CN204676542U - A kind of artificial clear earthenware of prefabricated pipe stake holes - Google Patents

A kind of artificial clear earthenware of prefabricated pipe stake holes Download PDF

Info

Publication number
CN204676542U
CN204676542U CN201520344903.1U CN201520344903U CN204676542U CN 204676542 U CN204676542 U CN 204676542U CN 201520344903 U CN201520344903 U CN 201520344903U CN 204676542 U CN204676542 U CN 204676542U
Authority
CN
China
Prior art keywords
rod
stake holes
clear
prefabricated pipe
earthenware
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520344903.1U
Other languages
Chinese (zh)
Inventor
黄银河
刘家铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201520344903.1U priority Critical patent/CN204676542U/en
Application granted granted Critical
Publication of CN204676542U publication Critical patent/CN204676542U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

An artificial clear earthenware for prefabricated pipe stake holes, comprises the body of rod, and handle and clear soil end, is characterized in that: the described body of rod (2) is one section of diameter 20mm round steel, and length is determined according to the filling core degree of depth of pile body and cushion cap connection request; Described handle (1) is one section of diameter 20mm round steel, and long 200mm, fixes with one end vertical welding of the body of rod (2); Described clear soil end is arranged on the other end of the body of rod (2), clear soil end comprises helical blade (3) and circular cone tip (4), wherein: circular cone tip (4) long 50mm is as the top of the body of rod (2), and helical blade (3) is positioned at epiconus head-tail, and is weldingly fixed on the body of rod (2).It is simple, easy to make that the artificial clear earthenware of prefabricated pipe stake holes of the present utility model has apparatus structure, and clear earthenware is easy and simple to handle, with low cost and except the advantage of native Be very effective.

Description

A kind of artificial clear earthenware of prefabricated pipe stake holes
Technical field
The utility model relates to a kind of instrument for removing earth in hole of post, specifically, is a kind of artificial clear earthenware of prefabricated pipe stake holes.
Background technology
Prefabricated tubular pile is one of engineering material commonly used the most in current building trade groundsill and foundation.In tube pile construction process or constructed rear not in place to the closed protective of stake holes in pile tube be Problems existing in tube pile construction always; often cause pile tube due to hole accident or human factor make stake holes inner product soil; and then need before causing stake to be connected with cushion cap to carry out stake holes cleaning; and to cause to construction with spade cleaning eye inner product soil and waste time and energy, affect efficiency of construction.
Therefore known spade cleaning eye inner product earthwork formula also exists above-mentioned all inconvenience and problem.
Summary of the invention
The purpose of this utility model, is the artificial clear earthenware proposing a kind of structure prefabricated pipe stake holes simple, easy to use.
For achieving the above object, technical solution of the present utility model is:
An artificial clear earthenware for prefabricated pipe stake holes, comprises the body of rod, and handle and clear soil end, is characterized in that:
The described body of rod is one section of diameter 20mm round steel, and length is determined according to the filling core degree of depth of pile body and cushion cap connection request;
Described handle is one section of diameter 20mm round steel, and long 200mm, fixes with one end vertical welding of the body of rod;
Described clear soil end is arranged on the other end of the body of rod, and clear soil end comprises helical blade and circular cone tip, wherein: the long 50mm of circular cone tip is as the top of the body of rod, and helical blade is positioned at epiconus head-tail, and is weldingly fixed on the body of rod.
The artificial clear earthenware of prefabricated pipe stake holes of the present utility model can also be further achieved by the following technical measures.
The artificial clear earthenware of aforesaid prefabricated pipe stake holes, the pitch of wherein said helical blade is 100mm.
The artificial clear earthenware of aforesaid prefabricated pipe stake holes, the height of wherein said helical blade helicoid is 50mm.
The artificial clear earthenware of aforesaid prefabricated pipe stake holes, the number of turns of wherein said helical blade (3) is 1 circle.
The artificial clear earthenware of aforesaid prefabricated pipe stake holes, wherein said handle (1) outpacking rubber sheath.
After adopting technique scheme, the artificial clear earthenware of prefabricated pipe stake holes of the present utility model has the following advantages:
1, clear earthenware apparatus structure is simple, easy to make;
2, clear earthenware is easy and simple to handle, with low cost, except native Be very effective.
Accompanying drawing explanation
Fig. 1 is the artificial clear earthenware structural representation of the utility model embodiment.
In figure: 1 handle, 2 bodies of rod, 3 helical blades, 4 circular cone tips.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing thereof, the utility model is illustrated further.
Embodiment 1
The artificial clear earthenware of prefabricated pipe stake holes of the present utility model, comprises the body of rod, handle and clear soil end.
Now refer to Fig. 1, Fig. 1 is the artificial clear earthenware structural representation of the utility model embodiment.As shown in the figure, the described body of rod 2 is one section of diameter 20mm round steel, and length is determined according to the filling core degree of depth of pile body and cushion cap connection request, and body of rod length fills with than pile tube that the core degree of depth is long is no less than 200mm, and during to ensure clear hole, handle, more than stake top, meets easy construction.
Described handle 1 is one section of diameter 20mm round steel, and long 200mm, fixes with one end vertical welding of the body of rod 2; Described handle 1 outpacking rubber sheath, rotates clear earthenware and enters the soil body when both conveniently fetching earth, increase simultaneously operating personnel when constructing with clear earthenware hold frictional force, slippage when avoiding constructing.
Described clear soil end is arranged on the other end of the body of rod 2, and clear soil end comprises helical blade 3 and circular cone tip 4, wherein: the long 50mm of circular cone tip 4 is as the top of the body of rod 2, and top is polished into awl shape, to enter the soil body during clear hole.Helical blade 3 is positioned at epiconus head-tail, and is weldingly fixed on the body of rod 2.It is 3mm steel plate that clear soil end comprises helical blade, and steel plate end upper port is 100mm to the total pitch of lower port, reduces the weight that once fetches earth, and extracts when being convenient to artificial clear soil, and outer rim is to clear vent stem gradient i=10%, and the gradient is inside, and avoiding fetching earth is soil body slump.
The utility model has substantive distinguishing features and significant technological progress, and the artificial clear earthenware structure of prefabricated pipe stake holes of the present utility model is simple, easy to make, and clear earthenware is easy and simple to handle, with low cost, except native Be very effective.
The manually clear earthenware of prefabricated pipe stake holes of the present utility model uses in commercial residential buildings, 37A-01A plot, Shanghai Songjiang district She Shan north projects, and Be very effective when the clear soil of stake holes is constructed, obtains exploiting entity, supervisor and Construction unit's abundant affirmation.
Above embodiment is only for illustration of the utility model, but not to restriction of the present utility model, person skilled in the relevant technique, when not departing from spirit and scope of the present utility model, can also make various conversion or change.Therefore, all equivalent technical schemes also should belong to category of the present utility model, should be limited by each claim.

Claims (5)

1. an artificial clear earthenware for prefabricated pipe stake holes, comprises the body of rod, and handle and clear soil end, is characterized in that:
The described body of rod (2) is one section of diameter 20mm round steel, and length is determined according to the filling core degree of depth of pile body and cushion cap connection request;
Described handle (1) is one section of diameter 20mm round steel, and long 200mm, fixes with one end vertical welding of the body of rod (2);
Described clear soil end is arranged on the other end of the body of rod (2), clear soil end comprises helical blade (3) and circular cone tip (4), wherein: circular cone tip (4) long 50mm is as the top of the body of rod (2), and helical blade (3) is positioned at epiconus head-tail, and is weldingly fixed on the body of rod (2).
2. the artificial clear earthenware of prefabricated pipe stake holes as claimed in claim 1, it is characterized in that, the pitch of described helical blade (3) is 100mm.
3. the artificial clear earthenware of prefabricated pipe stake holes as claimed in claim 1, it is characterized in that, the height of described helical blade (3) helicoid is 50mm.
4. the artificial clear earthenware of prefabricated pipe stake holes as claimed in claim 1, it is characterized in that, the number of turns of described helical blade (3) is 1 circle.
5. the artificial clear earthenware of prefabricated pipe stake holes as claimed in claim 1, is characterized in that, described handle (1) outpacking rubber sheath.
CN201520344903.1U 2015-05-26 2015-05-26 A kind of artificial clear earthenware of prefabricated pipe stake holes Active CN204676542U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520344903.1U CN204676542U (en) 2015-05-26 2015-05-26 A kind of artificial clear earthenware of prefabricated pipe stake holes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520344903.1U CN204676542U (en) 2015-05-26 2015-05-26 A kind of artificial clear earthenware of prefabricated pipe stake holes

