Utility model content
The utility model provides a kind of water supply installation easy to use.
A kind of water supply installation, including the liquid of the first temperature of transmission the first body, the of the liquid of transmission second temperature
Two bodys and the delivery port connected with the first body and the second body, the liquid of the first temperature and the liquid of second temperature from
Delivery port flows out water supply installation.
The liquid of the first temperature and the liquid of second temperature flow out water supply installation after blending.
First body is connected with the second body, and delivery port is located at the link position of the first body and the second body.
First body bends toward each other with the second body, and the end of the first body directly connects with the end of the second body
Connect.
It is respectively formed runner in first body and the second body, the diameter of the runner of the first body and the second body is along towards the
One body is gradually reduced with the direction of the second body junction.
First body and the second body are collectively forming continuous arc.
Delivery port is higher than the bottom of the first body and the second body, and less than the first body and the top of the second body.
The liquid of the first temperature gradually rises up to the top of the first body from the bottom of the first body, and under delivery port
Fall.
Water supply installation also includes the first fluid reservoir connected with the first body and the second fluid reservoir connected with the second body,
First fluid reservoir and the second fluid reservoir are embedded in supporter, and the first body and the second body expose to supporter.
Water supply installation also includes the flexible touch plate being attached on the first body, and flexible touch plate sensing touch is acted and controlled
Make the fluid flow in the first body.
Water supply installation also includes the heat insulation layer below flexible touch plate.
Water supply installation also include located at the first body liquid inlet at valve, flexible touch plate electrically connected with valve and
The opening degree of control valve.
Because the first temperature of water supply installation and the liquid of second temperature are only needed to from delivery port outflow, thus user
Delivery port connects the liquid that water is obtained with being mixed with the first temperature and second temperature, so as to obtain between the first temperature and
Water temperature between second temperature, and without multiple water receiving.Therefore, water supply installation is more convenient in use, is suitable for using
The drinking-water demand at family.
Specific embodiment
In order that the purpose of this utility model, technical scheme and advantage become more apparent, below in conjunction with multiple embodiment party
Formula and accompanying drawing, are further elaborated to the utility model.It should be appreciated that specific embodiment described herein is only
It is used to explain the utility model, is not used to limit the utility model.Also, its display does not represent each element of the utility model
Actual ratio relation, only does and illustrates.
Fig. 1 is referred to, the water supply installation of the embodiment of the utility model one is shown, it is included for transmitting the first temperature
First body 10 of liquid, the second body 20 of the liquid for transmitting second temperature and connected with the first body and the second body
Delivery port 30.The liquid of the first temperature is flowed out to outside water supply installation with the liquid of second temperature from delivery port 30.It is excellent
Selection of land, the first temperature is higher than second temperature.Especially, the first temperature is high temperature, and second temperature is normal temperature or low temperature.
Also referring to Fig. 2-3, the first body 10 and the second body 20 are in symmetrical structure, and the two is in water supply installation
X is symmetrical for heart line.First body 10 and the second body 20 are manufactured by transparent material, such as glass, plastics etc..First pipe
Body 10 can be integrally formed with the second body 20, it is also possible to be combined by viscose glue etc. after separately manufactured.First body 10 and the second pipe
Body 20 is curved, and the first body 10 and the second body 20 gradually bend in opposite directions from the bottom up, and the end of the two is direct in top
Connection.First body 10 and the second body 20 are collectively forming continuous arc.First body 10 and the inside of the second body 20 shape
Into runner 100, for flowing for liquid.The diameter of the runner 100 of the first body 10 and the second body 20 from outside to inside (or from
Under up) be gradually reduced.In the present embodiment, the first body 10 is connected with the runner 100 of the second body 20 in the intersection of the two,
So that the liquid of the first temperature transmitted by the first body 10 is being handed over the liquid of the second temperature transmitted by the second body 20
(namely the first body 10 with the link position of the second body 20) mixes at the position on boundary, is then flowed out from delivery port 30.
Delivery port 30 is located on the first body 10 and the second body 20.Delivery port 30 is connected to the first body 10 and the second pipe
The top downside of body 20, and connected with runner 100.Delivery port 30 is located under the intersection of the first body 10 and the second body 20
Side.Preferably, the half of delivery port 30 is connected with the runner 100 of the first body 10, second half runner 100 with the second body 20
Connection.Delivery port 30 higher than the first body 10 and the second body 20 bottom, and less than the first body 10 and the second body 20
Top.Entrance of the liquid of the first temperature and second temperature respectively from the first body 10 and the second body 20 enters air stream enter runner 100 simultaneously
The top of the first body 10 and the second body 20 is gradually risen up to, is then fallen from delivery port 30.Except in the first body 10 and
Outside the liquid of the intersection mixing of two bodys 20, also the liquid of part the first body 10 and the second body 20 is in delivery port 30
Position can also mix, and then flow out again outside delivery port 30.It will of course be understood that ground, the first body 10 and the second body 20 also may be used
Dividing plate is set at the position of boundary, the runner 100 of the first body 10 is separated with the runner 100 of the second body 20, to avoid the
Liquid in one body 10 is flow in the second body 20, or liquid in the second body 20 is flow in the first body 10.Dividing plate
Also may be further extended to delivery port 30 and in water supply installation thoroughly by the liquid of the first temperature and the liquid of second temperature
Separate.Only after the liquid of the first temperature and the liquid of second temperature leave from delivery port 30, towards positioned at delivery port
The container of 30 lower sections can just mix during dropping, or drop and just mix into after container.
