CN109819038A - A kind of subway comprehensive managing and control system uploaded in real time based on passenger flow information and method - Google Patents

A kind of subway comprehensive managing and control system uploaded in real time based on passenger flow information and method Download PDF

Info

Publication number
CN109819038A
CN109819038A CN201910090946.4A CN201910090946A CN109819038A CN 109819038 A CN109819038 A CN 109819038A CN 201910090946 A CN201910090946 A CN 201910090946A CN 109819038 A CN109819038 A CN 109819038A
Authority
CN
China
Prior art keywords
subway
information
passenger flow
station
base station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910090946.4A
Other languages
Chinese (zh)
Inventor
邓秋雄
邓波
严军
欧华平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Zhi Yuan Exchange Information Technology Ltd By Share Ltd
Original Assignee
Chengdu Zhi Yuan Exchange Information Technology Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Zhi Yuan Exchange Information Technology Ltd By Share Ltd filed Critical Chengdu Zhi Yuan Exchange Information Technology Ltd By Share Ltd
Priority to CN201910090946.4A priority Critical patent/CN109819038A/en
Publication of CN109819038A publication Critical patent/CN109819038A/en
Pending legal-status Critical Current

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention discloses a kind of subway comprehensive managing and control system uploaded in real time based on passenger flow information and methods, and the system comprises passenger flow data processing center, subway ATS system, subway ticketing center, communication base station backstage and the multiple information monitoring nodes for being set to different subway stations;The passenger flow data processing center is connect with subway ATS system, communication base station backstage, subway ticketing center and each information monitoring node respectively;The subway ticketing center is connect with each information monitoring node respectively, and the communication base station backstage is connect with each information monitoring node respectively.The present invention can obtain comprehensively and accurately passenger flow data, and analyze and obtain the congestion information of subway station, carry out comprehensively monitoring and the integrated management of subway, be conducive to the efficient operation of subway train.

Description

A kind of subway comprehensive managing and control system uploaded in real time based on passenger flow information and method
Technical field
The present invention relates to subway control, more particularly to a kind of subway comprehensive control system uploaded in real time based on passenger flow information System and method.
Background technique
Subway is a kind of quick large conveying quantity urban track traffic tool with electric propulsion, and route is usually laid in underground In tunnel.For other urban transportation tools, subway hardly by it is more than noise transmission to ground to reducing The noise on ground, while transportation system (such as surface road) be not Chong Die, intersects with other for the travel route of subway, when driving by The Coherent traffic noise arrived is less, therefore passenger can be allowed to save a large amount of riding time, thus for people trip bring it is very big It is convenient.
For convenience of in subway management, the passenger flow information to each subway station is often needed to be acquired, and will collect Passenger flow information be transferred to long-range passenger flow data processing center, in order to comprehensively monitoring, still, for now, subway visitor Stream acquisition realizes that gate terminal is realizing verifying out of the station generally by the gate terminal for being set to subway inlet and outlet position During clearance, number information out of the station is obtained, is transferred to passenger flow data processing center.
But this passenger flow information statistical, it is merely able to count the whole passenger flow number at entry/exit station, it can neither Know the patronage of subway station each region, is also unable to get number of getting on or off the bus by bus;This is allowed at passenger flow data The data that reason center obtains are not comprehensive, can not accurately carry out the comprehensively monitoring of subway station;Meanwhile traditional passenger flow information prison Control system is difficult to formulate corresponding strategy according to real-time passenger flow situation, is unfavorable for alleviating subway train transport pressure and raising Subway train operational efficiency.
Summary of the invention
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of subways uploaded in real time based on passenger flow information Integrated control system and method can obtain comprehensive passenger flow data, and analyze and obtain the congestion information of subway station, carry out The comprehensively monitoring of subway and integrated management are conducive to the efficient operation of subway train.
The purpose of the present invention is achieved through the following technical solutions: a kind of subway uploaded in real time based on passenger flow information Integrated control system, including passenger flow data processing center, subway ATS system, subway ticketing center, communication base station backstage and setting Multiple information monitoring nodes in different subway stations;The passenger flow data processing center respectively with subway ATS system, communicate base Stand backstage, subway ticketing center connects with each information monitoring node;The subway ticketing center respectively with each information Node connection is monitored, the communication base station backstage is connect with each information monitoring node respectively;
The information monitoring node, for acquiring the passenger flow number of getting on or off the bus of subway station, transferring passage passenger flow number is uploaded to Passenger flow data processing center;Passenger flow number of getting on or off the bus is acquired, passenger flow data processing center is uploaded to by subway ticketing center, is adopted Collect the passenger flow number in subway station in each region, gives passenger flow data processing center by communication base station backstage upload;And it connects It receives passenger flow data processing center control instruction and carries out local management;
The subway ATS system provides subway column for completing the command scheduling of subway train, and to passenger flow data processing center The operation information of vehicle;
The passenger flow data processing center carries out comprehensively monitoring to the information from each information monitoring node, and analyzes and obtain The passenger flow crowding of each subway station generates control instruction and is sent to information monitoring section in conjunction with the operation information of subway train Point and subway ATS system, realize the current limliting management of each subway station and the command scheduling project setting of subway ATS system.
Preferably, the information monitoring node includes first network Switching Module, acquires each shield door in subway station or more The shield door counting module of vehicle number information acquires the channel counts module of number information in each transferring passage in subway station, adopts The gate module for collecting the communication base station module of number information in the different zones of subway station, obtaining subway station number of people entering information With the local management module for showing passenger flow data processing center control instruction;
The shield door counting module, channel counts module and local management module are connect with first network Switching Module, institute First network Switching Module is stated to connect with passenger flow data processing center;The communication base station module is connect with communication base station backstage, Collected information is given to passenger flow data processing center by communication base station backstage upload;In the gate module and subway ticketing Heart connection gives collected information to passenger flow data processing center by subway ticketing central transmission.
Preferably, the shield door counting module includes multiple the first meters being set on the difference shield door of subway station Number camera;Each first counting camera is used to acquire the number information that gets on or off the bus of corresponding shield door, and respectively with The connection of first network Switching Module;The channel counts module includes multiple be set in the difference transferring passage of subway station Two count cameras, and each second camera is used to acquire the number information in corresponding transferring passage, and respectively with the The connection of one network exchange module;The communication base station module includes multiple communication base stations in the different zones of subway station Unit, each communication base station unit are connect with communication base station backstage;The gate module includes multiple being set to subway station The gate terminal of inlet and outlet, each gate terminal are connect with subway ticketing center respectively;The local management module includes micro- place Reason device and display screen, the micro process are connect with display screen and first network Switching Module respectively.
Preferably, the communication base station unit includes mobile communication base station, connection communication base station and telecommunication base station;Institute Stating communication base station backstage includes mobile base station backstage, connection base station backstage and telecomm base station backstage.Wherein mobile communication base station with Mobile base station backstage connects, and connection communication base station is connect with connection base station backstage, and telecommunication base station connects with telecommunication backstage It connects, mobile base station backstage, connection base station backstage and telecomm base station backstage are connect with passenger flow data processing center.
Preferably, the passenger flow data processing center includes the second network exchange module, passenger flow information server and monitoring Manage platform;Second network exchange module is connect with the first network Switching Module in each information monitoring node respectively, The passenger flow information server is respectively and after monitoring management platform, the second network exchange module, subway ATS system, communication base station Platform is connected with subway ticketing center;
The passenger flow information server is obtained each by the second network exchange module, communication base station backstage and subway ticketing center The information that a information monitoring node uploads carries out crowding analysis to the corresponding subway station of each information monitoring node, and complete It is pushed at the forwarding of information and control instruction;
The monitoring management platform, the information, each information monitoring node for uploading to each information monitoring node are corresponding The subway train operation information of subway station crowding and subway ATS system carries out comprehensively monitoring, and generates control instruction, realizes The current limliting management of each subway station and the command scheduling project setting of subway ATS system.
Preferably, the passenger flow information server includes: passenger flow crowding analytical unit, passes through the second network exchange mould Block, communication base station backstage and subway ticketing center, obtain the information that each information monitoring node uploads, to each information monitoring section The corresponding subway station of point carries out crowding analysis, obtains the passenger flow crowding of each subway station;Information push unit receives Subway train operation information from subway ATS system, the information uploaded with each information monitoring, each information monitoring node pair The subway station crowding answered is transferred to monitoring management platform together;Control instruction forwarding module, for monitoring management will to be come from The instruction of platform is transferred to subway ATS system and each information monitoring node.
Preferably, the first network Switching Module may include a network switch, also may include multiple interconnections The network switch;Similarly, second network exchange module may include a network switch, also may include multiple mutual The network switch of connection.
Preferably, the monitoring management platform includes: comprehensively monitoring unit, for upload each information monitoring node The subway train operation information of information, the corresponding subway station crowding of each information monitoring node and subway ATS system is shown Comprehensively monitoring is carried out to working platform personnel;Current limliting directive generation module, for being arranged for working platform personnel to subway station The control instruction of current limliting is carried out, and each information monitoring node is transmitted to by passenger flow information server;Dispatch command generates Unit for the control instruction of subway traffic control to be arranged for working platform personnel, and is transmitted to by passenger flow information server Subway ATS system.
A method of subway comprehensive control is carried out based on the subway comprehensive managing and control system that passenger flow information uploads in real time, including Following steps:
S1. be distributed in the information monitoring node of different subway stations, acquire corresponding subway station passenger flow number out of the station, up and down Passenger flow number in vehicle passenger flow number, transferring passage passenger flow number and the subway station in each region, is uploaded to visitor in real time Flow data processing center;
S2. passenger flow information server is obtained each by the second network exchange module, communication base station backstage and subway ticketing center The information that information monitoring node uploads carries out crowding analysis to the corresponding subway station of each information monitoring node, obtains each The passenger flow crowding of a subway station;
S3. passenger flow information server receives the subway train operation information from subway ATS system, uploads with each information monitoring Information, the corresponding subway station crowding of each information monitoring node be transferred to monitoring management platform together;
S4. monitoring management platform uploads each information monitoring node information, the corresponding subway station of each information monitoring node The subway train operation information of point crowding and subway ATS system shows working platform personnel to carry out comprehensively monitoring;
S5. during comprehensively monitoring, working platform personnel are arranged by monitoring management platform and issue control instruction, to alleviate The crowded state of each subway station.
In the step S5, the mode for alleviating the subway station degree of crowding includes the following two kinds:
First, the subway station excessively high to crowding, working platform personnel setting and the control instruction for issuing current limliting are transferred to visitor The control instruction of current limliting is handed down to corresponding letter by the second network exchange module by stream information server, passenger flow information server Breath monitoring node is limited in corresponding information monitoring node by being obtained by first network Switching Module for local management module The control instruction of stream, and the local staff in subway station is showed, notify local staff to carry out subway current limiting tube Reason;
Second, the subway station excessively high for crowding, working platform personnel setting and the control for issuing subway circulation scheduling refer to It enables, gives subway ATS system by passenger flow information server transport, adjust the command scheduling scheme of subway ATS system, improve corresponding The subway train of route runs the frequency where subway station.
The beneficial effects of the present invention are: information monitoring node of the invention gets on or off the bus passenger flow number, transferring passage to website Passenger flow number in passenger flow number, passenger flow number out of the station and subway station each region has carried out unified acquisition, Neng Gouti For comprehensively and accurately passenger flow data, accurate foundation is provided for the comprehensively monitoring of passenger flow data processing center;The present invention can divide The crowding for analysing each subway station is transferred to monitoring management platform, for platform together with the upload information of information monitoring node Staff is monitored, and facilitates the passenger flow information that working platform personnel more accurately grasp subway station;Working platform Personnel can be arranged by monitoring management platform and issue control instruction, realize current limliting management and the subway of each subway station The command scheduling project setting of ATS system advantageously reduces the crowding of subway station, improves subway transportation environment.
Detailed description of the invention
Fig. 1 is system principle diagram of the invention;
Fig. 2 is the schematic illustration of information monitoring node;
Fig. 3 is flow chart of the method for the present invention.
Specific embodiment
Technical solution of the present invention is described in further detail with reference to the accompanying drawing, but protection scope of the present invention is not limited to It is as described below.
As shown in Figure 1, a kind of subway comprehensive managing and control system uploaded in real time based on passenger flow information, including passenger flow data processing Center, subway ATS system, subway ticketing center, communication base station backstage and the multiple information monitorings for being set to different subway stations Node;The passenger flow data processing center respectively with subway ATS system, communication base station backstage, subway ticketing center and each The connection of information monitoring node;The subway ticketing center is connect with each information monitoring node respectively, after the communication base station Platform is connect with each information monitoring node respectively;
The information monitoring node, for acquiring the passenger flow number of getting on or off the bus of subway station, transferring passage passenger flow number is uploaded to Passenger flow data processing center;Passenger flow number of getting on or off the bus is acquired, passenger flow data processing center is uploaded to by subway ticketing center, is adopted Collect the passenger flow number in subway station in each region, gives passenger flow data processing center by communication base station backstage upload;And it connects It receives passenger flow data processing center control instruction and carries out local management;
The subway ATS system provides subway column for completing the command scheduling of subway train, and to passenger flow data processing center The operation information of vehicle;
The passenger flow data processing center carries out comprehensively monitoring to the information from each information monitoring node, and analyzes and obtain The passenger flow crowding of each subway station generates control instruction and is sent to information monitoring section in conjunction with the operation information of subway train Point and subway ATS system, realize the current limliting management of each subway station and the command scheduling project setting of subway ATS system.
As shown in Fig. 2, the information monitoring node includes first network Switching Module, acquires on each shield door in subway station Get off number information shield door counting module, acquisition each transferring passage in subway station in number information channel counts module, The gate mould for acquiring the communication base station module of number information in the different zones of subway station, obtaining subway station number of people entering information Block and the local management module for showing passenger flow data processing center control instruction;The shield door counting module, channel counts mould Block and local management module are connect with first network Switching Module, in the first network Switching Module and passenger flow data processing Heart connection;The communication base station module is connect with communication base station backstage, and collected information is passed through communication base station backstage upload Give passenger flow data processing center;The gate module is connect with subway ticketing center, and collected information is passed through subway ticketing Central transmission gives passenger flow data processing center.
In embodiments herein, the shield door counting module includes that multiple subway station differences that are set to shield First on door counts camera;Each first counting camera is used to acquire the number letter of getting on or off the bus of corresponding shield door Breath, and connect respectively with first network Switching Module;The channel counts module includes that multiple subway station differences that are set to are changed Multiply second in channel and count camera, each second camera is used to acquire the number letter in corresponding transferring passage Breath, and connect respectively with first network Switching Module;The communication base station module includes multiple being located at subway station not same district Communication base station unit in domain, each communication base station unit are connect with communication base station backstage;The gate module includes multiple It is set to the gate terminal of subway station inlet and outlet, each gate terminal is connect with subway ticketing center respectively;The local pipe Managing module includes microprocessor and display screen, and the micro process is connect with display screen and first network Switching Module respectively;Micro- place It manages device and the control instruction from passenger flow data processing center is received by first network Switching Module, and showed by display screen The local staff of subway station notifies local staff to carry out the management of subway current limliting.In this embodiment, the communication Base station unit includes mobile communication base station, connection communication base station and telecommunication base station, by being distributed in subway station not same district On the one hand communication base station unit in domain can significantly increase the signal of communication in subway station, another aspect communication base station energy Enough mobile terminal (mobile phone) numbers according to connection, obtain the passenger flow number in each region, since communication base station unit includes Mobile communication base station, connection communication base station and telecommunication base station, therefore can be to all kinds of mobile phones for being adapted to passenger;Corresponding institute Stating communication base station backstage also includes mobile base station backstage, connection base station backstage and telecomm base station backstage.Wherein mobile communication base station It is connect with mobile base station backstage, connection communication base station is connect with connection base station backstage, telecommunication base station and telecommunication backstage Connection, mobile base station backstage, connection base station backstage and telecomm base station backstage are connect with passenger flow data processing center.In the implementation In example, gate terminal includes two dimensional code/radio-frequency card reader, industrial control host, gate driver and subway gate counting unit, described Two dimensional code/radio-frequency card reader output end is connect with industrial control host, industrial control host respectively with gate driver and subway gate meter Counting unit connection, the information that industrial control host is recognized according to two dimensional code/radio-frequency card reader carry out verifying out of the station to passenger and put Row;The subway gate counting unit is for acquiring Metro Passenger quantity out of the station, and passing through industrial control host will be out of the station Passengers quantity is transferred to subway ticketing center;Since the gate terminal of subway is generally divided into enter the station gate and outbound gate, therefore into The collected passengers quantity of gate of standing enters the station number, the outbound collected passengers quantity of gate, that is, outbound number.In the application Embodiment in, it is described first counting camera and second counting camera be all made of Haikang prestige view iDS-2CD6810F-C binocular Camera.
In embodiments herein, the passenger flow data processing center includes the second network exchange module, passenger flow information Server and monitoring management platform;Second network exchange module is handed over the first network in each information monitoring node respectively Change the mold block connection, the passenger flow information server respectively with monitoring management platform, the second network exchange module, subway ATS system, Communication base station backstage is connected with subway ticketing center;In the embodiment, the passenger flow information server passes through the second network exchange Module, communication base station backstage and subway ticketing center, obtain the information that each information monitoring node uploads, to each information monitoring The corresponding subway station of node carries out crowding analysis, and completes the forwarding push of information and control instruction;Specifically, described Passenger flow information server includes: passenger flow crowding analytical unit, passes through the second network exchange module, communication base station backstage and subway Ticketing Centre obtains the information that each information monitoring node uploads, carries out to the corresponding subway station of each information monitoring node Crowding analysis, obtains the passenger flow crowding of each subway station;Information push unit receives the ground from subway ATS system Iron train running information, subway station crowding corresponding with the information of each information monitoring upload, each information monitoring node It is transferred to monitoring management platform together;Control instruction forwarding module, for being transferred to ground for the instruction from monitoring management platform Iron ATS system and each information monitoring node;In the embodiment, the monitoring management platform, for each information monitoring The subway train fortune for information, the corresponding subway station crowding of each information monitoring node and the subway ATS system that node uploads Row information carries out comprehensively monitoring, and generates control instruction, realizes the current limliting management of each subway station and the finger of subway ATS system Wave scheduling scheme adjustment.Specifically, the monitoring management platform includes: comprehensively monitoring unit, is used for each information monitoring section The subway train operation for information, the corresponding subway station crowding of each information monitoring node and the subway ATS system that point uploads Information shows working platform personnel to carry out comprehensively monitoring;Current limliting directive generation module, for for working platform personnel setting pair Subway station carries out the control instruction of current limliting, and is transmitted to each information monitoring node by passenger flow information server;Scheduling Instruction generation unit for the control instruction of subway traffic control to be arranged for working platform personnel, and passes through passenger flow information service Device is transmitted to subway ATS system;
In embodiments herein, the first network Switching Module may include a network switch, also may include The network switch of multiple interconnections;Similarly, second network exchange module may include a network switch, also can wrap Include the network switch of multiple interconnections.
As shown in figure 3, a kind of subway comprehensive managing and control system uploaded in real time based on passenger flow information carries out subway comprehensive control Method, comprising the following steps:
S1. be distributed in the information monitoring node of different subway stations, acquire corresponding subway station passenger flow number out of the station, up and down Passenger flow number in vehicle passenger flow number, transferring passage passenger flow number and the subway station in each region, is uploaded to visitor in real time Flow data processing center;
S2. passenger flow information server is obtained each by the second network exchange module, communication base station backstage and subway ticketing center The information that information monitoring node uploads carries out crowding analysis to the corresponding subway station of each information monitoring node, obtains each The passenger flow crowding of a subway station;In embodiments herein, the analysis mode of passenger flow crowding is varied, is not limited to It is as described below: for example, first, to can use in each region of subway station real-time passenger flow number summation X divided by parameter preset A, to obtain congestion information A1=X/A, number crowding in characterization station;Second, it can also be by the number information Y1 that enters the station in real time Outbound number information Y2 is subtracted, then obtained difference is obtained into congestion information B2=(Y1- divided by subway station parameter preset B Y2)/B characterizes the demand crowding that enters the station;It is total can be subtracted number of getting off in real time by third by the number summation Z1 that gets on the bus in real time And Z2 obtains congestion information C1=(Z1-Z2)/C, characterizes demand crowding of getting on the bus in the difference that will be obtained divided by parameter preset C; 4th, park-and-ride demand crowding D1=H/D can be obtained by the number summation H in each transferring passage divided by parameter preset D.With Upper any crowding can be used as the analysis of passenger flow crowding as a result, in some embodiments, can also carry out to A1, B1, C1, D1 Weighting, using weighted results as final passenger flow crowding, such as a* A1+b* B1+c* C1+d* D1 can be used as it is final Passenger flow crowding, wherein a, b, c, d are preset weighting coefficient, and summation is 1.
S3. passenger flow information server receives the subway train operation information from subway ATS system, with each information monitoring The information of upload, the corresponding subway station crowding of each information monitoring node are transferred to monitoring management platform together;
S4. monitoring management platform uploads each information monitoring node information, the corresponding subway station of each information monitoring node The subway train operation information of point crowding and subway ATS system shows working platform personnel to carry out comprehensively monitoring;
S5. during comprehensively monitoring, working platform personnel are arranged by monitoring management platform and issue control instruction, to alleviate The crowded state of each subway station.
Wherein, in the step S5, the mode for alleviating the subway station degree of crowding includes the following two kinds:
First, the subway station excessively high to crowding, working platform personnel setting and the control instruction for issuing current limliting are transferred to visitor The control instruction of current limliting is handed down to corresponding letter by the second network exchange module by stream information server, passenger flow information server Breath monitoring node is limited in corresponding information monitoring node by being obtained by first network Switching Module for local management module The control instruction of stream, and the local staff in subway station is showed, notify local staff to carry out subway current limiting tube Reason;
Second, the subway station excessively high for crowding, working platform personnel setting and the control for issuing subway circulation scheduling refer to It enables, gives subway ATS system by passenger flow information server transport, adjust the command scheduling scheme of subway ATS system, improve corresponding The subway train of route runs the frequency where subway station.In embodiments herein, if the crowding of subway station is greater than Given threshold, then it is assumed that crowding is excessively high.
To sum up, information monitoring node of the invention gets on or off the bus passenger flow number, transferring passage passenger flow number, out of the station to website Passenger flow number in passenger flow number and subway station each region has carried out unified acquisition, is capable of providing comprehensively and accurately objective Flow data provides accurate foundation for the comprehensively monitoring of passenger flow data processing center;The present invention can analyze each subway station Crowding, monitoring management platform is transferred to together with the upload information of information monitoring node, personnel supervise for working platform Control, facilitates the passenger flow information that working platform personnel more accurately grasp subway station;Working platform personnel can pass through prison The setting of keyholed back plate platform and publication control instruction, realize the current limliting management of each subway station and commander's tune of subway ATS system Project setting is spent, the crowding of subway station is advantageously reduced, improves subway transportation environment.
The above is a preferred embodiment of the present invention, it should be understood that the present invention is not limited to shape described herein Formula should not be viewed as excluding other embodiments, and can be used for other combinations, modification and environment, and can be in this paper institute It states in contemplated scope, modifications can be made through the above teachings or related fields of technology or knowledge.And what those skilled in the art were carried out Modifications and changes do not depart from the spirit and scope of the present invention, then all should be within the scope of protection of the appended claims of the present invention.

Claims (9)

1. a kind of subway comprehensive managing and control system uploaded in real time based on passenger flow information, it is characterised in that: including passenger flow data processing Center, subway ATS system, subway ticketing center, communication base station backstage and the multiple information monitorings for being set to different subway stations Node;The passenger flow data processing center respectively with subway ATS system, communication base station backstage, subway ticketing center and each The connection of information monitoring node;The subway ticketing center is connect with each information monitoring node respectively, after the communication base station Platform is connect with each information monitoring node respectively;
The information monitoring node, for acquiring the passenger flow number of getting on or off the bus of subway station, transferring passage passenger flow number is uploaded to Passenger flow data processing center;Passenger flow number of getting on or off the bus is acquired, passenger flow data processing center is uploaded to by subway ticketing center, is adopted Collect the passenger flow number in subway station in each region, gives passenger flow data processing center by communication base station backstage upload;And it connects It receives passenger flow data processing center control instruction and carries out local management;
The subway ATS system provides subway column for completing the command scheduling of subway train, and to passenger flow data processing center The operation information of vehicle;
The passenger flow data processing center carries out comprehensively monitoring to the information from each information monitoring node, and analyzes and obtain The passenger flow crowding of each subway station generates control instruction and is sent to information monitoring section in conjunction with the operation information of subway train Point and subway ATS system, realize the current limliting management of each subway station and the command scheduling project setting of subway ATS system.
2. a kind of subway comprehensive managing and control system uploaded in real time based on passenger flow information according to claim 1, feature are existed It include that first network Switching Module, the acquisition each shield door in subway station get on or off the bus number information's in: the information monitoring node Shield door counting module acquires the channel counts module of number information in each transferring passage in subway station, acquisition subway station not With the communication base station module of number information, the gate module for obtaining subway station number of people entering information and displaying passenger flow number in region According to the local management module of processing center control instruction;
The shield door counting module, channel counts module and local management module are connect with first network Switching Module, institute First network Switching Module is stated to connect with passenger flow data processing center;The communication base station module is connect with communication base station backstage, Collected information is given to passenger flow data processing center by communication base station backstage upload;In the gate module and subway ticketing Heart connection gives collected information to passenger flow data processing center by subway ticketing central transmission.
3. a kind of subway comprehensive managing and control system uploaded in real time based on passenger flow information according to claim 2, feature are existed In:
The shield door counting module includes that multiple first be set on the difference shield door of subway station count camera;Respectively A first counting camera is used to acquire the number information that gets on or off the bus of corresponding shield door, and exchanges respectively with first network Module connection;
The channel counts module includes that multiple second be set in the difference transferring passage of subway station count camera, each The second camera is used to acquire the number information in corresponding transferring passage, and connects respectively with first network Switching Module It connects;
The communication base station module includes multiple communication base station units in the different zones of subway station, each communication base Unit of standing is connect with communication base station backstage respectively;
The gate module include it is multiple be set to subway station inlet and outlet gate terminal, each gate terminal respectively with subway Ticketing Centre's connection;
The local management module includes microprocessor and display screen, and the micro process is exchanged with display screen and first network respectively Module connection.
4. a kind of subway comprehensive managing and control system uploaded in real time based on passenger flow information according to claim 3, feature are existed In: the communication base station unit includes mobile communication base station, connection communication base station and telecommunication base station;After the communication base station Platform includes mobile base station backstage, connection base station backstage and telecomm base station backstage.
5. a kind of subway comprehensive managing and control system uploaded in real time based on passenger flow information according to claim 1, feature are existed In: the passenger flow data processing center includes the second network exchange module, passenger flow information server and monitoring management platform;It is described Second network exchange module is connect with the first network Switching Module in each information monitoring node respectively, the passenger flow information clothes Device be engaged in respectively and in monitoring management platform, the second network exchange module, subway ATS system, communication base station backstage and subway ticketing Heart connection;
The passenger flow information server is obtained each by the second network exchange module, communication base station backstage and subway ticketing center The information that a information monitoring node uploads carries out crowding analysis to the corresponding subway station of each information monitoring node, and complete It is pushed at the forwarding of information and control instruction;
The monitoring management platform, the information, each information monitoring node for uploading to each information monitoring node are corresponding The subway train operation information of subway station crowding and subway ATS system carries out comprehensively monitoring, and generates control instruction, realizes The current limliting management of each subway station and the command scheduling project setting of subway ATS system.
6. a kind of subway comprehensive managing and control system uploaded in real time based on passenger flow information according to claim 5, feature are existed In: the passenger flow information server includes:
Passenger flow crowding analytical unit is obtained each by the second network exchange module, communication base station backstage and subway ticketing center The information that a information monitoring node uploads carries out crowding analysis to the corresponding subway station of each information monitoring node, obtains The passenger flow crowding of each subway station;
Information push unit receives the subway train operation information from subway ATS system, the letter uploaded with each information monitoring Breath, the corresponding subway station crowding of each information monitoring node are transferred to monitoring management platform together;
Control instruction forwarding module, for the instruction from monitoring management platform to be transferred to subway ATS system and each letter Breath monitoring node.
7. a kind of subway comprehensive managing and control system uploaded in real time based on passenger flow information according to claim 5, feature are existed In: the monitoring management platform includes:
Comprehensively monitoring unit, information, the corresponding subway of each information monitoring node for uploading each information monitoring node The subway train operation information of website crowding and subway ATS system shows working platform personnel to carry out comprehensively monitoring;
Current limliting directive generation module for carrying out the control instruction of current limliting to subway station for working platform personnel setting, and leads to It crosses passenger flow information server and is transmitted to each information monitoring node;
Dispatch command generation unit for the control instruction of subway traffic control to be arranged for working platform personnel, and passes through passenger flow Information server is transmitted to subway ATS system.
8. a kind of subway comprehensive control system uploaded in real time based on passenger flow information described according to claim 1 ~ any one of 7 The method that system carries out subway comprehensive control, it is characterised in that: the following steps are included:
S1. be distributed in the information monitoring node of different subway stations, acquire corresponding subway station passenger flow number out of the station, up and down Passenger flow number in vehicle passenger flow number, transferring passage passenger flow number and the subway station in each region, is uploaded to visitor in real time Flow data processing center;
S2. passenger flow information server is obtained each by the second network exchange module, communication base station backstage and subway ticketing center The information that information monitoring node uploads carries out crowding analysis to the corresponding subway station of each information monitoring node, obtains each The passenger flow crowding of a subway station;
S3. passenger flow information server receives the subway train operation information from subway ATS system, uploads with each information monitoring Information, the corresponding subway station crowding of each information monitoring node be transferred to monitoring management platform together;
S4. monitoring management platform uploads each information monitoring node information, the corresponding subway station of each information monitoring node The subway train operation information of point crowding and subway ATS system shows working platform personnel to carry out comprehensively monitoring;
S5. during comprehensively monitoring, working platform personnel are arranged by monitoring management platform and issue control instruction, to alleviate The crowded state of each subway station.
9. it is comprehensive that a kind of subway comprehensive managing and control system uploaded in real time based on passenger flow information according to claim 8 carries out subway The method for closing control, it is characterised in that: in the step S5, the mode for alleviating the subway station degree of crowding includes the following two kinds:
First, the subway station excessively high to crowding, working platform personnel setting and the control instruction for issuing current limliting are transferred to visitor The control instruction of current limliting is handed down to corresponding letter by the second network exchange module by stream information server, passenger flow information server Breath monitoring node is limited in corresponding information monitoring node by being obtained by first network Switching Module for local management module The control instruction of stream, and the local staff in subway station is showed, notify local staff to carry out subway current limiting tube Reason;
Second, the subway station excessively high for crowding, working platform personnel setting and the control for issuing subway circulation scheduling refer to It enables, gives subway ATS system by passenger flow information server transport, adjust the command scheduling scheme of subway ATS system, improve corresponding The subway train of route runs the frequency where subway station.
CN201910090946.4A 2019-01-30 2019-01-30 A kind of subway comprehensive managing and control system uploaded in real time based on passenger flow information and method Pending CN109819038A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910090946.4A CN109819038A (en) 2019-01-30 2019-01-30 A kind of subway comprehensive managing and control system uploaded in real time based on passenger flow information and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910090946.4A CN109819038A (en) 2019-01-30 2019-01-30 A kind of subway comprehensive managing and control system uploaded in real time based on passenger flow information and method

Publications (1)

Publication Number Publication Date
CN109819038A true CN109819038A (en) 2019-05-28

Family

ID=66605818

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910090946.4A Pending CN109819038A (en) 2019-01-30 2019-01-30 A kind of subway comprehensive managing and control system uploaded in real time based on passenger flow information and method

Country Status (1)

Country Link
CN (1) CN109819038A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111734293A (en) * 2020-08-20 2020-10-02 北京和利时***工程有限公司 Equipment control method and monitoring system for subway station
CN112542040A (en) * 2019-09-20 2021-03-23 比亚迪股份有限公司 Guardrail control method and device and storage medium
CN115294785A (en) * 2022-06-30 2022-11-04 通号城市轨道交通技术有限公司 Subway dynamic operation adjusting method and device based on mobile phone signals
CN115423220A (en) * 2022-11-03 2022-12-02 南京国电南自轨道交通工程有限公司 Operation and maintenance monitoring system based on subway rail transit vehicle
WO2023138212A1 (en) * 2022-01-19 2023-07-27 广州新科佳都科技有限公司 In-station path planning method and apparatus based on subway crowdedness

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2644794A1 (en) * 2008-11-18 2010-05-18 Sharon Yetman Subway barrier wall with enhanced passenger flow
CN103043084A (en) * 2012-12-31 2013-04-17 北京交通大学 Method and system for optimizing urban railway transit transfer
CN103661501A (en) * 2013-12-31 2014-03-26 北方工业大学 Automatic station current limiting method based on multi-point passenger flow detection information feedback
CN105404850A (en) * 2015-10-21 2016-03-16 中南大学 Station passenger flow monitoring system, station passenger flow monitoring method, station passenger flow control system and station passenger flow control method
CN106327632A (en) * 2016-08-17 2017-01-11 成都仁通融合信息技术有限公司 System and method for acquiring real-time road conditions of all stations of subway line
CN108132913A (en) * 2017-12-11 2018-06-08 深圳先进技术研究院 A kind of track traffic for passenger flow mobile estimating method, system and electronic equipment
CN108229400A (en) * 2018-01-04 2018-06-29 东南大学 Subway station large passenger flow identification method for early warning and system
CN108622142A (en) * 2018-03-30 2018-10-09 卡斯柯信号有限公司 A kind of train intelligent operation adjustment system and method based on real-time passenger flow
CN108819991A (en) * 2018-07-27 2018-11-16 上海市城市建设设计研究总院(集团)有限公司 The detection device and its operation method of subway platform passenger flow and passenger capacity saturation degree

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2644794A1 (en) * 2008-11-18 2010-05-18 Sharon Yetman Subway barrier wall with enhanced passenger flow
CN103043084A (en) * 2012-12-31 2013-04-17 北京交通大学 Method and system for optimizing urban railway transit transfer
CN103661501A (en) * 2013-12-31 2014-03-26 北方工业大学 Automatic station current limiting method based on multi-point passenger flow detection information feedback
CN105404850A (en) * 2015-10-21 2016-03-16 中南大学 Station passenger flow monitoring system, station passenger flow monitoring method, station passenger flow control system and station passenger flow control method
CN106327632A (en) * 2016-08-17 2017-01-11 成都仁通融合信息技术有限公司 System and method for acquiring real-time road conditions of all stations of subway line
CN108132913A (en) * 2017-12-11 2018-06-08 深圳先进技术研究院 A kind of track traffic for passenger flow mobile estimating method, system and electronic equipment
CN108229400A (en) * 2018-01-04 2018-06-29 东南大学 Subway station large passenger flow identification method for early warning and system
CN108622142A (en) * 2018-03-30 2018-10-09 卡斯柯信号有限公司 A kind of train intelligent operation adjustment system and method based on real-time passenger flow
CN108819991A (en) * 2018-07-27 2018-11-16 上海市城市建设设计研究总院(集团)有限公司 The detection device and its operation method of subway platform passenger flow and passenger capacity saturation degree

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112542040A (en) * 2019-09-20 2021-03-23 比亚迪股份有限公司 Guardrail control method and device and storage medium
CN111734293A (en) * 2020-08-20 2020-10-02 北京和利时***工程有限公司 Equipment control method and monitoring system for subway station
CN111734293B (en) * 2020-08-20 2020-12-18 北京和利时***工程有限公司 Equipment control method and monitoring system for subway station
WO2023138212A1 (en) * 2022-01-19 2023-07-27 广州新科佳都科技有限公司 In-station path planning method and apparatus based on subway crowdedness
CN115294785A (en) * 2022-06-30 2022-11-04 通号城市轨道交通技术有限公司 Subway dynamic operation adjusting method and device based on mobile phone signals
CN115294785B (en) * 2022-06-30 2024-03-29 通号城市轨道交通技术有限公司 Subway dynamic operation adjustment method and device based on mobile phone signals
CN115423220A (en) * 2022-11-03 2022-12-02 南京国电南自轨道交通工程有限公司 Operation and maintenance monitoring system based on subway rail transit vehicle
CN115423220B (en) * 2022-11-03 2023-03-03 南京国电南自轨道交通工程有限公司 Operation and maintenance monitoring system based on subway rail transit vehicle

Similar Documents

Publication Publication Date Title
CN109819038A (en) A kind of subway comprehensive managing and control system uploaded in real time based on passenger flow information and method
CN104463364B (en) A kind of Metro Passenger real-time distribution and subway real-time density Forecasting Methodology and system
CN101510357B (en) Method for detecting traffic state based on mobile phone signal data
CN109711523A (en) A kind of metro passenger flow information real-time publishing system and method based on APP client
CN109816085A (en) A kind of metro passenger flow information real-time publishing system and method based on outpost display
CN106972954B (en) A kind of design method of automation of transformation substations equipment wide area O&M framework
CN101409017B (en) Control system and method for priority signal facing to rapid public transportation
CN202134048U (en) Scenic area visitor distribution statistical system
CN102088365B (en) Energy consumption collecting and energy-saving metering system of communication room
CN101465055A (en) Rapid intelligent public transport stereo monitoring apparatus and working method thereof
CN104899947A (en) Public transport passenger flow statistical method
CN102800212B (en) Intelligent parking system under a kind of environment of internet of things
CN201334036Y (en) Locomotive preparation management system
CN103544653A (en) User member information integrated data processing system for electric cars
CN110096804A (en) The layout method and system of Expressway Service based on mobile terminal data
CN110910293A (en) Subway crowd behavior tag identification method based on base station position
CN107991942A (en) Intelligent radio net RSU equipment, mobile base station, monitoring system and control method
CN205792730U (en) Metro passenger flow intelligence score-clearing system
CN111367900B (en) Method for calculating normal current limiting intensity of urban rail transit network based on AFC data
CN203849739U (en) Wireless intelligent community monitoring device based on RFID
CN105205554A (en) Method and system for predicting queuing time of subway station
CN112087743A (en) Intelligent traffic-oriented high-speed rail virtual gate arriving and dispatching passenger analysis method
CN102938195B (en) Smart power grid wireless communication corridor system based on overhead line
CN102510432A (en) Cellular prewarning information distribution system
CN103700260A (en) Self-networking technology-based city bus monitoring guide system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190528