CN205875459U - A mounting structure for assembled is gone along with sb. to guard him - Google Patents

A mounting structure for assembled is gone along with sb. to guard him Download PDF

Info

Publication number
CN205875459U
CN205875459U CN201620774774.4U CN201620774774U CN205875459U CN 205875459 U CN205875459 U CN 205875459U CN 201620774774 U CN201620774774 U CN 201620774774U CN 205875459 U CN205875459 U CN 205875459U
Authority
CN
China
Prior art keywords
installed part
installation
guard
assembled
mounting structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620774774.4U
Other languages
Chinese (zh)
Inventor
马荣全
苗冬梅
王浩
孙学锋
廖显东
冯俊
孙翠华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201620774774.4U priority Critical patent/CN205875459U/en
Application granted granted Critical
Publication of CN205875459U publication Critical patent/CN205875459U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model relates to a mounting structure for assembled is gone along with sb. To guard him, include: install the support body, locate one side of envelope, the installation support body corresponds the envelope interval is equipped with the installation fossil fragments, first installed part has set firmly on the installation fossil fragments, and with first installed part assorted second installed part, the second installed part is worn to establish envelope and with first installed part block is fixed. Adopt the installation support body to install envelope on the steel construction house, need not to build the building block by laying bricks or stones at the outer wall position, reduced the consumption artifical and material, can lighten the total weight of building, relevant cost such as reduction structure and basis. Adopt installation support body laian dress envelope, can directly hoist, will install the support body fix on the steel construction can, can save a large amount of time limits for a project, and the block of first installed part and second installed part is fixed, increase envelope and the connection stability that installs the support body, guarantee the security of the process of hoisting.

