CN112116228A - Engineering project dynamic safety supervision system based on BIM - Google Patents

Engineering project dynamic safety supervision system based on BIM Download PDF

Info

Publication number
CN112116228A
CN112116228A CN202010932817.8A CN202010932817A CN112116228A CN 112116228 A CN112116228 A CN 112116228A CN 202010932817 A CN202010932817 A CN 202010932817A CN 112116228 A CN112116228 A CN 112116228A
Authority
CN
China
Prior art keywords
module
information
bim
safety
engineering project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010932817.8A
Other languages
Chinese (zh)
Inventor
胡靓靓
吴佳
顾思义
王培霞
潘涛
徐超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Shuzhuyun Technology Co ltd
Original Assignee
Hangzhou Shuzhuyun Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Shuzhuyun Technology Co ltd filed Critical Hangzhou Shuzhuyun Technology Co ltd
Priority to CN202010932817.8A priority Critical patent/CN112116228A/en
Publication of CN112116228A publication Critical patent/CN112116228A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Geometry (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Computer Hardware Design (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Mathematical Analysis (AREA)
  • Evolutionary Computation (AREA)
  • Pure & Applied Mathematics (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mathematical Optimization (AREA)
  • Computational Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses a BIM-based engineering project dynamic safety supervision system, which comprises: management platform and safety terminal equipment, management platform includes: the positioning module is used for outputting communication; the secure terminal device includes: the system comprises a communication receiving module, an identity recognition module and a central processing module; the management platform further comprises: a storage module; and a monitoring module. In the invention, compared with the prior art, the method has the advantages that the constructor is positioned more accurately, and the construction supervision standard can be higher based on the technology; various supervision modes are set, and the communication information between managers and field construction personnel is richer; the safety of field construction personnel is guaranteed by adding a module for risk assessment and real-time danger alarm of a safety terminal equipment wearer; the advantages of the BIM model are combined, the three-dimensional information of the building is combined and applied to construction supervision, and the supervision effect is more excellent.

Description

Engineering project dynamic safety supervision system based on BIM
Technical Field
The invention relates to a BIM-based engineering project dynamic safety supervision system.
Background
Under the development of science and technology in the modern building construction industry, many steps are free from the traditional construction method. In the aspect of construction supervision, along with diversification of monitoring modes, the prior art provides many different types of solutions for supervision problems of constructors. Because the traditional supervision mode needs a large amount of manpower and material resources, the supervision through equipment is the most important supervision mode for modern construction. However, there are many problems with supervision through the device, such as: the supervision range is not in place, the supervision effectiveness can not be guaranteed, the supervision function is limited, and the like.
The existing real-time monitoring system for the construction site is connected with a management platform through monitoring equipment arranged on the site and interacts with a safety helmet to achieve the purpose of monitoring constructors and construction tasks, and the solution solves some problems of construction monitoring to a certain extent, but still has the problems of easiness in drilling during monitoring, poor monitoring effect and the like.
Disclosure of Invention
The invention aims to provide a BIM-based engineering project dynamic safety supervision system, which solves the problems that the project is easy to be bored and the supervision effect is poor during supervision.
In order to achieve the purpose, the invention adopts the following technical scheme:
a BIM-based engineering project dynamic safety supervision system, comprising: management platform and safety terminal equipment, management platform includes: the positioning module is used for outputting communication;
the secure terminal device includes: the system comprises a communication receiving module, an identity recognition module and a central processing module;
the communication receiving module is also used for sending the use information to the communication output module;
the positioning module is used for positioning the identity of the personnel according to the information input by the communication output module and transmitting the information to the identity recognition module for identity recognition, wherein the information corresponds to the identity of the personnel;
the management platform further comprises: a storage module: storing the model established by the BIM, and corresponding the recorded personnel identity position information to the model to reflect instant information and historical information;
a monitoring module: analyzing and judging the positions of the personnel in the storage module to determine whether the personnel are located in a normal construction area;
the safety terminal device is carried by constructors.
As a further description of the above technical solution:
the positioning module is used for periodically positioning production; the communication output module is used for transmitting the positioning information to the communication receiving module.
As a further description of the above technical solution:
the security terminal module further comprises: the environment module is used for detecting the surrounding environment information of the safety terminal equipment;
and the early warning module analyzes and judges the positions of constructors and reminds workers possibly in danger.
As a further description of the above technical solution:
the management platform further comprises: and the task module is used for dividing and distributing task areas in the construction process, recording historical task information by the storage module, analyzing and processing the historical task information by the central processing module, and distributing subsequent tasks according to the expertise of constructors.
As a further description of the above technical solution:
and when the position information sent back by the positioning module deviates, the monitoring module can be used for receiving the video request sent by the communication receiving module.
As a further description of the above technical solution:
the safety terminal equipment is arranged on the safety helmet.
As a further description of the above technical solution:
the environment monitoring apparatus includes: the acquisition module is used for acquiring construction area information; and the BIM module transmits the information acquired by the acquisition module to the BIM module to establish a construction model, so that the accuracy of information establishment is ensured.
The invention has at least the following beneficial effects:
the constructor positioning is more accurate than that of the prior art, and the construction supervision standard can be higher based on the technology; various supervision modes are set, and the communication information between managers and field construction personnel is richer; the safety of field construction personnel is guaranteed by adding a module for risk assessment and real-time danger alarm of a safety terminal equipment wearer; the advantages of the BIM model are combined, the three-dimensional information of the building is combined and applied to construction supervision, and the supervision effect is more excellent.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings needed to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
FIG. 1 illustrates a system architecture diagram provided in accordance with an embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Example one
Referring to fig. 1, a BIM-based engineering project dynamic safety supervision system includes: management platform and safety terminal equipment, management platform includes: the positioning module is used for periodically positioning production; the communication output module is used for transmitting the positioning information to the communication receiving module;
the security terminal device includes: the communication receiving module, the identity identification module, central processing module, the security terminal module still includes: the environment module is used for detecting the surrounding environment information of the safety terminal equipment;
the early warning module is used for analyzing and judging the positions of constructors and reminding workers possibly in danger;
the communication receiving module is also used for sending the use information to the communication output module;
the positioning module carries out personnel identity positioning according to the information input by the communication output module, and simultaneously transmits the information to the identity recognition module for identity recognition, wherein the information corresponds to personnel identity;
the management platform further comprises: a storage module: storing the model established by the BIM, and corresponding the recorded personnel identity position information to the model to reflect instant information and historical information;
a monitoring module: the personnel position in the storage module is analyzed and judged to determine whether the personnel position is in a normal construction area, and when the position information sent back by the positioning module deviates, the monitoring module can be used for receiving the video request sent by the communication receiving module;
the management platform further comprises: the task module is used for dividing and distributing task areas in the construction process, meanwhile, the storage module is used for recording historical task information, the historical task information is analyzed and processed through the central processing module, and subsequent task distribution is carried out according to the expertise of constructors;
the safety terminal equipment is carried by constructors and is arranged on the safety helmet;
the environment monitoring apparatus includes: the acquisition module is used for acquiring construction area information; and the BIM module transmits the information acquired by the acquisition module to the BIM module to establish a construction model, so that the accuracy of information establishment is ensured.
The working principle is as follows: in construction, the management platform forms a communication connection relation with communication receiving modules of all monitored safety terminal equipment through a communication output module; the management platform positions the specific position of the safety terminal equipment through the positioning module, and determines the specific position of a constructor in a construction area through the safety terminal equipment; the management platform monitors whether the constructor is in the construction area or not through the monitoring module, the time when the constructor is in the construction area and whether the physical sign of the constructor is normal or not through the processing module; and the manager performs voice communication or on-site video supervision on the construction area with the constructor corresponding to the safety terminal equipment through the management platform.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are merely illustrative of the principles of the invention, but that various changes and modifications may be made without departing from the spirit and scope of the invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (7)

1. A BIM-based engineering project dynamic safety supervision system, comprising: management platform and safety terminal equipment, its characterized in that, management platform includes: the positioning module is used for outputting communication;
the secure terminal device includes: the system comprises a communication receiving module, an identity recognition module and a central processing module;
the communication receiving module is also used for sending the use information to the communication output module;
the positioning module is used for positioning the identity of the personnel according to the information input by the communication output module and transmitting the information to the identity recognition module for identity recognition, wherein the information corresponds to the identity of the personnel;
the management platform further comprises: a storage module: storing the model established by the BIM, and corresponding the recorded personnel identity position information to the model to reflect instant information and historical information;
a monitoring module: analyzing and judging the positions of the personnel in the storage module to determine whether the personnel are located in a normal construction area;
the safety terminal device is carried by constructors.
2. The BIM-based engineering project dynamic safety supervision system according to claim 1, wherein the positioning module periodically performs production positioning; the communication output module is used for transmitting the positioning information to the communication receiving module.
3. The BIM-based engineering project dynamic safety supervision system according to claim 1, wherein the safety terminal module further comprises: the environment module is used for detecting the surrounding environment information of the safety terminal equipment;
and the early warning module analyzes and judges the positions of constructors and reminds workers possibly in danger.
4. The BIM-based engineering project dynamic safety supervision system according to claim 1, wherein the management platform further comprises: and the task module is used for dividing and distributing task areas in the construction process, recording historical task information by the storage module, analyzing and processing the historical task information by the central processing module, and distributing subsequent tasks according to the expertise of constructors.
5. The BIM-based engineering project dynamic safety supervision system according to claim 1, wherein the monitoring module is configured to receive the video request sent by the communication receiving module when the position information sent back by the positioning module is deviated.
6. The BIM-based engineering project dynamic safety supervision system according to claim 1, wherein the safety terminal device is arranged on a safety helmet.
7. The BIM-based engineering project dynamic safety supervision system according to claim 1, wherein the environment monitoring device comprises: the acquisition module is used for acquiring construction area information; and the BIM module transmits the information acquired by the acquisition module to the BIM module to establish a construction model, so that the accuracy of information establishment is ensured.
CN202010932817.8A 2020-09-08 2020-09-08 Engineering project dynamic safety supervision system based on BIM Pending CN112116228A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010932817.8A CN112116228A (en) 2020-09-08 2020-09-08 Engineering project dynamic safety supervision system based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010932817.8A CN112116228A (en) 2020-09-08 2020-09-08 Engineering project dynamic safety supervision system based on BIM

Publications (1)

Publication Number Publication Date
CN112116228A true CN112116228A (en) 2020-12-22

Family

ID=73803367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010932817.8A Pending CN112116228A (en) 2020-09-08 2020-09-08 Engineering project dynamic safety supervision system based on BIM

Country Status (1)

Country Link
CN (1) CN112116228A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113034311A (en) * 2021-03-07 2021-06-25 赵子佩 Building construction supervision system and method based on BIM
CN113570233A (en) * 2021-07-22 2021-10-29 吕福瑞 Construction organization management system based on 5G technology

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130000732A (en) * 2011-06-24 2013-01-03 서일대학산학협력단 Safety magnagement system for construction site
CN107682807A (en) * 2017-08-30 2018-02-09 深圳市易联智道科技有限公司 Construction site workmen's BIM model real-time location methods
CN111144776A (en) * 2019-12-30 2020-05-12 广州途威慧信息科技有限公司 Construction safety supervisory systems based on BIM model

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130000732A (en) * 2011-06-24 2013-01-03 서일대학산학협력단 Safety magnagement system for construction site
CN107682807A (en) * 2017-08-30 2018-02-09 深圳市易联智道科技有限公司 Construction site workmen's BIM model real-time location methods
CN111144776A (en) * 2019-12-30 2020-05-12 广州途威慧信息科技有限公司 Construction safety supervisory systems based on BIM model

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113034311A (en) * 2021-03-07 2021-06-25 赵子佩 Building construction supervision system and method based on BIM
CN113570233A (en) * 2021-07-22 2021-10-29 吕福瑞 Construction organization management system based on 5G technology

Similar Documents

Publication Publication Date Title
CN108564676B (en) Intelligent inspection system and method for hydraulic power plant
CN209746580U (en) Intelligent tracking and monitoring system and device for railway construction tool
CN112116228A (en) Engineering project dynamic safety supervision system based on BIM
CN109240126A (en) A kind of distributed application services monitoring system and method with simulated operation function
CN108875857B (en) Inspection method, device and system
CN212933544U (en) On-site operation safety identification system based on edge calculation
CN105931311A (en) Equipment routine inspection system and equipment routine inspection method
CN115497185B (en) Attendance checking method based on intelligent safety helmet and electronic fence
CN111932132B (en) Prefabricated T roof beam safety quality inspection terminal and construction auxiliary system based on block chain
CN110717736A (en) Construction progress intelligent tracking method and system for building
CN112819374A (en) System and method for risk management of railway bridge constructors
CN111144776A (en) Construction safety supervisory systems based on BIM model
CN110471028B (en) Personnel positioning method, device and system for construction site
CN114417981B (en) Intelligent river length inspection system
CN103020721A (en) Method for evaluating real-time data processing efficiency of power grid dispatching automation system
CN111490593A (en) Urban cable prevents external damage risk assessment early warning platform
CN117081917A (en) Intelligent gateway based on AI (advanced technology attachment) internet of things sewage treatment operation and maintenance management
CN113316085B (en) Method, device and system for giving alarm for detention in closed space
CN113762225B (en) Automatic monitoring alarm system for chemical workshop
CN215905729U (en) Multi-terminal engineering progress monitoring system
CN211877111U (en) Construction site management system
CN111612995A (en) Frontier defense equipment and system for construction site safety supervision
CN111476922A (en) Method and device for judging arrival of power transmission line inspection personnel
CN219893456U (en) Active monitoring system for card data of Internet of things
CN113569637B (en) Personnel track positioning and supervising system based on Internet of things

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination