CN206233430U - Assembly concrete floorboard system - Google Patents

Assembly concrete floorboard system Download PDF

Info

Publication number
CN206233430U
CN206233430U CN201621291981.0U CN201621291981U CN206233430U CN 206233430 U CN206233430 U CN 206233430U CN 201621291981 U CN201621291981 U CN 201621291981U CN 206233430 U CN206233430 U CN 206233430U
Authority
CN
China
Prior art keywords
truss
heat
insulation layer
overcoat
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621291981.0U
Other languages
Chinese (zh)
Inventor
林国海
翟洪远
林宣佐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Hongsheng building material manufacturing Limited by Share Ltd
Harbin Hongsheng House Energy Saving System R&D Center
Original Assignee
Harbin Hongsheng House Energy Saving System R&D Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Hongsheng House Energy Saving System R&D Center filed Critical Harbin Hongsheng House Energy Saving System R&D Center
Priority to CN201621291981.0U priority Critical patent/CN206233430U/en
Application granted granted Critical
Publication of CN206233430U publication Critical patent/CN206233430U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model provides a kind of assembly concrete floorboard system.Including heat-insulation layer, overcoat and steel frame, the steel frame includes truss, truss connection reinforcing bar and stiffener, the truss along floorboard longitudinally spaced arrangement, truss connects reinforcing bar being arranged laterally at a spacing along floorboard, truss connection reinforcing bar is fixedly connected with truss in intersection, stiffener is connected reinforcing bar and is fixedly connected in intersection with truss, the heat-insulation layer is made up of the mutual tongue and groove grafting of heat preservation module, overcoat is laid in outside heat-insulation layer, and overcoat and heat-insulation layer are ordered by connection and be fixed on truss.The utility model can make the on-site construction processes of floor greatly simplified, improve the construction speed of building, strengthen the energy-saving heat preserving effect of building.

Description

Assembly concrete floorboard system
Technical field
The utility model relates to a kind of construction material, specifically a kind of structure for building construction floor Material.
Background technology
The floorboard of current building mainly has two kinds of forms, and one kind is prefabricated board, and another kind is cast-in-place concrete floor. Prefabricated board floor is installed using ground is pre-formed, by the way of on-site hoisting, its advantage be construction speed accelerate, cost It is low.But lack effective connection between existing prefabricated board floor and wall, when running into the natural calamities such as earthquake, it is easy to pine Move, come off, cause any property loss even casualties.In addition, after existing prefabricated board floor is completed, between each floor With certain gap, dealing with improperly can produce smallpox plank split, not only influence attractive in appearance, and the phenomenons such as leak can be also produced sometimes.
Cast-in-place concrete floor overcomes some defects of prefabricated board floor, and the shock resistance of building can be made to carry significantly It is high.But the construction of cast-in-place concrete floor needs to set up support frame at the scene, template, in a template cloth is laid on support frame If reinforcing bar, then in sequence of operations such as casting concretes.Have impact on the integral construction speed of building.
Either prefabricated board floor or cast-in-place concrete floor, after completion is laid, will also smear overcoat or day Card decorative layer, and they all can cause the whole of building without insulation, the radiating of heat insulating function, particularly top floor The reduction of body heat insulation effect.Along with the popularization and application of geothermal heating system mode, the heat-insulation and heat-preservation to building interlayer floor is proposed New requirement.And existing floor system can not meet these requirements.
The content of the invention
The purpose of this utility model be provide that a kind of heat insulation and preservation effect is good, the anti-seismic performance of building can be strengthened, Improve the assembly concrete floorboard system of speed of application.
What the purpose of this utility model was realized in:Including heat-insulation layer, overcoat and steel frame, the steel frame includes Truss, truss connection reinforcing bar and stiffener, the truss along floorboard longitudinally spaced arrangement, truss connect reinforcing bar along flooring Plate is arranged laterally at a spacing, and truss connection reinforcing bar is fixedly connected with truss in intersection, and stiffener is connected reinforcing bar and exists with truss Intersection is fixedly connected, and the heat-insulation layer is made up of the mutual tongue and groove grafting of heat preservation module, and overcoat is laid in outside heat-insulation layer, protection Layer and heat-insulation layer are ordered by connection and are fixed on truss.
The utility model can also include:
1st, the edge of overcoat and heat-insulation layer is stretched out at the two ends of stiffener and truss connection reinforcing bar.
2nd, the truss is truss of angle steel.
3rd, the truss is porous C steel truss.
4th, with the ability mouthful of mutually overlap joint on two sides long of overcoat and heat-insulation layer.
By the way of ground assembles be arranged on steel frame for heat-insulation layer and overcoat by the utility model, constitutes assembled Concrete building panel system, on on-site hoisting to wall after, the assembly concrete floorboard system is as the weight of floor Want part and as template, directly pour flooring board concrete.
Steel frame of the present utility model is made up of truss, truss connection reinforcing bar and stiffener, and truss connects reinforcing bar and adds Strong reinforcing bar is to realize the interconnection between truss, is also the load-bearing reinforcing bar of floor.
Overcoat of the present utility model and heat-insulation layer are ordered by connection and are fixed on truss, have been poured after concrete, are prevented Sheath, heat-insulation layer and concrete layer are stably formed one, not only with the function of common floor, and have under concrete layer Heat-insulation layer, can effectively prevent the radiating between upper strata, be particularly suitable as the interlayer floor using the building of floor heating heat supply, It is more suitable for the roofing floor of building top layer.
Overcoat of the present utility model and heat-insulation layer one-shot forming.
Features described above of the present utility model, can make the on-site construction processes of floor greatly simplified, improve applying for building Work progress, strengthens the energy-saving heat preserving effect of building.
Brief description of the drawings
Fig. 1 is the structural representation of the first implementation method of the present utility model.
Fig. 2, Fig. 3 are the profiles of the both direction in length and breadth of Fig. 1.
Fig. 4 is the structural representation of truss of angle steel.
Fig. 5 is the structural representation of second implementation method of the present utility model.
Fig. 6, Fig. 7 are the profiles of the both direction in length and breadth of Fig. 5.
Fig. 8 is the structural representation of porous C steel truss.
Specific embodiment
Illustrate below for a more detailed description to the utility model.
With reference to Fig. 1 to Fig. 4, the first implementation method heat-insulation layer 1-1 of the present utility model, overcoat 1-2 and steel frame.Steel Framework includes truss of angle steel 1-3, truss connection reinforcing bar 1-4 and stiffener 1-5.Truss along floorboard longitudinally spaced arrangement, Truss connects reinforcing bar being arranged laterally at a spacing along floorboard, and truss connection reinforcing bar is welded to connect with truss in intersection, strengthens steel Muscle is connected reinforcing bar and is welded to connect in intersection with truss, and truss connection reinforcing bar and stiffener form bar-mat reinforcement.Heat-insulation layer is by protecting The warm mutual tongue and groove grafting of module is constituted, and overcoat is laid in outside heat-insulation layer, and overcoat and heat-insulation layer are ordered 1-6 and be fixed on by connection On truss.
With reference to Fig. 5 to Fig. 8, second implementation method heat-insulation layer 2-1 of the present utility model, overcoat 2-2 and steel frame.Steel Framework includes porous C steel truss 2-3, truss connection reinforcing bar 2-4 and stiffener 2-5.Truss is along the longitudinally spaced of floorboard Arrangement, truss connection reinforcing bar being arranged laterally at a spacing along floorboard, truss connection reinforcing bar is welded to connect with truss in intersection, plus Strong reinforcing bar is connected reinforcing bar and is welded to connect in intersection with truss, and truss connection reinforcing bar and stiffener form bar-mat reinforcement.Heat-insulation layer It is made up of the mutual tongue and groove grafting of heat preservation module, overcoat is laid in outside heat-insulation layer, overcoat and heat-insulation layer are ordered 2-6 and consolidated by connection It is scheduled on truss.
Above two implementation method can have following two improvement projects respectively:
The first improvement project is:The side of overcoat and heat-insulation layer is stretched out at the two ends of stiffener and truss connection reinforcing bar Edge.Truss connection reinforcing bar is welded with wall steel bar after lifting in place, and the stiffener between two floorboards is welded to each other.It is to pour The floor of injection forming turns into a complete entirety with wall.
The first improvement project is:With the ability mouthful of mutually overlap joint on two sides long of overcoat and heat-insulation layer.It is lifted into Mutually overlapped between two floorboards after position, it is possible to achieve the connection of seamless or slit.

Claims (7)

1. a kind of assembly concrete floorboard system, including heat-insulation layer, overcoat and steel frame, it is characterized in that:The steel framework Frame include truss, truss connection reinforcing bar and stiffener, the truss along floorboard longitudinally spaced arrangement, truss connection reinforcing bar Along being arranged laterally at a spacing for floorboard, truss connection reinforcing bar is fixedly connected with truss in intersection, and stiffener is connected with truss Reinforcing bar is fixedly connected in intersection, and the heat-insulation layer is made up of the mutual tongue and groove grafting of heat preservation module, and overcoat is laid in heat-insulation layer Outward, overcoat and heat-insulation layer are ordered by connection and are fixed on truss.
2. assembly concrete floorboard system according to claim 1, it is characterized in that:Stiffener and truss connection steel The edge of overcoat and heat-insulation layer is stretched out at the two ends of muscle.
3. assembly concrete floorboard system according to claim 1 and 2, it is characterized in that:The truss is angle steel purlin Frame.
4. assembly concrete floorboard system according to claim 1 and 2, it is characterized in that:The truss is porous C type Steel truss.
5. assembly concrete floorboard system according to claim 1 and 2, it is characterized in that:Overcoat and heat-insulation layer With the ability mouthful of mutually overlap joint on two sides long.
6. assembly concrete floorboard system according to claim 3, it is characterized in that:Two of overcoat and heat-insulation layer With the ability mouthful of mutually overlap joint on side long.
7. assembly concrete floorboard system according to claim 4, it is characterized in that:Two of overcoat and heat-insulation layer With the ability mouthful of mutually overlap joint on side long.
CN201621291981.0U 2016-11-29 2016-11-29 Assembly concrete floorboard system Active CN206233430U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621291981.0U CN206233430U (en) 2016-11-29 2016-11-29 Assembly concrete floorboard system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621291981.0U CN206233430U (en) 2016-11-29 2016-11-29 Assembly concrete floorboard system

Publications (1)

Publication Number Publication Date
CN206233430U true CN206233430U (en) 2017-06-09

Family

ID=58981193

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621291981.0U Active CN206233430U (en) 2016-11-29 2016-11-29 Assembly concrete floorboard system

Country Status (1)

Country Link
CN (1) CN206233430U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522434A (en) * 2016-11-29 2017-03-22 哈尔滨鸿盛房屋节能体系研发中心 Assembly type concrete floorboard system
CN109577538A (en) * 2018-12-12 2019-04-05 湖南易兴建筑有限公司 Roof construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106522434A (en) * 2016-11-29 2017-03-22 哈尔滨鸿盛房屋节能体系研发中心 Assembly type concrete floorboard system
CN109577538A (en) * 2018-12-12 2019-04-05 湖南易兴建筑有限公司 Roof construction method

Similar Documents

Publication Publication Date Title
CN105735464B (en) A kind of assembled composite structure and its installation method
CN105714963B (en) A kind of inorganic light weight combined heat-insulating integral exterior wall cladding system and its installation method
CN204418426U (en) Precast wall panel seam syndeton
CN207063269U (en) The beam-column node structure of assembled floor
CN104763085B (en) The double T floor frames structures of assembled integral prestressing force and its construction method
CN103290952A (en) Integrated assembled concrete frame and shear wall connection structure and construction method thereof
CN106978877A (en) The steel wire net rack composite sand wiched wall board and its construction method of built-in three layers of warming plate
CN205153114U (en) Lightweight steel structure modularized residential building
CN206570920U (en) One kind utilizes ALC plates design production assembled architecture
CN206428551U (en) A kind of repeatable assembled engagement temporary pavement plate utilized of monoblock type
CN101787760B (en) Steel bar concrete precast floor slab
CN104060853A (en) Lightweight steel structure modularized residential building
CN107165271A (en) A kind of assembled Special-Shaped Column concrete frame structure
CN107130715A (en) Teeth groove is poured after a kind of to be linked and packed the construction method of formula building roof system
CN203821625U (en) Fiber cloth-reinforced mortar-free reinforced masonry shear wall
CN206233430U (en) Assembly concrete floorboard system
CN106968362A (en) Steel wire net rack complex heat-preservation sandwich wall board node and its construction method
CN202766969U (en) Steel and wood combination bridge deck pavement structure with shear keys
CN108316533A (en) Bidirectional laminated slab and prestressed concrete prefabricated component and making and construction method
CN202248526U (en) Precast reinforced concrete structural beam for assembled house building
CN205116013U (en) Empty core plate beam bridge structure of horizontal reinforced (rfd) assembled
CN206646722U (en) A kind of reinforced concrete composite structure overlaps beam slab
CN106351373A (en) Lattice type prefabricated heat insulation and sound insulation floor
CN106522434A (en) Assembly type concrete floorboard system
CN205907887U (en) Ceramsite concrete coincide floor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170728

Address after: 150036 Xiangfang street, Xiangfang District, Heilongjiang, No. 145, No.

Co-patentee after: Harbin Hongsheng building material manufacturing Limited by Share Ltd

Patentee after: Hongsheng Room Energy Saving System Research Dev. Centre, Harbin

Address before: 150036 Xiangfang street, Xiangfang District, Heilongjiang, No. 145, No.

Patentee before: Hongsheng Room Energy Saving System Research Dev. Centre, Harbin

TR01 Transfer of patent right