Publications (1)

Publication Number Publication Date
CN204676542U true CN204676542U (en) 2015-09-30

Family

ID=54176247

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520344903.1U Active CN204676542U (en) 2015-05-26 2015-05-26 A kind of artificial clear earthenware of prefabricated pipe stake holes

Country Status (1)

Country Link
CN (1) CN204676542U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105369808A (en) * 2015-10-13 2016-03-02 江苏建筑职业技术学院 Device and method for clearing away mud in hollow pile
CN105839641A (en) * 2015-12-28 2016-08-10 上海建工七建集团有限公司 Spiral type soil dig-out device
CN106894460A (en) * 2015-12-17 2017-06-27 五冶集团上海有限公司 Instrument of soil and preparation method thereof in a kind of quick cleaning Spiral digging machine drilling bucket
CN112475681A (en) * 2020-11-23 2021-03-12 哈尔滨蜜国郎物业有限公司 Pipeline welding system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105369808A (en) * 2015-10-13 2016-03-02 江苏建筑职业技术学院 Device and method for clearing away mud in hollow pile
CN105369808B (en) * 2015-10-13 2017-08-25 江苏建筑职业技术学院 Clear up the device and method for cleaning of soil in hollow pile
CN106894460A (en) * 2015-12-17 2017-06-27 五冶集团上海有限公司 Instrument of soil and preparation method thereof in a kind of quick cleaning Spiral digging machine drilling bucket
CN105839641A (en) * 2015-12-28 2016-08-10 上海建工七建集团有限公司 Spiral type soil dig-out device
CN112475681A (en) * 2020-11-23 2021-03-12 哈尔滨蜜国郎物业有限公司 Pipeline welding system

Similar Documents

Publication Publication Date Title
CN204676542U (en) A kind of artificial clear earthenware of prefabricated pipe stake holes
CN202969389U (en) Spiral shovel for clearing soil of pile core
CN204385727U (en) Spiral grouting preformed pile
CN103913348B (en) A kind of for field inspection well fixed depth sampling device and sampling method
CN205188944U (en) Reinforcing concrete circular pile
CN205400121U (en) Vertical interim strutting arrangement who props usefulness that trades
CN204401611U (en) The pile making device of concrete pile
CN204122650U (en) Tension rib bending tool
CN203947478U (en) A kind of novel pile tube pile follower equipment
CN203725833U (en) Electric drill horizontal supporting device
CN201943071U (en) Implantable steel tube anchor rod with stabs
CN203768909U (en) Prefabricated tubular pile inner core hole cleaning tool
CN203729302U (en) Umbrella-shaped horizontal brace
CN206418494U (en) Steel reinforcement cage plants pile foundation structure
CN208830311U (en) A kind of pile crown void stake part integrally hangs out auxiliary construction device
CN109837889A (en) A kind of electric welding connection prestressed concrete abnormal shape tubular pole
CN218322683U (en) Foundation ditch excavation deformation characteristic research experimental apparatus
CN203188227U (en) Anti-floating anchor pile pool
CN202482863U (en) Underwater ground anchor pile driving equipment
CN203238624U (en) Novel steel tube cement pile
CN203361223U (en) Rapid-connection grabbing rod type methane tank drawing-out clearing machine
CN204326073U (en) Underground anti-floating anchor rod structure
CN219298213U (en) Soil-digging device for pile core of pipe pile
CN204343777U (en) A kind of convenient line bar base
CN102425174A (en) Drainage tubular pile and soil nailing wall composite supporting structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant