CN204933202U - A kind of for the spraying layer pipeline in absorption tower and system - Google Patents

A kind of for the spraying layer pipeline in absorption tower and system Download PDF

Info

Publication number
CN204933202U
CN204933202U CN201520476955.4U CN201520476955U CN204933202U CN 204933202 U CN204933202 U CN 204933202U CN 201520476955 U CN201520476955 U CN 201520476955U CN 204933202 U CN204933202 U CN 204933202U
Authority
CN
China
Prior art keywords
brace summer
supervisor
spraying layer
absorption tower
anticorrosive coat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520476955.4U
Other languages
Chinese (zh)
Inventor
刘磊
刘沂秋
杨宝成
李晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING FENGYE ELECTRIC POWER ENVIRONMENTAL PROTECTION ENGINEERING Co Ltd
Original Assignee
BEIJING FENGYE ELECTRIC POWER ENVIRONMENTAL PROTECTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING FENGYE ELECTRIC POWER ENVIRONMENTAL PROTECTION ENGINEERING Co Ltd filed Critical BEIJING FENGYE ELECTRIC POWER ENVIRONMENTAL PROTECTION ENGINEERING Co Ltd
Priority to CN201520476955.4U priority Critical patent/CN204933202U/en
Application granted granted Critical
Publication of CN204933202U publication Critical patent/CN204933202U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a kind of for the spraying layer pipeline in absorption tower and system, described spraying layer pipeline comprises supervisor and is positioned at the brace summer of supervisor tube wall both sides, described brace summer side and supervisor pass through Interal fixation, opposite side is provided with anticorrosive coat, also be provided with pipe clamp between described supervisor and brace summer, described anticorrosive coat is also provided with polypropylene board outward; The nozzle that described spraying layer system comprises supervisor, is positioned at the brace summer of supervisor tube wall both sides, arm and is connected with arm, described brace summer side and supervisor pass through Interal fixation, opposite side is provided with anticorrosive coat, also be provided with pipe clamp between described supervisor and brace summer, described anticorrosive coat is also provided with polypropylene board outward.The utility model, by carrying out design optimization to absorption tower spraying layer support beam structure and anticorrosion structure, solves absorption tower spraying layer brace summer and is washed, and brace summer is bored a hole, anticorrosive coat comes off problem.

Description

A kind of for the spraying layer pipeline in absorption tower and system
Technical field
The utility model relates to a kind of anticorrosion protection against erosion spraying layer pipeline for spray system in absorption tower and system, belongs to industrial absorbent tower technical field of desulfurization.
Background technology
Maximum pyramidal structures applied in process for flue gas desulfurization by limestone/lime-gypsum wet by spray column, by the downward spraying (Bidirectional nozzle can be sprayed up and down) of Multi-layer sprinkling layer simultaneously, contacts the SO absorbed wherein with flue gas adverse current 2, owing to there being Multi-layer sprinkling layer, the spray coverage rate on cross section, absorption tower can reach very high, and every layer of corresponding slurry circulating pump of spraying layer is for slurry.Because circulating pump is more with the spray number of plies, especially for medium-high sulfur coal, therefore absorption tower is general higher, and slurry pool of absorption tower also power consumption that is comparatively large, circulating pump is higher, but spray column has the following advantages: 1) desulfuration efficiency is high; 2) system reliability and availability high; 3) system suitability is strong.
But the wear-resisting protection against erosion of desulfuration absorbing tower spraying layer is a weak link in desulphurization system always, the high speed slurries continuous punching of tower inner nozzle ejection brushes spraying layer brace summer and causes anticorrosive coat to destroy, brace summer distortion, perforation.For solving problems, proposing in existing report and multiplely improving Corrosion prevention scheme, such as, absorption tower spray system brace summer being optimized, brace summer and inner wall of tower are connected into overall structure; Washing away brace summer is reduced by the position of nozzle near adjustment brace summer; By improving, anti-corrosion material performance improvement is anti-washes away intensity.But, under the washing away for a long time of nozzle, anticorrosive coat still can come off, the problem that brace summer is perforated, is out of shape occurs, prevent washing away of brace summer by improving the position of nozzle near brace summer simultaneously, this kind of way cannot reach designing requirement because of construction accuracy problems, so difficulty is very large, brace summer protection against erosion effect can not be ensured.
For solving the problem, the utility model provides a kind of for the spraying layer pipeline in absorption tower and system.
Summary of the invention
The utility model, by carrying out design optimization to absorption tower spraying layer support beam structure and anticorrosion structure, solves absorption tower spraying layer brace summer and is washed, and brace summer is bored a hole, anticorrosive coat comes off problem.
For achieving the above object, the utility model provide firstly a kind of for the spraying layer pipeline in absorption tower:
For the spraying layer pipeline in absorption tower, comprise supervisor and be positioned at the brace summer being responsible for tube wall both sides, described brace summer side and supervisor are by Interal fixation, and opposite side is provided with anticorrosive coat, is also provided with pipe clamp between described supervisor and brace summer;
In a preferred embodiment of the present utility model, described anticorrosive coat is line with rubber layer.
In a preferred embodiment of the present utility model, described anticorrosive coat is also provided with polypropylene board outward.Because polypropylene material has stronger corrosion-resistant and anti-ly wash away performance, thus when described polypropylene board is used at the location external easily washed away by nozzle, can well play and prevent brace summer from being washed away by spray.In the present invention's preferred embodiment, described polypropylene board is U-shaped.
In a preferred embodiment of the present utility model, described supervisor and the connected mode of brace summer adopt punched-type mounting means.
The utility model provides a kind of for the spraying layer system in absorption tower on the other hand, the nozzle comprising supervisor, be positioned at the brace summer of supervisor tube wall both sides, arm and be connected with arm, described brace summer side and supervisor pass through Interal fixation, opposite side is provided with anticorrosive coat, also be provided with pipe clamp between described supervisor and brace summer, described anticorrosive coat is also provided with polypropylene board outward.
In a preferred embodiment in accordance with this invention, described nozzle is arranged on brace summer both sides.
In a preferred embodiment in accordance with this invention, described nozzle and the spacing of brace summer are 400-550mm.When spray liquid is after nozzle ejection, according to the spray radius of spray liquid, while described spacing can ensure spray desulfurized effect, what contact with spray liquid at supporting layer washes away place, owing to being provided with anticorrosive coat and polypropylene board, reaching and decrease spraying layer washing away and corroding pipeline.
Compared with the spraying layer in existing absorption tower, the utility model has following characteristics:
(1) the utility model is studied and numerical simulation by experiment, thus determine the key structure that spray system is arranged and parameter, achieve while maximizing spray desulfurized effect, decrease spraying layer washing away and corroding pipeline, add the service life of pipeline.
(2) scheme of the anticorrosion protection against erosion of the utility model optimal design spraying layer brace summer pattern and brace summer, the final complete set technology forming the anticorrosion protection against erosion being applicable to variety classes absorption tower spraying layer.
(3) the utility model solves absorption tower spraying layer brace summer for the spraying layer structure in absorption tower and system be washed by providing a kind of, and brace summer perforation, anticorrosive coat come off problem.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in further detail.
Fig. 1 is a kind of schematic diagram for the spraying layer pipeline in absorption tower of the utility model;
Fig. 2 is a kind of schematic diagram for the spraying layer system in absorption tower of the utility model.
Wherein, 1 is stay pipe, and 2 is nozzle, and 3 is arm, and 4 wash away place for spray liquid, and 5 is anticorrosive coat, and 6 is polypropylene board, and 7 is supervisor, and 8 is pipe clamp, and 9 is steel plate.
Detailed description of the invention
As shown in Figure 1 for the spraying layer pipeline in absorption tower, comprise supervisor 7 and the brace summer 1 being positioned at supervisor 7 tube wall both sides, supervisor 7 and brace summer 1 adopt punched-type to install, and described brace summer 1 side is fixed by steel plate 9 with supervisor, opposite side is provided with anticorrosive coat 5, is also provided with pipe clamp 8 between described supervisor 7 and brace summer 1; Wherein, described anticorrosive coat 5 is line with rubber layer, and described anticorrosive coat 5 is outer is also provided with polypropylene board 6, and polypropylene board is U-shaped, and for preventing, brace summer from boring a hole, anticorrosive coat comes off.
As shown in Figure 2 for the spraying layer system in absorption tower, comprise supervisor 7, be positioned at the brace summer 1 of supervisor 7 tube wall both sides, arm 3 and the nozzle 2 that is connected with arm 3, nozzle 2 is arranged on brace summer 1 both sides, nozzle 2 is 400-550mm with the spacing of brace summer 1, described brace summer 1 side and supervisor pass through Interal fixation, opposite side is provided with anticorrosive coat 5, is also provided with pipe clamp between described supervisor and brace summer, and described anticorrosive coat is also provided with polypropylene board 6 outward.Wherein, described anticorrosive coat 5 is line with rubber layer, and described anticorrosive coat 5 is outer is also provided with polypropylene board 6, and polypropylene board is U-shaped, and for preventing, brace summer from boring a hole, anticorrosive coat comes off.
In the process of carrying out desulfurization, spray liquid flows to nozzle from arm 3, from nozzle with fan-shaped spray, because the utility model is optimized the distance between nozzle and stay pipe, therefore, while achieving maximization spray desulfurized effect, decrease spraying layer washing away and corroding pipeline, add the service life of pipeline.

Claims (7)

1. one kind for the spraying layer pipeline in absorption tower, comprise supervisor and be positioned at the brace summer being responsible for tube wall both sides, it is characterized in that, described brace summer side and supervisor pass through Interal fixation, opposite side is provided with anticorrosive coat, also be provided with pipe clamp between described supervisor and brace summer, described anticorrosive coat is also provided with polypropylene board outward.
2. according to claim 1ly a kind ofly to it is characterized in that for the spraying layer pipeline in absorption tower, described anticorrosive coat is line with rubber layer.
3. according to claim 1ly a kind ofly to it is characterized in that for the spraying layer pipeline in absorption tower, described polypropylene board is U-shaped.
4. according to claim 1ly a kind ofly to it is characterized in that for the spraying layer pipeline in absorption tower, described supervisor and brace summer adopt punched-type to install.
5. one kind for the spraying layer system in absorption tower, the nozzle comprising supervisor, be positioned at the brace summer of supervisor tube wall both sides, arm and be connected with arm, it is characterized in that, described brace summer side and supervisor pass through Interal fixation, opposite side is provided with anticorrosive coat, also be provided with pipe clamp between described supervisor and brace summer, described anticorrosive coat is also provided with polypropylene board outward.
6. according to claim 5ly a kind ofly to it is characterized in that for the spraying layer system in absorption tower, described nozzle is arranged on brace summer both sides.
7. according to claim 5ly a kind ofly to it is characterized in that for the spraying layer system in absorption tower, described nozzle and the spacing of brace summer are 400-550mm.
CN201520476955.4U 2015-07-06 2015-07-06 A kind of for the spraying layer pipeline in absorption tower and system Active CN204933202U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520476955.4U CN204933202U (en) 2015-07-06 2015-07-06 A kind of for the spraying layer pipeline in absorption tower and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520476955.4U CN204933202U (en) 2015-07-06 2015-07-06 A kind of for the spraying layer pipeline in absorption tower and system

Publications (1)

Publication Number Publication Date
CN204933202U true CN204933202U (en) 2016-01-06

Family

ID=55000661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520476955.4U Active CN204933202U (en) 2015-07-06 2015-07-06 A kind of for the spraying layer pipeline in absorption tower and system

Country Status (1)

Country Link
CN (1) CN204933202U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111482055A (en) * 2019-01-28 2020-08-04 南京定环新能源科技有限公司 Synergistic wear-resisting ring

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111482055A (en) * 2019-01-28 2020-08-04 南京定环新能源科技有限公司 Synergistic wear-resisting ring

Similar Documents

Publication Publication Date Title
CN207694563U (en) A kind of desulfurization slurry collection device
CN104857836A (en) Flue gas desulfurization absorber interactive spray system
CN202569948U (en) Absorption device for wet-process smoke desulfurization and denitrification
CN204865457U (en) Wet flue gas desulfurization carries torrent pipe bars device and desulfurization absorption tower of effect
CN204933202U (en) A kind of for the spraying layer pipeline in absorption tower and system
CN206810022U (en) A kind of desulfuration absorbing tower shower group support meanss
CN206911118U (en) A kind of corrugated sheet and its airflow distribution device for wet desulfuration tower
CN103357246A (en) Seawater desulfurization absorption tower for purifying smoke, desulfurization system and desulfurization method
CN201880465U (en) Seawater desulfurizing spray tower
CN204816209U (en) Desulfurizing tower spray piping strutting arrangement
CN201719955U (en) Water soluble gas absorption device
CN203803362U (en) Efficient transmission layer desulfurization device in desulfurization absorption tower
CN105169915A (en) Novel desulphurization absorption tower
CN206519022U (en) A kind of improved mist eliminator flushing water system
CN201244442Y (en) Spraying tube
CN215138570U (en) Device for absorbing and washing flue gas containing sulfur trioxide in three spraying modes
CN204841339U (en) Coal fired power plant absorption tower scour prevention device
CN205073873U (en) Novel desulfurization absorption tower
CN209865709U (en) Annular spraying pipe network of desulfurization absorption tower
CN213790870U (en) Wet desulphurization synergistic ring
CN206334526U (en) Spraying layer device in a kind of desulphurization system
CN204952654U (en) Connection structure of desulfurization absorption tower thick liquid spray piping and nozzle
CN204247064U (en) A kind of smoke absorption tower of gas-liquid bidirectional guide
CN204952618U (en) Desulfurization absorption tower
CN203264547U (en) Combined type desulfurization and dust removing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant