Prior art keywords
discharge port
feed inlet
preheating
cooling
powder concentrator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910272897.6A
Other languages
Chinese (zh)
Other versions
CN109809717B (en
Inventor
康宇
李安平
武艳文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Kisen International Engineering Co Ltd
Original Assignee
Nanjing Kisen International Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Kisen International Engineering Co Ltd filed Critical Nanjing Kisen International Engineering Co Ltd
Priority to CN201910272897.6A priority Critical patent/CN109809717B/en
Publication of CN109809717A publication Critical patent/CN109809717A/en
Application granted granted Critical
Publication of CN109809717B publication Critical patent/CN109809717B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P40/00Technologies relating to the processing of minerals
    • Y02P40/40Production or processing of lime, e.g. limestone regeneration of lime in pulp and sugar mills

Landscapes

  • Furnace Details (AREA)
  • Muffle Furnaces And Rotary Kilns (AREA)

Abstract

The present invention provides a kind of powdered lime preparation system, including roll squeezer, the feed inlet of roll squeezer is connected with current stabilization storehouse, and discharge port is connected with the feed inlet of V-type powder concentrator;The coarse powder discharge port of V-type powder concentrator is connected with the feed inlet in current stabilization storehouse, and fine powder discharge port is connected with the feed inlet of fine powder concentrator;The coarse powder discharge port of fine powder concentrator is connected with current stabilization storehouse, and fine powder discharge port is connected with the air inlet of dust-precipitator;The discharge port of dust-precipitator is connected with the feed inlet of preheating unit;The agstone discharge port of preheating unit is connected with the feed inlet of dore furnace, and the air outlet of preheating unit is connected with the air inlet of V-type powder concentrator;The air outlet of dore furnace is connected with the pulverized limestone feed inlet of preheating unit, and the pulverized limestone discharge port of preheating unit is connected with the feed inlet of cooling unit;The air outlet of cooling unit is connected with the air inlet of the dore furnace.The present invention realizes the advantageous combination of lime stone crushing and calcine technology, significantly reduces the whole energy consumption of system.

Description

A kind of powdered lime preparation system
Technical field
The present invention relates to powdered lime preparation field, especially a kind of powdered lime preparation system.
Background technique
Traditional pulverized limestone is that block-like lime stone is directly over calcining and decomposing to form Block activated lime, then will be By Block activated lime pulverizing at pulverized limestone, such preparation method have following defects that first is that due to blocky lime stone partial size It is larger, therefore heat consumption needed for its decomposition can be very high, i.e., bulk inner is often difficult to the activation that is decomposed, and at this moment just needs to improve to calcine Temperature causes system heat consumption higher to obtain relatively high resolution ratio;Second is that obtain blocky lime grindability compared with It is higher to be prepared into granular material power consumption for difference.Therefore traditional lime powder, preparation method thereof power consumption, heat are high higher.
In order to further decrease the heat consumption and power consumption of pulverized limestone preparation, agstone first can be worn into powdery, then again Calcining and decomposing, the thinner powdered lime stone decomposition rate of granularity is very fast, and resolution ratio is higher, however, how favorably to combine lime stone Crushing and calcine technology, make its on the whole to the greatest extent reduce energy consumption become currently emphasis is needed to consider the problems of.
Summary of the invention
For overcome the deficiencies in the prior art, the present invention provides a kind of powdered lime preparation system, lime is realized Stone crushes the advantageous combination with calcine technology, significantly reduces the whole energy consumption of system.
The technical solution adopted by the present invention to solve the technical problems is: a kind of powdered lime preparation system, including roll-in Machine and dore furnace further include blocky lime stone current stabilization storehouse, V-type powder concentrator, fine powder concentrator, dust-precipitator, preheating unit and cooling Unit;The feed inlet of the roll squeezer is connected with the discharge port in blocky lime stone current stabilization storehouse, and the discharge port of roll squeezer passes through first Bucket elevator is connected with the feed inlet of V-type powder concentrator;The coarse powder discharge port of the V-type powder concentrator passes through the second bucket elevator and blocky stone The feed inlet in lime stone current stabilization storehouse is connected, and the fine powder discharge port of V-type powder concentrator is connected with the feed inlet of the fine powder concentrator;It is described The coarse powder discharge port of fine powder concentrator is connected by the second bucket elevator with the feed inlet in blocky lime stone current stabilization storehouse, fine powder concentrator Fine powder discharge port be connected with the air inlet of the dust-precipitator;The feed inlet phase of the discharge port of dust-precipitator and the preheating unit Even, the air outlet of dust-precipitator is connected with the first blower;The agstone discharge port of the preheating unit and the feed inlet of dore furnace It is connected, the air outlet of preheating unit is connected through the second blower with the air inlet of the V-type powder concentrator;The decomposition furnace bottom is equipped with Fuel inlet and air inlet, the strip air outlet of dore furnace are connected with the pulverized limestone feed inlet of preheating unit, the stone of preheating unit Ashes discharge port is connected with the feed inlet of cooling unit;The air inlet of the cooling unit is communicated with the atmosphere, air outlet with it is described The air inlet of dore furnace is connected.
Preferably, the preheating unit is made of a preheating cyclone cylinder being serially connected of N (6 >=N >=2), from top to bottom according to It is secondary to preheat cyclone cylinder, second level preheating N grades of preheating cyclone cylinders of cyclone cylinder ... for the first order;N-1 grades preheat cyclone cylinder Discharge port is the agstone discharge port of the preheating unit, is connected with the feed inlet of dore furnace;N grades preheat cyclone cylinder Air inlet is the pulverized limestone feed inlet of the preheating unit, is connected with the strip air outlet of dore furnace, N grades of preheating cyclone cylinders Discharge port be the preheating unit pulverized limestone discharge port, be connected with the feed inlet of cooling unit.
Preferably, the cooling unit is made of a cooling cyclone cylinder being serially connected of M (6 >=M >=2), from top to bottom according to Secondary is the cooling cyclone cylinder of the first order, the cooling cooling cyclone cylinder of M grades of cyclone cylinder ... in the second level, the air inlet of cooling cyclone cylinders at different levels Mouthful be connected respectively with outside atmosphere, the air outlet of cooling cyclone cylinders at different levels respectively with the air inlet phase of the dore furnace Even, the discharge port of the cooling cyclone cylinder of upper level is connected with the feed inlet of the cooling cyclone cylinder of next stage.
Preferably, the connecting line between second blower and the V-type powder concentrator is equipped with wind-supplying mouth, on the wind-supplying mouth Equipped with benefit air-valve.
Preferably, burner at the fuel inlet of the dore furnace, the burner are connected with third blower.
Preferably, the air inlet of the third blower is equipped with motor-driven valve.
The positive effect of the present invention:
1, lime stone is first ground into powdery, then realizes pre- thermal decomposition, i.e., by lime stone crushing system and decomposing system into Row is strong to be combined, and the decomposition rate and decomposition efficiency of lime stone are substantially increased, and also improves pulverized limestone activity.
2, it is ground well due to blocky lime stone than blocky lime, substitutes grinding bulk lime with grinding bulk lime stone, be made The power consumption of powdered lime substantially reduces, and in addition grinds agstone using final grinding system of roll squeezer, grinding pow consumption is lower.
3, it is mutually tied using more energy-efficient roll squeezer end grinding with suspension preheating decomposing and calcining technology, suspension cooling technology It closes, system power consumption and heat consumption index realize reduced levels.
4, the preheating of agstone is realized with multistage preheating cyclone cylinder series connection, heat exchange efficiency is high, advantageously reduces system Heat consumption.
5, the cooling that powdered lime is realized with multistage cooling cyclone cylinder series connection, provides a kind of preferable side for powder cooling Formula, in addition realizes the heating of cooling air in cooling procedure, and hot-air can be used as dore furnace fuel wind, improve fuel Burning situation and efficiency are more superior than single cylinder cooling machine, water-cooling pattern.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of powdered lime preparation system described in embodiment 1;
Fig. 2 is the structural schematic diagram of preheating unit described in embodiment 1;
Fig. 3 is the structural schematic diagram of cooling unit described in embodiment 1;
Fig. 4 is the structural schematic diagram of powdered lime preparation system described in embodiment 2;
Fig. 5 is the structural schematic diagram of powdered lime preparation system described in embodiment 3.
In figure: 1, current stabilization storehouse, 2, roll squeezer, the 3, first bucket elevator, 4, V-type powder concentrator, the 5, second bucket elevator, 6, fine choosing Powder machine, 7, dust-precipitator, the 8, first blower, 9, preheating unit, 10, dore furnace, the air inlet of 10-1, dore furnace, 10-2, dore furnace Fuel inlet, 11, cooling unit, the 12, second blower, 13, wind-supplying mouth, 14, third blower, 15, motor-driven valve.
Specific embodiment
With reference to the accompanying drawing to a preferred embodiment of the present invention will be described in detail.
Embodiment 1
Referring to Fig.1, the embodiment of the present invention 1 provides a kind of powdered lime preparation system, including roll squeezer 2 and dore furnace 10, It further include blocky lime stone current stabilization storehouse 1, V-type powder concentrator 4, fine powder concentrator 6, dust-precipitator 7, preheating unit 9 and cooling unit 11; The feed inlet of the roll squeezer 2 is connected with the discharge port in blocky lime stone current stabilization storehouse 1, and the discharge port of roll squeezer 2 passes through the first bucket Machine 3 is mentioned to be connected with the feed inlet of V-type powder concentrator 4;The coarse powder discharge port of the V-type powder concentrator 4 passes through the second bucket elevator 5 and bulk The feed inlet in lime stone current stabilization storehouse 1 is connected, the feed inlet phase of the fine powder discharge port of V-type powder concentrator 4 and the fine powder concentrator 6 Even;The coarse powder discharge port of the fine powder concentrator 6 is connected by the second bucket elevator 5 with the feed inlet in blocky lime stone current stabilization storehouse 1, The fine powder discharge port of fine powder concentrator 6 is connected with the air inlet of the dust-precipitator 7;The discharge port of dust-precipitator 7 and the preheating are single The feed inlet of member 9 is connected, and the air outlet of dust-precipitator 7 is connected with the first blower 8;The agstone discharge port of the preheating unit 9 It is connected with the feed inlet of dore furnace 10, the air outlet of preheating unit 9 is through the air inlet of the second blower 12 and the V-type powder concentrator 4 It is connected;10 bottom of dore furnace is equipped with fuel inlet 10-2 and air inlet 10-1, the strip air outlet of dore furnace 10 and preheating The pulverized limestone feed inlet of unit 9 is connected, and the pulverized limestone discharge port of preheating unit 9 is connected with the feed inlet of cooling unit 11;It is described The air inlet 11-1 of cooling unit 11 is communicated with the atmosphere, and air outlet 11-2 is connected with the air inlet 10-1 of the dore furnace.
Further, as shown in Fig. 2, the preheating cyclone cylinder that the preheating unit 9 is serially connected by 4 forms, from upper and Under be followed successively by the first order preheating cyclone cylinder 91, the second level preheating cyclone cylinder 92, the third level preheating cyclone cylinder 93, the fourth stage preheating rotation Air duct 94;The discharge port that the third level preheats cyclone cylinder 93 is the agstone discharge port of the preheating unit, with dore furnace 10 Feed inlet be connected;The air inlet that the fourth stage preheats cyclone cylinder 94 is the pulverized limestone feed inlet of the preheating unit, with decomposition The strip air outlet of furnace 10 is connected, and the discharge port that the fourth stage preheats cyclone cylinder 94 is the pulverized limestone discharge port of the preheating unit, It is connected with the feed inlet of cooling unit 11.Wherein from dust arrester 7 agstone feeding the first order preheating cyclone cylinder 91 with The second level preheats on the connection air hose of cyclone cylinder 92, and fourth stage preheating cyclone cylinder 94 primarily serves the effect (separation of gas solid separation Hot fume and pulverized limestone from dore furnace).
Further, as shown in figure 3, the cooling cyclone cylinder that the cooling unit 11 is serially connected by 3 forms, from upper and Under be followed successively by the cooling cyclone cylinder 111 of the first order, the cooling cyclone cylinder 111 in the second level, the cooling cyclone cylinder 113 of the third level, coolings at different levels The air inlet of cyclone cylinder is connected with outside atmosphere respectively, the air outlet of cooling cyclone cylinders at different levels respectively with the dore furnace 10 air inlet is connected, and the discharge port of the cooling cyclone cylinder of upper level is connected with the feed inlet of the cooling cyclone cylinder of next stage.
Process flow is as follows: the broken blocky lime stone of exploitation being fed current stabilization storehouse 1, is then fed by the current stabilization storehouse 1 Blocky lime stone is squeezed into the material that fine powder is mixed with coarse powder by roll squeezer 2, roll squeezer 2, feeds V-type by the first bucket elevator 3 Powder concentrator 4;It completes powder in V-type powder concentrator 4 to be tentatively classified and dry, wherein fine powder brings fine powder concentrator 6 by hot wind, slightly Powder returns to current stabilization storehouse 1 by the second bucket elevator 5 and carries out cycle extrusion;Into fine powder concentrator 6 powder in fine powder concentrator 6 It is sorted again and continues to dry, entered dust-precipitator 7 compared with fine powder and collect into semi-finished product agstone, coarse powder returns to roll squeezer 2 carry out cycle extrusion.Select hot cigarette of the hot wind of powder system (V-type powder concentrator and fine powder concentrator) after the heat exchange of preheating unit 9 Gas is discharged into atmosphere finally by the first blower 8 (exhaust blower);Semi-finished product agstone feeds preheating unit, and it is laggard to complete preheating Enter dore furnace 10 complete Decomposition of Calcium Carbonate (Decomposition of Calcium Carbonate be calcium oxide react, eventually form using calcium oxide as primary chemical at The powder divided), the hot lime of powdery is generated, subsequently into cooling unit, heat is realized in the heat exchange for passing through lime hot material and cooling air Lime is cooling to be heated with air, and powdered lime after cooling is sent into pulverized limestone library as finished product, and the air after heating enters decomposition It inside furnace 10, mixes, burn with the fuel for being sent into dore furnace 10, hot fume is formed, to the stone after the preheating entered in dore furnace 10 Limestone flour is decomposed, and the hot fume of 9 preheating lime stone powder of preheating unit is passed through V by the second blower 12 (high temperature relay air blower) Type powder concentrator 4, and pass sequentially through fine powder concentrator 6, dust-precipitator 7, the first blower 8 and be discharged into atmosphere, with realize lime stone drying and Select powder.
Embodiment 2
Referring to Fig. 4, the embodiment of the present invention 2 provides a kind of powdered lime preparation system, with embodiment 1 the difference is that institute It states the connecting line between the second blower 12 and the V-type powder concentrator 4 and is equipped with wind-supplying mouth 13, which, which is equipped with, mends wind Valve, so that adjust V-type powder concentrator 4 and fine powder concentrator 6 selects powder air quantity and wind-warm syndrome, if lime stone moisture content is little, hot wind heat Value meets lime stone drying requirement, but air quantity is not able to satisfy and selects powder requirement, reaches air quantity by cold wind and selects powder requirement, can be into one Step is conducive to impact and breaks up material, improve select powder system select powder and drying efficiency.
Embodiment 3
Referring to Fig. 5, the embodiment of the present invention 3 provides a kind of powdered lime preparation system, with embodiment 2 the difference is that institute Burner at the fuel inlet of dore furnace 10 is stated, which is connected with third blower 14.The air inlet of the third blower 14 Place is equipped with motor-driven valve 15.It is blasted by burner setting with First air, facilitates the burning of 10 fuel of dore furnace, in third 14 inlet design motor-driven valve 15 of blower is conducive to control primary air flow supply, in order to match with burner and fuel quantity.
The present invention realizes the crushing and decomposition, cooling of blocky lime stone, and system heat consumption and power consumption reduce, be it is a kind of more Energy-efficient powdered lime preparation system.
It is above-described to be merely a preferred embodiment of the present invention, it should be understood that the explanation of above embodiments is only used In facilitating the understanding of the method and its core concept of the invention, it is not intended to limit the scope of protection of the present invention, it is all of the invention Any modification for being made within thought and principle, equivalent replacement etc., should all be included in the protection scope of the present invention.

Claims (6)

1. a kind of powdered lime preparation system, including roll squeezer and dore furnace, it is characterised in that: further include blocky lime stone current stabilization Storehouse, V-type powder concentrator, fine powder concentrator, dust-precipitator, preheating unit and cooling unit;The feed inlet of the roll squeezer and blocky stone The discharge port in lime stone current stabilization storehouse is connected, and the discharge port of roll squeezer is connected by the first bucket elevator with the feed inlet of V-type powder concentrator;Institute The coarse powder discharge port for stating V-type powder concentrator is connected by the second bucket elevator with the feed inlet in blocky lime stone current stabilization storehouse, V-type powder concentrator Fine powder discharge port be connected with the feed inlet of the fine powder concentrator;The coarse powder discharge port of the fine powder concentrator passes through the second bucket It mentions machine to be connected with the feed inlet in blocky lime stone current stabilization storehouse, the fine powder discharge port of fine powder concentrator and the air inlet of the dust-precipitator It is connected;The discharge port of dust-precipitator is connected with the feed inlet of the preheating unit, and the air outlet of dust-precipitator is connected with the first blower;Institute The agstone discharge port for stating preheating unit is connected with the feed inlet of dore furnace, and the air outlet of preheating unit is through the second blower and institute The air inlet for stating V-type powder concentrator is connected;The decomposition furnace bottom is equipped with fuel inlet and air inlet, the strip air outlet of dore furnace It is connected with the pulverized limestone feed inlet of preheating unit, the pulverized limestone discharge port of preheating unit is connected with the feed inlet of cooling unit;Institute The air inlet for stating cooling unit is communicated with the atmosphere, and air outlet is connected with the air inlet of the dore furnace.
2. a kind of powdered lime preparation system according to claim 1, it is characterised in that: the preheating unit is by N number of phase Mutually concatenated preheating cyclone cylinder composition is followed successively by first order preheating cyclone cylinder, second level preheating cyclone cylinder ... N from top to bottom Grade preheating cyclone cylinder;The discharge port of N-1 grades of preheating cyclone cylinders is the agstone discharge port of the preheating unit, with decomposition The feed inlet of furnace is connected;The air inlet of N grades of preheating cyclone cylinders is the pulverized limestone feed inlet of the preheating unit, with dore furnace Strip air outlet be connected, N grade preheating cyclone cylinders discharge ports be the preheating unit pulverized limestone discharge port, with cooling The feed inlet of unit is connected.
3. a kind of powdered lime preparation system according to claim 2, it is characterised in that: the cooling unit is by M phase Mutually concatenated cooling cyclone cylinder composition is followed successively by the cooling cyclone cylinder of the first order, cooling cyclone cylinder ... the M in the second level from top to bottom The cooling cyclone cylinder of grade, the air inlet of cooling cyclone cylinders at different levels are connected with outside atmosphere respectively, and cooling cyclone cylinders at different levels go out Air port is connected with the air inlet of the dore furnace respectively, the discharge port and the cooling cyclone cylinder of next stage of the cooling cyclone cylinder of upper level Feed inlet be connected.
4. a kind of powdered lime preparation system according to claim 1 or 2 or 3, it is characterised in that: second blower with Connecting line between the V-type powder concentrator is equipped with wind-supplying mouth, which, which is equipped with, mends air-valve.
5. a kind of powdered lime preparation system according to claim 4, it is characterised in that: the fuel inlet of the dore furnace Locate burner, which is connected with third blower.
6. a kind of powdered lime preparation system according to claim 5, it is characterised in that: the air inlet of the third blower Place is equipped with motor-driven valve.
CN201910272897.6A 2019-04-04 2019-04-04 Powdery lime preparation system Active CN109809717B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910272897.6A CN109809717B (en) 2019-04-04 2019-04-04 Powdery lime preparation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910272897.6A CN109809717B (en) 2019-04-04 2019-04-04 Powdery lime preparation system

Publications (2)

Publication Number Publication Date
CN109809717A true CN109809717A (en) 2019-05-28
CN109809717B CN109809717B (en) 2024-01-30

Family

ID=66611366

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910272897.6A Active CN109809717B (en) 2019-04-04 2019-04-04 Powdery lime preparation system

Country Status (1)

Country Link
CN (1) CN109809717B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111646710A (en) * 2020-06-30 2020-09-11 浙江钙科机械设备有限公司 Suspension calcination production line for powdered lime and suspension calcination process thereof
CN113173717A (en) * 2021-05-20 2021-07-27 江西福得利碳酸钙业有限责任公司 Calcium oxide production process and preparation device thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU657843A1 (en) * 1976-02-23 1979-04-25 Донецкий Ордена Трудового Красного Знамени Политехнический Институт Roll crusher drive
KR20100042397A (en) * 2008-10-16 2010-04-26 삼호환경기술 주식회사 A crusher
CN102372450A (en) * 2010-08-18 2012-03-14 宝山钢铁股份有限公司 Powdered lime calcining technology and system
CN107759115A (en) * 2017-12-12 2018-03-06 泰安中意重型工业设备有限公司 The new process for calcining and device of a kind of powdered lime
CN209669074U (en) * 2019-04-04 2019-11-22 南京凯盛国际工程有限公司 A kind of powdered lime preparation system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU657843A1 (en) * 1976-02-23 1979-04-25 Донецкий Ордена Трудового Красного Знамени Политехнический Институт Roll crusher drive
KR20100042397A (en) * 2008-10-16 2010-04-26 삼호환경기술 주식회사 A crusher
CN102372450A (en) * 2010-08-18 2012-03-14 宝山钢铁股份有限公司 Powdered lime calcining technology and system
CN107759115A (en) * 2017-12-12 2018-03-06 泰安中意重型工业设备有限公司 The new process for calcining and device of a kind of powdered lime
CN209669074U (en) * 2019-04-04 2019-11-22 南京凯盛国际工程有限公司 A kind of powdered lime preparation system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111646710A (en) * 2020-06-30 2020-09-11 浙江钙科机械设备有限公司 Suspension calcination production line for powdered lime and suspension calcination process thereof
CN113173717A (en) * 2021-05-20 2021-07-27 江西福得利碳酸钙业有限责任公司 Calcium oxide production process and preparation device thereof

Also Published As

Publication number Publication date
CN109809717B (en) 2024-01-30

Similar Documents

Publication Publication Date Title
CN201245560Y (en) Cocurrent heat storing type dual-chamber limekiln capable of realizing two-stage calcination
CN101456690B (en) Method for preparing active coal gangue
CN101811839B (en) Method for producing cement clinker by calcining chalk
CN206746767U (en) A kind of desulfurization agstone preparation system
CN109437608B (en) Double-path air built-in heat exchanger lime shaft kiln and calcining method thereof
CN209669074U (en) A kind of powdered lime preparation system
CN103342482A (en) External-circulation cement finish grinding system for vertical mill
CN204866115U (en) Wet upright crocus of coal -fired slag of arranging grinds drying system
CN109809717A (en) A kind of powdered lime preparation system
CN109836060A (en) A kind of powdered lime calcining and decomposing preparation system
CN102992661A (en) Beam type heat storage lime kiln
CN108585555B (en) Industrial powder clinker homogeneous calcination preparation equipment and preparation method
CN103468934B (en) Powdery difficulty selects iron ore of low ore grade multistage fluidised form magnetizing roasting method
CN103351106B (en) Energy-saving environment-friendly cement clinker preparation system
CN208613051U (en) A kind of steel slag micro mist using steel plant's waste heat flue gas selects powder system
CN107285651A (en) A kind of active powder lime suspension calcining device
CN112010332A (en) Aluminum oxide clinker preparation system and process flow thereof
CN208700591U (en) A kind of aluminium oxide joint roasting system
CN208218697U (en) A kind of high activity MgO roasting dedicated unit
WO2020034298A1 (en) Combined cement grinding system and method applicable to high-moisture materials
CN108855941A (en) A kind of steel slag micro mist using steel plant's waste heat flue gas selects powder system
CN115111918A (en) Carbide slag suspension roasting system
CN105174756A (en) Method for preparing cement from manganese iron slag
CN109305770A (en) A kind of production technology of expanded perlite
CN214747299U (en) Device for producing mineral admixture by using coal gangue

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 303 Hanzhongmen street, Gulou District, Nanjing City, Jiangsu Province

Applicant after: Zhongcai International Intelligent Technology Co.,Ltd.

Address before: 303 Hanzhongmen street, Gulou District, Nanjing City, Jiangsu Province

Applicant before: NANJING KISEN INTERNATIONAL ENGINEERING Co.,Ltd.

GR01 Patent grant