CN202899094U - Large-scale gate pier for water gate projects - Google Patents

Large-scale gate pier for water gate projects Download PDF

Info

Publication number
CN202899094U
CN202899094U CN2012205920548U CN201220592054U CN202899094U CN 202899094 U CN202899094 U CN 202899094U CN 2012205920548 U CN2012205920548 U CN 2012205920548U CN 201220592054 U CN201220592054 U CN 201220592054U CN 202899094 U CN202899094 U CN 202899094U
Authority
CN
China
Prior art keywords
pier
gate
tail
gate pier
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012205920548U
Other languages
Chinese (zh)
Inventor
刘达
黄本胜
邱静
王丽雯
王珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Research Institute of Water Resources and Hydropower
Original Assignee
Guangdong Research Institute of Water Resources and Hydropower
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Research Institute of Water Resources and Hydropower filed Critical Guangdong Research Institute of Water Resources and Hydropower
Priority to CN2012205920548U priority Critical patent/CN202899094U/en
Application granted granted Critical
Publication of CN202899094U publication Critical patent/CN202899094U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Barrages (AREA)

Abstract

The utility model discloses a large-scale gate pier for water gate projects. The large-scale gate pier comprises a pier body, a gate pier head is arranged at one end of the pier body, a gate pier tail is arranged at the other end of the pier body, side walls on two sides of the gate pier tail adducted inwardly gradually and smoothly from the head end of the gate pier tail to the tail end thereof, and an arc-shaped side wall smoothly connecting the side walls on two sides of the gate pier tail is further arranged at the tail end of the same. Since the side walls adducted inwardly gradually and smoothly from the head end of the gate pier tail to the tail end thereof are arranged on two sides of the gate pier tail, when water flow passes, the water flow is diffused to enable the water flow passing a gate to have good water flow flowing state; and the side walls on two sides are connected by the arc-shaped side wall, strength of concrete at the position is guaranteed, and the large-scale gate pier is more stable in structure. The large-scale gate pier is applicable to various water gate projects.

Description

A kind of large gate Pier Project
Technical field
The utility model relates to a kind of large gate Pier Project.
Background technology
Water gate engineering be build in the river course, channel or lake, Haikou, utilize gate control flow and regulate the hydraulic structure of water level, the application in hydraulic engineering is very extensive.During the sluice closed shutter, can flood retention, gear tide, retaining raise upper pond level, to satisfy the needs of upstream water intaking or navigation; During starting gate, can flood discharge, water drainage, sand surfing, water intaking or according to the needs adjust flux of downstream water.
Sluice is comprised of lock chamber, upstream linkage section and downstream linkage section.Lock chamber is the main body of sluice, is provided with base plate, gate, headstock gear, gate pier, breastwork, service bridge, access bridge etc.Gate is used for dash and control lock flow, and gate pier is in order to separate lock hole and supporting gate, breastwork, service bridge, access bridge etc.Base plate is the basis of lock chamber, to the ground transmission, has the weight of lock chamber superstructure and load concurrently the anti-effect that blends erosion control.Because the lockage flow shape is complicated, flow velocity is larger, and the configuration design of gate pier usually affects for the lockage flow-shape.At present for the design of gate pier, pier nose is generally taked semi-circular design owing to be the position that meets water, and for gate pier pier tail, generally adopts semi-circular, square and airflow design.
In the actual moving process of sluice gate, we usually find because its gate pier pier tail is designed to square or semi-circular, can not obtain good diffusion after causing current through the sluice gate lock chamber, current produce vortex in a big way behind pier, under the extruding of whirlpool, it is unstable to go out water seal stream, it is larger to fluctuate, flow-shape is comparatively unfavorable in the absorption basin, the increase of the local open degree of the intensity of whirlpool and strengthening, the bad fluidised form of this absorption basin is very big to the security implication of sluice self, because current are unstable, cause absorption basin base plate pressure fluctuation meter larger, cause the unstability of base plate.
In order to improve the flow-shape behind the gate pier pier tail, a kind of improved fairshaped pier tail pattern is suggested, through the model testing check, the pier tail of this pattern can effectively improve the flow-shape of absorption basin really, but through the Practical Project check, there are some shortcomings in this build, larger such as fairshaped tail point difficulty of construction, because the tail point is thinner on concrete structure, can not carry out arrangement of reinforcement again, under the impact of current, can cause damage, affect the normal operation of engineering.
The utility model content
The purpose of this utility model is to provide a kind of large gate Pier Project.
The solution that the utility model solves its technical problem is: a kind of large gate Pier Project, it comprises the pier body, one end of described pier body is provided with the gate pier pier nose, the other end of pier body is provided with gate pier pier tail, the sidewall on described gate pier pier tail both sides is received in the terminal round and smooth gradual change of gate pier pier tail from the head end of gate pier pier tail, and the end of gate pier pier tail also is provided with a curved wall with the round and smooth connection of sidewall on its both sides.
As further improvement in the technical proposal, the cross section of described curved wall is fan-shaped, and its radius is 1 ~ 2 meter.
As further improvement in the technical proposal, the cross section of described gate pier pier nose is semicircle.
As further improvement in the technical proposal, evenly be provided with several gate slots on the two side of described pier body, the gate slot of both sides is corresponding one by one, and gate slot all is arranged between gate pier pier nose and gate pier pier tail.
As further improvement in the technical proposal, the below of described pier body also is provided with the base plate that is fixedly connected with the pier body.
The beneficial effects of the utility model are: the sidewall of the utility model by receiving arrange from the head end of gate pier pier tail to the terminal round and smooth gradual change of gate pier pier tail on the both sides of gate pier pier tail in, so, when current through out-of-date, current obtain diffusion, make the current of lockage have good flow-shape, and by curved wall the both sides sidewall is connected, ensure the concrete intensity at this place, make its structure more stable.
The utility model is applicable to various water gate engineerings.
Description of drawings
Below in conjunction with accompanying drawing and example the utility model is further described.
Fig. 1 is sectional view of the present utility model;
Fig. 2 is top view of the present utility model.
The specific embodiment
Below in conjunction with accompanying drawing, describe application of the present utility model in detail.
With reference to Fig. 1~Fig. 2, a kind of large gate Pier Project, it comprises pier body 1, one end of pier body is provided with gate pier pier nose 2, the other end of pier body is provided with gate pier pier tail 3, the sidewall on gate pier pier tail 3 both sides is received in the terminal round and smooth gradual change of gate pier pier tail from the head end of gate pier pier tail, and the end of gate pier pier tail 3 also is provided with a curved wall 6 with the round and smooth connection of sidewall on its both sides.
By the sidewall of receiving arrange from the head end of gate pier pier tail 3 to the terminal round and smooth gradual change of gate pier pier tail on the both sides of gate pier pier tail 3 in, so, when current through out-of-date, current obtain diffusion, make the current of lockage have good flow-shape, and pass through curved wall 6 with the connection of both sides sidewall, and ensure the concrete intensity at this place, make its structure more stable.
Be further used as preferred embodiment, the cross section of curved wall 6 is fan-shaped, and its radius is 1 ~ 2 meter.Fan-shaped curved wall 6 ensures the concrete intensity at this place, makes its structure more stable.
Be further used as preferred embodiment, the cross section of gate pier pier nose 2 is semicircle.The gate pier pier nose 2 of semicircle shape is beneficial to current and enters gate.
Be further used as preferred embodiment, evenly be provided with several gate slots 5 on the two side of pier body 1, the gate slot 5 of both sides is corresponding one by one, and gate slot 5 all is arranged on 3 on gate pier pier nose 2 and gate pier pier tail.The cross section of gate slot 5 can be rectangle, semicircle or arc according to difform gate locating.
Be further used as preferred embodiment, the below of pier body 1 also is provided with the base plate 4 that is fixedly connected with pier body 1.
More than be that preferred embodiments of the present utility model is specified, but the invention is not limited to described embodiment, those of ordinary skill in the art also can make all equivalent modifications or replacement under the prerequisite of the utility model spirit, the modification that these are equal to or replacement all are included in the application's claim limited range.

