CN112681703A - Cooling formula building platform - Google Patents

Cooling formula building platform Download PDF

Info

Publication number
CN112681703A
CN112681703A CN202011510201.8A CN202011510201A CN112681703A CN 112681703 A CN112681703 A CN 112681703A CN 202011510201 A CN202011510201 A CN 202011510201A CN 112681703 A CN112681703 A CN 112681703A
Authority
CN
China
Prior art keywords
water
construction platform
plate
spraying
pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011510201.8A
Other languages
Chinese (zh)
Inventor
甘铮
刘湘
陈安
张钰钊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Cangmang Construction Technology Co ltd
Original Assignee
Chengdu Cangmang Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Cangmang Construction Technology Co ltd filed Critical Chengdu Cangmang Construction Technology Co ltd
Priority to CN202011510201.8A priority Critical patent/CN112681703A/en
Publication of CN112681703A publication Critical patent/CN112681703A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Special Spraying Apparatus (AREA)

Abstract

The utility model relates to a cooling formula building platform, including construction platform, construction platform is provided with many support columns near ground side, construction platform's below just is located the space that leaves the confession workman to have a rest between the support column, its characterized in that: the construction platform is provided with a first spraying device close to the ground side, and the first spraying device is used for spraying and cooling workers who have a rest in the space; the construction platform is provided with a second spraying device, and the second spraying device is used for spraying and cooling construction workers on the construction platform. This application has the effect that improves the operational environment of construction worker when having a rest under construction platform and being under construction on construction platform.

Description

Cooling formula building platform
Technical Field
The application relates to the field of building construction equipment, in particular to a cooling type building platform.
Background
The building construction platform is used for facilitating construction operators to construct different positions of a building in building construction, and meanwhile, building materials needed to be used in the construction process are stacked and transported. Therefore, the building construction platform is an indispensable device for improving the working efficiency in the building construction process. In hot summer, during the rest time, constructors can also rest in the space below the construction platform to avoid direct sunlight.
With respect to the related art in the above, the inventors consider that the space under the construction platform is still hot when the process of construction is performed in hot summer, resulting in that the construction worker is still hot when resting there, and also very hot when constructing on the construction platform.
Disclosure of Invention
In order to improve the operational environment of construction workman when having a rest under construction platform and being under construction on construction platform, this application provides a cooling formula building platform.
The application provides a cooling formula building platform adopts following technical scheme:
a cooling type building platform comprises a construction platform, wherein a plurality of support columns are arranged on the side, close to the ground, of the construction platform, a space for workers to rest is reserved below the construction platform and among the support columns, a first spraying device is arranged on the side, close to the ground, of the construction platform, and the first spraying device is used for spraying and cooling the workers who rest in the space; the construction platform is provided with a second spraying device, and the second spraying device is used for spraying and cooling construction workers on the construction platform.
By adopting the technical scheme, when a worker carries out construction operation on the construction platform, the second spraying device can carry out spraying and cooling on the worker on the construction platform, so that the construction environment of the worker in hot weather is improved, and the comfort level of the worker during construction is improved; similarly, when the workman was when the rest, was in the below of construction platform and avoids the burning sun directly to shine, sprays the cooling through first spray set to the space of construction platform below this moment to make the workman can enough avoid the burning sun directly to shine when the rest, can reduce temperature when the rest again, and then improve the comfort level when the workman has a rest.
Optionally, a circular truncated cone is arranged on the side, close to the ground, of the construction platform, the first spraying device comprises an atomizing and spraying assembly and a water supply assembly, the atomizing and spraying assembly is mounted on the circular truncated cone, and the atomizing and spraying assembly is used for spraying water mist into a space below the construction platform; the water supply assembly is also installed on the round platform and used for providing a water source for the atomization spraying assembly.
By adopting the technical scheme, when a worker has a rest below the construction platform, the water supply assembly provides a water source for the atomization spraying assembly, and the atomization spraying assembly changes water into water mist to be sprayed out, so that the water mist can be directly contacted with the skin of the worker when the worker has a rest below the construction platform, and cool experience is brought to the worker; moreover, after the water mist is attached to the skin of a worker and is evaporated, the heat on the surface of the skin of the worker can be taken away, and the effect of cooling the worker is achieved.
Optionally, the atomization spray assembly comprises a first water pump, a water suction pipe, a water outlet pipe, an atomization nozzle, a turnover plate and a driving member, the turnover plate is movably arranged on the circular table, and the driving member is mounted on the turnover plate and used for driving the turnover plate to make circular motion on the circular table; the first water pump is arranged on the turnover plate, the water suction pipe is arranged at the pump inlet end of the first water pump, and the water supply assembly supplies water to the first water pump through the water suction pipe; the outlet pipe is installed at the pump outlet end of first water pump, atomizer installs on the outlet pipe, and installs a plurality ofly on the outlet pipe, and is a plurality of atomizer all faces ground side.
Through adopting above-mentioned technical scheme, first water pump starts the back, and the pipe that absorbs water inhales the water of water supply assembly department, goes into in the outlet pipe through first water pump, then directly from atomizer department blowout. And then the driving part is started to enable the turnover plate to do circular motion on the circular truncated cone, and at the moment, the atomizing nozzle can also do circular motion continuously in the process of spraying water mist, so that the spraying range of the water mist is improved, and the effect of improving the wider spraying range of the water mist is achieved.
Optionally, install the circumference board on the circumference outer wall of round platform, the annular slip table is installed to one side that the circumference board is close to ground, annular slide has been seted up on the annular slip table, the axis of the circle of the formation of annular slide coincides mutually with the axis of round platform, be provided with ring shape slide sliding fit's pulley on the turnover board.
Through adopting above-mentioned technical scheme, the gyro wheel on the turnover board rolls in the annular slide on the annular slip table, can realize the circumferential motion of turnover board on the annular slip table to the cooperation of gyro wheel and annular slide can make the turnover board more smooth and easy when removing on the annular slip table.
Optionally, the driving part comprises a rotating motor and a rotating gear, the rotating gear is coaxially arranged on an output shaft of the rotating motor, an annular rack is installed on the inner side wall of the circumferential plate, the axis of a circle formed by the annular rack coincides with the axis of the circular truncated cone, and the rotating gear is meshed with the annular rack.
By adopting the technical scheme, the rotating motor is started, so that the output shaft of the rotating motor starts to rotate, and the rotating gear also starts to rotate at the moment; because the rotating gear is meshed with the annular rack, the rotating gear can move along the annular rack in the rotating process, so that the rollers on the turnover plate are driven to automatically roll in the annular slide way, and the effect of facilitating the turnover plate to do circular motion is achieved.
Optionally, the water supply assembly comprises a water storage tank and an installation plate, a cage net is arranged between the support columns and below the construction platform, and workers can rest on the cage net; the mounting plate is mounted on the top wall of the cage net, the water storage tank is placed on the mounting plate, a lifting piece used for driving the water storage tank to vertically move on the mounting plate is arranged on the mounting plate, and an inlet hole is formed in the end, back to the ground, of the water storage tank; the water absorption pipe comprises a horizontal pipe section and a vertical pipe section, the horizontal pipe section is perpendicular to the vertical pipe section and communicated with the vertical pipe section, the vertical pipe section is overlapped with the axis of the circular truncated cone, and the vertical pipe section is opposite to the inlet hole in the vertical direction.
By adopting the technical scheme, after water is filled into the water storage tank, the water storage tank is vertically lifted upwards through the lifting piece, the vertical pipe section of the water suction pipe is inserted into the water storage tank through the inlet hole, and at the moment, the first water pump can pump water out of the water storage tank through the water suction pipe and spray the water out of the atomizing spray head, so that the effect of conveniently providing a water source is achieved; when the water level in the water storage tank continuously drops, the water suction pipe can normally contact with the water in the water storage tank by continuously lifting the water storage tank; the water suction pipe is divided into a horizontal pipe section and a vertical pipe section, the vertical pipe section is overlapped with the axis of the circular truncated cone, and the axis of a circle formed by the annular slide way is overlapped with the axis of the circular truncated cone; therefore, when the turnover plate is provided with the pump body to do circular motion, the vertical pipe section does not displace but rotates, so that normal water absorption of the vertical pipe section in the water storage tank is not influenced, and the effect of normally conveying water in the process that the pump body does circular motion is achieved.
Optionally, the lifting piece is including setting up a plurality of cylinders on the mounting panel, and is a plurality of the equal vertical extension of piston rod of cylinder, the piston rod of cylinder is connected with the lateral wall of water storage box, still be provided with vertical guide bar on the mounting panel, install the guide cylinder on the lateral wall of water storage box, guide cylinder and vertical guide bar sliding fit.
By adopting the technical scheme, the air cylinder is started, so that the piston rod of the air cylinder is extended, the water storage tank can be pushed vertically upwards at the moment, and the water storage tank can vertically move upwards at the moment; after the piston rod of the air cylinder retracts, the water storage tank can be pulled vertically downwards at the moment, and the water storage tank can move vertically downwards at the moment, so that the effect of driving the water storage tank to move in the vertical direction conveniently is achieved; and the guide cylinder and the vertical guide rod are arranged to ensure that the water storage tank is stable when moving in the vertical direction.
Optionally, the second spraying device includes a plurality of induction spraying assemblies and water storage tanks, the induction spraying assemblies are arranged on the periphery of the construction platform, the water storage tanks are mounted on the supporting columns, a plurality of induction areas are arranged on the construction platform, and after the induction areas sense pressure, the induction spraying assemblies near the induction areas sense pressure to spray water in the water storage tanks; the inductive spray assembly in the vicinity of the inductive region where no pressure is sensed stops spraying water.
By adopting the technical scheme, when constructors perform construction on the construction platform, workers step on the sensing area, and the sensing area senses the pressure caused by the stepping of the workers on the sensing area, so that the sensing spraying assembly can directly pump water out of the water storage tank and then spray the water out; at the moment, workers in the sensing area can feel cool, and the sensing spray assembly near the non-treaded sensing area cannot spray water due to no pressure, so that the water can be sprayed only near the workers, and a more accurate spraying effect is achieved; and further saves water resources.
Optionally, a plurality of plate bodies are laid on the surface of the construction platform, a plurality of springs are arranged between the plate bodies and the surface of the construction platform, the induction spray assembly comprises a second water pump, a water delivery pipe, a water spray pipe, an atomization spray head and a storage battery, the second water pump is installed on the bottom wall of the construction platform close to the edge, the water delivery pipe is installed at the pump inlet end of the second water pump, one end of the water delivery pipe far away from the second water pump is communicated with the water storage tank, the water spray pipe is installed at the pump outlet end of the second water pump, the atomization spray head is installed at one end of the water spray pipe far away from the second water pump, and the atomization spray head faces the upper table surface side; the storage battery is arranged on the construction platform, a first lead is electrically connected to the storage battery, a first conductive plate is arranged on the plate surface of the plate body close to the construction platform, and the first conductive plate is electrically connected with one end, far away from the storage battery, of the first lead; the second water pump is electrically connected with a second wire, a second conductive plate is arranged on the table top of the construction platform close to the plate body, the second conductive plate is electrically connected with one end, far away from the second water pump, of the second wire, and the first conductive plate is opposite to the second conductive plate in the vertical direction.
By adopting the technical scheme, after a worker stands on the plate body, the spring is arranged between the plate body and the surface of the construction platform, and the plate body can move to the surface side of the construction platform after being pressed by the weight of the worker, so that the spring can be compressed; the first current-conducting plate and the second current-conducting plate are opposite to each other in the vertical direction, when the plate body is close to the construction platform, the first current-conducting plate and the second current-conducting plate are attached together, at the moment, electric energy in the storage battery can be transmitted to the second water pump through the first conducting wire, the first current-conducting plate, the second conducting wire and the second current-conducting plate in sequence, so that the second water pump runs, the first water in the water storage tank is pumped out through the water delivery pipe, and water is sprayed out of the atomizing spray header through the water spray pipe, so that workers on the plate body can feel cool brought by water mist; if the worker is not on the plate body any longer, the plate body does not feel pressure any longer, and the spring can restore to the original state under the action of the elasticity of the spring, so that the plate body is separated from the construction platform, and the first conductive plate is not in contact with the second conductive plate any longer; at the moment, the electric energy of the storage battery is not transmitted to the second water pump any more, and the atomizing spray header stops spraying water; after setting up like this for the atomizing shower head can realize automatic spray according to the workman on the plate body, and the workman leaves the back and realizes automatic shutdown and spray, thereby reaches the comparatively intelligent effect of spraying water smoke.
Optionally, be provided with around the construction platform and prevent weighing down the railing, the battery is installed and is prevented weighing down on the railing, prevent weighing down still to be provided with the solar photovoltaic board on the railing, the solar photovoltaic board with the battery electricity is connected.
Through adopting above-mentioned technical scheme, prevent that setting up of weighing down the railing can protect the workman that is on construction platform to a certain extent, and solar photovoltaic board then can provide the electric energy for the battery, conveniently charges the battery promptly, reaches the effect of make full use of light energy.
In summary, the present application includes at least one of the following beneficial technical effects:
when workers carry out construction operation on the construction platform, the second spraying device can carry out spraying and cooling on the construction workers on the construction platform, so that the construction environment of the workers in hot weather is improved, and the comfort level of the workers during construction is improved; similarly, when a worker has a rest, the worker is positioned below the construction platform to avoid burning sun and directly shine, and the space below the construction platform is sprayed and cooled through the first spraying device, so that the worker can avoid burning sun and directly shine and can reduce the temperature when having a rest, and the comfort level of the worker is further improved;
after water is poured into the water storage tank, the water storage tank is vertically lifted upwards through the lifting piece, the vertical pipe section of the water suction pipe is inserted into the water storage tank through the inlet hole, and at the moment, the first water pump can pump water out of the water storage tank through the water suction pipe and spray the water out of the atomizing nozzle, so that the effect of conveniently providing a water source is achieved; when the water level in the water storage tank continuously drops, the water suction pipe can normally contact with the water in the water storage tank by continuously lifting the water storage tank; the water suction pipe is divided into a horizontal pipe section and a vertical pipe section, the vertical pipe section is overlapped with the axis of the circular truncated cone, and the axis of a circle formed by the annular slide way is overlapped with the axis of the circular truncated cone; therefore, when the turnover plate carries out circular motion with the pump body, the vertical pipe section does not displace but rotates, so that normal water absorption of the vertical pipe section in the water storage tank is not influenced, and the effect of normally conveying water in the process of circular motion of the pump body is achieved;
when a worker stands on the plate body, the spring is arranged between the plate body and the surface of the construction platform, and the plate body can move to the surface side of the construction platform after being pressed by the weight of the worker, so that the spring can be compressed; the first current-conducting plate and the second current-conducting plate are opposite to each other in the vertical direction, when the plate body is close to the construction platform, the first current-conducting plate and the second current-conducting plate are attached together, at the moment, electric energy in the storage battery can be transmitted to the second water pump through the first conducting wire, the first current-conducting plate, the second conducting wire and the second current-conducting plate in sequence, so that the second water pump runs, the first water in the water storage tank is pumped out through the water delivery pipe, and water is sprayed out of the atomizing spray header through the water spray pipe, so that workers on the plate body can feel cool brought by water mist; if the worker is not on the plate body any longer, the plate body does not feel pressure any longer, and the spring can restore to the original state under the action of the elasticity of the spring, so that the plate body is separated from the construction platform, and the first conductive plate is not in contact with the second conductive plate any longer; at the moment, the electric energy of the storage battery is not transmitted to the second water pump any more, and the atomizing spray header stops spraying water; after setting up like this for the atomizing shower head can realize automatic spray according to the workman on the plate body, and the workman leaves the back and realizes automatic shutdown and spray, thereby reaches the comparatively intelligent effect of spraying water smoke.
Drawings
Fig. 1 is a schematic structural diagram of the present application.
Fig. 2 is a partial cross-sectional view of the present application.
Fig. 3 is an enlarged view of a portion a in fig. 2.
Fig. 4 is a partial sectional view in a front view of the present application.
Fig. 5 is an enlarged view of a portion B in fig. 4.
Description of reference numerals: 1. a construction platform; 11. a support pillar; 2. a first spraying device; 21. an atomizing spray assembly; 211. a first water pump; 212. a suction pipe; 2121. a horizontal pipe section; 2122. a vertical pipe section; 213. a water outlet pipe; 214. an atomizing spray head; 215. a turnover plate; 2151. a pulley; 216. a drive member; 2161. rotating the motor; 2162. a rotating gear; 22. a water supply assembly; 221. a water storage tank; 2211. a guide cylinder; 222. mounting a plate; 2221. a cylinder; 2222. a vertical guide bar; 3. a second spraying device; 31. an induction spray assembly; 311. a second water pump; 3111. a second conductive line; 3112. a second conductive plate; 312. a water delivery pipe; 313. a water spray pipe; 314. an atomizing spray header; 315. a storage battery; 3151. a first conductive line; 3152. a first conductive plate; 32. a water storage tank; 4. a circular truncated cone; 41. a circumferential plate; 411. an annular rack; 42. an annular sliding table; 421. an annular chute; 5. a cage net; 6. a plate body; 61. a spring; 7. an anti-falling handrail; 71. a solar photovoltaic panel.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
The embodiment of the application discloses cooling formula building platform. Referring to fig. 1, the cooling type building platform includes a construction platform 1, and the construction platform 1 is a plate-shaped body with a rectangular cross section in the embodiment; a plurality of support columns 11 are welded on the side, close to the ground, of the construction platform 1, namely, the support columns 11 in a vertical state are respectively arranged at four corners of the construction platform 1, and self-locking universal wheels are further arranged at the ends, close to the ground, of the support columns 11, so that the construction platform is convenient to move; a ladder stand is further arranged on one side of the construction platform, and workers can conveniently go to the construction platform from the ground by the ladder stand; a space for workers to rest is reserved below the construction platform 1 and between the support columns 11, a first spraying device 2 is arranged on the side, close to the ground, of the construction platform 1, and the first spraying device 2 is used for spraying and cooling the workers who rest in the space; the construction platform 1 is provided with a second spraying device 3, and the second spraying device 3 is used for spraying and cooling construction workers on the construction platform 1.
As shown in fig. 1 and 2, a circular truncated cone 4 is arranged on the construction platform 1 near the ground, the first spraying device 2 comprises an atomizing and spraying assembly 21 and a water supply assembly 22, the atomizing and spraying assembly 21 is installed on the circular truncated cone 4, and the atomizing and spraying assembly 21 is used for spraying water mist into a space below the construction platform 1; the water supply assembly 22 is also arranged on the circular truncated cone 4, and the water supply assembly 22 is used for supplying water to the atomization spraying assembly 21; in this example, the axis of the circular truncated cone 4 coincides with the center perpendicular of the construction platform 1, so that the whole construction platform can be more stable.
As shown in fig. 2 and 3, the atomizing spray assembly 21 includes a first water pump 211, a water suction pipe 212, a water outlet pipe 213, an atomizing nozzle 214, a revolving plate 215, and a driving member 216, the revolving plate 215 is movably disposed on the circular table 4, the revolving plate 215 is rectangular, and the moving arrangement is that the revolving plate 215 slides on the circular table 4; the driving piece 216 is installed on the turnover plate 215 and is used for driving the turnover plate 215 to make circular motion on the circular table 4; the first water pump 211 is installed on the turnover plate 215, the suction pipe 212 is installed at the pump inlet end of the first water pump 211, and the water supply assembly 22 supplies water to the first water pump 211 through the suction pipe 212; the water outlet pipe 213 is installed at the pump outlet end of the first water pump 211, the atomizer 214 is installed on the water outlet pipe 213, and a plurality of atomizers 214 are installed on the water outlet pipe 213, and all face the ground.
After the first water pump 211 is started, the water suction pipe 212 sucks water from the water supply assembly 22, pumps the water into the water outlet pipe 213 through the first water pump 211, and then directly sprays the water out of the atomizing nozzle 214. Then, the driving member 216 is started to make the revolving plate 215 circularly move on the circular table 4, and at this time, the atomizing nozzle 214 can also continuously circularly move in the process of spraying the water mist, so that the spraying range of the water mist is increased, and the effect of increasing the spraying range of the water mist is achieved.
As shown in fig. 2 and 3, a circumferential plate 41 is mounted on the circumferential outer wall of the circular truncated cone 4, and the circumferential plate 41 itself is an annular plate, that is, the circumferential plate 41 and the circular truncated cone 4 form a cylindrical body with a sealed upper end and an open lower end; the annular sliding table 42 is installed on one side, close to the ground, of the circumferential plate 41, the annular sliding table 42 is also in an annular shape, an annular slide rail 421 is arranged on the upper surface, away from the ground, of the annular sliding table 42, the axis of a circle formed by the annular slide rail 421 coincides with the axis of the circular table 4, and a pulley 2151 in sliding fit with the annular slide rail 421 is arranged on the turnover plate 215. The driving member 216 includes a rotating motor 2161 and a rotating gear 2162, the rotating gear 2162 is coaxially disposed on the output shaft of the rotating motor 2161, the annular rack 411 is mounted on the inner side wall of the circumferential plate 41, the axis of the circle formed by the annular rack 411 coincides with the axis of the circular truncated cone 4, and the rotating gear 2162 is engaged with the annular rack 411.
The rotating motor 2161 is started, so that the output shaft of the rotating motor 2161 starts to rotate, and at the moment, the rotating gear 2162 also starts to rotate; because the rotating gear 2162 is engaged with the annular rack 411, the rotating gear 2162 moves along the annular rack 411 during the rotation process, thereby driving the roller of the turnover plate 215 to automatically roll in the annular slideway 421, and achieving the effect of making the turnover plate 215 perform circular motion conveniently.
As shown in fig. 2 and 3, the water supply assembly 22 includes a water storage tank 221 and a mounting plate 222, a cage net 5 is disposed between the support columns 11 and below the construction platform 1, the cage net 5 is used for workers to rest, and if articles fall down between the construction platform 1 and the cage net 5, the cage net 5 can effectively protect the workers who rest; specifically, the cage net 5 is welded on four support columns 11, and the cage net 5 is separated from the ground by a certain distance; the mounting plate 222 is welded to the top wall of the cage 5, the water tank 221 is placed on the mounting plate 222, and the mounting plate 222 is provided with a lifting member for driving the water tank 221 to vertically move on the mounting plate 222. Specifically, the lifting member comprises a plurality of air cylinders 2221 mounted on the mounting plate 222, piston rods of the air cylinders 2221 all extend vertically, the air cylinders 2221 all run synchronously, and the piston rods of the air cylinders 2221 are welded with the side wall of the water storage tank 221; referring to fig. 1, a vertical guide bar 2222 is further welded to the mounting plate 222, a guide cylinder 2211 is mounted on a side wall of the water storage tank 221, and the guide cylinder 2211 is in sliding fit with the vertical guide bar 2222, that is, the guide cylinder 2211 is inserted into the vertical guide bar 2222. An inlet hole is formed in the end, away from the ground, of the water storage tank 221; the suction pipe 212 comprises a horizontal pipe section 2121 and a vertical pipe section 2122, wherein the horizontal pipe section 2121 is perpendicular to and communicated with the vertical pipe section 2122, the vertical pipe section 2122 is overlapped with the axis of the circular truncated cone 4, and the vertical pipe section 2122 is opposite to the inlet hole in the vertical direction; in this embodiment, the cat ladder is also installed to one side of cage net, conveniently lets the workman go up to the top of cage net from the cat ladder, then adds the water in to the cistern 221.
After water is filled into the water storage tank 221, the water storage tank 221 is vertically lifted upwards through the lifting piece, the vertical pipe section 2122 of the water suction pipe 212 is inserted into the water storage tank 221 through the inlet hole, and at the moment, the first water pump 211 can pump water out of the water storage tank 221 through the water suction pipe 212 and spray the water out of the atomizing nozzle 214, so that the effect of conveniently providing a water source is achieved; when the water level in the water storage tank 221 is continuously lowered, the water suction pipe 212 can normally contact the water in the water storage tank 221 by continuously raising the water storage tank 221; the suction pipe 212 is divided into a horizontal pipe section 2121 and a vertical pipe section 2122, the vertical pipe section 2122 coincides with the axis of the circular truncated cone 4, and the axis of the circle formed by the annular slideway 421 coincides with the axis of the circular truncated cone 4; therefore, when the revolving plate 215 drives the pump body to do circular motion, the vertical pipe section 2122 itself does not displace but rotates, so that the normal water absorption of the vertical pipe section 2122 in the water storage tank 221 is not affected, and the effect of normally conveying water in the process of circular motion of the pump body is achieved.
As shown in fig. 1, the second spraying device 3 includes an induction spraying assembly 31 and a water storage tank 32, and the induction spraying assembly 31 is provided in plurality around the construction platform 1. In this embodiment, four induction spray assemblies 31 are provided, each support column 11 corresponds to one induction spray assembly 31, and the water storage tank 32 is welded on the support column 11; the construction platform 1 is provided with a plurality of induction areas, and after the induction areas feel pressure, the induction spray assembly 31 near the induction areas which feel the pressure sprays water in the water storage tank 32; the inductive spray assembly 31 in the vicinity of the inductive region where no pressure is sensed stops spraying water.
As shown in fig. 1 and 4, a plurality of plate bodies 6 are laid on the surface of the construction platform 1, in this embodiment, the number of the plate bodies 6 is four, the four plate bodies 6 have the same shape and size, and the four plate bodies 6 block the construction platform 1; a plurality of springs 61 are arranged between each plate body 6 and the surface of the construction platform 1, and when the springs 61 are in a natural state, a gap is reserved between each plate body 6 and the construction platform 1; the induction spray assembly 31 comprises a second water pump 311, a water delivery pipe 312, a water spray pipe 313, an atomization spray head 314 and a storage battery 315; the second water pump 311 is installed on the bottom wall of the construction platform 1 close to the edge of the second water pump 311, the water delivery pipe 312 is installed at the pump inlet end of the second water pump 311, and one end of the water delivery pipe 312, which is far away from the second water pump 311, is communicated with the water storage tank 32; the spray pipe 313 is arranged at the outlet end of the pump of the second water pump 311, the atomizing spray heads 314 are arranged at the ends of the spray pipe 313 far away from the second water pump 311, and the atomizing spray heads 314 face the upper table surface side of the construction platform 1; in the present embodiment, the atomizing shower head 314 is provided in plurality on the shower pipe 313; with reference to fig. 5, the storage battery 315 is installed on the construction platform 1, the storage battery 315 is electrically connected to a first conducting wire 3151, a first conducting plate 3152 is disposed on the plate surface of the plate body 6 near the construction platform 1, and the first conducting plate 3152 is electrically connected to one end of the first conducting wire 3151 away from the storage battery 315; second water pump 311 is powered on and is connected with second wire 3111, and construction platform 1 is provided with second conductive plate 3112 on being close to the mesa of plate body 6, and second conductive plate 3112 is connected with the one end electricity that second wire 3111 is kept away from second water pump 311, and first conductive plate 3152 is just right in vertical direction with second conductive plate 3112.
After a worker stands on the plate body 6, the plate body 6 moves to the surface side of the construction platform 1 after being pressed by the weight of the worker due to the spring 61 arranged between the plate body 6 and the surface of the construction platform 1, so that the spring 61 is compressed; the first conductive plate 3152 is opposite to the second conductive plate 3112 in the vertical direction, when the plate body 6 is close to the construction platform 1, the first conductive plate 3152 and the second conductive plate 3112 are attached together, at this time, the electric energy in the storage battery 315 is transmitted to the second water pump 311 through the first conductive wire 3151, the first conductive plate 3152, the second conductive plate 3111 and the second conductive plate 3112 in sequence, so that the second water pump 311 operates, the first water pump 211 in the water storage tank 32 is discharged through the water pipe 312, and water is sprayed out from the atomizing spray head 314 through the water spray pipe 313, so that workers on the plate body 6 can feel cool brought by water mist; if the worker is no longer on the plate body 6, the plate body 6 no longer feels pressure, and the spring 61 is restored under the action of the elasticity of the spring, so that the plate body 6 is separated from the construction platform 1, and the first conductive plate 3152 is no longer in contact with the second conductive plate 3112; at this time, the electric energy of the storage battery 315 is not transmitted to the second water pump 311 any more, and the atomizing spray head 314 stops spraying water; after the arrangement, the atomizing spray header 314 can realize automatic spraying according to the worker on the plate body 6, and the worker can automatically stop spraying after leaving, so that the intelligent effect of spraying water mist is achieved.
As shown in fig. 1, an anti-falling railing 7 is welded around the construction platform 1, the anti-falling railing 7 surrounds the upper surface of the construction platform 1, and a storage battery 315 is installed on the anti-falling railing 7; the anti-falling handrail 7 is also provided with a solar photovoltaic plate 71, and the solar photovoltaic plate 71 is electrically connected with the storage battery 315.
The arrangement of preventing weighing down railing 7 can protect the worker on construction platform 1 to a certain extent, and solar photovoltaic board 71 then can provide the electric energy for battery 315, conveniently charges battery 315 promptly, reaches the effect of make full use of light energy.
The implementation principle of the cooling type building platform in the embodiment of the application is as follows: when workers carry out construction operation on the construction platform 1, the second spraying device 3 can carry out spraying and cooling on the construction workers on the construction platform 1, so that the construction environment of the workers in hot weather is improved, and the comfort level of the workers during construction is improved; similarly, when the workman was when the rest, was in the below of construction platform 1 and avoids the burning sun directly to shine, sprays the cooling through first spray set 2 to the space of construction platform 1 below this moment to make the workman can enough avoid the burning sun directly to shine when the rest, can reduce the temperature again when the rest, and then the comfort level when improving the workman and have a rest.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (10)

1. The utility model provides a cooling formula building platform, includes construction platform (1), construction platform (1) is close to the ground side and is provided with many support columns (11), the below of construction platform (1) just is located and leaves the space that supplies the workman to have a rest between support column (11), its characterized in that: the construction platform (1) is provided with a first spraying device (2) close to the ground side, and the first spraying device (2) is used for spraying and cooling workers who have a rest in the space; the construction platform is characterized in that a second spraying device (3) is arranged on the construction platform (1), and the second spraying device (3) is used for spraying and cooling construction workers on the construction platform (1).
2. A cooled construction platform according to claim 1, wherein: the construction platform (1) is provided with a circular truncated cone (4) close to the ground side, the first spraying device (2) comprises an atomizing and spraying assembly (21) and a water supply assembly (22), the atomizing and spraying assembly (21) is installed on the circular truncated cone (4), and the atomizing and spraying assembly (21) is used for spraying water mist in a space below the construction platform (1); the water supply assembly (22) is also arranged on the circular truncated cone (4), and the water supply assembly (22) is used for providing a water source for the atomization spraying assembly (21).
3. A cooled construction platform according to claim 2, wherein: the atomization spraying assembly (21) comprises a first water pump (211), a water suction pipe (212), a water outlet pipe (213), an atomization nozzle (214), a turnover plate (215) and a driving piece (216), wherein the turnover plate (215) is movably arranged on the circular table (4), and the driving piece (216) is arranged on the turnover plate (215) and is used for driving the turnover plate (215) to do circular motion on the circular table (4); the first water pump (211) is arranged on the turnover plate (215), the water suction pipe (212) is arranged at the pump inlet end of the first water pump (211), and the water supply assembly (22) supplies water to the first water pump (211) through the water suction pipe (212); outlet pipe (213) are installed at the pump outlet end of first water pump (211), atomizer (214) are installed on outlet pipe (213), and install a plurality ofly on outlet pipe (213), and are a plurality of atomizer (214) all face ground side.
4. A cooled construction platform according to claim 3, wherein: install circumference board (41) on the circumference outer wall of round platform (4), annular slip table (42) are installed to one side that circumference board (41) are close to ground, annular slide (421) have been seted up on annular slip table (42), the axis of the circle of the formation of annular slide (421) coincides mutually with the axis of round platform (4), be provided with ring shape slide (421) sliding fit's pulley (2151) on turnover board (215).
5. A cooled construction platform according to claim 4, wherein: the driving part (216) comprises a rotating motor (2161) and a rotating gear (2162), the rotating gear (2162) is coaxially arranged on an output shaft of the rotating motor (2161), an annular rack (411) is installed on the inner side wall of the circumferential plate (41), the axis of a circle formed by the annular rack (411) is coincided with the axis of the circular truncated cone (4), and the rotating gear (2162) is meshed with the annular rack (411).
6. A cooled construction platform according to claim 3, wherein: the water supply assembly (22) comprises a water storage tank (221) and a mounting plate (222), a cage net (5) is arranged between the support columns (11) and below the construction platform (1), and workers can rest on the cage net (5); the mounting plate (222) is mounted on the top wall of the cage net (5), the water storage tank (221) is placed on the mounting plate (222), a lifting piece used for driving the water storage tank (221) to vertically move on the mounting plate (222) is arranged on the mounting plate (222), and an inlet hole is formed in the end, deviating from the ground, of the water storage tank (221); the water suction pipe (212) comprises a horizontal pipe section (2121) and a vertical pipe section (2122), the horizontal pipe section (2121) is perpendicular to and communicated with the vertical pipe section (2122), the vertical pipe section (2122) is overlapped with the axis of the circular truncated cone (4), and the vertical pipe section (2122) is opposite to the inlet hole in the vertical direction.
7. A cooled construction platform according to claim 6, wherein: the lift is including setting up a plurality of cylinders (2221) on mounting panel (222), and is a plurality of the equal vertical extension of piston rod of cylinder (2221), the piston rod of cylinder (2221) is connected with the lateral wall of water storage box (221), still be provided with vertical guide bar (2222) on mounting panel (222), install guide cylinder (2211) on the lateral wall of water storage box (221), guide cylinder (2211) and vertical guide bar (2222) sliding fit.
8. A cooled construction platform according to claim 1, wherein: the second spraying device (3) comprises a plurality of induction spraying components (31) and water storage tanks (32), the induction spraying components (31) are arranged on the periphery of the construction platform (1), the water storage tanks (32) are installed on the supporting columns (11), a plurality of induction areas are arranged on the construction platform (1), and after the induction areas feel pressure, the induction spraying components (31) nearby the induction areas which feel the pressure spray out water in the water storage tanks (32); the sensing shower assembly (31) near the sensing area where no pressure is sensed stops spraying water.
9. A cooled construction platform according to claim 8, wherein: a plurality of plate bodies (6) are laid on the surface of the construction platform (1), a plurality of springs (61) are arranged between the plate bodies (6) and the surface of the construction platform (1), the induction spray assembly (31) comprises a second water pump (311), a water delivery pipe (312), a water spray pipe (313), an atomization spray head (314) and a storage battery (315), the second water pump (311) is arranged on the bottom wall of the construction platform (1) close to the edge, the water pipe (312) is arranged at the pump inlet end of the second water pump (311), one end of the water pipe (312) far away from the second water pump (311) is communicated with the water storage tank (32), the spray pipe (313) is arranged at the outlet end of the pump of the second water pump (311), the atomizing spray head (314) is arranged at one end of the spray pipe (313) far away from the second water pump (311), the atomizing spray heads (314) face the upper table surface side of the construction platform (1); the storage battery (315) is installed on the construction platform (1), a first lead (3151) is electrically connected to the storage battery (315), a first conductive plate (3152) is arranged on the plate surface of the plate body (6) close to the construction platform (1), and the first conductive plate (3152) is electrically connected with one end, far away from the storage battery (315), of the first lead (3151); second water pump (311) electricity is connected with second wire (3111), construction platform (1) is provided with second conductive plate (3112) on being close to the mesa of plate body (6), second conductive plate (3112) is connected with the one end electricity that second water pump (311) was kept away from to second wire (3111), first conductive plate (3152) is just right on vertical direction with second conductive plate (3112).
10. A cooled construction platform according to claim 9, wherein: be provided with around construction platform (1) and prevent weighing down railing (7), battery (315) are installed and are being prevented weighing down on railing (7), prevent weighing down and still be provided with solar photovoltaic board (71) on railing (7), solar photovoltaic board (71) with battery (315) electricity is connected.
CN202011510201.8A 2020-12-18 2020-12-18 Cooling formula building platform Pending CN112681703A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011510201.8A CN112681703A (en) 2020-12-18 2020-12-18 Cooling formula building platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011510201.8A CN112681703A (en) 2020-12-18 2020-12-18 Cooling formula building platform

Publications (1)

Publication Number Publication Date
CN112681703A true CN112681703A (en) 2021-04-20

Family

ID=75450146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011510201.8A Pending CN112681703A (en) 2020-12-18 2020-12-18 Cooling formula building platform

Country Status (1)

Country Link
CN (1) CN112681703A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114108484A (en) * 2021-12-09 2022-03-01 山东省交通科学研究院 Bridge engineering maintenance hanging basket in civil engineering field

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5531801A (en) * 1994-02-08 1996-07-02 Sewell; Frederic D. Liquid spray air purification and controlled humidification apparatus with air quality monitor and controller
CN104988879A (en) * 2015-05-18 2015-10-21 成都恒力达科技有限公司 Environmental protection spraying device capable of preventing building slag transport vehicle from raising dust
CN105544954A (en) * 2015-12-11 2016-05-04 江苏华海钢结构有限公司 Anticorrosion steel structure scaffold
CN206107067U (en) * 2016-09-19 2017-04-19 新希望六和股份有限公司 Summer beasts and birds transport vechicle
CN107246136A (en) * 2017-03-21 2017-10-13 无锡市龙海杰机械制造有限公司 Possesses the interval multi-layer scaffold of multifunctional working
CN108043958A (en) * 2017-11-04 2018-05-18 滁州市新康达金属制品有限公司 A kind of fast ram refrigerator parts mold
CN108590182A (en) * 2018-05-11 2018-09-28 四川福立盟智慧环保大数据有限公司 A kind of processing unit prevented construction vehicle and generate airborne dust
CN109205484A (en) * 2018-10-25 2019-01-15 李宗利 A kind of construction site can be improved dust removing effects tower crane spray equipment
CN210141152U (en) * 2019-05-23 2020-03-13 警通建设(集团)有限公司 Underground construction passageway dust device
KR102090469B1 (en) * 2019-10-31 2020-03-18 주식회사 케이씨티이엔씨 Apparatus and method for jetting water based on image recognition for fine dust reduction at construction sites
CN210695513U (en) * 2019-06-04 2020-06-09 阳江职业技术学院 Automatic water spraying and cooling system for industrial artificial breeding of Aristolochia warteriana
CN210940396U (en) * 2019-06-11 2020-07-07 浙江三和塑料有限公司 Cold air cooling device in plastic extruder
CN211074397U (en) * 2019-10-18 2020-07-24 长沙永昌车辆零部件有限公司 Rubber tube vulcanization cooling spraying system
CN111503343A (en) * 2020-04-21 2020-08-07 河海大学常州校区 Intelligent spraying device based on pressure induction
CN211631204U (en) * 2019-10-16 2020-10-09 江苏锦叶农业科技发展有限公司 Irrigation system is planted to nursery stock

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5531801A (en) * 1994-02-08 1996-07-02 Sewell; Frederic D. Liquid spray air purification and controlled humidification apparatus with air quality monitor and controller
CN104988879A (en) * 2015-05-18 2015-10-21 成都恒力达科技有限公司 Environmental protection spraying device capable of preventing building slag transport vehicle from raising dust
CN105544954A (en) * 2015-12-11 2016-05-04 江苏华海钢结构有限公司 Anticorrosion steel structure scaffold
CN206107067U (en) * 2016-09-19 2017-04-19 新希望六和股份有限公司 Summer beasts and birds transport vechicle
CN107246136A (en) * 2017-03-21 2017-10-13 无锡市龙海杰机械制造有限公司 Possesses the interval multi-layer scaffold of multifunctional working
CN108043958A (en) * 2017-11-04 2018-05-18 滁州市新康达金属制品有限公司 A kind of fast ram refrigerator parts mold
CN108590182A (en) * 2018-05-11 2018-09-28 四川福立盟智慧环保大数据有限公司 A kind of processing unit prevented construction vehicle and generate airborne dust
CN109205484A (en) * 2018-10-25 2019-01-15 李宗利 A kind of construction site can be improved dust removing effects tower crane spray equipment
CN210141152U (en) * 2019-05-23 2020-03-13 警通建设(集团)有限公司 Underground construction passageway dust device
CN210695513U (en) * 2019-06-04 2020-06-09 阳江职业技术学院 Automatic water spraying and cooling system for industrial artificial breeding of Aristolochia warteriana
CN210940396U (en) * 2019-06-11 2020-07-07 浙江三和塑料有限公司 Cold air cooling device in plastic extruder
CN211631204U (en) * 2019-10-16 2020-10-09 江苏锦叶农业科技发展有限公司 Irrigation system is planted to nursery stock
CN211074397U (en) * 2019-10-18 2020-07-24 长沙永昌车辆零部件有限公司 Rubber tube vulcanization cooling spraying system
KR102090469B1 (en) * 2019-10-31 2020-03-18 주식회사 케이씨티이엔씨 Apparatus and method for jetting water based on image recognition for fine dust reduction at construction sites
CN111503343A (en) * 2020-04-21 2020-08-07 河海大学常州校区 Intelligent spraying device based on pressure induction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114108484A (en) * 2021-12-09 2022-03-01 山东省交通科学研究院 Bridge engineering maintenance hanging basket in civil engineering field
CN114108484B (en) * 2021-12-09 2024-04-30 山东省交通科学研究院 Bridge engineering maintenance hanging basket in civil engineering field

Similar Documents

Publication Publication Date Title
CN206408910U (en) A kind of construction wall spray equipment
CN212731498U (en) Fog gun machine
CN112681703A (en) Cooling formula building platform
CN202936318U (en) Inner cavity glaze spraying machine
CN212069312U (en) Shell paint spraying apparatus is used in access control ware production
CN109013117A (en) A kind of jube of automatic charging iron plate painting on surface equipment
CN210257590U (en) Carton lithography apparatus with protector
CN202199461U (en) Tower frame type environment-friendly dust-removal air conveying sprayer
CN104389745B (en) Utilize solar energy and the watering device of wind energy
CN214382769U (en) Building site heat sink for construction
CN213887291U (en) Lifting climbing platform for cleaning photovoltaic power station
CN215585823U (en) Dust device for construction
CN205076770U (en) Aircraft part is ascended a height and is maintained device
CN212855092U (en) Novel fog gun machine
CN218358166U (en) Road construction is distributed processing apparatus for dust fall
CN217698494U (en) A energy-conserving dust device for architectural design construction
CN218077085U (en) A dust device for construction is built in room
CN220257522U (en) Green energy-saving construction dust fall equipment
CN218358229U (en) Municipal water conservancy construction reduces raise dust device
CN218090784U (en) Foundation leveling device for building engineering technology
CN110976143A (en) Automatic change mechanical paint spraying apparatus
CN220670350U (en) Surface blasting dust treatment device
CN214415932U (en) A dust device for municipal works construction
CN216642184U (en) Be used for dirt-proof automatic spray device of mine
CN220609672U (en) Prevent dust with atomizing spray set

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210420

RJ01 Rejection of invention patent application after publication