Description

The mounting structure gone along with sb. to guard him for assembled
Technical field
This utility model relates to the realm of building construction, refers in particular to a kind of mounting structure gone along with sb. to guard him for assembled.
Background technology
Conventional decorative heat-preservation plate is installed with concrete walls or masonry wall as base material, uses mortar and anchor, by viscous anchor In conjunction with mode be arranged on construction wall.
Due to steel construction many employings frame system, if building building block by laying bricks or stones to provide metope at exterior wall position, can expend bigger Manpower and materials, increase the gross weight of structure.
Utility model content
The purpose of this utility model is to overcome the defect of prior art, it is provided that a kind of installation knot gone along with sb. to guard him for assembled Structure, solves the manpower that during construction of existing steel house, the consuming of employing concrete substrate installation decorative heat-preservation plate existence is bigger Material resources and the problem increasing structure gross weight.
The technical scheme realizing above-mentioned purpose is:
This utility model provides a kind of mounting structure gone along with sb. to guard him for assembled, including:
Installation frame body, is located at the side of building enclosure, and the corresponding described building enclosure of described installation frame body is interval with installation Os Draconis, described installation Os Draconis are installed with the first installed part;And
The second installed part matched with described first installed part, described second installed part wear described building enclosure and with Described first installed part is fixed.
Use installation frame body building enclosure to be installed on steel house, it is not necessary to build building block by laying bricks or stones at exterior wall position, reduce Artificial and the consumption of material, can alleviate the gross weight of building, reduces structure and the correlative charges such as basic.Use installing rack Body installs building enclosure, can directly lift, and installation frame body is fixed on steel construction, can save substantial amounts of Duration, and being fixed of the first installed part and the second installed part, increase the connective stability of building enclosure and installation frame body, really Protect the safety of hoisting process.
Further improvement is that of the mounting structure that this utility model is gone along with sb. to guard him for assembled, the end of described first installed part Portion has been bent to form the first hook groove, and the end of described second installed part is bent to form and matches with described first hook groove Second hook groove, described second hook groove is stung merga pass connecting bolt mutually and is connected fixing with described first hook groove.
Further improvement is that of the mounting structure that this utility model is gone along with sb. to guard him for assembled, the end of described second installed part Portion is formed with spacing wing plate in the outside of described building enclosure.
Further improvement is that of the mounting structure that this utility model is gone along with sb. to guard him for assembled, fixed on described installation Os Draconis Having installation corner fittings, described installation corner fittings is connected fixing with described first installed part.
Further improvement is that of the mounting structure that this utility model is gone along with sb. to guard him for assembled, described first installed part is corresponding Described installation corner fittings is provided with installation wing plate, and described installation wing plate is connected fixing by bolt with described installation corner fittings.
Further improvement is that, between described installation frame body includes of the mounting structure that this utility model is gone along with sb. to guard him for assembled Every the multiple vertical keels arranged and multiple horizontal keel, described horizontal keel is connected with described vertical keel.
Further improvement is that of the mounting structure that this utility model is gone along with sb. to guard him for assembled, the top of described vertical keel Connect and have Os Draconis of encorbelmenting, described in Os Draconis of encorbelmenting be installed with connector.
Further improvement is that of the mounting structure that this utility model is gone along with sb. to guard him for assembled, the top of described vertical keel Be folded with a pair fixture being fixedly arranged on base structure with bottom, described fixture by the screw rod that wears be anchored on described vertically Os Draconis.
Accompanying drawing explanation
Fig. 1 is the front view of the mounting structure that this utility model is gone along with sb. to guard him for assembled.
Fig. 2 is the mounted side view of mounting structure that this utility model is gone along with sb. to guard him for assembled.
Fig. 3 is enlarged diagram at A in Fig. 2.
Fig. 4 is the front view of vertical keel attachment structure at B in Fig. 2.
Fig. 5 is the front view of another embodiment of the mounting structure that this utility model is gone along with sb. to guard him for assembled.
Detailed description of the invention
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
This utility model provides a kind of mounting structure gone along with sb. to guard him for assembled, it is adaptable to steel house, for steel The installation of the building enclosure in structure house.Building enclosure is fixed on mounting structure, lifts by crane then as mounting structure one The position being filled to set is fixed, it is not necessary to arrange in existing steel house builds building block by laying bricks or stones, decreases artificial, material etc. Consume, alleviate the gross weight of building, reduce structure and the correlative charges on basis.And lifting installation, easy construction is quick, it is possible to Save the substantial amounts of duration, use the first installed part and the second installed part to be mutually twisted and realize the fixing of building enclosure and installation frame body Connect, add the stability of connection, prevent screw from damaging and destroy connection entirety, it is ensured that the safety of lifting.Tie below The mounting structure that this utility model is gone along with sb. to guard him by conjunction accompanying drawing for assembled illustrates.
As depicted in figs. 1 and 2, the mounting structure that this utility model is gone along with sb. to guard him for assembled includes installation frame body 21, first Installed part 23 and the second installed part 24, installation frame body 21 is located at the side of building enclosure 22, and this installation frame body 21 correspondence is gone along with sb. to guard him Structure 22 is interval with installation Os Draconis 211, and these installation Os Draconis 211 are installed with the first installed part 23, the second installed part 24 and the One installed part 23 matches, and this second installed part 24 wears building enclosure 22 and is fixed with the first installed part 23.By Being mutually clamped of two installed parts 24 and the first installed part 23, it is achieved that building enclosure 22 is fixedly connected in installation frame body 21, enters And by installation frame body 21 lifting, building enclosure 22 is installed.During installation, building enclosure 22 is as the body of wall of steel house, and this encloses Protection structure 22 covers the lateral surface in steel house, and the outer surface of building enclosure 22, will as the alien invasion of steel house Installation frame body 21 is fixedly arranged on the girder steel 13 of steel house, upper strata floor 11 and lower floor's floor 12, carries for building enclosure 22 Supply to stablize and connection has firmly been installed.
Shown in Fig. 2 and Fig. 3, the end of the first installed part 23 has been bent to form the first hook groove 231, and the other end sets There are installation wing plate 232, this first installed part 23 t shape.The end of the second installed part 24 has been bent to form and the first hook groove 231 the second hook grooves 241 matched, the other end is formed with spacing wing plate 242, the second hook groove 241 and the first hook groove 231 phases are engaged and are bolted fixing.First hook groove 231 and the second hook groove 241 are U-lag, two U-lag phases Catching on mutually, form stable drawknot structure, so latter two U-lag is bolted fixing.Occlusion secure fit bolt is fixed, Add the stability of connection, it is ensured that the safety of hoisting process.
The spacing wing plate 242 of the second installed part 24 end is attached at the outside of building enclosure 22, and this building enclosure 22 uses Multiple unit spliceds form, and this spacing wing plate 242 is attached at the outer surface of two unit, and building enclosure 22 is applied inside drawing Clamp force, with against building enclosure 22 and then fastening building enclosure 22.The position of the corresponding spacing wing plate 242 in the outside of building enclosure 22 It is installed with storage tank so that this spacing wing plate 242 is placed in storage tank, it is ensured that building enclosure 22 outer surface smooth attractive in appearance.
Being installed with installation corner fittings 2111 on Os Draconis 211 installing, this installation corner fittings 2111 is L-shaped part, a folding of L-shaped part While be secured by bolts on installation Os Draconis 211, another flanging and the first fixing connection of installed part 23, the first installed part 23 end The flanging laminating setting installing wing plate 232 and this L-shaped part in portion, is then bolted fixing.Wing plate 232 and L is being installed Between the flanging of shape part, pad is provided with rubber blanket.
As depicted in figs. 1 and 2, installation frame body 21 includes spaced multiple vertical keel 212 and multiple horizontal keel 213, vertical keel 212 interval is arranged, and horizontal keel 213 is also spaced setting, and horizontal keel 213 is connected solid with vertical keel 212 Fixed, vertical keel 212 and horizontal keel 213 transverse and longitudinal have been cross-linked to form installation frame body 21, the installation dragon in installation frame body 21 Bone 211 be arranged in parallel with horizontal keel 213.Connect on the top of vertical keel 211 and have Os Draconis 214 of encorbelmenting, these Os Draconis 214 of encorbelmenting On be installed with connector 25, Os Draconis 214 of encorbelmenting are placed in the end of upper strata floor 11, and these Os Draconis 214 of encorbelmenting are folded in upper floor Between plate 11 and building enclosure 22, Os Draconis 214 of encorbelmenting are fixed on upper strata floor 11 by wearing the expansion bolt of connector 25. Also it is installed with installation Os Draconis 211 on Os Draconis 214 encorbelmenting, is connected with building enclosure 22 fixing by these installation Os Draconis 211.
Shown in Fig. 4, the top of vertical keel 212 and bottom sandwiched are fixedly arranged on a pair fixture 26 of base structure, This fixture 26 is anchored on vertical keel 212 by the screw rod 27 worn.Shown in Fig. 2, it is positioned at vertical keel 212 top Fixture 26 is fixed on girder steel 13, is provided with upper strata floor 11 on this girder steel 13.It is positioned at the fixture bottom vertical keel 212 26 are fixed on lower floor's floor 12, and the fixture 26 being fixed on lower floor's floor 12 is anchored in lower floor's floor 12 by dowel.
Below the installation process of the mounting structure that this utility model is gone along with sb. to guard him for assembled is illustrated.
Vertical keel, horizontal keel and installation Os Draconis assembly is utilized to form installation frame body, fixed on installation Os Draconis now Having the first installed part 23, be then connected on the first installed part 23 being positioned at bottom the second installed part 24, and passes through bolt Connect the first installed part 23 and the second installed part 24, on the second installed part 24, then place building enclosure 22, this building enclosure 22 include warming plate and are overlying on the decorative panel outside warming plate, and in the bottom of decorative panel, corresponding second installed part 24 is provided with accommodating Groove, the spacing wing plate 242 of the second installed part 24 is placed in this storage tank, and the bottom of building enclosure 22 is anchored on installation frame body On.Then installing the second installed part 24 of last layer, the spacing wing plate of the second installed part 24 of last layer is placed in mounted In the storage tank at the top of building enclosure 22, such building enclosure 22 is anchored on peace by the second installed part 24 of top and bottom Shelving on body 21, repeat the above steps i.e. completes building enclosure 22 and is installed in installation frame body 21, then by installation frame body 21 Lift together with building enclosure 22 to setting position, spiral shell is passed through in top and the bottom of the vertical keel 212 in installation frame body 21 Bar 27 is fixed on girder steel 13 and lower floor's floor 12, and Os Draconis 214 of encorbelmenting are fixed on upper strata floor 11, just by connector 25 The lifting completing building enclosure 22 is installed.
The size of installation frame body 21 of the present utility model selects as required, when installing a body of wall, and Ke Yifen Become multiple installation frame body 21, utilize multiple installation frame body 21 to be spliced to form a body of wall.As shown in Figure 5, it is also possible to by installing rack The size being dimensioned so as to a body of wall of body 21, so integral hoisting installation can just complete executing of a body of wall Work, in this installation frame body 21, corresponding door-window opening is installed with opening 14.
Having the beneficial effect that of the mounting structure that this utility model is gone along with sb. to guard him for assembled
Use the first installed part and the second installed part to be connected, and combine the fixing connection of bolt, add connection Stability, after preventing bolt failure, connects entirety destroyed, it is ensured that the safety of lifting.
The assembly of installation frame body 21 and building enclosure 22 can complete in factory, according to the size Selection breadth in room Size, so on-the-spot directly lifting is installed, and saves the substantial amounts of duration.
This mounting structure is applicable to steel-frame structure, it is not necessary to build building block by laying bricks or stones at exterior wall position, utilizes installation frame body to provide peace Dress face, cancels conventional building block, decreases the artificial and Bears Aiwa of material, alleviates the gross weight of building simultaneously, drop further Low structure and the correlative charges on basis.
Being described in detail this utility model above in association with accompanying drawing embodiment, those skilled in the art can root According to described above, this utility model made many variations example.Thus, some details in embodiment should not be constituted this practicality Novel restriction, this utility model by the scope that defines using appended claims as protection domain of the present utility model.

Claims (8)

1. the mounting structure gone along with sb. to guard him for assembled, it is characterised in that including:
Installation frame body, is located at the side of building enclosure, and the corresponding described building enclosure of described installation frame body is interval with installation Os Draconis, It is installed with the first installed part on described installation Os Draconis;And
The second installed part matched with described first installed part, described second installed part wears described building enclosure and with described First installed part is fixed.
2. the mounting structure gone along with sb. to guard him for assembled as claimed in claim 1, it is characterised in that the end of described first installed part Portion has been bent to form the first hook groove, and the end of described second installed part is bent to form and matches with described first hook groove Second hook groove, described second hook groove is stung merga pass connecting bolt mutually and is connected fixing with described first hook groove.
3. the mounting structure gone along with sb. to guard him for assembled as claimed in claim 1 or 2, it is characterised in that described second installed part End be formed with spacing wing plate in the outside of described building enclosure.
4. the mounting structure gone along with sb. to guard him for assembled as claimed in claim 1, it is characterised in that fixed on described installation Os Draconis Having installation corner fittings, described installation corner fittings is connected fixing with described first installed part.
5. the mounting structure gone along with sb. to guard him for assembled as claimed in claim 4, it is characterised in that described first installed part is corresponding Described installation corner fittings is provided with installation wing plate, and described installation wing plate is connected fixing by bolt with described installation corner fittings.
6. the mounting structure gone along with sb. to guard him for assembled as claimed in claim 1, it is characterised in that between described installation frame body includes Every the multiple vertical keels arranged and multiple horizontal keel, described horizontal keel is connected with described vertical keel.
7. the mounting structure gone along with sb. to guard him for assembled as claimed in claim 6, it is characterised in that the top of described vertical keel Connect and have Os Draconis of encorbelmenting, described in Os Draconis of encorbelmenting be installed with connector.
8. the mounting structure gone along with sb. to guard him for assembled as claimed in claim 6, it is characterised in that the top of described vertical keel Be folded with a pair fixture being fixedly arranged on base structure with bottom, described fixture by the screw rod that wears be anchored on described vertically Os Draconis.
CN201620774774.4U 2016-07-22 2016-07-22 A mounting structure for assembled is gone along with sb. to guard him Expired - Fee Related CN205875459U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620774774.4U CN205875459U (en) 2016-07-22 2016-07-22 A mounting structure for assembled is gone along with sb. to guard him

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620774774.4U CN205875459U (en) 2016-07-22 2016-07-22 A mounting structure for assembled is gone along with sb. to guard him

Publications (1)

Publication Number Publication Date
CN205875459U true CN205875459U (en) 2017-01-11

Family

ID=57698184

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620774774.4U Expired - Fee Related CN205875459U (en) 2016-07-22 2016-07-22 A mounting structure for assembled is gone along with sb. to guard him

Country Status (1)

Country Link
CN (1) CN205875459U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110318484A (en) * 2019-07-22 2019-10-11 金螳螂精装科技(苏州)有限公司 A kind of assembled clear water brick partition mounting structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110318484A (en) * 2019-07-22 2019-10-11 金螳螂精装科技(苏州)有限公司 A kind of assembled clear water brick partition mounting structure

Similar Documents

Publication Publication Date Title
CN105507539B (en) A kind of lightweight exterior wall point hangs thermal-insulation decorative board combination and is anchored system and its construction method
CN106869368A (en) A kind of assembling type steel structure external hanging type wallboard base-supporting attachment structure
CN104100028B (en) A kind of rod-type back of the body bolt altogether mounts system
CN209277282U (en) A kind of connection structure of damper assembling frame node
CN106351379A (en) Roof assembly method
CN212001800U (en) Connecting assembly and connecting structure of external wall panel
CN205875459U (en) A mounting structure for assembled is gone along with sb. to guard him
CN110130546A (en) A kind of assembled anti-knock internal partition wall and its installation method
CN106401024B (en) The partition wall of pre- crack resistence
CN105507541B (en) Building fancy face plate jhook type attachment device and installation method
CN205314449U (en) Building decorative board dogging formula connecting device
CN205530794U (en) Installation node of wallboard connecting piece and wallboard
CN215484254U (en) External wall heat preservation system
CN104878902A (en) Veneer point hanging system and construction method thereof
CN102425254B (en) Keel connecting device based on suspended curtain wall
CN206607709U (en) A kind of assembling type steel structure external hanging type wallboard base-supporting attachment structure
CN106894571A (en) Half built-in precast concrete sandwich heat preservation wallboard and its assembly system and construction method
CN215888819U (en) Open wire strip type drop ceiling
CN209053358U (en) A kind of mounting structure of elevator hall's metope slabstone
CN208594653U (en) A kind of assembled anti-knock internal partition wall
CN113463815A (en) Open wire strip type drop ceiling and installation method thereof
CN204876451U (en) Installed part and have decorative board installation component of this installed part
CN207032758U (en) A kind of installation system of groove formula porcelain plate
CN205990780U (en) One kind is safe, easy-to-dismount to face frontier defense protection unit
CN206829392U (en) A kind of external wall insulation

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170111