Claims (5)

1. large gate Pier Project, it is characterized in that: it comprises pier body (1), one end of described pier body is provided with gate pier pier nose (2), the other end of pier body is provided with gate pier pier tail (3), the sidewall on described gate pier pier tail (3) both sides is received in the terminal round and smooth gradual change of gate pier pier tail from the head end of gate pier pier tail, and the end of gate pier pier tail (3) also is provided with a curved wall (6) with the round and smooth connection of sidewall on its both sides.
2. large gate Pier Project according to claim 1, it is characterized in that: the cross section of described curved wall (6) is fan-shaped, its radius is 1 ~ 2 meter.
3. large gate Pier Project according to claim 1 is characterized in that: the cross section of described gate pier pier nose (2) is for semicircle.
4. large gate Pier Project according to claim 1, it is characterized in that: evenly be provided with several gate slots (5) on the two side of described pier body (1), the gate slot of both sides (5) is corresponding one by one, and gate slot (5) all is arranged between gate pier pier nose (2) and gate pier pier tail (3).
5. large gate Pier Project according to claim 1, it is characterized in that: the below of described pier body (1) also is provided with the base plate (4) that is fixedly connected with pier body (1).
CN2012205920548U 2012-11-09 2012-11-09 Large-scale gate pier for water gate projects Expired - Fee Related CN202899094U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012205920548U CN202899094U (en) 2012-11-09 2012-11-09 Large-scale gate pier for water gate projects

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012205920548U CN202899094U (en) 2012-11-09 2012-11-09 Large-scale gate pier for water gate projects

Publications (1)

Publication Number Publication Date
CN202899094U true CN202899094U (en) 2013-04-24

Family

ID=48119783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012205920548U Expired - Fee Related CN202899094U (en) 2012-11-09 2012-11-09 Large-scale gate pier for water gate projects

Country Status (1)

Country Link
CN (1) CN202899094U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111733768A (en) * 2020-05-27 2020-10-02 长江水利委员会长江科学院 Pier tail structure of double-line water delivery aqueduct
CN112900373A (en) * 2021-01-19 2021-06-04 扬州大学 Gate slot with transition structure
CN112900372A (en) * 2021-01-19 2021-06-04 扬州大学 Gate slot structure for reducing water flow resistance

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111733768A (en) * 2020-05-27 2020-10-02 长江水利委员会长江科学院 Pier tail structure of double-line water delivery aqueduct
CN112900373A (en) * 2021-01-19 2021-06-04 扬州大学 Gate slot with transition structure
CN112900372A (en) * 2021-01-19 2021-06-04 扬州大学 Gate slot structure for reducing water flow resistance

Similar Documents

Publication Publication Date Title
CN103410130B (en) Multi-purpose tunnel arrangement structure
CN102619200B (en) Energy dissipation method of sidewall aeration steps and outlet submerged flip bucket of inclined shaft type flood discharge tunnel
CN202899094U (en) Large-scale gate pier for water gate projects
CN101761057A (en) Flood-discharging energy dissipater of hydroelectric project
CN202530433U (en) Flaring pier structure of flood discharge and energy dissipation system in hydraulic and hydro-power engineering
CN103174109B (en) Rapid-slow flow smooth transition flow diversion system for riverway intersection area
CN202181543U (en) Spillway tunnel structure
CN103966985B (en) A kind of side direction goes out to flow the absorption basin of rotary roll energy dissipating
CN203411957U (en) Aerification device used for flood discharge deep hole
CN204825802U (en) Compound line type overflow weir
CN206928256U (en) Overfall dam flip trajectory bucket facility
CN109750641A (en) Energy dissipation below spillway arragement construction when the difference discharge structure centralized arrangement of hydroelectric project bank
CN203200711U (en) River way intersection zone rapid-slow flow smooth transition flow guiding structure
CN203021973U (en) Sand intercepting groove
CN209779577U (en) Outlet energy dissipation arrangement structure for concentrated arrangement of different water release structures on shore in hydroelectric engineering
CN201598620U (en) Inverted-L sediment retaining weir structure
CN103290804A (en) Method and structure for providing downstream ecological flow after gate locking of stream guidance water release structure
CN203188184U (en) Device for aerial drainage and desilting
CN112195877B (en) Three-partition burst-down type energy dissipation structure for inner bottom slope of gentle slope open channel
CN109914359A (en) A kind of composite structure of arch dam table hole exits energy dissipating
CN209555870U (en) A kind of broken line type weir reducing upstream hammed water height
CN104524821B (en) Butterfly depositor
CN209760186U (en) Power mound that disappears of novel size among power station low reaches absorption basin
CN212129072U (en) Submerged energy dissipation pool for water conservancy system tail end
CN201933471U (en) Double-layer separation flood discharge structure of side spillway

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130424

Termination date: 20141109

EXPY Termination of patent right or utility model