CN202075912U - Instructional training platform for refrigerating system of digital vortex multi-gang air conditioner - Google Patents
Instructional training platform for refrigerating system of digital vortex multi-gang air conditioner Download PDFInfo
- Publication number
- CN202075912U CN202075912U CN2011201771361U CN201120177136U CN202075912U CN 202075912 U CN202075912 U CN 202075912U CN 2011201771361 U CN2011201771361 U CN 2011201771361U CN 201120177136 U CN201120177136 U CN 201120177136U CN 202075912 U CN202075912 U CN 202075912U
- Authority
- CN
- China
- Prior art keywords
- refrigeration system
- digital vortex
- control
- training
- digital
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Air Conditioning Control Device (AREA)
Abstract
The utility model discloses an instructional training platform for a refrigerating system of a digital vortex multi-gang air conditioner, which consists of a digital vortex multi-gang air conditioner set and a refrigerating system operation and control training platform. The digital vortex multi-gang air conditioner set comprises the refrigerating system and an electric control system; the refrigerating system consists of a digital vortex compressor, a fixed-frequency compressor, a primary four-way valve, an auxiliary four-way valve, various control electromagnetic valves, a condenser, a throttling component and a multi-gang indoor machine set; the electric control system comprises a senor, a primary control board, a digital vortex controller and a plurality of electric appliance executing mechanisms; a refrigerating system pipeline structure schematic diagram is printed on the front surface of the refrigerating system operation and control training platform; and a thermodynamic parameter instrument and an electric quantity parameter instrument which display real-time parameter values are mounted on the front surface of the refrigerating system operation and control training platform. Through two modes of simulation run and true run, design functions such as the comprehensive study, training and experiment such as run mechanism study, signal measurement, fault setting and diagnosis, signal collection and real-time demonstration, performance tracking and researching and the like are achieved.
Description
Technical field
The utility model relates to the teaching aid field, more particularly, relates to a kind of digital vortex combined air conditioners machine cooling system teaching and training platform.
Background technology
The vortex multi-connected air conditioner uses digital control technology, because of its energy adjustment wide ranges with oil return is superior is used widely.The screw compressor core component be by two shapes identical but angle phase position staggers relatively 180 ° involute urve scroll wrap (sound whirlpool dish), form a plurality of crescent air cavitys.When one of them scroll during around the rotation of another scroll, the shape size of crescent air cavity is changing always, and its sealed volume just is transferred to the center of fixing scroll gradually and constantly dwindles, and gas is constantly compressed and the pressure rising.Digital scroll compressor then utilizes the axial elasticity technology of screw compressor, and sound whirlpool dish can break away from separately segment distance realization loading and unloading vertically, i.e. digital 0 and 1 transformation, and when sound whirlpool dish is in sealing state, compressor 100% operation; When sound whirlpool dish axially broke away from, the conducting of compressor suction-discharge chamber did not have compression in the compression chamber, though i.e. compressor electric motor running, not work done of compressor.By making up the time of 0 and 1 state, can realize the ability output of arbitrary proportion.Digital scroll compressor is a kind of compressor of uniqueness, its oil return performance is quite superior, digital scroll compressor is outer connect solenoid valve the open and close controlling compressor unload load, in unloading cycle, system's inner refrigerant flow velocity is almost nil, and the oil that leaves compressor seldom; In the duty cycle, system's inner refrigerant flow velocity is enough to make the oil in the pipeline to get back to compressor near the full load flow velocity.But, because the cycle of digital compressor unloads/load characteristic, digital air-conditioning unit is in most of interval of operation, every major parameter such as high pressure, low pressure, delivery temperature etc. all present cyclic fluctuation, increased certain degree of difficulty for the stable operation of digital unit, thereby requiring of the coupling requirement of compressor and refrigeration system and other compressor assembly is different.Digital control technology relative complex, the grasp that digital vortex multi-connected air conditioner maintenance technique grasp does not at present catch up with, most service technician lacks core skills, its hidden fault can't be got rid of, and causes refrigeration/thermal effect variation.Decline also lacks systematic study and enterprise is to performance.In view of the digital scroll air conditioning system complex structure, the skill that service technician is learnt its principle of work and accurate fault judgement has suitable difficulty, and does not also have special teaching aid to solve this difficulty at present.
Disclosed Chinese utility model patent CN200620074785.8 (name is called refrigeration air-conditioner multifunction test platform) on October 24th, 2007, this multifunction refrigeration air conditioner pilot system is by refrigeration system, and air treatment system and switch board are formed.Switch board is by refrigeration system, the air switch of each electricity consumption device of air treatment system, A.C. contactor, control auxiliary reclay, control high precision regulator, actuator, measurement instrument, data acquisition unit, dynamic similation shows low-voltage circuit, formations such as data acquisition and control computer.Can finish as the refrigeration compressor performance test, the handpiece Water Chilling Units performance test, water-water heat exchanger conducts heat, and multiple teaching tests such as resistance performance test are a kind of all-around test stands.But this test platform is primarily aimed at the demand of laboratory examination research aspect and develops, and it is used for the analytical equipment quantitative under the various operating modes and the situation of refrigeration system, and analytical parameters is to the influence of equipment and running situation.And impart knowledge to students and the detection of most common failure and the professor of maintenance knowledge for the principle of work of the multi-joint machine of digital vortex air-conditioning, then lack intuitive and demo function, and this testing table need increase various regulating and controlling instrument and equipments, data acquisition computer, need to drop into substantial contribution, can not satisfy the professional teaching need of practice.
The utility model content
The utility model is at the deficiencies in the prior art, a kind of teaching and training platform that is used for teaching of digital vortex combined air conditioners unit refrigeration principle and maintenance skills combined training is provided, can realize series training and experimental design functions such as the study of direct viewing type operation mechanism, operational factor monitoring, running status indication, real time demonstration, performance follow-up study, to solve the problem that above-mentioned prior art exists.
The technical solution adopted in the utility model is: a kind of digital vortex combined air conditioners machine cooling system teaching and training platform, controlling training station by digital vortex combined air conditioners unit and refrigeration system forms, digital vortex combined air conditioners unit comprises refrigeration system, electric-control system, refrigeration system is by digital scroll compressor, invariable frequency compressor, main four-way valve, auxiliary four-way valve, all kinds of control electromagnetic valve, condenser, throttle part, multi-joint indoor units is formed, electric-control system comprises sensor, master control borad, digital vortex controller and a plurality of electrical equipment topworks, the front of controlling training station in described refrigeration system is printed with the refrigeration system pipeline structural representation, and the front of controlling training station in refrigeration system is equipped with thermal parameter instrument and the electrical parameter instrument that shows the real-time parameter value.
Above-mentioned digital vortex combined air conditioners machine cooling system teaching and training platform, control training station in described refrigeration system operation mode changeover switch is set, comprise online true operational mode and off line simulation run pattern, control in refrigeration system and also be provided with adjustable parameter simulation device on the training station; Under true operational mode, the sensor of digital vortex combined air conditioners unit is connected with the master control borad input port, controls the operation of training station main control system; In the simulation run pattern, the parameter simulation device is connected with the master control borad input port, and the output port of master control borad control disconnects and being connected of digital vortex combined air conditioners unit electrical equipment topworks, and is connected with electrical equipment topworks pilot lamp.
Above-mentioned digital vortex combined air conditioners machine cooling system teaching and training platform: control the fault that training station is provided with a plurality of electrical equipment topworks in described refrigeration system switch is set, described fault is provided with switch and is connected with corresponding electrical equipment topworks.
Above-mentioned digital vortex combined air conditioners machine cooling system teaching and training platform, control the other electric signal measurement point that is provided with of a plurality of electrical equipment topworkies on the refrigeration system pipeline structural representation in training station front in described refrigeration system, described electric signal measurement point is by drawing on the electrical equipment actuating mechanism circuit accordingly on the air-conditioning unit.
Above-mentioned digital vortex combined air conditioners machine cooling system teaching and training platform, described refrigeration system are controlled the electronic expansion valve opening apparatus for demonstrating that training station is provided with reflection cold-producing medium Load Regulation.
Compared with prior art, the utlity model has following advantage:
1) digital vortex combined air conditioners machine cooling system teaching and training platform of the present utility model has been showed refrigeration principle and flow process in mode very intuitively, piping system syndeton and control features, for engineering technical personnel and after sale service personnel provide good technological synthesis study of digital vortex combined air conditioners unit and training tool, and the follow-up study that experimentizes of performance that can logarithmic code vortex combined air conditioners unit.
2) this teaching and training platform also can be realized functions such as online and two kinds of operational mode switchings of emulation, state parameter and electrical quantity demonstration and detection, fault are provided with, the demonstration of teaching and training platform signal accurately, fault setting, signal measurement, operation indication all meet every designing requirement, reached the designing requirement of training study has been carried out in aspects such as the multiclass solenoid valve in refrigeration system, the pipeline control, electronic expansion valve opening real time demonstration load, inside and outside machine connected mode, and can research and analyse the complete machine performance data.
3) this teaching and training platform is simple in structure, principle is directly perceived, is specially adapted to the experimental teaching of carrying out at general students of science and technology.
Description of drawings
Fig. 1 is a digital vortex combined air conditioners machine cooling system teaching and training platform connection diagram of the present utility model;
Fig. 2 is that refrigeration system shown in Figure 1 is controlled the training station structural representation;
Fig. 3 is that refrigeration system shown in Figure 2 is controlled training station refrigeration system pipeline structural representation;
Fig. 4 and automatically controlled training station printing synoptic diagram shown in Figure 1.
Embodiment
The utility model is described in further detail below in conjunction with drawings and Examples.
As Fig. 1--shown in 4, digital vortex combined air conditioners machine cooling system teaching and training platform is controlled training station 2 by digital vortex combined air conditioners unit (also claiming main frame 1) and refrigeration system and is formed, and is connected with automatically controlled training station 3.Digital scroll compressor, invariable frequency compressor, main four-way valve, auxiliary four-way valve, condenser, throttle part, multi-joint indoor units are installed in main frame, the sensor of electric-control system and each electrical equipment topworks are installed on the main frame 1, the master control borad of electric-control system, and part electrical equipment (electrical equipments such as transformer, blower fan electric capacity, relay, A.C. contactor) be installed on the automatically controlled training station 3.The front of controlling training station 2 in refrigeration system is printed with refrigeration system pipeline structural representation Figure 11, and the three-phase current table is installed in the front that refrigeration system is controlled training station, 220V source current table, the three-phase mains voltage table, the 220V line voltmeter, off-premises station Guan Wenbiao, the outdoor environment temperature table, the indoor temperature table, the fixed temperature of press gas outlet frequently table, digital vortex press gas outlet temperature table, indoor evaporator outlet temperature table, indoor evaporator middle part thermometer, and the Compressor Discharge Pressure table that shows the refrigeration system force value, blowout-back pressure gauge, low pressure gauge etc.Above-mentioned instrument is installed in the gauge field 12 and all shows the thermal parameter instrument and the electrical parameter instrument of real-time parameter value.
As shown in Figure 2, control in refrigeration system on the front of training station 2, also being provided with the district 13 that places obstacles, true and simulation run mode switch operational zone 15, analog parameter setting area 14.In mode switch operational zone 15, be provided with operation mode changeover switch is set, the parameter simulation device of parameter value can be manually adjusted in setting in analog parameter setting area 14, in true operational mode, the sensor in the main frame 1 is connected with the master control borad input port on the automatically controlled training station 3; When operation mode changeover switch during at the simulation run mode state, the parameter simulation device is connected with the master control borad input port, and the output port of master control borad disconnects and being connected of the interior electrical equipment topworks of main frame 1.The parameter that simulation is provided with comprises: outdoor environment temperature, off-premises station Guan Wen, indoor environment temperature, digital vortex press delivery temperature, fixed press delivery temperature, indoor evaporator central tube temperature etc. frequently.Under the analog operation state, control the output port of each topworks's duty display lamp connecting circuit plate of training station, the circuit board Analog signals is also exported control signal and is given each topworks's duty display lamp, is illustrated under the emulation mode duty of topworks by display lamp.In order to strengthen the training of air-conditioning unit malfunction elimination, control the fault that training station 2 is provided with a plurality of electrical equipment topworks in refrigeration system switch is set, and be provided with the electric signal measurement point 16 of crucial electrical equipment topworks.Fault is provided with switch and connects with the electrical equipment topworks that need place obstacles, and the switch of placing obstacles comprises " closure ", " disconnection " two states.Electric signal measurement point is by drawing on the corresponding electrical equipment actuating mechanism circuit on the air-conditioning unit, and the electric signal measurement point is located at by the illustrated electrical equipment topworks on the refrigeration system pipeline structural representation.For example, when the fault of opening auxiliary four-way valve ST2 is provided with switch, auxiliary four-way valve ST2 outage, the flow direction of cold-producing medium can not be selected, and can not detect the value of electrical signals of auxiliary four-way valve ST2, the student can improve the ability of site disposal problem rapidly by the training that fault is provided with.
As shown in Figure 3, the refrigeration work process of digital vortex combined air conditioners unit refrigeration system of the present utility model is as follows: fixed frequency/digital scroll compressor exhaust → main four-way valve ST1 → assist four-way valve ST2 (available flow to two condensers) → condenser → retaining valve → electric expansion valve → exhaust box → liquid storage pipe → branch pipe → multi-joint indoor units → throttle part → evaporator → low pressure ball valve → main four-way valve ST1 → compressor; When system heated, main four-way valve ST1 changed pipeline flow-direction, makes the high temperature refrigerant that comes out from compressor flow to multi-joint indoor units earlier, passes through throttling again, evaporates, gets back to compressor in outdoor condenser.
As Fig. 4, on the front of automatically controlled training station 3, print the connection wiring diagram of electric control elements such as off-premises station master control borad 31, indoor set master control borad 32, blower fan electric capacity, and on corresponding position, above-mentioned electrical equipment is installed, on the right side in training station front oscillograph 33 is set, in the positive lower left corner of training station topworks status display area 34 is set, the duty display lamp of a plurality of critical components such as digital scroll compressor, invariable frequency compressor, a plurality of solenoid valve, main four-way valve, auxiliary four-way valve is housed in this zone, the real-time running state of each parts is come into plain view.
The utility model is at the teaching of the refrigeration system principle of digital vortex combined air conditioners unit, by control of drawing system pipeline and the route map that is connected trend, make student's visual understanding refrigeration and heat the cold-producing medium trend of duty, thereby allow the student read by study practice voluntarily and judge, cultivate students'ability for practice, promote technical ability, be familiar with device structure.Teaching and training platform of the present utility model can be controlled in refrigeration system and carry out simulation operations, Long-distance Control on the training station and truly move two kinds of patterns, and realize signal measurement, fault setting, Load Regulation real time demonstration, etc. system synthesis study, training and experimental design function, also can utilize the principle of work and the electric control principle of this training station logarithmic code vortex combined air conditioners unit to carry out deep research, powerful, practical.
Embodiment as the another kind simplification, when only doing refrigeration system teaching use, on the basis of the foregoing description, the refrigeration system that shows refrigerant system configurations is controlled training station directly to be connected with main frame, and master control borad, the part electrical equipment (electrical equipments such as transformer, blower fan electric capacity, relay, A.C. contactor) of automatically controlled training station is put back in the main frame, thereby reduce the wiring of system, save taking up room of training station, reduce equipment cost.
Claims (5)
1. digital vortex combined air conditioners machine cooling system teaching and training platform, controlling training station by digital vortex combined air conditioners unit and refrigeration system forms, digital vortex combined air conditioners unit comprises refrigeration system, electric-control system, refrigeration system is by digital scroll compressor, invariable frequency compressor, main four-way valve, auxiliary four-way valve, all kinds of control electromagnetic valve, condenser, throttle part, multi-joint indoor units is formed, electric-control system comprises sensor, master control borad, digital vortex controller and a plurality of electrical equipment topworks, it is characterized in that: the front of controlling training station in described refrigeration system is printed with the refrigeration system pipeline structural representation, and the front of controlling training station in refrigeration system is equipped with thermal parameter instrument and the electrical parameter instrument that shows the real-time parameter value.
2. digital vortex combined air conditioners machine cooling system teaching and training platform according to claim 1, it is characterized in that: control training station in described refrigeration system operation mode changeover switch is set, comprise online true operational mode and off line simulation run pattern, control in refrigeration system and also be provided with adjustable parameter simulation device on the training station; Under true operational mode, the sensor of digital vortex combined air conditioners unit is connected with the master control borad input port, controls the operation of training station main control system; In the simulation run pattern, the parameter simulation device is connected with the master control borad input port, and the output port of master control borad control disconnects and being connected of digital vortex combined air conditioners unit electrical equipment topworks, and is connected with electrical equipment topworks pilot lamp.
3. digital vortex combined air conditioners machine cooling system teaching and training platform according to claim 1 and 2, it is characterized in that: control the fault that training station is provided with a plurality of electrical equipment topworks in described refrigeration system switch is set, described fault is provided with switch and is connected with corresponding electrical equipment topworks.
4. digital vortex combined air conditioners machine cooling system teaching and training platform according to claim 3, it is characterized in that: control the other electric signal measurement point that is provided with of a plurality of electrical equipment topworkies on the refrigeration system pipeline structural representation in training station front in described refrigeration system, described electric signal measurement point is by drawing on the electrical equipment actuating mechanism circuit accordingly on the air-conditioning unit.
5. digital vortex combined air conditioners machine cooling system teaching and training platform according to claim 4 is characterized in that: described refrigeration system is controlled the electronic expansion valve opening apparatus for demonstrating that training station is provided with reflection cold-producing medium Load Regulation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201771361U CN202075912U (en) | 2011-05-29 | 2011-05-29 | Instructional training platform for refrigerating system of digital vortex multi-gang air conditioner |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201771361U CN202075912U (en) | 2011-05-29 | 2011-05-29 | Instructional training platform for refrigerating system of digital vortex multi-gang air conditioner |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202075912U true CN202075912U (en) | 2011-12-14 |
Family
ID=45114005
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201771361U Expired - Lifetime CN202075912U (en) | 2011-05-29 | 2011-05-29 | Instructional training platform for refrigerating system of digital vortex multi-gang air conditioner |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202075912U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102184672A (en) * | 2011-05-29 | 2011-09-14 | 顺德职业技术学院 | Digital vortex multi-connected air conditioner refrigerating system teaching training station |
-
2011
- 2011-05-29 CN CN2011201771361U patent/CN202075912U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102184672A (en) * | 2011-05-29 | 2011-09-14 | 顺德职业技术学院 | Digital vortex multi-connected air conditioner refrigerating system teaching training station |
CN102184672B (en) * | 2011-05-29 | 2013-04-17 | 顺德职业技术学院 | Digital vortex multi-connected air conditioner refrigerating system teaching training station |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100485351C (en) | Multifunction refrigeration air conditioner test platform | |
Zhang et al. | A novel Variable Refrigerant Flow (VRF) heat recovery system model: Development and validation | |
CN102184672B (en) | Digital vortex multi-connected air conditioner refrigerating system teaching training station | |
CN102194364B (en) | Teaching training table for alternating-current variable-frequency multi-unit air conditioning unit | |
CN104764166A (en) | Method used for simulating all air-air conditioning system and device thereof | |
CN201104300Y (en) | Central air-conditioning teaching experiment practice training device | |
CN200965491Y (en) | Refrigeration air conditioning multi-function test platform | |
CN201207246Y (en) | Air-conditioner training device | |
CN201215699Y (en) | Analogue multifunctional central air-conditioner experiment device for teaching | |
CN202075911U (en) | Alternating-current variable-frequency multi-connected air conditioning unit teaching training platform | |
CN202075912U (en) | Instructional training platform for refrigerating system of digital vortex multi-gang air conditioner | |
CN202275548U (en) | Automobile air conditioner training platform used for teaching | |
Chuang et al. | Study on a fan coil unit and chiller by an intelligent control method with a stepless variable speed driving technology | |
CN203490893U (en) | Refrigeration training device | |
CN107726659B (en) | Air source heat pump/solar heat pump system installation and debugging practical training assessment device | |
CN103473979B (en) | Air conditioner comprehensive performance test practice teaching platform | |
CN207319516U (en) | A kind of Refrigeration & Air-Conditioning experimental real-training platform for teaching experiment real training | |
CN109060340B (en) | High-precision air conditioner performance test heat balance chamber | |
CN102354469B (en) | Training platform for automobile manual air conditioner teaching | |
CN116984037A (en) | Vibration-resistant multifunctional environment simulation test box for test | |
CN203503231U (en) | Teaching and practical training platform for air conditioner comprehensive performance test | |
CN202102632U (en) | Digital intelligent vortex multi-connection air conditioner integrated control system teaching apparatus | |
CN202454161U (en) | Constant-temperature and constant-humidity air conditioner simulating experimental device for teaching | |
CN202306943U (en) | Teaching and practical training table for automatic air conditioning electronic network intelligent control system of automobile | |
CN102194363A (en) | Teaching instrument for alternating-current variable-frequency multi-unit air conditioner integrated control system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20111214 Effective date of abandoning: 20130417 |
|
RGAV | Abandon patent right to avoid regrant |