CN202194425U - Base for high-voltage transmission and transformation wire and communication tower - Google Patents

Base for high-voltage transmission and transformation wire and communication tower Download PDF

Info

Publication number
CN202194425U
CN202194425U CN2011202585774U CN201120258577U CN202194425U CN 202194425 U CN202194425 U CN 202194425U CN 2011202585774 U CN2011202585774 U CN 2011202585774U CN 201120258577 U CN201120258577 U CN 201120258577U CN 202194425 U CN202194425 U CN 202194425U
Authority
CN
China
Prior art keywords
base
steel strand
strand cable
high pressure
modified line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202585774U
Other languages
Chinese (zh)
Inventor
从卫民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011202585774U priority Critical patent/CN202194425U/en
Application granted granted Critical
Publication of CN202194425U publication Critical patent/CN202194425U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model discloses a base for a high-voltage transmission and transformation wire and a communication tower, comprising a base, and a bearing platform surface disposed on the upper end surface of the base. The base for a high-voltage transmission and transformation wire and a communication tower is characterized in that a steel twisted rope is coaxially disposed in the base; a fixing-connecting piece after a stretching-drawing is disposed at the upper end of the steel twisted rope; the upper end of the steel twisted rope and the connecting piece thereof are located in the bearing platform surface; and a bulge is disposed on the steel twisted rope. In the utility model, because a pre-stress steel twisted rope is disposed in the base, the bearing capacity and the stable performance after a long-time service of the base are greatly enhanced; and steel consumption is reduced, so that the resource is saved.

Description

A kind of high pressure is failed modified line, communications tower base
Technical field
The utility model relates to reinforced concrete footing, is specifically related to the defeated modified line of a kind of high pressure, communications tower base.
Background technology
High pressure is failed modified line, communications tower in order to resist wind load and defeated line equipment is pullled, and prevents to topple, and needs firm and stocky base.Traditional tower base is a reinforced concrete structure, and its defective is: not only the base volume is big, and the steel material that need expend is many, and its bearing capacity is also not fully up to expectations, and the step-down of the stability of base meeting as time passes exists potential safety hazard.
Summary of the invention
The technical problem that the utility model will solve provides the defeated modified line of a kind of high pressure, communications tower base, and the base steel using amount is few, and bearing capacity is high, long service life.
The utility model is realized through following technical scheme:
A kind of high pressure is failed modified line, communications tower base; Comprise base, be arranged at the cushion cap face of base upper surface; Characteristics are coaxial prestress steel strand cables that are provided with in the base, and steel strand cable upper end is provided with the fixed connecting piece after the stretch-draw, and said steel strand cable upper end and connector thereof are positioned at the cushion cap face.
The further improvement project of the utility model is that described prestress steel strand cable is provided with convexity (in order to strengthen prestress steel strand cable and concrete adhesion stress).Described convexity is nut or extruding anchor or the concrete precast element that is fixedly connected on the prestress steel strand cable.
The utility model further improvement project is, said prestress steel strand cable along the base limit one week of portion etc. branch arrange.
The utility model further improvement project is that said prestress steel strand cable bottom is bonded in base (greatly
Cause 1/2nd following positions and be bonded in base), top is provided with sleeve pipe, and (the steel strand cable itself has sleeve pipe, and sliding agent is arranged in the sleeve pipe.If the steel strand cable is not established outer tube, then need add sleeve pipe and pipe in-lubricant in addition).Steel strand cable top is provided with sleeve pipe, and the steel strand cable of this part is in free state, is convenient to stretch-draw, forms stress.
The utility model compared with prior art has following advantage:
Therefore the utility model, makes the bearing capacity of base owing in base, be provided with the prestress steel strand cable, and the stability after long-time the use strengthened greatly, simultaneously, has reduced rolled steel dosage, has practiced thrift resource.
Description of drawings
Fig. 1 is the axial cross-sectional schematic of the utility model;
Fig. 2 overlooks enlarged diagram for Fig. 1.
The specific embodiment
As shown in Figure 1, the utility model comprises base 3, is arranged at the cushion cap face 1 of base 3 upper surfaces, is embedded with the stone bolt 5 (also can preset bolt hole) of king-post on the base cushion cap face 1.Still as shown in Figure 1, the coaxial prestress steel strand cable 2 that is provided with in the base 3, said steel strand cable upper end is provided with the fixed connecting piece after the stretch-draw, and said steel strand cable upper end and connector thereof are positioned at the cushion cap face.In the present embodiment, connector is selected anchor clamp for use.Still as shown in Figure 1; Steel strand cable 2 is provided with two convexities 4, and described protruding 4 for being fixedly connected on the extruding anchor of steel strand cable 2, and said steel strand cable bottom is bonded in base 3 (in the present embodiment; Steel strand cable 1/4th following positions are bonded in base 3), top is provided with sleeve pipe 6.
As shown in Figure 2, steel strand cable 2 is arranged along branches such as base one weeks of 3 limit portions.
The utility model prepares process: when colligation base reinforcing cage; Set the steel strand cable on request and do corresponding connection; After the concrete strength of base and cushion cap face thereof reaches requirement, the steel strand cable is carried out stretch-draw, behind the tensioning fixation; With concrete the stretch-draw hole on the cushion cap face is tamped again, steel strand cable and connector are embedded in the cushion cap face.

Claims (6)

1. a high pressure is failed modified line, communications tower base; Comprise base (3), be arranged at the cushion cap face (1) of base (3) upper surface; It is characterized in that: the coaxial prestress steel strand cable (2) that is provided with in the base (3); Said steel strand cable upper end is provided with the fixed connecting piece after the stretch-draw, and steel strand cable upper end and connector thereof are positioned at the cushion cap face.
2. a kind of high pressure as claimed in claim 1 is failed modified line, communications tower base, it is characterized in that: described prestress steel strand cable (2) is provided with convexity (4).
3. a kind of high pressure as claimed in claim 2 is failed modified line, communications tower base, it is characterized in that: nut or extruding anchor or the concrete precast element of described convexity (4) for being fixedly connected on prestress steel strand cable (2).
4. a kind of high pressure as claimed in claim 1 is failed modified line, communications tower base, it is characterized in that: said prestress steel strand cable (2) is arranged along branches such as base (3) one weeks of limit portion.
5. fail modified line, communications tower base like claim 1 or 2 or 4 described a kind of high pressure, it is characterized in that: prestress steel strand cable bottom is bonded in base (3), and top is provided with sleeve pipe (6).
6. a kind of high pressure as claimed in claim 1 is failed modified line, communications tower base, it is characterized in that: said connector is an anchor clamp.
CN2011202585774U 2011-07-21 2011-07-21 Base for high-voltage transmission and transformation wire and communication tower Expired - Fee Related CN202194425U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202585774U CN202194425U (en) 2011-07-21 2011-07-21 Base for high-voltage transmission and transformation wire and communication tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202585774U CN202194425U (en) 2011-07-21 2011-07-21 Base for high-voltage transmission and transformation wire and communication tower

Publications (1)

Publication Number Publication Date
CN202194425U true CN202194425U (en) 2012-04-18

Family

ID=45949342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202585774U Expired - Fee Related CN202194425U (en) 2011-07-21 2011-07-21 Base for high-voltage transmission and transformation wire and communication tower

Country Status (1)

Country Link
CN (1) CN202194425U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102345296A (en) * 2011-07-21 2012-02-08 从卫民 Base of high-voltage power transmission line and communication tower
CN102767190A (en) * 2012-07-18 2012-11-07 北京金风科创风电设备有限公司 Tower foundation and method for manufacturing same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102345296A (en) * 2011-07-21 2012-02-08 从卫民 Base of high-voltage power transmission line and communication tower
CN102767190A (en) * 2012-07-18 2012-11-07 北京金风科创风电设备有限公司 Tower foundation and method for manufacturing same

Similar Documents

Publication Publication Date Title
CN102002911B (en) Carbon fiber cable strand inner sleeve conical bonded anchorage device
CN202202483U (en) Anti-loose self anchor connector
CN202194425U (en) Base for high-voltage transmission and transformation wire and communication tower
CN204435406U (en) A kind of Rock Bolt Foundation
CN102747683B (en) Wire dividing plate of cold cast anchorage and wire dividing method thereof
CN102312606B (en) Multi-prism cross arm
CN202194153U (en) High-voltage line iron tower base
CN104234325B (en) The installation method of FRP rib tape screw plug bond type anchorage
CN105350816A (en) Power grid telegraph pole strengthening and heightening device and construction method thereof
CN102345407A (en) High-tension cable iron tower base
CN103437366A (en) Prestress loading device connecting part
CN102747687B (en) Non-floor type bracket bearing shear pin and construction method thereof
CN202644524U (en) Tubular pile steel reinforcement cage mixed with non-prestressed reinforcing steel bar
CN102345296A (en) Base of high-voltage power transmission line and communication tower
CN201753538U (en) Prestress electric pole with ground wire
CN204225096U (en) The stake of lower-prestressed prefabricated concrete solid
CN204850639U (en) GFRP pipe reinforced concrete combined member multiloop transmission of electricity pole
CN204703489U (en) Fast-assembled insulating scaffold special fixing device
CN204024443U (en) Adopt the bamboo ladder stand of connector overlapping
CN202989758U (en) Steel wire rope support structure used on horizontal drawing cable bridge
CN202989786U (en) Old bridge external prestressing reinforced structure
CN203370983U (en) Stay wire manufacturing device
CN203050118U (en) Easily-assembling type discharging platform steel wire rope pulling ring
CN218264549U (en) Prestressed steel strand FRP plate
CN201896406U (en) Conical bond anchor with inner sleeve for carbon fiber strands

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120418

Termination date: 20150721

EXPY Termination of patent right or utility model