CN205476065U CN201620110551.8U CN201620110551U CN205476065U CN 205476065 U CN205476065 U CN 205476065U CN 201620110551 U CN201620110551 U CN 201620110551U CN 205476065 U CN205476065 U CN 205476065U
Authority
CN
China
Prior art keywords
steel
concrete floor
prefabricated concrete
combination beam
full assembled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620110551.8U
Other languages
Chinese (zh)
Inventor
曲冰
侯和涛
邱灿星
冯明远
程积润
付玮琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201620110551.8U priority Critical patent/CN205476065U/en
Application granted granted Critical
Publication of CN205476065U publication Critical patent/CN205476065U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model discloses a full assembled steel - precast concrete floor combination beam belongs to the building field. Full assembled steel - precast concrete floor combination beam is including having the girder steel of top flange, pre -buried precast concrete floor, J type anchor clamps and the T type fastener that has the guide slot, wherein: the precast concrete floor sets up the upper surface in the girder steel top flange, J type anchor clamps include the hood, and the hood is connected with vertical connecting rod, and vertical connecting rod is connected with horizontal connecting rod, and the end of horizontal connecting rod has been offered and has been taken the internal screw thread sleeve, and the hood is stretched in the guide slot, T type fastener is including the friction steel sheet and set up the fastening screw at friction steel sheet downside, and fastening screw twists in the sleeve, and the friction steel sheet is closely laminated at the lower surface of girder steel top flange. The utility model discloses the efficiency of construction is high, and is with low costs, can not the polluted environment, simple to operate can dismantle, can realize the change of floor and recycle.

Description

Full assembled steel-prefabricated concrete floor combination beam
Technical field
This utility model relates to building field, particularly relates to a kind of full assembled steel-concrete Tulou Plate combination beam.
Background technology
Steel-concrete composite beam is that the one grown up on the basis of steel construction and xoncrete structure is new Type structural shape.It mainly by arrange between girder steel and concrete floor shear connector (peg, Channel-section steel, curved muscle etc.), both starting and Relative sliding at interface of opposing, make one Overall and cooperation.
At present, conventional steel-concrete composite beam is steel-cast-in-place concrete floor combination beam and steel-overlapping Integral concrete floor combination beam.
Steel-cast-in-place concrete floor combination beam is made up of girder steel, cast-in-place concrete floor and shear stud, There is the advantages such as integral rigidity is big, compound action is notable, be applicable to the flooring that horizontal layout is complicated. But having the disadvantage in that 1. wet trade amount is very big, causes efficiency of construction low, cost is high and pollutes environment; 2. template is many with on-the-spot support, reduce further efficiency of construction, improves cost;3. girder steel is with existing Pouring concrete floor is i.e. integrated after pouring, it is impossible to dismounting, causes the load of floor at existing structure During increase, it is impossible to change thick floor, when floor damages, it is impossible to the floor more renewed, and floor Can not recycle, be not suitable for building industrialization.
Steel-overlapping integral concrete floor combination beam by girder steel, overlapping integral concrete floor and Shear stud forms, and has the advantages such as integral rigidity is big, compound action is notable equally, and scene is saved Save template and portion support, carried compared to steel-cast-in-place concrete floor combination beam efficiency of construction High.But still Shortcomings, it is mainly manifested in: 1. scene remains a need for casting concrete and realizes combination Effect, wet trade is more, causes efficiency of construction low, and cost is high and pollutes environment;2. profiled sheet Concrete combined floor and steel bar girder concrete combined floor need to install support, plate when span is bigger The end, need to prevent fires and preservative treatment, relatively costly;Prestressed concrete overlapped slab (flat board) and reinforcing bar Truss concrete folding plate need to install support when span is more than 1.8m, and prestressed concrete with ribbing is folded Plywood need to install support when span is more than 3.6m, reduce further efficiency of construction, improves into This;3. girder steel and overlapping integral concrete floor are i.e. integrated after pouring, it is impossible to dismounting, cause When the load of floor of existing structure increases, it is impossible to change thick floor, when floor damages, it is impossible to more The floor renewed, and floor can not recycle, and is not suitable for building industrialization.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of full assembled steel-concrete Tulou Plate combination beam, this utility model efficiency of construction is high, and low cost does not pollutes the environment;It is easy for installation, Detachably, it is possible to realize replacing and the recycling of floor.
For solving above-mentioned technical problem, this utility model provides technical scheme as follows:
This utility model provides a kind of full assembled steel-prefabricated concrete floor combination beam, including with The girder steel of top flange, it is embedded with the prefabricated concrete floor of guide groove, J-type fixture and T-shaped securing member, Wherein:
Described prefabricated concrete floor is arranged on the upper surface of described girder steel top flange;
Described J-type fixture includes top cap, and described top cap connects vertical link, and described vertical link is even Being connected to waling stripe, the end of described waling stripe offers tapped sleeve, and described top cap is stretched In described guide groove;
Described T-shaped securing member includes friction steel plate and is arranged on the fastening spiral shell on the downside of described friction steel plate Bar, described fastening screw is screwed in described sleeve, and described friction steel plate is fitted tightly on described girder steel The lower surface on the edge of a wing.
Further, it is provided with ball pivot between described fastening screw and friction steel plate.
Further, described T-shaped securing member also includes nut, and described fastening screw lower end also includes using In the circular hole inserting spanner.
Further, what described waling stripe was perpendicular to that described top cap and described vertical link determine is flat Face, or, described waling stripe is positioned at described top cap and the plane of described vertical link decision.
Further, described guide groove is C-type steel guide groove, described C-type steel guide groove and described prefabricated mixed Solidifying Tulou plate passes through anchor connection.
Further, described girder steel is T-steel beam, steel beam with box shape or H profile steel beam, described prefabricated Concrete floor include prefabricating common concrete floor, precast prestressed concrete floor or prefabricated pre-should Power hollow concrete building floor.
Further, described prefabricated concrete floor is multiple, and adjacent two prefabricated concrete floors lead to Cross tongue and groove mode to connect.
Further, described J-type fixture and T-shaped securing member are two, lay respectively at described girder steel The both sides of top flange.
Further, the material of described J-type fixture is common iron or high-strength steel, described T-shaped tightly Firmware material is steel.
This utility model has the advantages that
First, all parts of steel of the present utility model-prefabricated concrete floor combination beam is (especially Prefabricated concrete floor) it is factory and completes, it is not necessary to poured in place concrete wet trade so that Efficiency of construction is high, decreases cost, and does not pollutes the environment.
Then, steel of the present utility model-prefabricated concrete floor combination beam is when construction, it is not necessary to template With on-the-spot support, further increase efficiency of construction, reduce cost;Further, utility model people is also Finding, this utility model need not arranging peg on girder steel, the lowest cost, improves Efficiency of construction.
Further, steel of the present utility model-prefabricated concrete floor combination beam when mounted, only needs Fastening screw it is screwed in sleeve, and top cap to be stretched in guide groove, finally tighten fastening screw, Otherwise during dismounting so that install quick with convenient disassembly.And due to girder steel and prefabricated concrete floor Detachably so that when the load of floor of existing structure increases, can change the floor of thickness, floor damages Time, the floor that can more renew, and floor can recycle, it is achieved that building industrialization.
Finally, steel of the present utility model-prefabricated concrete floor combination beam firmly installs, superior performance.
In sum, steel of the present utility model-prefabricated concrete floor combination beam efficiency of construction is high, becomes This is low, does not pollutes the environment;Easy for installation, detachably, it is possible to the replacing and the circulation that realize floor make With.
Accompanying drawing explanation
Fig. 1 is an enforcement of full assembled steel-prefabricated concrete floor combination beam of the present utility model The front view of example;
Fig. 2 is an enforcement of full assembled steel-prefabricated concrete floor combination beam of the present utility model The right view of example;
Fig. 3 is the axonometric chart of an embodiment of the J-type fixture in this utility model;
Fig. 4 is the front view of an embodiment of the T-shaped securing member in this utility model;
Fig. 5 is the front view of another embodiment of the J-type fixture in this utility model;
Fig. 6 is another reality of full assembled steel-prefabricated concrete floor combination beam of the present utility model Execute the front view of example.
Detailed description of the invention
For making the technical problems to be solved in the utility model, technical scheme and advantage clearer, below To be described in detail in conjunction with the drawings and the specific embodiments.
On the one hand, this utility model provides a kind of full assembled steel-prefabricated concrete floor combination beam, One of them embodiment as shown in Figures 1 to 4, including the girder steel 1, pre-buried with top flange 101 There are the prefabricated concrete floor 2 of guide groove 3, J-type fixture 4 and T-shaped securing member 5, wherein:
Prefabricated concrete floor 2 is arranged on the upper surface of girder steel top flange 101;
J-type fixture 4 includes top cap 6, and top cap 6 connects vertical link 7, and vertical link 7 connects to be had Waling stripe 8, the end of waling stripe 8 offers tapped sleeve 9, and top cap 6 is stretched and led In groove 3;