Water supply installation further includes the first transfusion room 40 and the second fluid reservoir 50, for storing the first temperature and respectively
The liquid of two temperature.First fluid reservoir 40 is located at the lower section of the first body 10 and is connected with the first body 10, the second fluid reservoir 50
It is connected in the lower section of the second body 20 and with the second body 20.First fluid reservoir 40 and the second fluid reservoir 50 are below the first body 10
And second body 20.Cavity volume is respectively formed inside first fluid reservoir 40 and the second fluid reservoir 50, respectively with the first body 10 and second
The runner 100 of body 20 is connected.Thus, the liquid in the first fluid reservoir 40 can be entered in the first body 10 by runner 100,
The liquid of the second fluid reservoir 50 can be entered in the second body 20 by runner 100.Interior or the second fluid reservoir of first fluid reservoir 40
Register is provided with 50, for adjusting the fluid temperature in the first fluid reservoir 40 or the second fluid reservoir 50.In the present embodiment, the
Heater is provided with one fluid reservoir 40, for liquid to be heated into predetermined temperature.Cooling dress is provided with second fluid reservoir 50
Put, for by liquid cooling to predetermined temperature.The inner side of the first fluid reservoir 40 and the second fluid reservoir 50 is connected with each other, to reduce
Volume shared by water supply installation.The intersection of the first fluid reservoir 40 and the first body 10 is provided with valve 400, the second fluid reservoir 50 with
The intersection of the second body 20 also is provided with valve 500.Valve 400,500 is used for controlling to flow into the first body 10 and the second body 20
The flow of interior liquid.Valve 400,500 opens bigger, flows into the first body 10 more with the liquid of the second body 20.
When in use, may require that using the liquid of different temperatures to brew different drinks sometimes.Thus, on water supply installation
It is further provided with temperature-adjusting device.In the present embodiment, temperature-adjusting device is the flexible touch on the first body 10
Plate 60.Flexible touch plate 60 is electrically connected with the valve 400,500 of the first body 10 and the porch of the second body 20.Flexible touch plate
60 can sense the touch action for acting on its surface, and the valve 400,500 of the first body 10 of control and the second body 20 is opened
Degree of leaving, adjusts the mixed proportion of the liquid of the first temperature and the liquid of second temperature, and then control the liquid of outflow delivery port 30
Temperature.Such as, slided towards the direction of delivery port on flexible touch plate 60, the opening degree of valve 400 of the first body 10 becomes
Small, the opening degree of the valve 500 of the second body 20 becomes big, so that the fluid flow in the first body 10 diminishes, the second pipe
Liquid flow quantitative change in body 20 is big, and then blends the lower liquid of temperature.The surface of flexible touch plate 60 can also set temperature
Bar 600, to indicate the direction of temperature adjustment.It is cooling such as to slide to the right, and it is to heat up to slide to the left.Further,
Flexible touch plate 60 can also be set on two bodys 20, its surface is provided with multiple different temperature gears by way of silk-screen
602, user can touch these temperature gears 602 and carry out autocontrol valve 400,500, so as to directly obtain the liquid of relevant temperature
Body.Certainly, temperature gear 602 can be identified with the drink for being adapted to brew and replaced, such as milk powder, coffee, fruit powder etc..
To prevent high temperature or cryogenic liquid in the first body 10 and the second body 20 to the normal work of flexible touch plate 60
Impact, can further be sticked heat insulation layer 70 between the first body 10 and the second body 20 and flexible touch plate 60.It is adiabatic
Layer 70 stops on temperature conduction to the flexible touch plate 60 of the first body 10 and the second body 20.Certainly, the first body 10 and
Two bodys 20 can also be manufactured using double layer hollow laminated glass, to intercept temperature transmission by the gap between laminated glass
To flexible touch plate 60, now the gap between laminated glass is heat insulation layer.
Water supply installation is preferably integrated into supporter (such as desk) 80.First fluid reservoir 40 and the second fluid reservoir 50 are embedded
In in supporter 80, the first body 10 and the second body 20 expose to the top of supporter 80.Thus, user is only capable of seeing the first pipe
The body 20 of body 10 and second so that whole water supply installation structure is more compact, is conducive to save space.Additionally, container can be direct
The surface of supporter 80 is placed in, and without carrying out water receiving in other branch stake tools, thus can further reduce water supply installation
Volume.
The first temperature for being exported by the first body 10 and the second body 20 and the liquid of second temperature by it is same go out
Acquisition is mixed with the first temperature by the mouth of a river 30 is flowed out, thus user only needs to place container below water inlet 30 in water receiving
With the liquid of second temperature, and without multiple water receiving.Therefore, it is relatively simple using process, can effectively save the time of user.
The foregoing is only better embodiment of the present utility model, be not used to limit the utility model, it is all
Any modification, equivalent and improvement made within spirit of the present utility model and principle etc., should be included in this practicality new
Within the protection domain of type.