transformation of the well all intervals is finished, act fracturing string, under enter sand washing, suction, formation testing Tubing string.
In sum, the utility model compared with prior art, with advantages below:
First, upper packer is set by the chock pressure difference that the sanding machine that throttles is produced, and pressure break passage is unimpeded always, it is not necessary to Pitching builds the pressure and sets up pressure break passage.
Second, by directly above carrying whole time tubing string of deblocking, dragging tubing string is constructed, and efficiency high, risk are small
3rd, because sanding machine needs to set K344 packers by throttling action, tubing string operational discharge capacity is limited, the tubing string It is particularly suited for horizontal well small displacement multistage fracturing reform.
Exemplified as above is only for example, not constituting to protection domain of the present utility model to of the present utility model Limitation, every design same or analogous with the utility model is belonged within protection scope of the present invention.

Claims (5)

1. a kind of small displacement horizontal well drag fracturing tubing string, including oil pipe (1), it is characterised in that:The small displacement horizontal well is dragged Dynamic fracturing string also includes being sequentially arranged in safety joint (2), upper packer (4), throttling sanding machine (5) and the bottom of oil pipe lower end Packer (6), the safety joint (2) and upper packer (4), upper packer (4) and throttling sanding machine (5) are short by oil pipe Connect (3) connection.
2. small displacement horizontal well drag fracturing tubing string as claimed in claim 1, it is characterised in that:Described upper packer (4) It is K344 packers.
3. small displacement horizontal well drag fracturing tubing string as claimed in claim 2, it is characterised in that:Described upper packer (4) Chock pressure difference is produced to set by the sanding machine that throttles (5).
4. small displacement horizontal well drag fracturing tubing string as claimed in claim 3, it is characterised in that:Throttling sanding machine (5) For throttling and connecting reservoir reconstruction section.
5. small displacement horizontal well drag fracturing tubing string as claimed in claim 1, it is characterised in that:Described bottom packer (6) it is Y211 mechanical anchor packers.
CN201621313653.6U 2016-12-02 2016-12-02 Small-displacement horizontal well dragging fracturing string Active CN206309294U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621313653.6U CN206309294U (en) 2016-12-02 2016-12-02 Small-displacement horizontal well dragging fracturing string

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621313653.6U CN206309294U (en) 2016-12-02 2016-12-02 Small-displacement horizontal well dragging fracturing string

Publications (1)

Publication Number Publication Date
CN206309294U true CN206309294U (en) 2017-07-07

Family

ID=59249733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621313653.6U Active CN206309294U (en) 2016-12-02 2016-12-02 Small-displacement horizontal well dragging fracturing string

Country Status (1)

Country Link
CN (1) CN206309294U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847875A (en) * 2019-11-19 2020-02-28 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Short-time throttling pipe column and short-time throttling method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847875A (en) * 2019-11-19 2020-02-28 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Short-time throttling pipe column and short-time throttling method
CN110847875B (en) * 2019-11-19 2023-12-05 中国石油天然气集团有限公司 Short-time throttling pipe column and short-time throttling method

Similar Documents

Publication Publication Date Title
CN202108493U (en) Horizontal well hydraulic jet multi-cluster staged fracturing string
CN102733789B (en) Staged fracturing construction yield increment method for waterpower in deep thickened oil deposit thick-bedded sandstone storage layer
CN201273188Y (en) Integrated water exploration pipe column for casing well completion horizontal well
CN201546710U (en) Segmented water exploration test pipe column for casing completion horizontal well
CN105507865A (en) Re-fracturing method for oil, gas and water wells
CN202157792U (en) Downhole production allocator for oil well
CN103643931A (en) Completion and fracture integrated pipe column of offshore openhole horizontal well and construction method of pipe column
CN201705276U (en) Well completion and flow string of horizontal well
CN105443101B (en) A kind of double envelope single deck tape-recorder staged fracturing technology tube pillars of compression and its fracturing process
CN106050199A (en) Synthetic drainage and gas production device and method
CN105587300B (en) Oil recovery method for horizontal well
CN204126624U (en) Open-hole horizontal well fixed tubular column jetting sectional well completion fracturing string
CN104989325B (en) A kind of method using two-tube gas well liquid loading tubing string gas production arranged side by side
CN103061724B (en) Towards the layering pressure control associating mining device easily telling powder and telling the two coal seam of sand
CN108119134A (en) Hydrogeologic drilling is the same as footpath bailing test device twice
CN206309294U (en) Small-displacement horizontal well dragging fracturing string
CN206309372U (en) Small-displacement dragging fracturing string for horizontal well
CN107542435A (en) The method that selective sand control improves loose sand oil accumulation development effectiveness
CN205349316U (en) Two single deck tape -recorder staged fracturing technology tubular columns that seal of compression
CN107654207A (en) Section method for fixed-point preset sand plug of coiled tubing horizontal well
CN208137921U (en) A kind of packing element anchoring separate layer water injection string
CN204186371U (en) Staged fracturing tool pipe column with first-section perforated casing sliding sleeve
CN206309371U (en) Fracturing string suitable for horizontal well repeated fracturing and well closing and pressure expansion
CN205936571U (en) Raising output is transformed and novel coal seam gas well of formation to old well
CN201778772U (en) Small hole side drilling blocking fracturing string

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant