CN113833468A - Metal strip mine blasting pile grade distribution measuring and calculating system and accurate shoveling and loading method - Google Patents

Metal strip mine blasting pile grade distribution measuring and calculating system and accurate shoveling and loading method Download PDF

Info

Publication number
CN113833468A
CN113833468A CN202110587836.6A CN202110587836A CN113833468A CN 113833468 A CN113833468 A CN 113833468A CN 202110587836 A CN202110587836 A CN 202110587836A CN 113833468 A CN113833468 A CN 113833468A
Authority
CN
China
Prior art keywords
bucket
pile
blasting
grade
point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110587836.6A
Other languages
Chinese (zh)
Inventor
李小帅
高文学
宋肖龙
张声辉
胡宇
刘江超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Technology
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CN202110587836.6A priority Critical patent/CN113833468A/en
Publication of CN113833468A publication Critical patent/CN113833468A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C47/00Machines for obtaining or the removal of materials in open-pit mines
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Position Fixing By Use Of Radio Waves (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention relates to a metal strip mine blasting pile grade distribution measuring and calculating system and an accurate shovel loading method. According to the method, pile-blasting three-dimensional coordinate data measured by an unmanned aerial vehicle and blast hole test grades are combined and calculated through pile-blasting data base generation software built in a computer to form a pile-blasting data base, the pile-blasting data base is sent to an electric shovel mobile terminal through a remote terminal, coordinates of bucket teeth of a bucket are calculated through a bucket positioning system, the pile-blasting data base is matched to obtain the grade of each bucket ore, and an electric shovel driver is reminded through the mobile terminal when the bucket crosses a rock boundary. The problem of metal open mine ore loss and serious dilution is solved, the degree of accuracy of shovel loading operation has been promoted.

Description

Metal strip mine blasting pile grade distribution measuring and calculating system and accurate shoveling and loading method
Technical Field
The invention belongs to the fields of geotechnical engineering, mining engineering and mining machinery, and particularly relates to a metal strip mine blasting pile grade distribution measuring and calculating system and an accurate shoveling and loading method.
Background
Iron ore, a nonrenewable resource, has been depleted in reserves with long term mining. Meanwhile, in the traditional rough mining process of the mine, because the blasting grade distribution can not be accurately measured and calculated, the ore is often taken as barren rock or mixed into the ore in the shovel loading process, and the loss and dilution of the ore are caused. How to accurately measure and calculate the grade distribution of the blasting pile and further improve the precision of the shoveling operation is an urgent problem to be solved by mine enterprises.
Disclosure of Invention
The invention aims to provide a metal strip mine pile-blasting grade distribution measuring and calculating system and an accurate shovel loading method, which have the advantages of complete functions, simple calculation, capability of accurately measuring pile-blasting grade distribution conditions, capability of improving the accuracy degree of shovel loading operation and contribution to controlling waste of iron ore resources.
The purpose of the invention is realized by the following technical scheme:
the invention discloses a metal strip mine blasting pile grade distribution measuring and calculating system which is characterized by comprising the following steps: the system comprises a remote terminal, a pile burst grade acquisition system, a bucket positioning system and a vehicle-mounted mobile terminal;
software capable of generating a pile-bursting article bit database is arranged in the remote terminal;
the pile-blasting grade acquisition system comprises an unmanned aerial vehicle for measuring pile-blasting three-dimensional coordinates and a system for sampling and testing blast holes;
the bucket positioning system comprises two high-precision vehicle-mounted GPS modules I and II which are arranged on a point A and a point B of the bucket rod, and the connecting line of the positions of the point A and the point B is perpendicular to the bucket and intersects with a point C of the bucket tooth;
the vehicle-mounted mobile terminal can receive and display the explosive sample bit database and the real-time position of the bucket sent by the remote terminal.
The invention discloses a precise shoveling method for a metal strip mine, which is characterized by comprising the following steps of:
the method comprises the following steps: when the roller bit drilling machine drills holes, the mineral powder is taken once at the periphery of the drilled hole every drill depth d m, the mineral powder is taken and then tested, and the sample data p of different depths of each blast hole is obtained after the testijAfter blasting, surveying and mapping the blasting area by using the unmanned aerial vehicle, and finding the position (x) of the blast hole according to the position of the blasting funneli,yi,zi) Combining the test results to obtain the initial grade distribution (x)i,yi,zi-(j-1)d,pij) The method comprises the following steps of generating a blasting pile quality bit database with the size specification of 1m multiplied by 1m of a single ore block by using a distance power inverse ratio method through software built in a remote terminal, and sending the database to a vehicle-mounted mobile terminal, wherein the distance power inverse ratio method comprises the following calculation formula:
Figure BDA0003088350680000021
wherein i is the number of the blast hole, j is the sequence of the sampling points of the blast hole, and pijGrade of j-th sampling of a blast hole numbered i, DijThe distance G from the jth sampling point of the blast hole with the number i to the center of the unit ore blocknThe grade of the nth unit ore block;
step two: measuring the distance a between two points AB and the distance b between two points BC according to the real-time three-dimensional coordinates (x) of a high-precision vehicle-mounted GPS module I arranged at the point A of the bucket arm1,y1,z1) And real-time three-dimensional coordinates (x) of high-precision vehicle-mounted GPS module II at point B2,y2,z2) Calculating real-time three-dimensional coordinates (x) of the C point3,y3,z3) The calculation formula is as follows:
Figure BDA0003088350680000022
Figure BDA0003088350680000023
Figure BDA0003088350680000024
after the coordinates of the point C are obtained, three-dimensional coordinates of two points E, F of bucket teeth at two ends of the bucket can be further calculated, and after the EC distance e and the CF distance f are measured because the E, C, F three points are collinear with each other horizontally and are perpendicular to the AB straight line, instantaneous three-dimensional coordinates (x and x) of the two points E, F can be calculated according to the following formula5,y5,z5)、(x6,y6,z6):
Figure BDA0003088350680000025
Figure BDA0003088350680000031
According to the explosive pile level data base and the real-time positions of the bucket teeth, the ore grade of each bucket can be accurately obtained, and when the coordinates of the buckets are located on the boundary of ore rocks, the mobile terminal can give a warning to a driver, so that waste rocks are prevented from being mixed or the ore is prevented from being lost.
Compared with the prior art, the invention has the advantages that:
1. the method can accurately measure and calculate the grade distribution of the blasting pile and establish a more accurate blasting pile grade data base.
2. According to the invention, the bucket tooth position of the bucket can be accurately obtained by utilizing the high-precision positioning module and the corresponding calculation method, and the bucket tooth coordinate is combined with the pile blasting sample position data base, so that the grade of each bucket ore can be accurately controlled, and the ore rock distinguishing and accurate operation in the shoveling and loading process can be favorably realized.
3. The invention improves the monitoring of the shovel loading operation link, effectively grasps the grade of the mined ore and is beneficial to reducing the loss and dilution of the ore.
Drawings
Fig. 1 is a flow chart of the working principle of the present invention.
FIG. 2 is a layout diagram of a metal strip mine blasting pile grade distribution measuring and calculating system.
FIG. 3 is a schematic diagram of the plane coordinate calculation of the point C of the electric bucket tooth.
FIG. 4 is a schematic diagram of the calculation of the elevation coordinates of the C point of the teeth of the electric bucket.
FIG. 5 is a schematic illustration of the two-point coordinate calculation of the electric bucket tooth E, F.
FIG. 6 is a schematic diagram of the calculation of the explosive pile number data base.
Description of reference numerals:
1-a remote terminal; 2-a pile-blasting grade acquisition system; 21-unmanned aerial vehicle; 22-a grade assay system; 3-bucket positioning system; 31-high precision vehicle GPS module I; 32-high precision vehicle GPS module II; 4-vehicle mobile terminal; 5-electric dipper stick; 6-blasting pile; 7, blast hole; 8-blast hole grade testing points; 9-calculating point of burst grade.
Detailed Description
The invention will be further explained with reference to the drawings.
As shown in fig. 1, the invention comprises a remote terminal 1, a burst grade acquisition system 2, a bucket positioning system 3 and a vehicle-mounted mobile terminal 4,
software capable of generating a detonation product bit database is arranged in the remote terminal 1;
the explosive pile grade acquisition system 2 comprises an unmanned aerial vehicle 21 for measuring three-dimensional coordinates of an explosive pile and a system 22 for sampling and testing blast holes;
the bucket positioning system 3 comprises two high-precision vehicle-mounted GPS modules I31 and II 32 which are arranged on a point A and a point B of the bucket rod 5;
the explosive pile level data base generation software can generate an explosive pile level data base according to the three-dimensional explosive pile coordinate measured by the unmanned aerial vehicle 21 and the blast hole grade test result.
And the vehicle-mounted mobile terminal 4 is installed in the electric shovel operating room, is electrically connected with the bucket positioning system 3 and is in wireless transmission with a remote terminal.
The invention relates to a method for accurately shoveling and loading a metal strip mine, which comprises the following specific implementation steps of:
the method comprises the following steps: when the roller bit drilling machine drills holes, the mineral powder is taken once at the periphery of the drilled hole every drill depth d m, the mineral powder is taken and then tested, and the sample data p of different depths of each blast hole is obtained after the testijAfter blasting, surveying and mapping the blasting area by using the unmanned aerial vehicle, and finding the position (x) of the blast hole according to the position of the blasting funneli,yi,zi) Combining the test results to obtain the initial grade distribution (x)i,yi,zi-(j-1)d,pij) The distance power inverse ratio method is used by the explosive pile product bit database generation software built in the remote terminal 1
Figure BDA0003088350680000041
Generating a blasting product bit database with the size specification of 1m multiplied by 1m of a single ore block, and wirelessly transmitting the database to the electric shovel vehicle-mounted mobile terminal 4;
step two: measuring the distance a between two points AB and the distance b between two points BC according to the real-time three-dimensional coordinates (x) of a high-precision vehicle-mounted GPS module I31 arranged at the point A of the arm1,y1,z1) And the real-time three-dimensional coordinates (x) of the high-precision vehicle-mounted GPS module II 32 at the point B2,y2,z2) Calculating real-time three-dimensional coordinates (x) of the C point3,y3,z3) The calculation formula is as follows:
Figure BDA0003088350680000042
Figure BDA0003088350680000051
Figure BDA0003088350680000052
after the coordinate of the point C is obtained, three-dimensional coordinates of two points E, F of bucket teeth at two ends of the bucket can be further calculated, because the three points E, C, F are in the same horizontal collinear line and are vertical to the line AB, after the EC distance e and the CF distance f are measured,the instantaneous three-dimensional coordinates (x) of the two points E, F can be calculated according to the following formula5,y5,z5)、(x6,y6,z6):
Figure BDA0003088350680000053
Figure BDA0003088350680000054
The ore grade of each bucket can be accurately obtained by referring to the explosive pile level data base and the real-time positions of the bucket teeth, and when the coordinates of the bucket are located on the boundary of the ore rocks, the mobile terminal 4 can give a warning to a driver to avoid mixing of waste rocks or loss of the ore.
The foregoing is only a basic idea of the invention and is not intended to limit the invention, and all simple modifications, changes and equivalent structural changes made to the above embodiments according to the technical spirit of the invention still fall within the protection scope of the technical solution of the invention.

Claims (2)

1. The utility model provides a metal strip mine explodes heap grade distribution and calculates system which characterized in that: the system comprises a remote terminal, a pile burst grade acquisition system, a bucket positioning system and a vehicle-mounted mobile terminal;
software for generating a pile bursting bin database is arranged in the remote terminal;
the pile-blasting grade acquisition system comprises an unmanned aerial vehicle for measuring pile-blasting three-dimensional coordinates and a system for sampling and testing blast holes;
the bucket positioning system comprises two high-precision vehicle-mounted GPS modules I and II which are arranged on a point A and a point B of the bucket rod, and the connecting line of the positions of the point A and the point B is perpendicular to the bucket and intersects with a point C of the bucket tooth;
and the vehicle-mounted mobile terminal receives and displays the explosive pile position data base and the real-time position of the bucket sent by the remote terminal.
2. The method for applying the metal open-pit blasting pile grade distribution measuring and calculating system according to claim 1 is characterized by comprising the following steps:
the method comprises the following steps: when the roller bit drilling machine drills holes, the mineral powder is taken once at the periphery of the drilled hole every drill depth d m, the mineral powder is taken and then tested, and the sample data p of different depths of each blast hole is obtained after the testijAfter blasting, surveying and mapping the blasting area by using the unmanned aerial vehicle, and finding the position (x) of the blast hole according to the position of the blasting funneli,yi,zi) Combining the test results to obtain the initial grade distribution (x)i,yi,zi-(j-1)d,pij) By means of software built in the remote terminal and by means of inverse distance power ratio method
Figure FDA0003088350670000011
Generating a blasting pile grade data base with the size specification of 1m multiplied by 1m of a single ore block, and sending the data base to a vehicle-mounted mobile terminal;
wherein i is the number of the blast hole, j is the sequence of the sampling points of the blast hole, and pijGrade of j-th sampling of a blast hole numbered i, DijThe distance G from the jth sampling point of the blast hole with the number i to the center of the unit ore blocknThe grade of the nth unit ore block;
step two: measuring the distance a between two points AB and the distance b between two points BC according to the real-time three-dimensional coordinates (x) of a high-precision vehicle-mounted GPS module I arranged at the point A of the bucket arm1,y1,z1) And real-time three-dimensional coordinates (x) of high-precision vehicle-mounted GPS module II at point B2,y2,z2) Calculating real-time three-dimensional coordinates (x) of the C point3,y3,z3) The calculation formula is as follows:
Figure FDA0003088350670000012
Figure FDA0003088350670000021
Figure FDA0003088350670000022
after the coordinate of the point C is obtained, three-dimensional coordinates of two points of the bucket teeth E, F at two ends of the bucket are further calculated, and after the EC distance e and the CF distance f are measured because the E, C, F three points are collinear with each other horizontally and are perpendicular to the AB straight line, instantaneous three-dimensional coordinates (x) of the two points E, F are calculated according to the following formula5,y5,z5)、(x6,y6,z6):
Figure FDA0003088350670000023
Figure FDA0003088350670000024
And obtaining the ore grade of each bucket according to the explosive pile grade data base and the real-time positions of the bucket teeth, and when the coordinates of the bucket are positioned on the boundary of the ore rocks, the mobile terminal gives a warning to a driver to avoid mixing of waste rocks or loss of the ore.
CN202110587836.6A 2021-05-28 2021-05-28 Metal strip mine blasting pile grade distribution measuring and calculating system and accurate shoveling and loading method Pending CN113833468A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110587836.6A CN113833468A (en) 2021-05-28 2021-05-28 Metal strip mine blasting pile grade distribution measuring and calculating system and accurate shoveling and loading method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110587836.6A CN113833468A (en) 2021-05-28 2021-05-28 Metal strip mine blasting pile grade distribution measuring and calculating system and accurate shoveling and loading method

Publications (1)

Publication Number Publication Date
CN113833468A true CN113833468A (en) 2021-12-24

Family

ID=78962623

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110587836.6A Pending CN113833468A (en) 2021-05-28 2021-05-28 Metal strip mine blasting pile grade distribution measuring and calculating system and accurate shoveling and loading method

Country Status (1)

Country Link
CN (1) CN113833468A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000027585A (en) * 1998-03-05 2000-01-25 Caterpillar Inc Method for obtaining and displaying position of truck in material-transportation
CN101114276A (en) * 2007-08-28 2008-01-30 中国地质大学(武汉) Solid body mineral deposit three-dimensional visual reserves calculation system and computation method
CN106530101A (en) * 2016-08-26 2017-03-22 中国黄金集团内蒙古矿业有限公司 Ore rock determining and exploration contrast method
CN106560865A (en) * 2016-08-25 2017-04-12 中国黄金集团内蒙古矿业有限公司 Three big geologic models based on daily production correlation
CN106560817A (en) * 2016-08-26 2017-04-12 中国黄金集团内蒙古矿业有限公司 Control method of copper-molybdenum ore loss and dilution rate
CN107780938A (en) * 2016-08-30 2018-03-09 丹东东方测控技术股份有限公司 A kind of method for realizing opencut excavating equipment control ore mine grade
CN110197318A (en) * 2019-03-08 2019-09-03 长沙迪迈数码科技股份有限公司 Surface mine Grade Model update method
CN111691888A (en) * 2020-06-12 2020-09-22 鞍钢集团矿业有限公司 Accurate shovel loading system and method for surface mine

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000027585A (en) * 1998-03-05 2000-01-25 Caterpillar Inc Method for obtaining and displaying position of truck in material-transportation
CN101114276A (en) * 2007-08-28 2008-01-30 中国地质大学(武汉) Solid body mineral deposit three-dimensional visual reserves calculation system and computation method
CN106560865A (en) * 2016-08-25 2017-04-12 中国黄金集团内蒙古矿业有限公司 Three big geologic models based on daily production correlation
CN106530101A (en) * 2016-08-26 2017-03-22 中国黄金集团内蒙古矿业有限公司 Ore rock determining and exploration contrast method
CN106560817A (en) * 2016-08-26 2017-04-12 中国黄金集团内蒙古矿业有限公司 Control method of copper-molybdenum ore loss and dilution rate
CN107780938A (en) * 2016-08-30 2018-03-09 丹东东方测控技术股份有限公司 A kind of method for realizing opencut excavating equipment control ore mine grade
CN110197318A (en) * 2019-03-08 2019-09-03 长沙迪迈数码科技股份有限公司 Surface mine Grade Model update method
CN111691888A (en) * 2020-06-12 2020-09-22 鞍钢集团矿业有限公司 Accurate shovel loading system and method for surface mine

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
任碧琦,李榕楠,夏恺临,沙诗萌: "距离幂次反比法在矿点品位估算中的运用", 《世界有色金属》 *

Similar Documents

Publication Publication Date Title
CN108930539B (en) BIM-based tunnel overbreak and underexcavation control method
CN107100663B (en) A kind of accurate pumping method of coal mine gas
CN106968673B (en) metal surface mine goaf treatment method
CN107144192B (en) A kind of pinpoint blasting intelligence construction method
CN202187758U (en) Inclinometer for rotary drilling rig
CN207007177U (en) A kind of drill jumbo fast positioning automatic measurement system
CN110333024B (en) Method for determining three-dimensional initial ground stress of rock mass based on stress relief method
CN110287511B (en) Pile foundation type selection and construction quality control method based on BIM technology
CN104361211A (en) Construction and application method of statistical damage constitutive model of rock
CN104141483A (en) Digital drilling control method and system for open-pit deep hole blasting
CN103063335A (en) Three-dimensional geological survey testing method of deep portion crustal stress based on loading monitoring data
CN113847948A (en) Dynamic compaction automatic monitoring and analyzing method and digital integrated system
AU2022275159A1 (en) Drilling device and drilling management system comprising same
CN112576257A (en) Tunnel blast hole lofting positioning method
CN111664762B (en) Automatic explosive charging control system and method for mixed explosive charging vehicle based on drilling positioning parameters
CN202900251U (en) Drill hole angle-locating device for channeling hole
CN103643996B (en) Driving face gas outbursts Prediction method based on graphic-arts technique
CN110044223B (en) Monitoring device and monitoring method for open-air radioactive mine blasting displacement
CN104698862A (en) Dynamic mined ore grade refining method using deposit modeling system
CN113833468A (en) Metal strip mine blasting pile grade distribution measuring and calculating system and accurate shoveling and loading method
CN103982171B (en) Method for monitoring and controlling the elevation of the bottom plane of a borehole and monitoring device
CN116379900B (en) Accurate perforation control method for mine drilling equipment based on charge offset collection
CN105178367A (en) Three-dimensional visualization method of final foundation settlement amount
CN110295848B (en) Blast hole bottom leveling drilling method
CN103967474A (en) Automatic positioning system of underground mining drill carriage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20211224