CN109024570A - Recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure and method - Google Patents

Recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure and method Download PDF

Info

Publication number
CN109024570A
CN109024570A CN201810568767.2A CN201810568767A CN109024570A CN 109024570 A CN109024570 A CN 109024570A CN 201810568767 A CN201810568767 A CN 201810568767A CN 109024570 A CN109024570 A CN 109024570A
Authority
CN
China
Prior art keywords
group
strand wires
steel strand
prestressing
working cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810568767.2A
Other languages
Chinese (zh)
Inventor
胡祖光
侯建青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI CONSTRUCTION EQUIPMENT ENGINEERING Co.,Ltd.
Shanghai Construction Group Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd filed Critical Shanghai Construction Group Co Ltd
Priority to CN201810568767.2A priority Critical patent/CN109024570A/en
Publication of CN109024570A publication Critical patent/CN109024570A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention provides a kind of recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure and methods, the supporting pile structure includes steel reinforcement cage and the prestressing force group's tread assembly being set on steel reinforcement cage, prestressing force group tread assembly is assembled with porous fixing end anchorage by prestressing force group beam and is formed, the lower end of prestressing force group's beam is installed in porous fixing end anchorage, the positioning bracket for carrying porous fixing end anchorage is provided in steel reinforcement cage, each prestressing force group beam includes several working cables and tool rope, tool rope and working cable are linear type unbonded prestressing tendon, unbonded prestressing tendon includes steel strand wires and the protecting pipe that is sheathed on the outside of steel strand wires, porous fixing end anchorage can anchor but also disanchor the steel strand wires of working cable, to can both improve the structural behaviour of fender post, improve the crack resistance of fender post, it can be tied again in underground Realize that the recycling and reusing of presstressed reinforcing steel meets environmentally protective theory to reduce construction cost when fender post is discarded after the completion of structure.

Description

Recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure and method
Technical field
The present invention relates in construction fender post field more particularly to a kind of recyclable group's beam post-tensioning soap-free emulsion polymeization answer in advance Power drill-pouring supporting pile structure and method.
Background technique
Cast-in-situ bored pile is a kind of pile-type classified by pile making method and defined.Cast-in-situ bored pile refers to logical in engineering site Cross machine drilling and form stake holes in foundation soil, and in it place framework of steel reinforcement (i.e. steel reinforcement cage), concrete perfusion and make At stake.
Cast-in-situ bored pile is widely applied in subterranean excavation building enclosure, and after the completion of underground structure, pile body is by discarded shape At underground garbage, have a great impact for the exploitation of the following underground space.
In order to improve the structural behaviour of fender post, the crack resistance of fender post is improved, the amount of reinforcement of steel reinforcement cage is reduced, is mitigated The weight of steel reinforcement cage, usually increases presstressed reinforcing steel in cast-in-situ bored pile.But it cannot achieve the pre- of cast-in-situ bored pile at present and answer The recycling and reusing of power muscle.
How the recycling of presstressed reinforcing steel cast-in-situ bored pile in is realized, to reduce for the unfavorable of the following underground space development It influences, improves the structural behaviour of pile body, reduce construction cost, meet environmentally protective and precision construction modern concepts, be ability A domain technical problem urgently to be resolved.
Summary of the invention
The purpose of the present invention is to provide a kind of recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structures And method, it can both improve the structural behaviour of fender post, improve the crack resistance of fender post, and back wall can be completed in underground structure The recycling and reusing of presstressed reinforcing steel is realized when fender pile is discarded, to reduce construction cost, meets environmentally protective theory, and can be with Reduce the adverse effect for the following underground space development.
In order to solve the above technical problems, the invention provides the following technical scheme:
A kind of recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure, including steel reinforcement cage and be set to Prestressing force group's tread assembly on steel reinforcement cage, the upper end of steel reinforcement cage are arranged collar tie beam, and prestressing force group tread assembly is by prestressing force group beam and more Hole fixing end anchorage assembles to be formed, and the top surface of collar tie beam, the lower end of the prestressing force group beam are stretched out in the upper end of the prestressing force group beam It is installed in the porous fixing end anchorage, each prestressing force group beam includes several for being answered in advance the application of drill-pouring fender post The working cable of power and tool rope for disanchoring to working cable, the working cable are compassingly set at outside the tool rope Side, the tool rope and the working cable are linear type unbonded prestressing tendon, and the unbonded prestressing tendon includes that steel twists Line and the protecting pipe being sheathed on the outside of steel strand wires, porous fixing end anchorage can anchor but also disanchor the steel strand wires of working cable.
Preferably, described pre- in above-mentioned recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure The quantity of stress group's beam be it is multiple, be uniformly arranged on the steel reinforcement cage, the steel reinforcement cage by spiral hoop with it is several non-prestressed Reinforcing bar connection composition, multiple prestressing force group beams are uniformly arranged on the surrounding of the spiral hoop.
Preferably, described more in above-mentioned recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure Hole fixing end anchorage includes outer anchor ring, interior anchor block, first clamping piece group, pressure-bearing end plate and seal bootr, right on the pressure-bearing end plate It should be equipped with the through-hole passed through for the steel strand wires of working cable and tool rope, the outer anchor ring is set to the following table of the pressure-bearing end plate Face, the interior anchor block are set to the inside of the outer anchor ring, each interior anchor block and outer anchor ring around the steel strand wires of the tool rope Between form one for accommodating the space of first clamping piece group, successively drawing-in steel sleeve connects for the lower end of the steel strand wires of the working cable Connector, pressure-bearing end plate correspondence through-hole and interior anchor block and outer anchor ring between for accommodating the space of first clamping piece group, it is described First clamping piece group includes that at least two panels first clamping piece, at least two panels first clamping piece is described around the setting of corresponding steel strand wires First clamping piece group does compression processing in the space for accommodating first clamping piece group, and the seal bootr is set to the pressure-bearing end plate Downside, the outer anchor ring, interior anchor block, first clamping piece group and group's prestressing tendon lower end be located in the seal bootr, it is described Grease is injected in seal bootr, it is described for accommodating first clamping piece group when interior anchor block is located at the outside of the steel strand wires of tool rope Space is the first bellmouth up and down;When the steel strand wires of the tool rope are pulled away interior anchor block, interior anchor block and outer anchor block Between the space of accommodating first clamping piece group become larger so that first clamping piece group loosens the bite force realization to the steel strand wires of working cable It disanchors.
Preferably, described to hold in above-mentioned recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure The upper surface of pressure side plate corresponds to each through-hole and is fixed with steel pipe socket connector, and the protecting pipe of the unbonded prestressing tendon penetrates In corresponding steel bushing pipe connector, using hydraulic device by the protecting pipe of unbonded prestressing tendon and corresponding steel bushing pipe connector It is connected.
Preferably, it in above-mentioned recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure, is answering in advance That one end that power group's beam stretches out collar tie beam top surface successively installs anchor plate and porous stretching end anchorage, the anchor plate are set to circle The top surface of beam, the porous stretching end anchorage include tensioning anchor slab and several second intermediate plate groups, and the tensioning anchor slab is set to The upside of anchor plate is correspondingly provided with the second bellmouth passed through for the steel strand wires of working cable and tool rope on the tensioning anchor slab, The second intermediate plate group is equipped in second bellmouth of corresponding working cable, each second intermediate plate group is pressed from both sides including at least two piece second Piece, at least two pieces of second intermediate plates are set around the outside of the steel strand wires of tool rope, and the second intermediate plate connects with steel strand wires The surface of touching is equipped with sawtooth, and second intermediate plate loosens steel strand wires when being displaced outwardly with respect to tensioning anchor slab, second intermediate plate is with respect to tensioning anchor Tight steel strand wires are stung when plate moves inward.
Preferably, in above-mentioned recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure, further include The tensioning equipment of steel strand wires for tensioning working cable, the tensioning equipment include the limit plate set gradually from the bottom to top, wear Core type jack and porous tool anchor, the surrounding of the limit plate have the support portion of evagination, and the limit plate passes through described Support portion is set on porous tension ground tackle, so that being equipped with gap between the limit plate and porous tension ground tackle.
Preferably, in above-mentioned recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure, further include The relief arrangement of off-load is carried out for the steel strand wires to working cable, the relief arrangement includes off-load bracket, centre-hole jack And porous tool anchor, the off-load bracket are set between porous tension ground tackle and centre-hole jack.
Preferably, in above-mentioned recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure, further include Bearing plate, spiral bar, several screw rods and several nuts are opened up on the bearing plate and are worn for working cable, tool rope and screw rod Through-hole more, the bearing plate are arranged at intervals at the top of the porous fixing end anchorage, institute by the screw rod and nut Spiral bar is stated between the bearing plate and porous fixing end anchorage.
Preferably, in above-mentioned recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure, the steel The lower part of muscle cage is provided with the positioning bracket for being used to support the porous fixing end anchorage.
The invention also discloses a kind of constructions of recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure Method, comprising:
Prestressing force group beam and porous fixing end anchorage are assembled to form prestressing force group's tread assembly, under the prestressing force group beam End is installed in the porous fixing end anchorage, and each prestressing force group beam includes several pre- for applying to drill-pouring fender post The working cable of stress and tool rope for disanchoring to working cable, the working cable are compassingly set at outside the tool rope Side, the tool rope and the working cable are linear type unbonded prestressing tendon, and the unbonded prestressing tendon includes that steel twists Line and the protecting pipe being sheathed on the outside of steel strand wires, the porous fixing end anchorage can anchor but also disanchor working cable steel twist Line;
Several prestressing force group tread assemblies are installed on steel reinforcement cage;
It will be equipped in the reinforcing bar cage hoisting to the stake holes for excavating completion of several prestressing force group tread assemblies;
It pours stake holes concrete and forms drill-pouring fender post;
After collar tie beam reaches design strength, collar tie beam is poured above drill-pouring fender post;
After collar tie beam reaches design strength, prestressing force group's beam stretch out collar tie beam top surface that one end successively install anchor plate and Porous stretching end anchorage;
The steel strand wires of working cable in stretch-draw prestressing force group's beam;
Underground Construction is carried out,
After the completion of Underground Construction, off-load is carried out to the steel strand wires of working cable;
The steel strand wires of recycling tool rope, so that the steel strand wires of working cable are disanchored;
Using manpower or the steel strand wires of admission machine recovery operation rope after disanchoring.
Preferably, in the construction method of above-mentioned recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure In, when recycling, first applies pulling capacity with the steel strand wires of preceding cassette punching jack pair tool rope, the steel strand wires of tool rope are pulled away Porous fixing end anchorage realizes disanchoring to the steel strand wires of working cable while recycling the steel strand wires of tool rope;It is used after disanchoring The steel strand wires of manpower or admission machine recovery operation rope.
By techniques disclosed above scheme it is found that compared with prior art, beneficial effects of the present invention are as follows:
Recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure provided by the invention, it is mixed in regular reinforcement On the basis of solidifying soil drill-pouring fender post, it is configured with prestressing force group's beam, improves the crack resistance of stake, reduces regular reinforcement use Amount, alleviates framework of steel reinforcement (i.e. steel reinforcement cage) weight.Prestressing force group's beam includes several pre- for applying to drill-pouring fender post The working cable of stress and tool rope for disanchoring to working cable, the working cable are compassingly set at outside the tool rope Side, the tool rope and the working cable are linear type unbonded prestressing tendon, and the unbonded prestressing tendon includes that steel twists The lower end installation one of line and the protecting pipe being sheathed on the outside of steel strand wires, prestressing force group's beam can anchor but also disanchor presstressed reinforcing steel Anchor, so as to realize prestressing force group's beam steel strand wires easy recycling, and steel strand wires will not be by removal process It to damage, can repeatedly use, reduce construction cost.
The construction method of recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure provided by the invention is led to It crosses and several prestressing force group tread assemblies is installed on steel reinforcement cage, by the reinforcing bar cage hoisting for being equipped with several prestressing force group tread assemblies to opening It digs in the stake holes completed, pours stake holes concrete and form drill-pouring fender post, pour collar tie beam above drill-pouring fender post, After collar tie beam reaches design strength, anchor plate and porous tensioning are successively installed in that one end that prestressing force group's beam stretches out collar tie beam top surface Anchorage is held, the steel strand wires of working cable in stretch-draw prestressing force group's beam carry out Underground Construction, right after the completion of Underground Construction The steel strand wires of working cable carry out off-load, recycle the steel strand wires of tool rope, so that the steel strand wires of working cable are disanchored, people is used after disanchoring The steel strand wires of power or admission machine recovery operation rope, so as to which in the construction stage of underground structure, pre- using working cable is answered Power improves the crack resistance of fender post, reduces the regular reinforcement dosage of fender post, alleviates framework of steel reinforcement (the i.e. reinforcing bar of fender post Cage) weight, and can be after the completion of Underground Construction, the easy recycling of the steel strand wires of implementation tool rope and working cable, and Steel strand wires are not damaged in removal process, can be repeatedly used, and construction cost is reduced.
Detailed description of the invention
Fig. 1 is the knot of recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure of one embodiment of the invention Structure schematic diagram (only illustrates one group of prestressing force group tread assembly) in figure.
Fig. 2 be one embodiment of the invention in fender post cross-sectional structure schematic diagram (i.e. the A-A schematic cross-sectional view of Fig. 1, Illustrate the horizontal layout situation of all prestressing force group tread assemblies).
Fig. 3 is the portion the B enlarged diagram of Fig. 1.
Fig. 4 is the assembling schematic diagram of the porous fixing end anchorage in one embodiment of the invention.
Fig. 5 is the C-C schematic cross-sectional view of Fig. 4.
Fig. 6 is the structural schematic diagram of the porous stretching end anchorage in one embodiment of the invention.
Fig. 7 is the D-D schematic cross-sectional view of Fig. 6.
Fig. 8 is the structural schematic diagram of the locating rack in one embodiment of the invention.
Fig. 9 is the assembling schematic diagram of the locating rack and prestressing force group beam in one embodiment of the invention.
Figure 10 is the structural schematic diagram of the tensioning equipment in one embodiment of the invention.
Figure 11 is the structural schematic diagram of the relief arrangement in one embodiment of the invention.
Figure 12 is the assembling schematic diagram of porous fixing end anchorage in another embodiment in the present invention.
In figure: 1- prestressing force group beam, 110- working cable, the steel strand wires of 111- working cable, 112- working cable protecting pipe, The outer anchor ring of 120- tool rope, the steel strand wires of 121- tool rope, the porous fixing end anchorage of protecting pipe, 2- of 122- tool rope, 21-, Anchor block, 23- first clamping piece group, 24- pressure-bearing end plate, 25- seal bootr, 26- grease, 27- steel pipe socket connector, 3- positioning in 22- Frame, 4- position bracket, 5- anchor plate, the porous stretching end anchorage of 6-, 61- tensioning anchor slab, 62- second intermediate plate group, 7- punching thousand Jin top, 71- inner casing, 72- outer shell, 8- porous tool anchor, 81- tool anchor slab, 82- third intermediate plate group, 9- limit plate, 10- bracket, 11- fender post, 12- collar tie beam, 13- stir pile water stopping curtain, 14- underground structure, 15- spiral hoop, 16- nonprestressed reinforcement, 17- Bearing plate, 18- spiral bar, 19- screw rod, 20- nut.
Specific embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.It below will be by cited implementation Example is in conjunction with attached drawing, the technology contents and feature that the present invention will be described in detail.Need in addition it illustrate, attached drawing is all made of very simplified Form and use non-accurate ratio, only for the purpose of facilitating and clarifying the purpose of the embodiments of the invention.For narration side Just, "upper" described below, "lower" are consistent with the upper and lower direction of attached drawing, but this can't be technical solution of the present invention Limitation.
Embodiment one
Fig. 1 to Figure 11 is please referred to, a kind of recyclable group's beam post-tensioning prestressing without bondn drill-pouring is present embodiments provided Supporting pile structure, including steel reinforcement cage and the prestressing force group's tread assembly being set on steel reinforcement cage, collar tie beam is arranged in the upper end of steel reinforcement cage 12, prestressing force group tread assembly is formed by prestressing force group beam 1 and the assembling of porous fixing end anchorage 2, the upper end of the prestressing force group beam 1 The top surface of collar tie beam 12 is stretched out, the lower end of the prestressing force group beam 1 is installed in the porous fixing end anchorage 2, each prestressing force Group beam 1 include it is several for drill-pouring fender post 11 apply prestressed working cable 110 and for working cable 110 into The tool rope 120 that row is disanchored, the working cable 110 are compassingly set at 120 outside of tool rope, the tool rope 120 and institute Stating working cable 110 is linear type unbonded prestressing tendon, and the unbonded prestressing tendon includes steel strand wires and is sheathed on steel Protecting pipe on the outside of twisted wire, porous fixing end anchorage 2 can anchor but also disanchor the steel strand wires 111 of working cable.
Recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure provided in this embodiment, in regular reinforcement Concrete drill hole is perfused on the basis of fender post 11, is configured with prestressing force group beam 1, improves the crack resistance of stake, reduces common Amount of reinforcement alleviates framework of steel reinforcement (i.e. steel reinforcement cage) weight.Prestressing force group beam 1 includes several for drill-pouring fender post The prestressed working cable 110 of 11 applications and the tool rope 120 for disanchoring to working cable 110, the working cable 110 enclose Around 120 outside of tool rope is set to, the tool rope 120 and the working cable 110 are linear type prestressing without bondn Muscle, the unbonded prestressing tendon include steel strand wires and the protecting pipe that is sheathed on the outside of steel strand wires, the lower end of prestressing force group beam 1 The anchor that installation one can anchor but also disanchor presstressed reinforcing steel, so as to realize prestressing force group beam 1 steel strand wires letter Just it recycles, and steel strand wires are not damaged in removal process, can repeatedly use, reduce construction cost.
Due to the bottom sediment of drill-pouring fender post be difficult to remove it is clean, in order to avoid porous fixing end anchorage 2 because It is fallen into sediment in binding inaccuracy or in lifting, influences the anchoring effect of prestressing force group beam 1, it is preferred that in this implementation In example, the lower part of the steel reinforcement cage is provided with the positioning bracket 4 for being used to support the porous fixing end anchorage 2, so that in advance Stress group beam 1 is anchored in the concrete of denser homogeneous, improves anchoring effect.
In order to increase the integral strength of fender post 11, cracking resistance and performance is more uniform everywhere, it is preferred that above-mentioned In recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure, the quantity of the prestressing force group beam 1 be it is multiple, Even to be set on the steel reinforcement cage, the steel reinforcement cage is connect with several nonprestressed reinforcements 16 by spiral hoop 15 and is formed, non-pre- to answer Power reinforcing bar 16 is uniformly arranged on the surrounding of the spiral hoop 15, and multiple prestressing force group beams 1 are uniformly arranged on the spiral hoop 15 surrounding.In the present embodiment, the quantity of the prestressing force group tread assembly is 6 groups, is uniformly arranged on the spiral of the steel reinforcement cage On hoop 15.
In the present embodiment, the protecting pipe 112 of working cable is sheathed on 111 outside of steel strand wires of working cable;The sheath of tool rope Pipe 122 is sheathed on 121 outside of steel strand wires of tool rope, and the protecting pipe 112 of working cable and the protecting pipe 122 of tool rope are using high Density polyethylene materials are made, High Density Polyethylene, referred to as " HDPE ", and high density polyethylene (HDPE) is a kind of Crystallinity height, nonpolar thermoplastic resin.Protecting pipe is made with acid and alkali-resistance by HDPE, organic solvent-resistant, electrical insulating property is excellent Good advantage when low temperature, is still able to maintain certain toughness.And there is stronger surface hardness, tensile strength, the machinery such as rigidity is by force Degree.
Preferably, described more in above-mentioned recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure Hole fixing end anchorage 2 includes outer anchor ring 21, interior anchor block 22, first clamping piece group 23, pressure-bearing end plate 24 and seal bootr 25, described The through-hole passed through for the steel strand wires 121 of working cable 110 and tool rope is correspondingly provided on pressure-bearing end plate 24, the outer anchor ring 21 is arranged In the lower surface of the pressure-bearing end plate 24, the interior anchor block 22 is set to the outer anchor around the steel strand wires 121 of the tool rope The inside of ring 21 forms the space for being used to accommodate first clamping piece group 23 between each interior anchor block 22 and outer anchor ring 21, described The correspondence through-hole and interior anchor block 22 of the lower end of the steel strand wires 111 of working cable successively drawing-in steel bushing pipe connector, pressure-bearing end plate 24 The space for being used to accommodate first clamping piece group 23 between outer anchor ring 21, the first clamping piece group 23 include that at least two panels first is pressed from both sides Piece, at least two panels first clamping piece are arranged around corresponding steel strand wires, and the first clamping piece group 23 is for accommodating the first folder Doing compression processing in the space of piece group 23, the seal bootr 25 is set to the downside of the pressure-bearing end plate 24, the outer anchor ring 21, The lower end of interior anchor block 22, first clamping piece group 23 and group's prestressing tendon is located in the seal bootr 25, note in the seal bootr 25 Enter grease 26, it is described for accommodating the sky of first clamping piece group 23 when interior anchor block 22 is located at the outside of the steel strand wires 121 of tool rope Between for the first bellmouth up and down;When the steel strand wires 121 of the tool rope are pulled away interior anchor block 22, interior anchor block 22 with it is outer The space of accommodating first clamping piece group 23 between anchor block becomes larger, so that first clamping piece group 23 loosens the steel strand wires 111 to working cable Bite force realization disanchor.Therefore porous fixing end anchorage 2 using the above structure, tool rope can be fallen in withdrawing Realize that the steel strand wires 111 of working cable are disanchored after steel strand wires 121, and anchoring and the process of disanchoring will not be to the steel strand wires of working cable 111 generate damage, are conducive to the recycling and reusing of steel strand wires.
Preferably, described to hold in above-mentioned recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure The upper surface of pressure side plate 24 corresponds to each through-hole and is fixed with steel pipe socket connector 27, the protecting pipe of the unbonded prestressing tendon It penetrates in corresponding steel bushing pipe connector, is connected the protecting pipe of unbonded prestressing tendon with corresponding steel sleeve using hydraulic device Connector is connected.The length of the steel pipe socket connector 27 is 100-150mm, the length of steel pipe socket connector 27 in the present embodiment Degree is 100mm.By the way that steel pipe socket connector 27 is arranged, and the protecting pipe of the unbonded prestressing tendon is penetrated into corresponding steel bushing In pipe connector, the protecting pipe of unbonded prestressing tendon is connected with corresponding steel bushing pipe connector using hydraulic device, It can protect steel strand wires, and can be by fixed sheath pipe, convenient for the tensioning, off-load and recycling of steel strand wires.
Preferably, it in above-mentioned recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure, is answering in advance Anchor plate 5 and porous stretching end anchorage 6 are successively installed in that one end that power group beam 1 stretches out 12 top surface of collar tie beam, and the anchor plate 5 is set It is placed in the top surface of collar tie beam 12, the porous stretching end anchorage 6 includes tensioning anchor slab 61 and several second intermediate plate groups 62, and described It draws anchor slab 61 to be set to the upside of anchor plate 5, is correspondingly provided on the tensioning anchor slab 61 and is twisted for the steel of working cable 110 and tool rope The second bellmouth that line 121 passes through corresponds to and is equipped with the second intermediate plate group 62, Mei Ge in the second bellmouth of working cable 110 Two intermediate plate groups 62 include at least two pieces of second intermediate plates, and at least two pieces of second intermediate plates are set around the steel strand wires 121 of tool rope Outside, and the surface that the second intermediate plate is in contact with steel strand wires is equipped with sawtooth, second intermediate plate is moved out with respect to tensioning anchor slab 61 Loosen steel strand wires when dynamic, second intermediate plate stings tight steel strand wires when moving inward with respect to tensioning anchor slab 61.Pass through the porous of above structure Stretching end anchorage 6 cooperates porous fixing end anchorage 2, and the stretching construction of the steel strand wires 111 of working cable may be implemented.
Preferably, in above-mentioned recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure, further include The tensioning equipment of steel strand wires 111 for tensioning working cable, the tensioning equipment include the limit plate set gradually from the bottom to top 9, centre-hole jack 7 and porous tool anchor 8, the surrounding of the limit plate 9 have the support portion of evagination, the limit plate 9 It is set on porous tension ground tackle by the support portion, so that being equipped with gap between the limit plate 9 and porous tension ground tackle. Gap is usually in 6mm hereinafter, limit plate 9 is used to limit the mobile space of second intermediate plate group 62, the upper end of the prestressing force group beam 1 Sequentially pass through limit plate 9, centre-hole jack 7 and porous tool anchor 8 from the bottom to top, when tensioning, control stress for prestressing is taken as No more than the strength standard value of 0.70 times of steel strand wires.
Preferably, in above-mentioned recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure, further include The relief arrangement of off-load is carried out for the steel strand wires 111 to working cable, the relief arrangement includes off-load bracket 10, punching thousand Jin top 7 and porous tool anchor 8, the off-load bracket 10 are set between porous tension ground tackle and centre-hole jack 7.
In the present embodiment, emphasis refering to fig. 10, the centre-hole jack 7 in the tensioning equipment and relief arrangement, knot are asked Structure is identical.Centre-hole jack 7 and high-pressure oil pump are used cooperatively, and power is provided by the high pressure oil of high-pressure oil pump.Punching There is a punching duct along axis inside jack 7, the steel strand wires 121 of steel strand wires 111 and tool rope for working cable are worn It crosses.There are two hydraulic cylinders, i.e. inner casing 71 and outer shell 72 for centre-hole jack 7.Since centre-hole jack 7 is skill commonly used in the art Art means, therefore specific structure is herein without repeating.
In the present embodiment, emphasis refering to fig. 11, the tensioning equipment and the porous tool anchor structure phase in relief arrangement are asked Together, the porous tool anchor includes tool anchor slab 81 and several third intermediate plate groups 82, is correspondingly provided on the tool anchor slab 81 For the third bellmouth that the steel strand wires 121 of working cable 110 and tool rope 120 pass through, in the third bellmouth of corresponding working cable 110 Equipped with the third intermediate plate group 82, each third intermediate plate group 82 includes at least two pieces of third intermediate plates, at least two pieces of third folders Piece is set around the outside of the steel strand wires 111 of corresponding working cable, and the surface that the third intermediate plate is in contact with steel strand wires is equipped with saw Tooth.
Please continue to refer to Fig. 1 to Figure 11, the invention also discloses recyclable group's beam post-tensioning soap-free emulsion polymeizations as described above to answer in advance The construction method of power drill-pouring supporting pile structure, comprising:
Prestressing force group's tread assembly, the prestressing force group beam 1 are formed to prestressing force group beam 1 and the assembling of porous fixing end anchorage 2 Lower end be installed in the porous fixing end anchorage 2, each prestressing force group beam 1 includes several for drill-pouring fender post The prestressed working cable 110 of 11 applications and the tool rope 120 for disanchoring to working cable 110, the working cable 110 enclose Around 120 outside of tool rope is set to, the tool rope 120 and the working cable 110 are linear type prestressing without bondn Muscle, the unbonded prestressing tendon include steel strand wires and the protecting pipe that is sheathed on the outside of steel strand wires, the porous fixing end anchor The steel strand wires 111 that tool 2 can anchor but also disanchor working cable;
Several prestressing force group tread assemblies are installed on steel reinforcement cage;
It will be equipped in the reinforcing bar cage hoisting to the stake holes for excavating completion of several prestressing force group tread assemblies;
It pours stake holes concrete and forms drill-pouring fender post 11;
After collar tie beam 12 reaches design strength, collar tie beam 12 is poured above drill-pouring fender post 11;
After collar tie beam 12 reaches design strength, anchor pad is successively installed in that one end that prestressing force group beam 1 stretches out 12 top surface of collar tie beam Plate 5 and porous stretching end anchorage 6;
The steel strand wires 111 of working cable in stretch-draw prestressing force group beam 1;
Underground structure 14 is carried out to construct,
After the completion of underground structure 14 is constructed, off-load is carried out to the steel strand wires 111 of working cable;
The steel strand wires 121 of recycling tool rope, so that the steel strand wires 111 of working cable are disanchored;
Using manpower or the steel strand wires 111 of admission machine recovery operation rope after disanchoring.
The construction method of recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure provided by the invention is led to It crosses and several prestressing force group tread assemblies is installed on steel reinforcement cage, by the reinforcing bar cage hoisting for being equipped with several prestressing force group tread assemblies to opening It digs in the stake holes completed, pours stake holes concrete and form drill-pouring fender post, pour collar tie beam above drill-pouring fender post 12, after collar tie beam 12 reaches design strength, prestressing force group beam 1 stretch out 12 top surface of collar tie beam that one end successively install anchor plate 5 with And porous stretching end anchorage 6, the steel strand wires 111 of working cable in stretch-draw prestressing force group beam 1 carry out underground structure 14 and construct, underground After the completion of structure 14 is constructed, off-load is carried out to the steel strand wires 111 of working cable, the steel strand wires 121 of tool rope are recycled, so that working cable Steel strand wires 111 disanchor, using the steel strand wires 111 of manpower or admission machine recovery operation rope after disanchoring, so as in underground The construction stage of structure 14 is improved the crack resistance of fender post 11 using the prestressing force of the steel strand wires 111 of working cable, reduces and go along with sb. to guard him The regular reinforcement dosage of stake 11, alleviates framework of steel reinforcement (i.e. steel reinforcement cage) weight of fender post 11, and can be in underground structure After the completion of 14 constructions, the easy recycling of the steel strand wires of implementation tool rope 120 and working cable 110, and steel strand wires are not in removal process It will receive damage, can repeatedly use, reduce construction cost.
Preferably, in above-mentioned recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure, when recycling, First apply pulling capacity with the steel strand wires 121 of preceding cassette punching jack pair tool rope, the steel strand wires 121 of tool rope is pulled away porous Fixing end anchorage 2, the appearance when the steel strand wires 121 of the tool rope are pulled away interior anchor block 22, between interior anchor block 22 and outer anchor block The space for setting first clamping piece group 23 becomes larger, so that first clamping piece group 23 loosens the bite force realization to the steel strand wires 111 of working cable It disanchors, so as to subsequent recycling and reusing, the steel of working cable is twisted to be realized while recycling steel strand wires 121 of tool rope Line 111 is disanchored;Using manpower or the steel strand wires 111 of admission machine recovery operation rope after disanchoring.Further, since tool rope 120 It is linear type with the working cable 110, therefore, recycling resistance is smaller, and the easy recycling of steel strand wires may be implemented.
Embodiment two
Please refer to Figure 12, and in combination with Fig. 1 to Figure 11, the difference between this embodiment and the first embodiment lies in: above-mentioned can It recycles in group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure, further includes bearing plate 17, spiral bar 18, several screw rods 19 and several nuts 20, the through-hole passed through for working cable 110, tool rope 120 and screw rod 19 is opened up on the bearing plate 17, The bearing plate 17 is arranged at intervals at the top of the porous fixing end anchorage 2 by the screw rod 19 and nut 20, described Spiral bar 18 is between the bearing plate 17 and porous fixing end anchorage 2.The screw rod 19 can play power transmission and connection Effect, spiral bar 18 plays the role of increasing bearing capacity, using structure as above, steel strand wires 111 of the bearing plate 17 in working cable I.e. after tension of prestressed tendon, the buffer brake that presstressed reinforcing steel generates is dispersed, prevents from locally holding because of 11 concrete of fender post Pressure scarce capacity leads to fastening invalidation.
In conclusion recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure provided by the invention and side Method is configured with prestressing force group's beam, improves the crack resistance of stake on the basis of ordinary reinforced concrete drill-pouring fender post, Reduce regular reinforcement dosage, alleviates framework of steel reinforcement (i.e. steel reinforcement cage) weight.Prestressing force group's beam includes several for drilling Perfusion fender post applies prestressed working cable and the tool rope for disanchoring to working cable, and the working cable is surrounded and set It is placed on the outside of the tool rope, the tool rope and the working cable are linear type unbonded prestressing tendon, the soap-free emulsion polymeization Presstressed reinforcing steel includes steel strand wires and the protecting pipe that is sheathed on the outside of steel strand wires, and the lower end installation one of prestressing force group's beam can anchor Can disanchor the anchor of presstressed reinforcing steel again, so as to realize prestressing force group's beam steel strand wires easy recycling, and recycled Steel strand wires are not damaged in journey, can be repeatedly used, and construction cost is reduced.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, the modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Range.

Claims (10)

1. a kind of recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure, which is characterized in that including steel reinforcement cage And it is set to prestressing force group's tread assembly on steel reinforcement cage, collar tie beam is arranged in the upper end of steel reinforcement cage, and prestressing force group tread assembly by answering in advance Power group beam assembles to be formed with porous fixing end anchorage, and the top surface of collar tie beam, the prestressing force are stretched out in the upper end of the prestressing force group beam The lower end of group's beam is installed in the porous fixing end anchorage, and each prestressing force group beam includes several for going along with sb. to guard him to drill-pouring Stake applies prestressed working cable and the tool rope for disanchoring to working cable, and the working cable is compassingly set at described On the outside of tool rope, the tool rope and the working cable are linear type unbonded prestressing tendon, the unbonded prestressing tendon Including steel strand wires and the protecting pipe being sheathed on the outside of steel strand wires, porous fixing end anchorage can be anchored but also disanchor working cable Steel strand wires.
2. recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure, feature exist as described in claim 1 Be in the quantity of, the prestressing force group beam it is multiple, be uniformly arranged on the steel reinforcement cage, the steel reinforcement cage by spiral hoop with it is several Nonprestressed reinforcement connection composition, multiple prestressing force group beams are uniformly arranged on the surrounding of the spiral hoop.
3. recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure, feature exist as described in claim 1 In, the porous fixing end anchorage include outer anchor ring, interior anchor block, first clamping piece group, pressure-bearing end plate and seal bootr, it is described to hold The through-hole passed through for the steel strand wires of working cable and tool rope is correspondingly provided on pressure side plate, the outer anchor ring is set to the compression end The lower surface of plate, the interior anchor block are set to the inside of the outer anchor ring, each interior anchor block around the steel strand wires of the tool rope One is formed between outer anchor ring for accommodating the space of first clamping piece group, the lower end of the steel strand wires of the working cable successively drawing-in Steel bushing pipe connector, pressure-bearing end plate correspondence through-hole and interior anchor block and outer anchor ring between for accommodating the sky of first clamping piece group Between, the first clamping piece group includes that at least two panels first clamping piece, at least two panels first clamping piece is set around corresponding steel strand wires It sets, the first clamping piece group does compression processing in the space for accommodating first clamping piece group, and the seal bootr is set to described The downside of pressure-bearing end plate, the outer anchor ring, interior anchor block, first clamping piece group and group's prestressing tendon lower end be located at the seal bootr It is interior, grease is injected in the seal bootr, it is described for accommodating the first folder when interior anchor block is located at the outside of the steel strand wires of tool rope The space of piece group is the first bellmouth up and down;When the steel strand wires of the tool rope are pulled away interior anchor block, interior anchor block with The space of accommodating first clamping piece group between outer anchor block becomes larger, so that first clamping piece group loosens the occlusion to the steel strand wires of working cable Power realization is disanchored.
4. recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure, feature exist as claimed in claim 3 In the upper surface of the pressure-bearing end plate corresponds to each through-hole and is fixed with steel pipe socket connector, the unbonded prestressing tendon Protecting pipe penetrates in corresponding steel bushing pipe connector, using hydraulic device by the protecting pipe of unbonded prestressing tendon and corresponding steel Casing connection head is connected.
5. recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure, feature exist as described in claim 1 In, prestressing force group's beam stretch out collar tie beam top surface that one end anchor plate and porous stretching end anchorage, the anchor pad are successively installed Plate is set to the top surface of collar tie beam, and the porous stretching end anchorage includes tensioning anchor slab and several second intermediate plate groups, the tensioning Anchor slab is set to the upside of anchor plate, and passed through for the steel strand wires of working cable and tool rope is correspondingly provided on the tensioning anchor slab Two bellmouths correspond to and are equipped with the second intermediate plate group in the second bellmouth of working cable, and each second intermediate plate group includes at least two Block second intermediate plate, at least two pieces of second intermediate plates are set around the outside of the steel strand wires of tool rope, and the second intermediate plate and steel The surface that twisted wire is in contact is equipped with sawtooth, and second intermediate plate loosens steel strand wires, second intermediate plate phase when being displaced outwardly with respect to tensioning anchor slab Tight steel strand wires are stung when moving inward to tensioning anchor slab.
6. recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure, feature exist as claimed in claim 5 In further including the tensioning equipment for the steel strand wires of tensioning working cable, the tensioning equipment includes setting gradually from the bottom to top Limit plate, centre-hole jack and porous tool anchor, the surrounding of the limit plate have the support portion of evagination, the limit plate It is set on porous tension ground tackle by the support portion, so that being equipped with gap between the limit plate and porous tension ground tackle.
7. recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure, feature exist as claimed in claim 5 In, further include for working cable steel strand wires carry out off-load relief arrangement, the relief arrangement includes off-load bracket, punching Formula jack and porous tool anchor, the off-load bracket are set between porous tension ground tackle and centre-hole jack.
8. recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure, feature exist as described in claim 1 In the lower part of the steel reinforcement cage is provided with the positioning bracket for being used to support the porous fixing end anchorage.
9. recyclable group's beam post-tensioning prestressing without bondn drill-pouring fender post knot as described in any one of claim 1-8 Structure, which is characterized in that further include bearing plate, spiral bar, several screw rods and several nuts, opened up on the bearing plate for work The through-hole that rope, tool rope and screw rod pass through, the bearing plate are arranged at intervals at described porous by the screw rod and nut The top of fixing end anchorage, the spiral bar is between the bearing plate and porous fixing end anchorage.
10. a kind of group's beam post-tensioning prestressing without bondn drill-pouring recyclable as in one of claimed in any of claims 1 to 9 encloses The construction method of fender pile structure characterized by comprising
Prestressing force group beam and porous fixing end anchorage are assembled to form prestressing force group's tread assembly, the lower end peace of the prestressing force group beam Loaded in the porous fixing end anchorage, each prestressing force group beam includes several for applying prestressing force to drill-pouring fender post Working cable and tool rope for disanchoring to working cable, the working cable be compassingly set on the outside of the tool rope, The tool rope and the working cable are linear type unbonded prestressing tendon, the unbonded prestressing tendon include steel strand wires with And it is sheathed on the protecting pipe on the outside of steel strand wires, the porous fixing end anchorage can anchor but also disanchor the steel strand wires of working cable;
Several prestressing force group tread assemblies are installed on steel reinforcement cage;
It will be equipped in the reinforcing bar cage hoisting to the stake holes for excavating completion of several prestressing force group tread assemblies;
It pours stake holes concrete and forms drill-pouring fender post;
After collar tie beam reaches design strength, collar tie beam is poured above drill-pouring fender post;
After collar tie beam reaches design strength, anchor plate and porous is successively installed in that one end that prestressing force group's beam stretches out collar tie beam top surface Stretching end anchorage;
The steel strand wires of working cable in stretch-draw prestressing force group's beam;
Underground Construction is carried out,
After the completion of Underground Construction, off-load is carried out to the steel strand wires of working cable;
The steel strand wires of recycling tool rope, so that the steel strand wires of working cable are disanchored;
Using manpower or the steel strand wires of admission machine recovery operation rope after disanchoring.
CN201810568767.2A 2018-06-05 2018-06-05 Recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure and method Pending CN109024570A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810568767.2A CN109024570A (en) 2018-06-05 2018-06-05 Recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810568767.2A CN109024570A (en) 2018-06-05 2018-06-05 Recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure and method

Publications (1)

Publication Number Publication Date
CN109024570A true CN109024570A (en) 2018-12-18

Family

ID=64612052

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810568767.2A Pending CN109024570A (en) 2018-06-05 2018-06-05 Recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure and method

Country Status (1)

Country Link
CN (1) CN109024570A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109706922A (en) * 2019-02-25 2019-05-03 浙江中桥预应力设备有限公司 Using the steel reinforcement cage of Recyclable anchor rope, foundation pit enclosure stake and construction method
CN110578325A (en) * 2019-08-27 2019-12-17 上海建工集团股份有限公司 Recoverable prestress drilling and pouring fender post and construction method thereof
CN113585289A (en) * 2021-09-18 2021-11-02 中冶建工集团有限公司 Support method for collapse soil deep foundation pit
CN113863291A (en) * 2021-10-21 2021-12-31 中建三局集团有限公司 Novel construction method of unbonded prestressed poured uplift pile

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080008539A1 (en) * 2006-07-05 2008-01-10 Con-Tech Systems Ltd. Void form for constructing post-tensioned foundation piles
CN103174134A (en) * 2013-04-01 2013-06-26 中铁隧道勘测设计院有限公司 Prestressed concrete pile with recoverable steel strands and construction method
CN203729298U (en) * 2014-02-18 2014-07-23 钟景尧 Recyclable prestressed anchor rod
CN204703157U (en) * 2015-05-19 2015-10-14 昆明理工大学 The supporting pile structure of the recoverable prestress anchorage cable that a kind of linear pattern is arranged
CN107034894A (en) * 2017-03-21 2017-08-11 杭州钜力锚杆科技有限公司 Post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile and preparation method thereof and construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080008539A1 (en) * 2006-07-05 2008-01-10 Con-Tech Systems Ltd. Void form for constructing post-tensioned foundation piles
CN103174134A (en) * 2013-04-01 2013-06-26 中铁隧道勘测设计院有限公司 Prestressed concrete pile with recoverable steel strands and construction method
CN203729298U (en) * 2014-02-18 2014-07-23 钟景尧 Recyclable prestressed anchor rod
CN204703157U (en) * 2015-05-19 2015-10-14 昆明理工大学 The supporting pile structure of the recoverable prestress anchorage cable that a kind of linear pattern is arranged
CN107034894A (en) * 2017-03-21 2017-08-11 杭州钜力锚杆科技有限公司 Post-tensioned prestressed tension beam recoverable pattern foundation pit supporting structure prefabricated pile and preparation method thereof and construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109706922A (en) * 2019-02-25 2019-05-03 浙江中桥预应力设备有限公司 Using the steel reinforcement cage of Recyclable anchor rope, foundation pit enclosure stake and construction method
CN110578325A (en) * 2019-08-27 2019-12-17 上海建工集团股份有限公司 Recoverable prestress drilling and pouring fender post and construction method thereof
CN110578325B (en) * 2019-08-27 2022-03-18 上海建工集团股份有限公司 Recoverable prestress drilling and pouring fender post and construction method thereof
CN113585289A (en) * 2021-09-18 2021-11-02 中冶建工集团有限公司 Support method for collapse soil deep foundation pit
CN113863291A (en) * 2021-10-21 2021-12-31 中建三局集团有限公司 Novel construction method of unbonded prestressed poured uplift pile
CN113863291B (en) * 2021-10-21 2023-03-03 中建三局集团有限公司 Construction method of unbonded prestressed poured uplift pile

Similar Documents

Publication Publication Date Title
CN109024570A (en) Recyclable group's beam post-tensioning prestressing without bondn drill-pouring supporting pile structure and method
CN108708368B (en) Multistage anchoring prestress muscle continuous underground wall structure and its construction method
TR201808886T4 (en) Prestressed diaphragm wall and a method of realizing such a wall.
CN109853362A (en) A kind of interim prestress anchoraging prefabricated bent cap of segmentation and interim method for applying prestressing force
CN208586817U (en) A kind of external prestressing strengthening concrete frame beam structure
CN109778841B (en) Recyclable prestressed reinforcement cast-in-place pile for foundation pit enclosure and construction method thereof
CN103174134B (en) Prestressed concrete pile with recoverable steel strands and construction method
CN108589698A (en) Recyclable group's beam post-tensioning prestressing without bondn diaphram wall and construction method
CN212200490U (en) Anti-overturning large-rigidity pile integrated component
US4171176A (en) Flexible bar reinforced concrete pile and method of construction
JP2018193709A (en) Concrete structure applying continuous fiber reinforcing material and concrete member joining method
JP6564921B1 (en) Reinforcement method and reinforcement structure of hinge part in hinge girder bridge with PC
KR100792660B1 (en) Suspension Bridge Construction Method using a Composite Cables
CN216884551U (en) High-strength built-in post-tensioned reinforced concrete pole
CN216949735U (en) Self-adaptive anti-seismic combined column
CN205636777U (en) Basis is consolidated to assembled cement pole protection mound stock
CN204940273U (en) A kind of Prestressed anchor rope with pressure dispersing construction equipment
CN201024419Y (en) Partial adhesion prestressed anti-pulling anti-floating pile stranded wire cage
CN101029488A (en) Partial adhered prestressed pile against drawing and floating and its construction
CN210066763U (en) Foundation pit side wall structure reinforcing and supporting device
CN209040104U (en) Multistage anchor in a kind of presstressed reinforcing steel body
CN108797583B (en) Anti-seismic prestressed anchor cable and construction method thereof
CN203160233U (en) Prestressed concrete pile equipped with recoverable steel strands
CN205604581U (en) Large -span shaped steel prestressed concrete combination beam
CN219862914U (en) Full prefabricated quick assembled tower crane foundation structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200324

Address after: 200120 Pudong New Area, Shanghai, China (Shanghai) free trade pilot area 33 Fukuyama Road

Applicant after: SHANGHAI CONSTRUCTION GROUP Co.,Ltd.

Applicant after: SHANGHAI CONSTRUCTION EQUIPMENT ENGINEERING Co.,Ltd.

Address before: 200120 Pudong New Area, Shanghai, China (Shanghai) free trade pilot area 33 Fukuyama Road

Applicant before: SHANGHAI CONSTRUCTION GROUP Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181218