CN108802802A - A kind of mineral resources regional area qualitative method - Google Patents

A kind of mineral resources regional area qualitative method Download PDF

Info

Publication number
CN108802802A
CN108802802A CN201810373672.5A CN201810373672A CN108802802A CN 108802802 A CN108802802 A CN 108802802A CN 201810373672 A CN201810373672 A CN 201810373672A CN 108802802 A CN108802802 A CN 108802802A
Authority
CN
China
Prior art keywords
qualitative
ore
explosion
workbench
mineral resources
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810373672.5A
Other languages
Chinese (zh)
Other versions
CN108802802B (en
Inventor
吴传兴
周培琪
谢有旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN JINDONG MINING Co Ltd
Original Assignee
FUJIAN JINDONG MINING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN JINDONG MINING Co Ltd filed Critical FUJIAN JINDONG MINING Co Ltd
Priority to CN201810373672.5A priority Critical patent/CN108802802B/en
Publication of CN108802802A publication Critical patent/CN108802802A/en
Application granted granted Critical
Publication of CN108802802B publication Critical patent/CN108802802B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting

Landscapes

  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Acoustics & Sound (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Geophysics (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention discloses a kind of mineral resources regional area qualitative methods, including design drilling, set up workbench, region explosion and final qualitative technique, this method can quickly carry out the resource location in mineral products region qualitative, the qualitative ore of map for drawing rock mass provides a great convenience to carry out exploitation production for mining area.

Description

A kind of mineral resources regional area qualitative method
Technical field
The present invention relates to specifically a kind of mineral resources regional area qualitative methods.
Background technology
In regional mineral resources and mining area mineral resource assessment, the geologic data used belongs to continuously quantify geology Variable.But the range of the not stringent quantity variation of many geological phenomenons, also imappropriate quantitative approach, it only indicates geology The qualitativing concept of phenomenon.And this kind of geological phenomenon and mineralization geological process are closely related, are establishing Mineral Resource and geology item When the quantitative model of part relationship, it plays an important role.
The present invention is from the regional area of qualitative ore for providing a kind of mineral resources regional area qualitative method The exploitation of mineral products provides convenient plan.
Invention content
The purpose of the present invention is to provide a kind of mineral resources regional area qualitative methods, to solve in above-mentioned background technology The problem of proposition.
To achieve the above object, the present invention provides the following technical solutions:
A kind of mineral resources regional area qualitative method, including design drill, set up workbench, region explosion and finally determine Property technique, its step are as follows:
1) design drilling:It is explored using early period, basic mining mineral resource planning chart is drawn to area, in qualitative click-through Row drilling to drill out two determining lead cracks in surface rock layer, and determines in planning chart for deep hole filling explosion Wiring diagram;
2) workbench is set up:Using the mining mineral resource planning chart of drafting, workbench is established, workbench is located at two really Below angular bisector between fixed lead crack system, work edge of table set and im-pact location is 90 ° of angle;
3) region explosion:It is drilled out at the distance of 4 to 6 diameters in the hole apart from hole to be blasted first and is not charged with explosive Ancillary relief hole, as a result, forming cutting compensated cavity;Then, continuously the compensation lumen pore that is formed by drilled out is made and is prolonged Hangfire is broken;Later, the residual mass of hole ore accumulation is ejected by the short delay between exploitation deep hole ore group;Therefore, it is formed On the table by the partial cross section of the qualitative ore of bulk of explosion distribution, break height and the digging work of fractured rock The height for making platform is suitable, and the mining for obtaining the ore turns to the ore run after mining second;
4) final qualitative:It is expelled to the Free Surface above blast area using the ore obtained in blasting process, to profit The deep hole gone out with geophysical method test explosion, explores the natural block structure of rock mass, draws the qualitative ore of map of rock mass.
Compared with prior art, the beneficial effects of the invention are as follows:This method can be quickly to the resource-niche in mineral products region It is qualitative to set progress, draws the qualitative ore of map of rock mass, is provided a great convenience to carry out exploitation production for mining area.
Specific implementation mode
The technical scheme in the embodiments of the invention will be clearly and completely described below, it is clear that described implementation Example is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common The every other embodiment that technical staff is obtained without making creative work belongs to the model that the present invention protects It encloses.
In the embodiment of the present invention, a kind of mineral resources regional area qualitative method, including design drilling, set up workbench, Region explosion and final qualitative technique, its step are as follows:
1) design drilling:It is explored using early period, basic mining mineral resource planning chart is drawn to area, in qualitative click-through Row drilling to drill out two determining lead cracks in surface rock layer, and determines in planning chart for deep hole filling explosion Wiring diagram;
2) workbench is set up:Using the mining mineral resource planning chart of drafting, workbench is established, workbench is located at two really Below angular bisector between fixed lead crack system, work edge of table set and im-pact location is 90 ° of angle;
3) region explosion:It is drilled out at the distance of 4 to 6 diameters in the hole apart from hole to be blasted first and is not charged with explosive Ancillary relief hole, as a result, forming cutting compensated cavity;Then, continuously the compensation lumen pore that is formed by drilled out is made and is prolonged Hangfire is broken;Later, the residual mass of hole ore accumulation is ejected by the short delay between exploitation deep hole ore group;Therefore, it is formed On the table by the partial cross section of the qualitative ore of bulk of explosion distribution, break height and the digging work of fractured rock The height for making platform is suitable, and the mining for obtaining the ore turns to the ore run after mining second;
4) final qualitative:It is expelled to the Free Surface above blast area using the ore obtained in blasting process, to profit The deep hole gone out with geophysical method test explosion, explores the natural block structure of rock mass, draws the qualitative ore of map of rock mass.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Profit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent requirements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiment being appreciated that.

Claims (2)

1. a kind of mineral resources regional area qualitative method, which is characterized in that quick-fried including design drilling, erection workbench, region Broken and final qualitative technique, its step are as follows:1) design drilling:It is explored using early period, basic mineral resources is drawn to area Production program figure drills in qualitative point, to drill out two determining lead cracks in surface rock layer, and in planning chart really Surely it is used for the wiring diagram of deep hole filling explosion;2) workbench is set up:Using the mining mineral resource planning chart of drafting, work is established Platform, workbench are located at below the angular bisector between two determining lead crack systems;3) region explosion:It is waited for first in distance quick-fried The ancillary relief hole for being not charged with explosive is drilled out at the distance of 4 to 6 diameters in the hole of holes, as a result, forming cutting compensation Chamber;Then, delay-action blasting continuously is made to the compensation lumen pore that is formed by drilled out;Later, by between exploitation deep hole ore group Short delay eject hole ore accumulation residual mass;Therefore, it forms on the table not by the bulk of explosion distribution The break height of the partial cross section of qualitative ore, fractured rock is suitable with the height of mining work platform, and obtains the ore It digs up mine and turns to the ore run after mining second;4) final qualitative:It is expelled to explosion using the ore obtained in blasting process Free Surface above area explores the natural block structure of rock mass to the deep hole gone out using geophysical method test explosion, Draw the qualitative ore of map of rock mass.
2. a kind of mineral resources regional area qualitative method according to claim 1, which is characterized in that the workbench Edge is set with im-pact location as 90 ° of angle.
CN201810373672.5A 2018-04-24 2018-04-24 method for qualitative determination of local area of mineral resource Active CN108802802B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810373672.5A CN108802802B (en) 2018-04-24 2018-04-24 method for qualitative determination of local area of mineral resource

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810373672.5A CN108802802B (en) 2018-04-24 2018-04-24 method for qualitative determination of local area of mineral resource

Publications (2)

Publication Number Publication Date
CN108802802A true CN108802802A (en) 2018-11-13
CN108802802B CN108802802B (en) 2019-12-17

Family

ID=64093087

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810373672.5A Active CN108802802B (en) 2018-04-24 2018-04-24 method for qualitative determination of local area of mineral resource

Country Status (1)

Country Link
CN (1) CN108802802B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102279410A (en) * 2011-06-21 2011-12-14 北京蓝尊科技有限公司 Real-time monitoring system and method for underground mining activities of mine
CN102607341A (en) * 2012-02-27 2012-07-25 薛世忠 Stable-control blasting method for open-pit mine slopes
WO2014179832A1 (en) * 2013-05-08 2014-11-13 Technological Resources Pty Ltd A method of, and a system for, controlling a drilling operation
CN106679522A (en) * 2017-03-21 2017-05-17 葛洲坝易普力新疆***工程有限公司 High-efficiency bench blasting method for interbedded rock mass

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102279410A (en) * 2011-06-21 2011-12-14 北京蓝尊科技有限公司 Real-time monitoring system and method for underground mining activities of mine
CN102607341A (en) * 2012-02-27 2012-07-25 薛世忠 Stable-control blasting method for open-pit mine slopes
WO2014179832A1 (en) * 2013-05-08 2014-11-13 Technological Resources Pty Ltd A method of, and a system for, controlling a drilling operation
CN106679522A (en) * 2017-03-21 2017-05-17 葛洲坝易普力新疆***工程有限公司 High-efficiency bench blasting method for interbedded rock mass

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李启军 等: ""乌努格吐山铜钼矿冻土层***研究"", 《中国有色金属》 *

Also Published As

Publication number Publication date
CN108802802B (en) 2019-12-17

Similar Documents

Publication Publication Date Title
US10301939B2 (en) Method for designing supporting parameters of transition support for mixed mining face of filling and fully-mechanized mining
CN103498680B (en) Improve the method for fully mechanized coal face period of beginning mining top-coal recovery rate
CN104596371A (en) Digitized surface blasting operation method
CN104913696A (en) Side slope excavation smooth-surface blasting-method construction method
CN103114855A (en) Jamb recovery and cushion layer formation integrated technology in process of mining from outdoors into underground
CN105484738B (en) Method for simulating the flow conductivity in shale gas reservoir crack
CN107366530A (en) A kind of deep layer shale gas reservoir method for increasing and its application
CN104240133A (en) Acceptance inspection method of mine goaf caving and blasting treatment effect in conversion from underground mining to opencast mining
Zuo et al. A study of fractal deep‐hole blasting and its induced stress behavior of hard roof strata in Bayangaole Coal Mine, China
CN104296609A (en) Different-hardness-degree rock stratum blasting control method used in deep-hole bench blasting
Chistyakov et al. Investigation of the geomechanical processes while mining thick ore deposits by room systems with backfill of worked-out area
CN108802802A (en) A kind of mineral resources regional area qualitative method
WO2023221327A1 (en) Method and system for determining hydraulic fracturing roof-cutting pressure relief time of dynamic pressure tunnel
CN104481538B (en) Method for treating interlayer in steeply inclined multi-layer ore body of non-coal mine
CN105910514A (en) Pre-punching subsection differential once blasting well completion method
Nan et al. Migration law of different top coal thicknesses in top coal caving
Duan et al. Prevention Technology for Strong Mine Pressure Disaster in the Hard‐Roof Large‐Mining‐Height Working Face
CN113338931A (en) Method for controlling strong mine pressure of stope by ground pre-splitting high-position inclined coal pillar structure
RU2475698C2 (en) Method of blasting of rock mass
Lv et al. Empty-hole effect on fracture propagation under blasting load
Cao et al. Evolution law of mining-induced fractures in shallow buried close coal seams mining
Chen et al. In-situ fracturing induced caving of a hard orebody and its Application
CN109162690A (en) A kind of drilling machine intelligence control system
CN110552700A (en) top plate deep surrounding rock pressure relief method and system based on carbon dioxide blasting
CN111396053A (en) Actual measurement method for shallow coal seam roof inclination fracture angle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant