CN206197776U - Water supply installation - Google Patents

Water supply installation Download PDF

Info

Publication number
CN206197776U
CN206197776U CN201620839413.3U CN201620839413U CN206197776U CN 206197776 U CN206197776 U CN 206197776U CN 201620839413 U CN201620839413 U CN 201620839413U CN 206197776 U CN206197776 U CN 206197776U
Authority
CN
China
Prior art keywords
water supply
supply installation
temperature
liquid
delivery port
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620839413.3U
Other languages
Chinese (zh)
Inventor
林麒
杨帆
蒋超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Royole Technologies Co Ltd
Original Assignee
Shenzhen Royole Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Royole Technologies Co Ltd filed Critical Shenzhen Royole Technologies Co Ltd
Priority to CN201620839413.3U priority Critical patent/CN206197776U/en
Application granted granted Critical
Publication of CN206197776U publication Critical patent/CN206197776U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices For Dispensing Beverages (AREA)

Abstract

A kind of water supply installation, including the delivery port for transmitting the first body of the liquid of the first temperature, the second body of the liquid of transmission second temperature and connect with the first body and the second body, the liquid of the first temperature and the liquid of second temperature are from delivery port outflow water supply installation.Due to that can be connected to two kinds of liquid of temperature simultaneously in delivery port, thus water receiving process is more convenient.

