CN204176810U - A kind of operating room resh air requirement intelligent power saving regulator control system - Google Patents

A kind of operating room resh air requirement intelligent power saving regulator control system Download PDF

Info

Publication number
CN204176810U
CN204176810U CN201420544683.2U CN201420544683U CN204176810U CN 204176810 U CN204176810 U CN 204176810U CN 201420544683 U CN201420544683 U CN 201420544683U CN 204176810 U CN204176810 U CN 204176810U
Authority
CN
China
Prior art keywords
operating room
air
cycle unit
fresh air
handling units
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420544683.2U
Other languages
Chinese (zh)
Inventor
胡欣
朱易顺
张晗
黄永宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN GLORY MEDICAL CO Ltd
Original Assignee
SHENZHEN GLORY MEDICAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN GLORY MEDICAL CO Ltd filed Critical SHENZHEN GLORY MEDICAL CO Ltd
Priority to CN201420544683.2U priority Critical patent/CN204176810U/en
Application granted granted Critical
Publication of CN204176810U publication Critical patent/CN204176810U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

A kind of operating room resh air requirement intelligent power saving regulator control system, relate to the clean processing technology field of operating room air, solving above one drags resh air requirement in multi-form operating room non-adjustable, the technical problem of a large amount of energy wastes, more than two Cycle Unit for the operating room return air process to duty including Fresh air handling units and be connected with Fresh air handling units; The corresponding operating room of every platform Cycle Unit; Be connected respectively by Cycle Unit fresh air pipeline between the air outlet of described Fresh air handling units and the air inlet of each Cycle Unit, every bar Cycle Unit fresh air pipeline is respectively equipped with a Cycle Unit Xingfeng capsule valve; The air outlet of each Cycle Unit is connected with corresponding operating room by clean wind passage; The air inlet of each Cycle Unit is also connected with corresponding operating room return air inlet by return air duct; Also be respectively equipped with operating room fresh air pipeline between the air outlet of described Fresh air handling units and each operating room, every bar operating room fresh air pipeline is provided with an operating room Xingfeng capsule valve; Can effectively to one drag multi-form every between the resh air requirement of operating room under different conditions carry out intelligent control, thus solve current one-to-multi-type operating room and occur energy consumption issues such as " low load with strong power ", thus greatly reduce operating room energy consumption.

Description

A kind of operating room resh air requirement intelligent power saving regulator control system
Technical field
The utility model relates to the clean processing technology field of operating room air, is specifically related to operating room resh air requirement energy-conserving regulate and control aspect.
Background technology
Resh air requirement suitable in operating room meets the demand of indoor occupant breathing and gets rid of room air pollution gas.
Fresh air dehumidification cooling and humidification heating energy consumption are the main composition of the overall energy consumption of operating room.One of power saving of operating room air cleaning and conditioning system is resh air requirement defining method not science.In specification with maintain malleation, fresh air changes, personnel need and an enforceable resh air requirement minimum of a value in maximum for design outdoor air ventilation rate, this resh air requirement is contrasted by field measurement, be confirmed to be obviously bigger than normal, and in air cleaning and conditioning system energy consumption mainly on new wind, so, as long as reasonable disposition resh air requirement, just can effectively reduce a considerable number of energy consumption.
And in practice, operating room not all time all need high-cleanness, high; Meet the how many difference of operation indoor occupant and have different demands to resh air requirement; Most of hospital is in order to reduce engineering cost, cut down expenses, the air-conditioning system of ten thousand grades of operating rooms and other clean operating room of even lower level is set to one drag two, and drags three or more mode, make air-conditioning system be in the running status of " low load with strong power " for a long time.Such as hundred grades of 100,000 grades of operating rooms between ten thousand grades of operating rooms or 4 between operating room and two between air-conditioning system burden 1, as long as high-level operating room does not use, then system air quantity is at least greater than 112% and 84% of now Air Quantity Required, and that is now system Air Quantity Required is only 47% and 54.3% of system air quantity.As can be seen here, due to one drag multi-form every between operating room resh air requirement non-adjustable, cause a large amount of energy wastes.
Summary of the invention
Drag resh air requirement in multi-form operating room non-adjustable for solving above one, the technical problem of a large amount of energy wastes, the utility model provides a kind of operating room resh air requirement intelligent power saving regulator control system.
For solving the technical problem that the utility model proposes, the technical scheme adopted is: a kind of operating room resh air requirement intelligent power saving regulator control system, is characterized in that more than two Cycle Unit for the operating room return air process to duty that described system includes Fresh air handling units and is connected with Fresh air handling units; The corresponding operating room of every platform Cycle Unit;
Be connected respectively by Cycle Unit fresh air pipeline between the air outlet of described Fresh air handling units and the air inlet of each Cycle Unit, every bar Cycle Unit fresh air pipeline is respectively equipped with a Cycle Unit Xingfeng capsule valve; The air outlet of each Cycle Unit is connected with corresponding operating room by clean wind passage; The air inlet of each Cycle Unit is also connected with corresponding operating room return air inlet by return air duct;
Also be respectively equipped with operating room fresh air pipeline between the air outlet of described Fresh air handling units and each operating room, every bar operating room fresh air pipeline is provided with an operating room Xingfeng capsule valve;
The operation shadowless lamp the detection module whether operation shadowless lamp that between every, operating room is provided with a set of detection operating room is opened; Described each operation shadowless lamp detection module is connected with a top control module respectively, the Fresh air handling units of top control module also described in connection control, operating room Xingfeng capsule valve and Cycle Unit Xingfeng capsule valve; When detecting that when operation shadowless lamp detection module the operation shadowless lamp of operating room is opened, top control module controls operating room Xingfeng capsule valve corresponding to this operating room and closes, corresponding Cycle Unit and Cycle Unit Xingfeng capsule valve are opened, and control described Fresh air handling units simultaneously and provide the total resh air requirement maintaining resh air requirement needed for all working state operating room and the resh air requirement sum of off working state operating room maintenance needed for malleation.
Described Fresh air handling units from air inlet to air outlet between be provided with into low efficient filter, hot-water coil pipe, blower fan, medium effeciency filter, water coil, high efficiency particulate air filter and humidifier successively; Fresh air handling units air inlet is provided with controlled air intake valve and mass air flow sensor.
The air outlet of described Fresh air handling units is connected by main conduit with between Cycle Unit fresh air pipeline, and main conduit is provided with master control valve.
Mixing section, bringing-up section, surface cooling section, electric heating humidification section, fan section, medium effeciency filter and hot arc is again included successively between described Cycle Unit air inlet to air outlet.
Apply described system and realize operating room resh air requirement intelligent power saving regulate and control method, it is characterized in that described method includes: the control method of off working state operating room resh air requirement, the control method of duty operating room resh air requirement and the required fresh air quantity control method of partial surgical room work;
The control method of off working state operating room resh air requirement, detect whether the operation shadowless lamp of operating room is opened by operation shadowless lamp detection module, when detecting as non-opening, then represent that operating room is in off working state, control operating room Xingfeng capsule valve by total control module to open, maintain resh air requirement needed for malleation by the operating room fresh air pipeline of the air outlet separate connection with Fresh air handling units for off working state operating room; Top control module controls Fresh air handling units and provides the resh air requirement of all off working state operating rooms maintenance needed for malleation;
The control method of duty operating room resh air requirement, when detecting that when operation shadowless lamp detection module the operation shadowless lamp of operating room is opened, then represent that operating room is in running order, top control module controls operating room Xingfeng capsule valve corresponding to this operating room and closes, corresponding Cycle Unit and Cycle Unit Xingfeng capsule valve are opened, the new wind that Fresh air handling units provides under the effect of Cycle Unit mixes with operating room return air, carry out temperature, humidity and cleanliness factor after mixing again to process, to meet operation required air environment; Top control module controls Fresh air handling units and provides resh air requirement needed for maintenance all working state operating room;
The required fresh air quantity control method of partial surgical room work, the control method of described off working state operating room resh air requirement is adopted independently to control for part off working state operating room, adopt the control method of described duty operating room resh air requirement independently to control for some work state operating room, top control module controls according to off working state operating room quantity and duty operating room quantity total resh air requirement that Fresh air handling units provides the resh air requirement sum maintained needed for resh air requirement needed for all working state operating room and off working state operating room maintenance malleation.
The beneficial effects of the utility model are: the utility model Fresh air handling units adopts independently method of supplying to duty operating room and off working state operating room, can effectively to one drag multi-form every between the resh air requirement of operating room under different conditions carry out intelligent control, thus solve the energy consumption issues such as current one-to-multi-type operating room appearance " low load with strong power ", thus greatly reduce operating room energy consumption.
Accompanying drawing explanation
Fig. 1 is the structural representation of operating room resh air requirement intelligent power saving regulator control system of the present utility model;
Fig. 2 is control circuit structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing and preferred specific embodiment, structure of the present utility model is further described.
With reference to shown in Fig. 1, operating room resh air requirement intelligent power saving regulator control system of the present utility model include Fresh air handling units 2 and be connected with Fresh air handling units 2 more than two the Cycle Unit A1 for the operating room return air process to duty, A2, A3; The corresponding operating room of every platform Cycle Unit.
Fresh air handling units 2 from air inlet to air outlet between be provided with into low efficient filter, hot-water coil pipe, blower fan, medium effeciency filter, water coil, high efficiency particulate air filter and humidifier successively; Fresh air handling units air inlet is provided with controlled air intake valve and mass air flow sensor.Fresh air handling units 2 for filtering clean process to outdoor air, and to temperature and or humidity carry out preliminary treatment.
Mixing section, bringing-up section, surface cooling section, electric heating humidification section, fan section, medium effeciency filter and hot arc is again included successively between described each Cycle Unit A1, A2, A3 air inlet to air outlet.Be mainly used in operation return air inlet backflow wind is exported to new wind with Fresh air handling units 2 and mixes, meet cleanliness factor needed for operation and resh air requirement demand for corresponding operating room provides, as required temperature and or humidity are carried out to mixing wind simultaneously and carry out fine adjustment.
Fresh air handling units 2 and the concrete structural relation between Cycle Unit A1, A2, A3 and each operating room are:
Be connected respectively by Cycle Unit fresh air pipeline 61,62,63 between the air outlet of described Fresh air handling units 2 and the air inlet of each Cycle Unit A1, A2, A3, every bar Cycle Unit fresh air pipeline 61,62,63 is respectively equipped with a Cycle Unit Xingfeng capsule valve 31,32,33; The air outlet of Fresh air handling units 2 described is if desired connected by main conduit 6 with between each Cycle Unit fresh air pipeline 61,62,63, and main conduit 6 is provided with master control valve 3; The air outlet of each Cycle Unit A1, A2, A3 is connected with corresponding operating room B1, B2, B3 by clean wind passage; The air inlet of each Cycle Unit A1, A2, A3 is also connected with corresponding operating room B1, B2, B3 return air inlet by return air duct.
The air outlet of described Fresh air handling units 2 and be respectively also respectively equipped with operating room fresh air pipeline 51,52,53 between operating room B1, B2, B3, every bar operating room fresh air pipeline 51,52,53 is provided with an operating room Xingfeng capsule valve 41,42,43.
Shown in seeing figures.1.and.2, in order to realize the automatic control of the utility model system, the operation shadowless lamp the detection module whether operation shadowless lamp that operating room B1, B2, B3 are provided with a set of detection operating room between is often opened; Whether whether operation shadowless lamp detection module can adopt optoelectronic switch to detect operation shadowless lamp and open, or open by detecting operation shadowless lamp with the switch of operation shadowless lamp gauge tap Synchronization Control; Operation shadowless lamp is opened and is then represented this operating room work for the treatment of state, otherwise is off working state; Described each operation shadowless lamp detection module is connected with a top control module respectively, the Fresh air handling units 2 of top control module also described in connection control, operating room Xingfeng capsule valve 41,42,43 and Cycle Unit Xingfeng capsule valve 31,32,33; When detecting that when operation shadowless lamp detection module the operation shadowless lamp of operating room is opened, top control module controls operating room Xingfeng capsule valve corresponding to this operating room and closes, corresponding Cycle Unit and Cycle Unit Xingfeng capsule valve are opened, and control described Fresh air handling units simultaneously and provide the total resh air requirement maintaining resh air requirement needed for all working state operating room and the resh air requirement sum of off working state operating room maintenance needed for malleation.
With reference to shown in Fig. 1, below for three operating rooms, operating room resh air requirement intelligent power saving regulate and control method is realized to system described in the utility model and is described further.
The first state, three operating rooms are all in running order:
Three operating room B1, B2, the operation shadowless lamp detection module of B3 detects that three operating room operation shadowless lamps are opening, detection signal is passed to main control module by operation shadowless lamp detection module, main control module then controls three operating room B1, B2, the operating room Xingfeng capsule valve 41 of B3, 42, 43 close, master control valve 3 and Cycle Unit Xingfeng capsule valve 31, 32, 33 open, main control module also controls the new wind total amount of Fresh air handling units 2 simultaneously, that is to say and make the variable of the mass air flow sensor of Fresh air handling units 2 and preset three operating rooms that all to enable required new wind total amount equal.If the lustration class of three operating rooms is all II level, according to national standard, Xin Feng Liang≤800 m during II level operation room work 3/ h, operating room 800 m between getting often 3/ h, so the variable of Fresh air handling units 2 air inlet mass air flow sensor should reach 2400 m 3the new wind total amount of/h, the controlled air intake valve regulated that can be arranged by Fresh air handling units air inlet enters the new wind total amount of Fresh air handling units air inlet.
The second state, three operating rooms are all in off working state:
The operation shadowless lamp detection module of three operating rooms B1, B2, B3 detects that three operating room operation shadowless lamps are closed condition, detection signal is passed to main control module by operation shadowless lamp detection module, the operating room Xingfeng capsule valve 41,42,43 that main control module then controls three operating rooms B1, B2, B3 is opened, master control valve 3 and Cycle Unit Xingfeng capsule valve 31,32,33 are closed, and top control module controls the resh air requirement needed for maintenance malleation that Fresh air handling units 2 provides three operating rooms B1, B2, B3.
The third state, first operating room B1 deals with the work state, and operating room B2, B3 are in off working state between second and between the 3rd:
The operation shadowless lamp detection module of first operating room B1 detects that operation shadowless lamp is opened, operating room B2 between second and between the 3rd, the operation shadowless lamp detection module of B3 detects that operation shadowless lamp is closed, three operating room B1, B2, detection signal is all passed to main control module by the operation shadowless lamp detection module of B3, master control module controls operating room Xingfeng capsule valve 41 cuts out, operating room Xingfeng capsule valve 42, 43 open, master control valve 3 and Cycle Unit Xingfeng capsule valve 31 are opened, Cycle Unit Xingfeng capsule valve 32, 33 close, top control module controls Fresh air handling units to be provided needed for maintenance first duty operating room B1 between resh air requirement and second and operating room B2 between the 3rd, B3 off working state operating room maintains total resh air requirement of the resh air requirement sum needed for malleation.

Claims (4)

1. an operating room resh air requirement intelligent power saving regulator control system, is characterized in that more than two Cycle Unit for the operating room return air process to duty that described system includes Fresh air handling units and is connected with Fresh air handling units; The corresponding operating room of every platform Cycle Unit; Be connected respectively by Cycle Unit fresh air pipeline between the air outlet of described Fresh air handling units and the air inlet of each Cycle Unit, every bar Cycle Unit fresh air pipeline is respectively equipped with a Cycle Unit Xingfeng capsule valve; The air outlet of each Cycle Unit is connected with corresponding operating room by clean wind passage; The air inlet of each Cycle Unit is also connected with corresponding operating room return air inlet by return air duct; Also be respectively equipped with operating room fresh air pipeline between the air outlet of described Fresh air handling units and each operating room, every bar operating room fresh air pipeline is provided with an operating room Xingfeng capsule valve; The operation shadowless lamp the detection module whether operation shadowless lamp that between every, operating room is provided with a set of detection operating room is opened; Described each operation shadowless lamp detection module is connected with a top control module respectively, the Fresh air handling units of top control module also described in connection control, operating room Xingfeng capsule valve and Cycle Unit Xingfeng capsule valve; When detecting that when operation shadowless lamp detection module the operation shadowless lamp of operating room is opened, top control module controls operating room Xingfeng capsule valve corresponding to this operating room and closes, corresponding Cycle Unit and Cycle Unit Xingfeng capsule valve are opened, and control described Fresh air handling units simultaneously and provide the total resh air requirement maintaining resh air requirement needed for all working state operating room and the resh air requirement sum of off working state operating room maintenance needed for malleation.
2. a kind of operating room resh air requirement intelligent power saving regulator control system according to claim 1, is characterized in that: described Fresh air handling units from air inlet to air outlet between be provided with into low efficient filter, hot-water coil pipe, blower fan, medium effeciency filter, water coil, high efficiency particulate air filter and humidifier successively; Fresh air handling units air inlet is provided with controlled air intake valve and mass air flow sensor.
3. a kind of operating room resh air requirement intelligent power saving regulator control system according to claim 1, is characterized in that: the air outlet of described Fresh air handling units is connected by main conduit with between Cycle Unit fresh air pipeline, and main conduit is provided with master control valve.
4. a kind of operating room resh air requirement intelligent power saving regulator control system according to claim 1, is characterized in that: include mixing section, bringing-up section, surface cooling section, electric heating humidification section, fan section, medium effeciency filter and hot arc again between described Cycle Unit air inlet to air outlet successively.
CN201420544683.2U 2014-09-22 2014-09-22 A kind of operating room resh air requirement intelligent power saving regulator control system Expired - Fee Related CN204176810U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420544683.2U CN204176810U (en) 2014-09-22 2014-09-22 A kind of operating room resh air requirement intelligent power saving regulator control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420544683.2U CN204176810U (en) 2014-09-22 2014-09-22 A kind of operating room resh air requirement intelligent power saving regulator control system

Publications (1)

Publication Number Publication Date
CN204176810U true CN204176810U (en) 2015-02-25

Family

ID=52565618

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420544683.2U Expired - Fee Related CN204176810U (en) 2014-09-22 2014-09-22 A kind of operating room resh air requirement intelligent power saving regulator control system

Country Status (1)

Country Link
CN (1) CN204176810U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104235972A (en) * 2014-09-22 2014-12-24 深圳市尚荣医疗股份有限公司 Intelligent energy-saving control system and method for fresh air volume of operating rooms
CN109451059A (en) * 2018-12-22 2019-03-08 广州市赛科自动化控制设备有限公司 One kind being based on cleaning equipment intelligent management cloud computing mobile terminal
CN110260426A (en) * 2019-06-12 2019-09-20 冠恒建设工程有限公司 Assembled sterilizes aseptic room certainly
CN118089146A (en) * 2023-11-22 2024-05-28 广东申安建设科技有限公司 Dynamic balance operating room air conditioning system capable of adjusting cleanliness

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104235972A (en) * 2014-09-22 2014-12-24 深圳市尚荣医疗股份有限公司 Intelligent energy-saving control system and method for fresh air volume of operating rooms
CN109451059A (en) * 2018-12-22 2019-03-08 广州市赛科自动化控制设备有限公司 One kind being based on cleaning equipment intelligent management cloud computing mobile terminal
CN110260426A (en) * 2019-06-12 2019-09-20 冠恒建设工程有限公司 Assembled sterilizes aseptic room certainly
CN118089146A (en) * 2023-11-22 2024-05-28 广东申安建设科技有限公司 Dynamic balance operating room air conditioning system capable of adjusting cleanliness

Similar Documents

Publication Publication Date Title
CN204648544U (en) Indoor environmental condition control unit and system and building system and passive type building
CN203586433U (en) Fresh air conveying and control system of central air conditioning
CN203010779U (en) Air treatment system for cleaning operating departments by fixed-proportion secondary return air
CN202074655U (en) System for controlling indoor fresh air quantity according to carbon dioxide (CO2) concentration
CN204421274U (en) A kind of mixed type fresh air ventilator of two-stage heat exchange
CN202074654U (en) Closed-loop control system for controlling constant air volume of purification air conditioner system
CN104296362A (en) A building air duct filter device that automatically adjusts according to the concentration of outdoor PM2.5
CN201837020U (en) Energy-saving fresh air and air conditioning control system
CN201779747U (en) Zoning and temperature system of gas-heating water heater
CN204176810U (en) A kind of operating room resh air requirement intelligent power saving regulator control system
CN104235972A (en) Intelligent energy-saving control system and method for fresh air volume of operating rooms
CN108036438B (en) Energy-saving fresh air system
CN202675488U (en) Intelligence frequency conversion double air conditioning system
CN201318755Y (en) Novel ventilation system applicable to home-use central air conditioner
CN203964232U (en) Duct type Evaporative Cooling Air-conditioning System
CN103807972A (en) Indoor temperature and humidity automatic regulation system based on condensate water of air conditioner
CN206522902U (en) The fresh air all-in-one architectural applied to passive room
CN202835602U (en) Scaling secondary air return and double-surface-cooling purification air-container unit
CN206846961U (en) Laboratory saves air supplying and exhausting system
CN205227682U (en) SVC valves room temperature degree regulation and control system
CN204268593U (en) The combined air-conditioning system of the low operation energy consumption of a kind of filtration efficiency new wind section process
CN207688359U (en) A kind of multi-functional air conditioner temperature and humidity adjustment system
CN208873061U (en) Switchgear house switchgear temperature and humidity control system
CN108800397A (en) The energy-saving temperature and humidity control ventilating system of fully-automatic intelligent
CN204963105U (en) Invariable system of air conditioner water system flow

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: An intelligent energy saving control system of fresh air volume in operating room

Effective date of registration: 20201027

Granted publication date: 20150225

Pledgee: Shenzhen hi tech investment small loan Co.,Ltd.

Pledgor: SHENZHEN GLORY MEDICAL Co.,Ltd.

Registration number: Y2020980007208

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20211126

Granted publication date: 20150225

Pledgee: Shenzhen hi tech investment small loan Co.,Ltd.

Pledgor: SHENZHEN GLORY MEDICAL Co.,Ltd.

Registration number: Y2020980007208

PC01 Cancellation of the registration of the contract for pledge of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150225

CF01 Termination of patent right due to non-payment of annual fee