CN205886578U - Desulfurization absorption tower sprays ring of enlarging - Google Patents

Desulfurization absorption tower sprays ring of enlarging Download PDF

Info

Publication number
CN205886578U
CN205886578U CN201620859796.0U CN201620859796U CN205886578U CN 205886578 U CN205886578 U CN 205886578U CN 201620859796 U CN201620859796 U CN 201620859796U CN 205886578 U CN205886578 U CN 205886578U
Authority
CN
China
Prior art keywords
absorbing tower
desulfuration absorbing
annular slab
arc
spray
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620859796.0U
Other languages
Chinese (zh)
Inventor
张端柱
张华�
王学海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Senhua Engineering Technology Co Ltd
Original Assignee
Jinan Senhua Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Senhua Engineering Technology Co Ltd filed Critical Jinan Senhua Engineering Technology Co Ltd
Priority to CN201620859796.0U priority Critical patent/CN205886578U/en
Application granted granted Critical
Publication of CN205886578U publication Critical patent/CN205886578U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treating Waste Gases (AREA)

Abstract

Desulfurization absorption tower sprays ring of enlarging, including the annular slab of three vertical range, the outer wall of annular slab is installed on the inner wall of desulfurization absorption tower, and below the annular slab was located the spray set on desulfurization absorption tower, the annular slab was formed by a plurality of arc end to end, the inboard downward sloping of arc, the angle alpha less than or equal to 30 of slope. The utility model has the advantages of: the utility model discloses set up the three annular slab of installing on the inner wall of desulfurization absorption tower, the annular slab is spliced in the tower by the several arc and forms, and assembly process need not to get angry, and the installation is simple, safety. Arc slope sets up, and arc and the contained angle less than or equal to 30 that the horizontal plane formed make can the not be markedly increased flow resistance of in tower flue gas of arc to can make the flow direction the spraying the liquid redistribution and flow to central region gathered of neighboring area in the absorption tower, can effectively eliminate flue gas bypass phenomenon in the tower, the flue gas desulfurization efficiency of improvement system.

Description

Desulfuration absorbing tower sprays CPR dust
Technical field
This utility model is related to filed of flue gas purification, specifically desulfuration absorbing tower spray CPR dust.
Background technology
The flue gas desulfurization device of domestic Large-sized Coal-fired Power group mainly adopts limestone-gypsum wet desulfuration technique at present, should In technique, nucleus equipment desulfuration absorbing tower, substantially all using spraying type absorption structure, is sent out in specific design, construction and operation Existing, the existing spray design on absorption tower still suffers from some shortcomings, essentially consists in: because of anticorrosion needs, the inwall on absorption tower is designed with Corrosion protective lining, in order that backing layer is not excessively washed away the service life it is ensured that equipment, in tower, the arrangement of spraying layer must consider spray Protection against erosion safe spacing between mouth and tower body inwall, during arrangement nozzle, outermost arrangement of nozzles spacing is restricted it is difficult to cloth Close, spray coverage rate is low.And the arrangement of nozzles of central area does not limit, can be obtained closeer with cloth, the spray coverage rate of each nozzle Can be overlapped mutually, spray coverage rate is higher.Because spray coverage rate has obvious deviation, the spraying layer pressure drop of outermost region Less, so that flue gas is easily escaped from this region, causing gas bypass, thus affecting the desulfuration efficiency of system.
Utility model content
For solving the above problems, the purpose of this utility model is to overcome the deficiencies in the prior art, provides a kind of desulfurization to inhale Receive tower spray CPR dust.
This utility model for achieving the above object, is achieved through the following technical solutions: desulfuration absorbing tower spray CPR dust, bag Include three annular slabs being vertically arranged, the outer wall of annular slab is arranged on desulfuration absorbing tower inwall, annular slab is located at desulfurization and absorbs Below spray equipment in tower, annular slab is joined end to end by several arcs and forms, and is sloped downwardly in arc, tilts Angle [alpha] be less than or equal to 30 °.
For realizing the purpose of this utility model further, can also employ the following technical solutions: desulfuration absorbing tower inwall edge Circumference installs several connecting plates, and adjacent arc is arranged on connecting plate by bolt;Desulfuration absorbing tower inwall is circumferentially pacified Fill the gusset of several vertical trianglees, the bottom of annular slab is connected with the hypotenuse of gusset;Described arc and connecting plate it Between arrange carbon steel anticorrosive coat;Desulfuration absorbing tower inwall circumferentially installs several vertical hypotenuses triangle gusset upwards, gusset Hypotenuse on several connecting plates are installed, connecting plate and link of boards are passed through in the bottom of annular slab;Described arc and connecting plate Between, the lower end surface of connecting plate and gusset be respectively provided with carbon steel anticorrosive coat;Desulfuration absorbing tower inwall circumferentially installs several connections Plate, connecting plate arranges at least two screw rods, and the fixed cover opening up female thread is installed in cooperation on screw rod, and adjacent arc passes through Screw rod and fixed cover are fixed on connecting plate, and fixed cover outer wall arranges setting fix bar in the installation set of hollow, installation set, Gu Mounting plate in fixed pole, fixed plate is located in installation set, fixedly mounts spring between fixed plate and installation set inwall, and spring begins Give fixed plate thrust, one end setting inclined-plane of fix bar eventually, the other end of fix bar stretches out installation set and arranges draw ring, fixed cover Connecting hole is opened up on the wall of side, screw rod opens up penetrating fixing hole, the end of the fix bar that inclined-plane is located is located at through connecting hole Fixing in the hole.
The utility model has the advantage of: this utility model arranges three annulars being arranged on desulfuration absorbing tower inwall Plate, annular slab is spliced in tower by several arcs, and assembling process need not be got angry, and installation process is simple, safety.Arc It is obliquely installed, the angle that arc is formed with horizontal plane is less than or equal to 30 °, makes arc will not substantially increase the stream of flue gas in tower Dynamic resistance, and can make to flow to the spray liquid redistribution in absorption tower inner rim region and to middle section aggregative flow, can be effective Eliminate gas bypass phenomenon in tower, improve the smoke desulfurization efficiency of system.
Brief description
Fig. 1 is this utility model structural representation;Fig. 2 is the a-a line cutaway view Amplified image along Fig. 1;Fig. 3 is the b-b along Fig. 2 Line profile;Fig. 4 is another kind of structural representation of Fig. 2;Fig. 5 is portion's enlarged drawing of Fig. 4.
Reference: 1 annular slab, 2 connecting plate, 3 gusset, 4 carbon steel anticorrosive coat, 5 bolt, 6 arc, 7 fixed cover 8 is even Connect hole 9 installation set, 10 fix bar, 11 fixed plate, 12 spring, 13 fixing hole, 14 inclined-plane 15 draw ring 16 screw rod.
Specific embodiment
Desulfuration absorbing tower sprays CPR dust, and including three annular slabs being vertically arranged 1, the outer wall of annular slab 1 is arranged on de- Sulfur absorbs on inner wall of tower, and below the spray equipment that annular slab 1 is located in desulfuration absorbing tower, annular slab 1 is first by several arcs 6 Tail is connected and forms, and is sloped downwardly in arc 6, and the angle [alpha] of inclination is less than or equal to 30 °.This three installations of structure setting Annular slab 1 on desulfuration absorbing tower inwall, annular slab 1 is spliced in tower by several arcs 6, and assembling process need not move Fire, installation process is simple, safety.Arc 6 is obliquely installed, and the angle that arc 6 is formed with horizontal plane is less than or equal to 30 °, makes Arc 6 will not substantially increase the flow resistance of flue gas in tower, and can make to flow to the spray liquid in absorption tower inner rim region again It is distributed and to middle section aggregative flow, can effectively eliminate gas bypass phenomenon in tower, improve the smoke desulfurization efficiency of system.
For making arc 6 fixing-stable, it is to avoid come off, desulfuration absorbing tower inwall circumferentially installs several connecting plates 2, adjacent Arc 6 be arranged on connecting plate 2 by bolt 5.This structure can make arc 6 be fixed on desulfurization by connecting plate 2 Absorb on inner wall of tower, it is to avoid arc 6 comes off.
For making arc 6 fixing-stable, it is to avoid come off, desulfuration absorbing tower inwall circumferentially installs several vertical trianglees Gusset 3, the bottom of annular slab 1 is connected with the hypotenuse of gusset 3.It is de- that this structure can make annular slab 1 be fixed on by gusset 3 Sulfur absorbs on inner wall of tower, it is to avoid annular slab 1 comes off.Simultaneously as annular slab 1 is obliquely installed, the bottom of annular slab 1 and gusset 3 Hypotenuse connect the contact area that can increase annular slab 1 and gusset 3, enable annular slab 1 fix stably, remain inclination State.
For protecting connecting plate 2 excessively not washed away it is ensured that the service life of connecting plate 2, described arc 6 and connecting plate Carbon steel anticorrosive coat 4 is set between 2.
Desulfuration absorbing tower inwall circumferentially installs several vertical hypotenuses triangle gusset 3 upwards, on the hypotenuse of gusset 3 Several connecting plates 2 are installed, the bottom of annular slab 1 is connected with gusset 3 by connecting plate 2.This structure makes annular slab 1 fixed stably Gu, remain heeling condition, be difficult to rock.
For protecting connecting plate 2 and gusset 3 excessively not to be washed away it is ensured that the service life of connecting plate 2 and gusset 3, described Between arc 6 and connecting plate 2, the lower end surface of connecting plate 2 and gusset 3 be respectively provided with carbon steel anticorrosive coat 4.
For making arc 6 fixing-stable, it is to avoid come off, desulfuration absorbing tower inwall circumferentially installs several connecting plates 2, connects At least two screw rods 16 are arranged on plate 2, the fixed cover 7 opening up female thread is installed in cooperation on screw rod 16, and adjacent arc 6 passes through Screw rod 16 and fixed cover 7 are fixed on connecting plate 2, fixed cover 7 outer wall arrange the installation set 9 of hollow, in installation set 9, setting is solid Fixed pole 10, mounting plate 11 in fix bar 10, fixed plate 11 is located in installation set 9, between fixed plate 11 and installation set 9 inwall Fixed installation spring 12, spring 12 all the time give fixed plate 11 thrust, one end setting inclined-plane 14 of fix bar 10, fix bar 10 another One end is stretched out installation set 9 and is arranged draw ring 15, fixed cover 7 side wall opens up connecting hole 8, screw rod 16 opens up penetrating fixing hole 13, the end of the fix bar 10 that inclined-plane 14 is located passes through connecting hole 8 to be located in fixing hole 13.This structure can make arc 6 It is fixed on desulfuration absorbing tower inwall by connecting plate 2, it is to avoid arc 6 comes off.This structure, when installing fixed cover 7, needs Draw ring 15 to be held, after fixed cover 7 rotates to approximate location, unclamps draw ring 15, hole 13 to be fixed and fix bar 10 are located at same During centrage, fix bar 10 enters fixing hole 13 under the thrust of spring 12, realizes the positioning of screw rod 16 and fixed cover 7, Avoiding screw rod 16 and fixed cover 7 to relatively rotate leads to arc 6 fixation unstable.
The technical solution of the utility model is not restricted in the range of embodiment described in the utility model.This practicality is new The technology contents of the not detailed description of type are known technology.

Claims (7)

1. desulfuration absorbing tower spray CPR dust it is characterised in that: include three annular slabs being vertically arranged (1), annular slab (1) Outer wall is arranged on desulfuration absorbing tower inwall, below the spray equipment that annular slab (1) is located in desulfuration absorbing tower, annular slab (1) Joined end to end by several arcs (6) and form, arc is sloped downwardly in (6), the angle [alpha] of inclination is less than or equal to 30 °.
2. desulfuration absorbing tower according to claim 1 spray CPR dust it is characterised in that: desulfuration absorbing tower inwall is circumferentially Several connecting plates (2) are installed, adjacent arc (6) is arranged on connecting plate (2) by bolt (5).
3. desulfuration absorbing tower according to claim 1 spray CPR dust it is characterised in that: desulfuration absorbing tower inwall is circumferentially The gusset (3) of several vertical trianglees is installed, the bottom of annular slab (1) is connected with the hypotenuse of gusset (3).
4. desulfuration absorbing tower according to claim 2 spray CPR dust it is characterised in that: described arc (6) with even Setting carbon steel anticorrosive coat (4) between fishplate bar (2).
5. desulfuration absorbing tower according to claim 3 spray CPR dust it is characterised in that: desulfuration absorbing tower inwall is circumferentially Several vertical hypotenuses triangle gusset (3) upwards is installed, the hypotenuse of gusset (3) is installed several connecting plates (2), annular slab (1) bottom is connected with gusset (3) by connecting plate (2).
6. desulfuration absorbing tower according to claim 5 spray CPR dust it is characterised in that: described arc (6) with even Between fishplate bar (2), the lower end surface of connecting plate (2) and gusset (3) be respectively provided with carbon steel anticorrosive coat (4).
7. desulfuration absorbing tower according to claim 1 spray CPR dust it is characterised in that: desulfuration absorbing tower inwall is circumferentially Several connecting plates (2) are installed, connecting plate (2) is upper to arrange at least two screw rods (16), screw rod (16) is upper to coordinate installation to open up interior spiral shell The fixed cover (7) of stricture of vagina, adjacent arc (6) passes through screw rod (16) and fixed cover (7) is fixed on connecting plate (2), fixed cover (7) installation set (9) of hollow is arranged on outer wall, setting fix bar (10) in installation set (9), the upper mounting plate of fix bar (10) (11), fixed plate (11) is located in installation set (9), fixed installation spring (12) between fixed plate (11) and installation set (9) inwall, Spring (12) gives fixed plate (11) thrust, one end setting inclined-plane (14) of fix bar (10), the other end of fix bar (10) all the time Stretch out installation set (9) and draw ring (15) is set, fixed cover (7) side wall opens up connecting hole (8), screw rod (16) opens up penetrating Fixing hole (13), the end of the fix bar (10) that inclined-plane (14) are located passes through connecting hole (8) to be located in fixing hole (13).
CN201620859796.0U 2016-08-10 2016-08-10 Desulfurization absorption tower sprays ring of enlarging Expired - Fee Related CN205886578U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620859796.0U CN205886578U (en) 2016-08-10 2016-08-10 Desulfurization absorption tower sprays ring of enlarging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620859796.0U CN205886578U (en) 2016-08-10 2016-08-10 Desulfurization absorption tower sprays ring of enlarging

Publications (1)

Publication Number Publication Date
CN205886578U true CN205886578U (en) 2017-01-18

Family

ID=57780930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620859796.0U Expired - Fee Related CN205886578U (en) 2016-08-10 2016-08-10 Desulfurization absorption tower sprays ring of enlarging

Country Status (1)

Country Link
CN (1) CN205886578U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109865385A (en) * 2019-04-01 2019-06-11 吐鲁番瑞德化轻有限公司 The device and process of two sections of binary processing flue gases

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109865385A (en) * 2019-04-01 2019-06-11 吐鲁番瑞德化轻有限公司 The device and process of two sections of binary processing flue gases

Similar Documents

Publication Publication Date Title
CN206996173U (en) A kind of waste gas multi-pollutant multi- scenarios method synergistic purification device
WO2017092509A1 (en) Cellular mist eliminator
CN104874235A (en) Dedusting and demisting device of spiral flow plate
CN200995120Y (en) Smoke desulfurizing absorbing tower by integrated glass fiber reinforced plastic ammonia method
CN201880439U (en) Multi-ring spiral demister for desulfurization by ammonia method
CN202555093U (en) Special wet flue gas dehydrator for desulfurization engineering
CN205886578U (en) Desulfurization absorption tower sprays ring of enlarging
CN204684801U (en) A kind of spiral board dedusting demister
CN105582799B (en) A kind of spray equipment that can meet desulfurizing tower under CFB boiler difference operating mode
CN210367011U (en) Recovery unit of hydrogen sulfide in coal burning for liquid ammonia production
CN201880465U (en) Seawater desulfurizing spray tower
CN209900956U (en) Demisting device for tube bundle of desulfurization system
CN203829906U (en) Anti-abrasion and diversion wet flue gas desulfurization spray tower
CN105169915A (en) Novel desulphurization absorption tower
CN205073873U (en) Novel desulfurization absorption tower
CN213965988U (en) High-efficient spraying system
CN206008408U (en) A kind of flue gas desulfurization and denitrification spray absorber spray equipment
CN204619719U (en) A kind of baffling absorption tower for ammonia desulfurizing process
CN105396409B (en) A kind of improved multistage double cyclone dedusting demisters
CN204798999U (en) Water slinger device of tube bundle dust remover
CN211486979U (en) Water curtain type dust removing device
WO2021128495A1 (en) High-efficiency swirling tower tray suitable for marine exhaust gas washing tower
CN203768393U (en) Tower-venturi integrated converter gas purification tower
CN103834761B (en) A kind of tower literary composition integral type converter coal gas purification tower
CN208716848U (en) A kind of desulfurizing device producing anhydrous hydrofluoric acid

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170118

CF01 Termination of patent right due to non-payment of annual fee