CN1128277C - Multiple self-locked elevating scaffold - Google Patents

Multiple self-locked elevating scaffold Download PDF

Info

Publication number
CN1128277C
CN1128277C CN 99111613 CN99111613A CN1128277C CN 1128277 C CN1128277 C CN 1128277C CN 99111613 CN99111613 CN 99111613 CN 99111613 A CN99111613 A CN 99111613A CN 1128277 C CN1128277 C CN 1128277C
Authority
CN
China
Prior art keywords
outrigger
suspension ring
locked
lock
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 99111613
Other languages
Chinese (zh)
Other versions
CN1260434A (en
Inventor
陈胜坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 99111613 priority Critical patent/CN1128277C/en
Publication of CN1260434A publication Critical patent/CN1260434A/en
Application granted granted Critical
Publication of CN1128277C publication Critical patent/CN1128277C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The present invention relates to a multiple self-locked elevation scaffold which is characterized in that each hanging point is provided with multi-channel automatic locking devices. An anti-fall device has the principle that the measurement to the hoisting weight of an electric hoist in the process of elevation determines whether the scaffold is locked; when the weight variation reaches a certain value, the multi-channel automatic locking devices simultaneously operate to lock the scaffold; the scaffold is locked, and simultaneously a power supply is automatically cut off. The elevation scaffold has the advantages of quick and stable elevation speed and stable and safe locking devices. The present invention is suitable for being constructed and used by any building structure.

Description

Multiple self-locked hoisting scaffold
The present invention relates to the external wall scaffold, especially a kind of hoisting scaffold with multiple self-locked function.
The scaffold that building operations is at present used has various ways: 1, basket-hanging scaffold, 2, the track lifting false work, 3, integral hoisting scaffold, 4, land the scaffold of setting up.There is following point in various degree in the scaffold of these types: 1, troublesome poeration, 2, cost height, 3, anti-fall measure mostly is friction-type, distance of glide is big, influence safety, 4, lack the weight prediction unit, though 5, anti-drop device has multiple tracks, but what automatically lock often has only together, and its safety is affected.
The object of the present invention is to provide a kind of hoisting velocity fast, has multiple self-locked function, the scaffold that effectively pre-fall arrest takes place, this kind scaffold can be predicted the variation of weight when promoting, when the scaffold weight change reaches certain value, multiple self-locked device is had an effect simultaneously, scaffold is locked rapidly, in the locking scaffold, cut off the electricity supply automatically, prevent the generation of falling, its anti-drop method is safe, effectively.
In order to achieve the above object, the scheme that the present invention adopts is: scaffold is established main frame, main frame is by anti-fall track, little cross bar, the main frame vertical rod in the cross binding and the outside fuses, and also fuse with the various rod members of scaffold, anti-fall track is opened a circular hole at a certain distance, pass the guiding device that is arranged at every floor from bottom to top, each guiding device all is provided with a lock rod, lock rod by the excellent spring holder of lock around, its rear end links together with the excellent handle of lock, horizontal control lever is positioned at the excellent handle of lock left side, and vertical control lever is connected with the horizontal control lever of each floor, and links to each other with portable plate, portable plate and suspension ring upper end weld together, suspension ring by the suspension ring spring holder around, when the suspension ring spring moves up and down, portable plate, vertical control lever, horizontal control lever also moves up and down, and controlling locking rod, thereby reaches the purpose that automatically locks from a plurality of points.In the outrigger outer end knife switch is installed, the knife switch of each suspension centre is together in series, and is cascaded with the starting switch of the control circuit of control electric block starting, knife switch with portable plate rise, descending disconnects and closure.
The present invention compares following outstanding advantage with existing scaffold technology: the function that 1, has multiple self-locked scaffold, 2, the weight prediction unit is arranged, control each floor locking device by the weight prediction unit, 3, adopt the lock rod anti-fall, bearing capacity is big, and is effective, and 4, descending operation is convenient, speed is fast, and 5, be fit to any building structure and use.
Below in conjunction with accompanying drawing, the present invention is described in further detail.
Fig. 1 is the scaffold lateral view
Fig. 2 is anti-fall track structure figure
Fig. 3 is Fig. 2 right view
Fig. 4 is Fig. 2 outrigger 1-1 of place position profile figure
Fig. 5 is the scaffold vertical view
Fig. 6 is the scaffold elevation
Fig. 7 is an outrigger attch wall side view
Fig. 8 is Fig. 7 right view
Fig. 9 is Fig. 7 vertical view
Scaffold 33 is by vertical rod 36, little cross bar 18, leger 16 and bridging 34 are set up and are formed, scaffold is established bottom truss 35, bottom truss 35 connects together with scaffold 33 and main frame 13, main frame 13 is by anti-fall track 11 and outer vertical rod, cross binding 17, little transverse tube 18 is formed by connecting, vertically establish main frame 13 one every a segment distance, anti-fall track 11 is opened a circular hole 10 at a certain distance, anti-fall track 11 passes the guiding device 12 of every floor, at guiding device 12 lock rod 28 is installed, lock rod 28 is by excellent spring 30 coilings of lock, and its outer end has the excellent outer tube 9 of a lock to entangle, locking excellent spring bearer plate 29 welds together with lock rod 28, lock excellent 28 rear ends and link, lock excellent spring 30, lock excellent handle 31 and be positioned at horizontal control lever 21 right sides by excellent spring bearer plate 29 compressions of lock with the excellent handle 31 of lock, horizontal control lever 21 1 ends link fulcrum 20, the other end is associated in vertical control lever 32, moves up and down by vertical control lever 32, to control locking rod 28.Limiting plate 39 was to its guiding when horizontal control lever 21 moved up and down, vertical control lever 32 links together with portable plate 22, portable plate 22 welds together with suspension ring 27 or with bolted on connection together, suspension ring 27 are by 25 coilings of suspension ring spring, suspension ring spring 25 tops are pushed down by spring bearer plate 24, and spring bearer plate 24 and suspension ring 27 weld together, and bottom rail 26 and top rail 23 weld together with spring overcoat pipe 38, and be enclosed within outrigger 5 outsides, fixing with bolt and outrigger 5.Top rail 23 and bottom rail 26 have circular hole, so that suspension ring 27 can therefrom pass, suspension ring 27 lower ends hang electric block 15, support handle 19 is hooked in electric block 15 lower ends, support handle 19 is fixing with bottom truss 35, scaffold 33 next levels are established strengthening frame 1, strengthening frame 1 outer end installation and guide device 12, so that anti-fall track 11 is led, at every floor guiding crossbeam 6 is installed, guiding crossbeam 6 outer ends and guiding device 12 link together, 12 pairs of anti-fall tracks 11 of guiding device lead, outrigger 5 one ends are fixing with building 7 by built-in fitting 4, the other end is by outrigger pull bar 3 tractives, outrigger pull bar 3 supports 2 tops by outrigger, and link with built-in fitting 4, outrigger pull bar 3 also can pass through last layer building drawknot, outrigger 5 fixing meanss can also thereunder be established the outer end that diagonal brace is supported on outrigger 5, outrigger 5 outer ends also hang self-locking device 14, and self-locking device 14 is by suspension ring 27, suspension ring spring 25, spring bearer plate 24, portable plate 22, horizontal control lever 21, vertical control lever 32, lock rod 28, lock excellent spring 30, lock excellent spring bearer plate 29, lock excellent handle 31 and form, knife switch 37 is also installed in outrigger 5 outer ends, the knife switch 37 of each outrigger 5 is cascaded, and links together with the control circuit starting switch of controlling electric block 15 startings, and knife switch 37 disconnects by the connecting rod control with portable plate 22 bindings and be closed.
When the building enters main body construction, in the time of will promoting scaffold, outrigger 5 is installed on the position of scaffold 33 the 4th floor, electric block 15 hangs on the suspension ring 27, the knife switch 37 that the lock rod 28 that is installed in guiding device 12 is each suspension centre place that unlocking condition and control circuit starting switch be cascaded is closure state, and safetybolt 8 is installed in every floor guiding crossbeam 6 tops, often move the position of safetybolt 8 during hoisting scaffold, to prevent to run into guiding crossbeam 6.Scaffold is in normal lifting state, locking the lock rod handle 31 of excellent 28 rear ends is lived and can not move forward by 21 grades of horizontal control levers, lock rod 28 is in unlocking condition, when the weight that weight and original state takes place when each suspension centre of scaffold in the lifting process changes, it is heavy that the weight of some suspension centres becomes, other suspension centre weight lighten, the suspension centre suspension ring spring 25 that lightens is upspring electric block 15 automatically, suspension ring 27 and portable plate 22 are also upspring simultaneously, horizontal control lever 21, vertical control lever 32 moves up with portable plate 22 and moves up, thereby lock rod 28 is out of hand, and lock rod 28 flicks off forward rapidly under the energy that the excellent spring 30 of lock discharges, and insert in the circular hole 10 of anti-fall track 11, thereby scaffold is carried out a plurality of some lockings, and in the locking scaffold, the knife switch 37 of outrigger 5 outer ends is off-state owing to portable plate 22 moves up, electric block 15 also shuts down thereupon, falls thereby avoided contingent.
After scaffold promoted and puts in place, anti-fall track 11 is fixing with the guiding crossbeam 6 of each floor, and scaffold just can use for construction.Electric block 15 can be controlled 15 runnings of many electric blocks simultaneously by the unified control of console lifting.Scaffold can adopt monolithic to promote, and also can adopt split blade type to promote.

Claims (7)

1, a kind of multiple self-locked hoisting scaffold, comprise scaffold (33), main frame (13), outrigger (5), guiding crossbeam (6), guiding device (12), lock rod (28), suspension ring (27), knife switch (37), electric block (15), console, it is characterized in that: main frame (13) is by anti-fall track (11), little cross bar (18), cross binding (17) and outside main frame vertical rod are formed by connecting, on anti-fall track (11) center line, open a circular hole (10) at a certain distance, anti-fall track (11) passes the guiding device (12) that is arranged at every floor, guiding crossbeam (6) one end fixed buildings (7), the other end connects guiding device (12), each guiding device (12) one side is provided with lock rod (28), the place ahead of lock rod (28) is over against the center line of anti-fall track (11), lock rod (28) is by the excellent spring of lock (30) coiling, its rear end is connected with the excellent handle of lock (31), horizontal control lever (21) is positioned at the excellent handle of lock (31) left side, vertical control lever (32) is connected with the horizontal control lever (21) of every floor, and be connected with the portable plate (22) that is fixed in suspension ring (27) upper ends, suspension ring (27) are coiled by suspension ring spring (25), suspension ring spring (25) places in the spring overcoat pipe (38), on the spring overcoat pipe (38), the lower end respectively with top rail (23), bottom rail (26) welds together, suspension ring (27) pass top rail (23), the circular hole of bottom rail (26), outrigger (5) one ends and building (7) are fixing, the other end hangs suspension ring (27), electric block (15) is gone up and is hooked suspension ring (27) lower end, lower draw-bar hooks support handle (19), support handle (19) is fixing with bottom truss (35), knife switch (37) is installed in outrigger (5) outer end, the knife switch of each suspension centre (37) is together in series, and with control electric block (15) starting the control circuit starting switch be cascaded, knife switch (37) is by controlling with the connecting rod of portable plate (22) binding, when portable plate (22) rises, during decline, knife switch takes place to disconnect and is closed.
2, multiple self-locked hoisting scaffold according to claim 1 is characterized in that guiding device (12) is connected with strengthening frame (1), and strengthening frame (1) is in the next level setting of scaffold (33).
3, multiple self-locked hoisting scaffold according to claim 1, it is characterized in that outrigger (5) one ends are installed on the building (7), the other end is by outrigger pull bar (3) tractive, and it is fixing with built-in fitting (4) that outrigger pull bar (3) supports (2) by outrigger.
4, multiple self-locked hoisting scaffold according to claim 1 is characterized in that outrigger (5) one ends and building (7) are fixing, and the outer end that diagonal brace is supported on outrigger (5) is established in other end below.
5, multiple self-locked hoisting scaffold according to claim 1 is characterized in that being pushed down by spring bearer plate (24) above the suspension ring spring (25), and spring bearer plate (24) and suspension ring (27) weld together.
6, multiple self-locked hoisting scaffold according to claim 1, it is characterized in that locking excellent spring (30) outer end has an excellent outer tube of lock (9) to entangle, locking excellent outer tube (9) front-end and back-end has a plate with holes to weld together with it respectively, lock rod (28) passes from the hole of the plate locking excellent outer tube (9) front end, rear end and weld, locking excellent spring (30) front end has an excellent spring bearer plate of lock (29) and lock rod (28) to weld together, horizontal control lever (21) is upper and lower mobile by fulcrum (20) and limiting plate (39), to control locking rod (28).
7, multiple self-locked hoisting scaffold according to claim 1 is characterized in that the safetybolt (8) in anti-fall track (11) setting, is positioned at the top of every floor guiding crossbeam (6).
CN 99111613 1999-08-23 1999-08-23 Multiple self-locked elevating scaffold Expired - Fee Related CN1128277C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 99111613 CN1128277C (en) 1999-08-23 1999-08-23 Multiple self-locked elevating scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 99111613 CN1128277C (en) 1999-08-23 1999-08-23 Multiple self-locked elevating scaffold

Publications (2)

Publication Number Publication Date
CN1260434A CN1260434A (en) 2000-07-19
CN1128277C true CN1128277C (en) 2003-11-19

Family

ID=5275195

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 99111613 Expired - Fee Related CN1128277C (en) 1999-08-23 1999-08-23 Multiple self-locked elevating scaffold

Country Status (1)

Country Link
CN (1) CN1128277C (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101845883B (en) * 2010-06-04 2012-08-29 刘玉伟 Climbing scaffold system and construction method
CN101852008A (en) * 2010-06-04 2010-10-06 刘玉伟 Lifting scaffold device
CN102877637B (en) * 2012-09-29 2015-02-25 深圳市建工集团股份有限公司 Method for implementing operating platform in bottom wall construction of cantilever beam
CN102900228B (en) * 2012-11-02 2015-09-16 福建翔银工贸有限公司 Engineering scaffold self-locking connection structure
CN106586908B (en) * 2016-11-16 2019-07-12 上海市建筑装饰工程集团有限公司 Stone Vertical transports hanging basket in exterior wall scaffold

Also Published As

Publication number Publication date
CN1260434A (en) 2000-07-19

Similar Documents

Publication Publication Date Title
CN103375023A (en) Attached type lifting scaffold
CN1128277C (en) Multiple self-locked elevating scaffold
CN213268983U (en) Self-climbing discharging platform
CN209538646U (en) A kind of arc gradual change is interior to receive structure attached lifting scaffold
CN101215928B (en) Attached lifting scaffold trolley type inclining-proof device and method of use thereof
CN216474543U (en) Stay cable crane for offshore cable-stayed bridge construction
CN109629813A (en) A kind of arc gradual change is interior to receive structure attached lifting scaffold
CN110565937A (en) Door type integral lifting steel platform
CN203603439U (en) Guiding seat type lifting scaffold
CN219491674U (en) Scaffold with synchronous lifting monitoring function
CN109398386A (en) Railcar with joint control operation circuit
CN201148725Y (en) Trolley type inclining-proof device adhering to elevating scaffold
CN213651533U (en) Elevator maintenance protection structure for non-pit or shallow pit
CN201144392Y (en) Mobile detection and maintenance device for bridge structure
CN1932212A (en) Full automatic antifalling lifting scaffold
CN214243594U (en) Automatic control device for preventing petroleum electric drilling machine traveling block from being knocked up and down
CN209366148U (en) Railcar with joint control operation circuit
CN216476251U (en) Safety protection platform that construction was used
CN1173109C (en) Full-automatic anti-dropping lift scaffold
CN2306284Y (en) Bridgeing rail type attached lift scaffold
CN2209702Y (en) Saffold
CN1059176C (en) Mechanical and electrical elevating scaffold preventing falling
CN114852870A (en) Gantry hoisting wireless control and gantry hoisting operation method for track line
CN219098451U (en) Car of construction elevator with telescopic ladder
CN216076216U (en) Elevator shaft tool type operating platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Chen Shengkun

Document name: payment instructions

C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Chen Shengkun

Document name: Notification to Pay the Fees

C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Chen Shengkun

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice

Addressee: Chen Shengkun

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice

Addressee: Chen Yuee

Document name: Notification of Termination of Patent Right

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20031119

Termination date: 20100823