T-shaped securing member 5 includes that friction steel plate 10 is arranged on the fastening screw 12 on the downside of friction steel plate 10, Fastening screw 12 is screwed in sleeve 9, and friction steel plate 10 is fitted tightly over girder steel top flange 101 times Surface.
The girder steel of the steel of this utility model embodiment-prefabricated concrete floor combination beam and precast concrete Floor is connected by J-type fixture and T-shaped securing member, and concrete, J-type fixture is by T-shaped securing member Friction steel plate is fitted tightly over the lower surface of girder steel top flange, makes girder steel with pre-by pressure and frictional force Concrete floor processed is fixed together.
This utility model has the advantages that
First, all parts of the steel of this utility model embodiment-prefabricated concrete floor combination beam is (outstanding It is prefabricated concrete floor) it is factory and completes, it is not necessary to poured in place concrete wet trade, Make efficiency of construction high, decrease cost, and do not pollute the environment.
Then, the steel of this utility model embodiment-prefabricated concrete floor combination beam construction time, nothing Need template and on-the-spot support, further increase efficiency of construction, reduce cost;Further, practical new Type people also find, this utility model need not arranging peg on girder steel, the lowest cost, Improve efficiency of construction.
Further, the steel of this utility model embodiment-prefabricated concrete floor combination beam when mounted, Have only to be screwed in sleeve fastening screw, and top cap is stretched in guide groove, finally tighten fastening screw Otherwise, during dismounting so that install quick with convenient disassembly, and to the required precision installed not High.And owing to girder steel and prefabricated concrete floor are detachable so that the load of floor of existing structure increases Added-time, the floor of thickness can be changed, when floor damages, the floor that can more renew, and floor energy Enough recyclings, it is achieved that building industrialization.
Finally, the steel of this utility model embodiment-prefabricated concrete floor combination beam firmly installs, property Can be superior.
In sum, the steel of this utility model embodiment-prefabricated concrete floor combination beam efficiency of construction Height, low cost, do not pollute the environment;Easy for installation, detachably, it is possible to realize floor replacing and Recycle.
As a kind of improvement of this utility model embodiment, between fastening screw 12 and friction steel plate 10 It is provided with ball pivot 11.
Ball pivot can ensure the most strictly to put down at prefabricated concrete floor lower surface and girder steel top flange lower surface During row (or flatness is undesirable), friction steel plate still can be adjacent to girder steel top flange lower surface, Meet required reliable frictional power.
Further, T-shaped securing member 4 also includes nut 15, and nut is screwed in fastening screw lower end, anti- Only T-shaped securing member loosens;Fastening screw 12 lower end also includes the circular hole 13 for inserting spanner 14, Spanner can be inserted easily, rotate fastening screw.
The structure of T-shaped securing member can have multiple, provides two embodiments here:
Embodiment 1:
Waling stripe 8 is perpendicular to top cap 6 and the plane of vertical link 7 decision, as it is shown on figure 3, this Time, the length direction of guide groove is perpendicular to the length direction of girder steel, i.e. along prefabricated concrete floor length side To, can be along the elongated layout of floor, it is also possible to step-by-step arrangement.
Embodiment 2:
Waling stripe 8 ' is positioned at the plane that top cap 6 ' determines with vertical link 7 ', as it is shown in figure 5, this Time, the length direction of guide groove is parallel to the length direction of girder steel, i.e. along prefabricated concrete floor width side To.
As the another kind of improvement of this utility model embodiment, the full assembled of this utility model embodiment In steel-prefabricated concrete floor combination beam, guide groove can have numerous embodiments, it is preferred that such as Fig. 2 Shown in, guide groove 3 is C-type steel guide groove, and C-type steel guide barrel construction is simple, so that C-type steel guide groove Being connected firmly with prefabricated concrete floor, C-type steel guide groove and prefabricated concrete floor are by anchoring even Connect.
Further, the full assembled steel-prefabricated concrete floor combination beam of this utility model embodiment In, girder steel can have numerous embodiments, and such as, girder steel 1 can be T-steel beam, including upper limb Edge and web;Or girder steel 1 can be steel beam with box shape, including overhanging top flange, web and bottom wing Edge;Or girder steel 1 can be H profile steel beam, as it is shown in figure 1, include top flange 101, web 102 With lower flange 103;Prefabricated concrete floor can realize multispan arrange and without disconnect, factory make Simply, installing the most quick, make low with installation cost, prefabricated concrete floor includes but not limited to Prefabricating common concrete floor, precast prestressed concrete floor or precast prestressed hollow concrete building Plate.
Preferably, prefabricated concrete floor can be multiple, and adjacent two prefabricated concrete floors pass through Tongue and groove mode connects.The width of prefabricated concrete floor and span with modularization, and can take into account transporter The demand in face, is connected by tongue and groove mode between prefabricated concrete floor.If desired, can be along prefabricated mixed Solidifying Tulou plate is laterally applied to horizontal prestressing force, and between increase prefabricated concrete floor, the occlusion at tongue and groove is strong Degree and frictional force.
Above-mentioned introduction is J-type fixture and situation that T-shaped securing member is 1, J-type fixture and T-shaped Securing member can be two, as shown in Figure 6, lays respectively at the both sides of girder steel top flange, increases pressure Power and frictional force, install more firm.
In order to meet the intensity of all parts, the material of J-type fixture is common iron or high-strength steel, T Type securing member material is steel.
On the other hand, this utility model provides a kind of above-mentioned full assembled steel-prefabricated concrete floor group Closing the installation method of beam, one of them embodiment includes:
Step 1: install girder steel;Concrete, install H profile steel beam, T-steel beam, steel beam with box shape or The girder steel (containing overhanging top flange) of other cross section type, wherein top flange is above web.
Step 2: prefabricated concrete floor is shelved on girder steel top flange upper surface.
Step 3: the fastening screw of T-shaped securing member is screwed in the sleeve of J-type fixture from top to bottom, And adjust its height to correct position.
Step 4: the top cap of J-type fixture is stretched into (preferably C in the guide groove in prefabricated concrete floor Shaped steel guide groove), then half-twist.
Step 5: upwards tightened by T-shaped securing member, makes the lower surface of friction steel plate and girder steel top flange Fit tightly, and produce reliable frictional force.
Further, when T-shaped securing member includes ball pivot and circular hole, originally it is preferably a step: by spanner Inserting circular hole, rotary spanner, upwards tightened by fastening screw, period constantly adjusts ball pivot and friction steel Plate, makes friction steel plate fit tightly with the lower surface of girder steel top flange, and produces reliable frictional force, Become an entirety.
Further, when T-shaped securing member includes nut, also include step 6: by nut under Up it is screwed into fastening screw, and tightens.
The installation method of this utility model embodiment has the advantage that
1. without poured in place concrete wet trade so that efficiency of construction is high, decreases cost, and Do not pollute the environment.
2., without template and on-the-spot support, further increase efficiency of construction, reduce cost.
3. have only to be screwed in sleeve fastening screw during construction, and top cap is stretched in guide groove, finally Tighten fastening screw, otherwise during dismounting so that install quick with convenient disassembly, and to installation Required precision the highest.
4. and owing to girder steel and prefabricated concrete floor are detachable so that the load of floor of existing structure During increase, the floor of thickness can be changed, when floor damages, the floor that can more renew, and floor Can recycle, it is achieved that building industrialization.
5. this utility model embodiment firmly installs, superior performance.
The above is preferred implementation of the present utility model, it is noted that for the art Those of ordinary skill for, on the premise of without departing from principle described in the utility model, it is also possible to make Going out some improvements and modifications, these improvements and modifications also should be regarded as protection domain of the present utility model.

Claims (9)

1. full assembled steel-prefabricated concrete floor combination beam, it is characterised in that include with The girder steel of top flange, it is embedded with the prefabricated concrete floor of guide groove, J-type fixture and T-shaped securing member, Wherein:
Described prefabricated concrete floor is arranged on the upper surface of described girder steel top flange;
Described J-type fixture includes top cap, and described top cap connects vertical link, and described vertical link is even Being connected to waling stripe, the end of described waling stripe offers tapped sleeve, and described top cap is stretched In described guide groove;
Described T-shaped securing member includes friction steel plate and is arranged on the fastening spiral shell on the downside of described friction steel plate Bar, described fastening screw is screwed in described sleeve, and described friction steel plate is fitted tightly on described girder steel The lower surface on the edge of a wing.
Full assembled steel-prefabricated concrete floor combination beam the most according to claim 1, it is special Levy and be, between described fastening screw and friction steel plate, be provided with ball pivot.
Full assembled steel-prefabricated concrete floor combination beam the most according to claim 2, it is special Levying and be, described T-shaped securing member also includes that nut, described fastening screw lower end also include for inserting The circular hole of spanner.
Full assembled steel-prefabricated concrete floor combination beam the most according to claim 1, it is special Levying and be, described waling stripe is perpendicular to described top cap and the plane of described vertical link decision, or, Described waling stripe is positioned at described top cap and the plane of described vertical link decision.
Full assembled steel-prefabricated concrete floor combination beam the most according to claim 1, it is special Levying and be, described guide groove is C-type steel guide groove, described C-type steel guide groove and described concrete Tulou Plate passes through anchor connection.
Full assembled steel-prefabricated concrete floor combination beam the most according to claim 1, it is special Levying and be, described girder steel is T-steel beam, steel beam with box shape or H profile steel beam, described precast concrete Floor includes prefabricating common concrete floor, precast prestressed concrete floor or precast prestressed hollow Concrete floor.
Full assembled steel-prefabricated concrete floor combination beam the most according to claim 6, it is special Levying and be, described prefabricated concrete floor is multiple, and adjacent two prefabricated concrete floors pass through tongue and groove Mode connects.
8. according to the arbitrary described full assembled steel-prefabricated concrete floor combination beam of claim 1-7, It is characterized in that, described J-type fixture and T-shaped securing member are two, lay respectively on described girder steel The both sides on the edge of a wing.
Full assembled steel-prefabricated concrete floor combination beam the most according to claim 8, it is special Levying and be, the material of described J-type fixture is common iron or high-strength steel, described T-shaped securing member material Matter is steel.
CN201620110551.8U 2016-02-03 2016-02-03 Full assembled steel - precast concrete floor combination beam Active CN205476065U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620110551.8U CN205476065U (en) 2016-02-03 2016-02-03 Full assembled steel - precast concrete floor combination beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620110551.8U CN205476065U (en) 2016-02-03 2016-02-03 Full assembled steel - precast concrete floor combination beam

Publications (1)

Publication Number Publication Date
CN205476065U true CN205476065U (en) 2016-08-17

Family

ID=56673799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620110551.8U Active CN205476065U (en) 2016-02-03 2016-02-03 Full assembled steel - precast concrete floor combination beam

Country Status (1)

Country Link
CN (1) CN205476065U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105569263A (en) * 2016-02-03 2016-05-11 山东大学 Full-assembly-type steel-prefabricated concrete floor slab combination beam and installing method thereof
CN106869385A (en) * 2017-03-03 2017-06-20 山东大学 Full assembled steel prefabricated concrete floor combination beam
CN110284656A (en) * 2019-08-05 2019-09-27 郑州大学 A kind of full assembled steel concrete combination beam

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105569263A (en) * 2016-02-03 2016-05-11 山东大学 Full-assembly-type steel-prefabricated concrete floor slab combination beam and installing method thereof
CN105569263B (en) * 2016-02-03 2017-07-14 山东大学 Full assembled steel prefabricated concrete floor combination beam and its installation method
CN106869385A (en) * 2017-03-03 2017-06-20 山东大学 Full assembled steel prefabricated concrete floor combination beam
CN110284656A (en) * 2019-08-05 2019-09-27 郑州大学 A kind of full assembled steel concrete combination beam

Similar Documents

Publication Publication Date Title
CN105569263B (en) Full assembled steel prefabricated concrete floor combination beam and its installation method
CN205476065U (en) Full assembled steel - precast concrete floor combination beam
CN102828615B (en) Overlapped shear wall template system and construction method thereof
CN108691416A (en) Cast-in-place special-shaped beam plain form system with arc-shaped side edges
CN106836482A (en) Construction method for reinforcing steel structure beam or column
CN209990143U (en) Floor template support system of suspension type
CN208072733U (en) A kind of silent floor support plate of 360 degree of seamings connection
CN206545269U (en) The beam prefabricated floor connection structure of full assembled steel
CN206737183U (en) The outer page board fabricated shear wall of lightweight
CN106869385A (en) Full assembled steel prefabricated concrete floor combination beam
CN209129149U (en) A kind of connection structure of straight building wall board
CN110158463A (en) Orthotropic Steel Bridge Deck structure and its construction method
CN207194438U (en) Bound edge plywood form
CN206554343U (en) Full assembled steel prefabricated concrete floor combination beam
CN211571440U (en) Variable cross section roof beam prestressing force carbon fiber plate multiple spot anchor segmentation reinforced structure
CN209686855U (en) A kind of shear wall exempts from aperture support template structure
CN208604929U (en) A kind of cast-in-place special-shaped beam plain form system with arc-shaped side edges
CN209277018U (en) The mounting assembly fixed for carbon fiber board
CN104652267B (en) Band edge of a wing grooved FRP plate material-concrete combined bridge deck
CN208830162U (en) A kind of Railway Bridges surface composite material walking board mounting structure
KR101080924B1 (en) Beams reinforced structures and reinforcement method
CN206220482U (en) A kind of cast-in-situ wall template support system
CN218396680U (en) Section steel column composite structure of stiffness column
CN102409786A (en) Concrete reinforced channeled steel plate, building roof panel and construction method of building roof panel
CN219548123U (en) Anti-leakage composite floor slab connecting structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model