Description

Water supply installation
Technical field
The utility model is related to water supply installation, more particularly to a kind of water dispenser.
Background technology
Existing water dispenser generally includes hot water outlet and cooling water outlet, and user can select hot water according to the demand of itself Or cold water.But, sometimes user may require that and drink warm water, hot water just can only be first connect in this case and connects cold water again, or First connect cold water and connect hot water again, hot water and cold water mix are obtained into warm water.However, this method is relatively complicated, it is necessary to user is multiple Water receiving, causes inconvenience to the user.
Utility model content
The utility model provides a kind of water supply installation easy to use.
A kind of water supply installation, including the liquid of the first temperature of transmission the first body, the of the liquid of transmission second temperature Two bodys and the delivery port connected with the first body and the second body, the liquid of the first temperature and the liquid of second temperature from Delivery port flows out water supply installation.
The liquid of the first temperature and the liquid of second temperature flow out water supply installation after blending.
First body is connected with the second body, and delivery port is located at the link position of the first body and the second body.
First body bends toward each other with the second body, and the end of the first body directly connects with the end of the second body Connect.
It is respectively formed runner in first body and the second body, the diameter of the runner of the first body and the second body is along towards the One body is gradually reduced with the direction of the second body junction.
First body and the second body are collectively forming continuous arc.
Delivery port is higher than the bottom of the first body and the second body, and less than the first body and the top of the second body.
The liquid of the first temperature gradually rises up to the top of the first body from the bottom of the first body, and under delivery port Fall.
Water supply installation also includes the first fluid reservoir connected with the first body and the second fluid reservoir connected with the second body, First fluid reservoir and the second fluid reservoir are embedded in supporter, and the first body and the second body expose to supporter.
Water supply installation also includes the flexible touch plate being attached on the first body, and flexible touch plate sensing touch is acted and controlled Make the fluid flow in the first body.
Water supply installation also includes the heat insulation layer below flexible touch plate.
Water supply installation also include located at the first body liquid inlet at valve, flexible touch plate electrically connected with valve and The opening degree of control valve.
Because the first temperature of water supply installation and the liquid of second temperature are only needed to from delivery port outflow, thus user Delivery port connects the liquid that water is obtained with being mixed with the first temperature and second temperature, so as to obtain between the first temperature and Water temperature between second temperature, and without multiple water receiving.Therefore, water supply installation is more convenient in use, is suitable for using The drinking-water demand at family.
Brief description of the drawings
Drawings below is used to combine specific embodiment detailed description the various embodiments of the utility model.Should manage Solution, each element illustrated in accompanying drawing does not represent actual size and proportionate relationship, merely to clearly illustrating and illustrating The schematic diagram for coming, should not be understood paired limitation of the present utility model.
Fig. 1 is the schematic diagram of the water supply installation of the embodiment of the utility model one, and wherein water supply installation is installed on supporter.
Fig. 2 is the front view of Fig. 1.
Fig. 3 is the schematic cross-section of Fig. 1.
Fig. 4 is the top view of the water supply installation of Fig. 1.
Specific embodiment
In order that the purpose of this utility model, technical scheme and advantage become more apparent, below in conjunction with multiple embodiment party Formula and accompanying drawing, are further elaborated to the utility model.It should be appreciated that specific embodiment described herein is only It is used to explain the utility model, is not used to limit the utility model.Also, its display does not represent each element of the utility model Actual ratio relation, only does and illustrates.
Fig. 1 is referred to, the water supply installation of the embodiment of the utility model one is shown, it is included for transmitting the first temperature First body 10 of liquid, the second body 20 of the liquid for transmitting second temperature and connected with the first body and the second body Delivery port 30.The liquid of the first temperature is flowed out to outside water supply installation with the liquid of second temperature from delivery port 30.It is excellent Selection of land, the first temperature is higher than second temperature.Especially, the first temperature is high temperature, and second temperature is normal temperature or low temperature.
Also referring to Fig. 2-3, the first body 10 and the second body 20 are in symmetrical structure, and the two is in water supply installation X is symmetrical for heart line.First body 10 and the second body 20 are manufactured by transparent material, such as glass, plastics etc..First pipe Body 10 can be integrally formed with the second body 20, it is also possible to be combined by viscose glue etc. after separately manufactured.First body 10 and the second pipe Body 20 is curved, and the first body 10 and the second body 20 gradually bend in opposite directions from the bottom up, and the end of the two is direct in top Connection.First body 10 and the second body 20 are collectively forming continuous arc.First body 10 and the inside of the second body 20 shape Into runner 100, for flowing for liquid.The diameter of the runner 100 of the first body 10 and the second body 20 from outside to inside (or from Under up) be gradually reduced.In the present embodiment, the first body 10 is connected with the runner 100 of the second body 20 in the intersection of the two, So that the liquid of the first temperature transmitted by the first body 10 is being handed over the liquid of the second temperature transmitted by the second body 20 (namely the first body 10 with the link position of the second body 20) mixes at the position on boundary, is then flowed out from delivery port 30.
Delivery port 30 is located on the first body 10 and the second body 20.Delivery port 30 is connected to the first body 10 and the second pipe The top downside of body 20, and connected with runner 100.Delivery port 30 is located under the intersection of the first body 10 and the second body 20 Side.Preferably, the half of delivery port 30 is connected with the runner 100 of the first body 10, second half runner 100 with the second body 20 Connection.Delivery port 30 higher than the first body 10 and the second body 20 bottom, and less than the first body 10 and the second body 20 Top.Entrance of the liquid of the first temperature and second temperature respectively from the first body 10 and the second body 20 enters air stream enter runner 100 simultaneously The top of the first body 10 and the second body 20 is gradually risen up to, is then fallen from delivery port 30.Except in the first body 10 and Outside the liquid of the intersection mixing of two bodys 20, also the liquid of part the first body 10 and the second body 20 is in delivery port 30 Position can also mix, and then flow out again outside delivery port 30.It will of course be understood that ground, the first body 10 and the second body 20 also may be used Dividing plate is set at the position of boundary, the runner 100 of the first body 10 is separated with the runner 100 of the second body 20, to avoid the Liquid in one body 10 is flow in the second body 20, or liquid in the second body 20 is flow in the first body 10.Dividing plate Also may be further extended to delivery port 30 and in water supply installation thoroughly by the liquid of the first temperature and the liquid of second temperature Separate.Only after the liquid of the first temperature and the liquid of second temperature leave from delivery port 30, towards positioned at delivery port The container of 30 lower sections can just mix during dropping, or drop and just mix into after container.
Water supply installation further includes the first transfusion room 40 and the second fluid reservoir 50, for storing the first temperature and respectively The liquid of two temperature.First fluid reservoir 40 is located at the lower section of the first body 10 and is connected with the first body 10, the second fluid reservoir 50 It is connected in the lower section of the second body 20 and with the second body 20.First fluid reservoir 40 and the second fluid reservoir 50 are below the first body 10 And second body 20.Cavity volume is respectively formed inside first fluid reservoir 40 and the second fluid reservoir 50, respectively with the first body 10 and second The runner 100 of body 20 is connected.Thus, the liquid in the first fluid reservoir 40 can be entered in the first body 10 by runner 100, The liquid of the second fluid reservoir 50 can be entered in the second body 20 by runner 100.Interior or the second fluid reservoir of first fluid reservoir 40 Register is provided with 50, for adjusting the fluid temperature in the first fluid reservoir 40 or the second fluid reservoir 50.In the present embodiment, the Heater is provided with one fluid reservoir 40, for liquid to be heated into predetermined temperature.Cooling dress is provided with second fluid reservoir 50 Put, for by liquid cooling to predetermined temperature.The inner side of the first fluid reservoir 40 and the second fluid reservoir 50 is connected with each other, to reduce Volume shared by water supply installation.The intersection of the first fluid reservoir 40 and the first body 10 is provided with valve 400, the second fluid reservoir 50 with The intersection of the second body 20 also is provided with valve 500.Valve 400,500 is used for controlling to flow into the first body 10 and the second body 20 The flow of interior liquid.Valve 400,500 opens bigger, flows into the first body 10 more with the liquid of the second body 20.
When in use, may require that using the liquid of different temperatures to brew different drinks sometimes.Thus, on water supply installation It is further provided with temperature-adjusting device.In the present embodiment, temperature-adjusting device is the flexible touch on the first body 10 Plate 60.Flexible touch plate 60 is electrically connected with the valve 400,500 of the first body 10 and the porch of the second body 20.Flexible touch plate 60 can sense the touch action for acting on its surface, and the valve 400,500 of the first body 10 of control and the second body 20 is opened Degree of leaving, adjusts the mixed proportion of the liquid of the first temperature and the liquid of second temperature, and then control the liquid of outflow delivery port 30 Temperature.Such as, slided towards the direction of delivery port on flexible touch plate 60, the opening degree of valve 400 of the first body 10 becomes Small, the opening degree of the valve 500 of the second body 20 becomes big, so that the fluid flow in the first body 10 diminishes, the second pipe Liquid flow quantitative change in body 20 is big, and then blends the lower liquid of temperature.The surface of flexible touch plate 60 can also set temperature Bar 600, to indicate the direction of temperature adjustment.It is cooling such as to slide to the right, and it is to heat up to slide to the left.Further, Flexible touch plate 60 can also be set on two bodys 20, its surface is provided with multiple different temperature gears by way of silk-screen 602, user can touch these temperature gears 602 and carry out autocontrol valve 400,500, so as to directly obtain the liquid of relevant temperature Body.Certainly, temperature gear 602 can be identified with the drink for being adapted to brew and replaced, such as milk powder, coffee, fruit powder etc..
To prevent high temperature or cryogenic liquid in the first body 10 and the second body 20 to the normal work of flexible touch plate 60 Impact, can further be sticked heat insulation layer 70 between the first body 10 and the second body 20 and flexible touch plate 60.It is adiabatic Layer 70 stops on temperature conduction to the flexible touch plate 60 of the first body 10 and the second body 20.Certainly, the first body 10 and Two bodys 20 can also be manufactured using double layer hollow laminated glass, to intercept temperature transmission by the gap between laminated glass To flexible touch plate 60, now the gap between laminated glass is heat insulation layer.
Water supply installation is preferably integrated into supporter (such as desk) 80.First fluid reservoir 40 and the second fluid reservoir 50 are embedded In in supporter 80, the first body 10 and the second body 20 expose to the top of supporter 80.Thus, user is only capable of seeing the first pipe The body 20 of body 10 and second so that whole water supply installation structure is more compact, is conducive to save space.Additionally, container can be direct The surface of supporter 80 is placed in, and without carrying out water receiving in other branch stake tools, thus can further reduce water supply installation Volume.
The first temperature for being exported by the first body 10 and the second body 20 and the liquid of second temperature by it is same go out Acquisition is mixed with the first temperature by the mouth of a river 30 is flowed out, thus user only needs to place container below water inlet 30 in water receiving With the liquid of second temperature, and without multiple water receiving.Therefore, it is relatively simple using process, can effectively save the time of user.
The foregoing is only better embodiment of the present utility model, be not used to limit the utility model, it is all Any modification, equivalent and improvement made within spirit of the present utility model and principle etc., should be included in this practicality new Within the protection domain of type.

Claims (11)

1. a kind of water supply installation, it is characterised in that:Including transmitting the first body of the liquid of the first temperature, transmitting second temperature Second body of liquid and the delivery port connected with the first body and the second body, the liquid and second temperature of the first temperature Liquid flow out water supply installation from delivery port, delivery port higher than the first body and the second body bottom, and less than the first body And second body top.
2. water supply installation as claimed in claim 1, it is characterised in that:The liquid of the first temperature and the liquid of second temperature are mixed Water supply installation is flowed out after conjunction.
3. water supply installation as claimed in claim 1, it is characterised in that:First body is connected with the second body, and delivery port is located at At the link position of the first body and the second body.
4. water supply installation as claimed in claim 3, it is characterised in that:First body bends toward each other with the second body, the The end of one body is directly connected to the end of the second body.
5. water supply installation as claimed in claim 3, it is characterised in that:Runner is respectively formed in first body and the second body, the One body is gradually reduced along towards the first body with the diameter of the runner of the second body with the direction of the second body junction.
6. water supply installation as claimed in claim 1, it is characterised in that:First body and the second body are collectively forming continuous arc Shape.
7. water supply installation as claimed in claim 1, it is characterised in that:The liquid of the first temperature from the bottom of the first body gradually The top of the first body is risen to, and is fallen from delivery port.
8. water supply installation as claimed in claim 1, it is characterised in that:Also include the first fluid reservoir for being connected with the first body and The second fluid reservoir connected with the second body, the first fluid reservoir and the second fluid reservoir are embedded in supporter, the first body and Two bodys expose to supporter.
9. the water supply installation as described in any one of claim 1 to 8, it is characterised in that:Also include being attached on the first body Flexible touch plate, flexible touch plate sensing touch is acted and controls the fluid flow in the first body.
10. water supply installation as claimed in claim 9, it is characterised in that:Also include the heat insulation layer below flexible touch plate.
11. water supply installations as claimed in claim 9, it is characterised in that:Also include at the liquid inlet of the first body Valve, flexible touch plate is electrically connected and the opening degree of control valve with valve.
CN201620839413.3U 2016-08-04 2016-08-04 Water supply installation Active CN206197776U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620839413.3U CN206197776U (en) 2016-08-04 2016-08-04 Water supply installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620839413.3U CN206197776U (en) 2016-08-04 2016-08-04 Water supply installation

Publications (1)

Publication Number Publication Date
CN206197776U true CN206197776U (en) 2017-05-31

Family

ID=58755645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620839413.3U Active CN206197776U (en) 2016-08-04 2016-08-04 Water supply installation

Country Status (1)

Country Link
CN (1) CN206197776U (en)

Similar Documents

Publication Publication Date Title
EP3695760B1 (en) Refrigerator
US20160007798A1 (en) Coffee maker water heater
CN107917573B (en) Refrigerator with a door
RU2586824C1 (en) Modular automatic device for dispensing seasonal beverages
CN209295460U (en) Concentration hot water mixing dynamic regulation system for shower
DE202017106460U1 (en) Water dispenser with warm and hot water for lactating women and infants
CN102342752A (en) Drinking water device and drinking water temperature adjusting method
CN203597789U (en) Intelligent temperature control water dispenser
CN206197776U (en) Water supply installation
CN107536473A (en) Milk tea coffee machine and its collocation method for exporting beverage
CN202919949U (en) Polyhedral water outlet structure of energy-saving water dispenser
CN108577538A (en) A kind of water dispenser with a variety of leaving water temperatures
CN208751009U (en) I.e. hot Heating Cup and water heater
CN2498958Y (en) Temperature regualtor for water drinking machine
CN208205393U (en) Storage is hot integrated electric hydrophone
CN104879910A (en) Water heating device with automatic water adding function
CN206755562U (en) Type instant water heating device
CN202598992U (en) Refrigerator
CN208567155U (en) A kind of constant temperature of water heater control device
CN108444093A (en) Storage is hot integrated electric hydrophone
CN209401107U (en) The water circuit system of cup tea Vending Machine
CN209219980U (en) A kind of making tea machine
CN209003606U (en) Soda water machine
CN208952208U (en) The full room intelligent integrated hot water cyclesystem of energy-saving type
CN206867106U (en) More mouthfuls of formula water dispensers of energy-saving temperature-regulating

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Water flow converter for pressure-superposed water supplying device

Effective date of registration: 20180508

Granted publication date: 20170531

Pledgee: CITIC Bank Limited by Share Ltd. Shenzhen branch

Pledgor: SHENZHEN ROYOLE TECHNOLOGIES Co.,Ltd.

Registration number: 2018440020028

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Shenzhen City, Guangdong province 518052 Keyuan Road, Nanshan District science and Technology Park No. 15 Science Park Sinovac A4-1501

Patentee after: Shenzhen Ruoyu Technology Co.,Ltd.

Address before: Shenzhen City, Guangdong province 518052 Keyuan Road, Nanshan District science and Technology Park No. 15 Science Park Sinovac A4-1501

Patentee before: SHENZHEN ROYOLE TECHNOLOGIES Co.,Ltd.

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20240123

Granted publication date: 20170531