CN107620608A CN201710889798.3A CN201710889798A CN107620608A CN 107620608 A CN107620608 A CN 107620608A CN 201710889798 A CN201710889798 A CN 201710889798A CN 107620608 A CN107620608 A CN 107620608A
Authority
CN
China
Prior art keywords
retrofilling
mine
tunnel
space
mining area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710889798.3A
Other languages
Chinese (zh)
Other versions
CN107620608B (en
Inventor
齐宝军
杨景华
魏宇
马超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shougang Group Co Ltd
Original Assignee
Shougang Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shougang Group Co Ltd filed Critical Shougang Group Co Ltd
Priority to CN201710889798.3A priority Critical patent/CN107620608B/en
Publication of CN107620608A publication Critical patent/CN107620608A/en
Application granted granted Critical
Publication of CN107620608B publication Critical patent/CN107620608B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of ground retrofilling mine arrangement of mining area device and method, belong to mining technique field.Described ground retrofilling mine arrangement of mining area device includes:Some space mechanisms are arranged in the exploiting field of mine;Rolling mechanism is arranged among accommodation space;First tunnel is arranged in accommodation space;Detour and be arranged in accommodation space, the first end that detours connects with the first tunnel, detours and is arranged at rolling mechanism;Second tunnel is arranged in accommodation space, and the second tunnel connects with the second end detoured.Ground of the invention retrofilling mine arrangement of mining area device and method improves ore recovery rate to greatest extent on the premise of drop shaft safety and stability is ensured.

Description

A kind of ground retrofilling mine arrangement of mining area device and method
Technical field
The present invention relates to mining technique field, more particularly to a kind of ground retrofilling mine arrangement of mining area device and method.
Background technology
Ma Chengtiekuang designs mainly use stage rock drilling stage open stope afterwards filling mining methods, and rapid back production, is adopted in two steps Ore deposit stage 60m, haulage stage 180m, haulage level serve three mining stages.Panel, extent length are divided along orebody trend 108m, panel barrier 18m are thick, wear arteries and veins roadway layout among studding, and stope box is arranged in tunnel side, the wide 4.8m in tunnel, Drop shaft diameter 3.5m.But drop shaft of the prior art only has 3m away from studding edge, it is contemplated that drop shaft abrasion is disturbed with stope explosion It is dynamic, the thick safety pillars of 5m need to be separately set up on drop shaft periphery, to ensure drop shaft safety, but after increasing ore pillar, ore deposit certainly will be caused Stone loss and waste, reduce ore recovery rate.
The content of the invention
The present invention provides a kind of ground retrofilling mine arrangement of mining area device and method, solves or part solves existing skill In art drop shaft with Stope safty apart from too small, it is necessary to set up safety pillar to ensure the technical problem of drop shaft safety and stability.
To include in order to solve the above technical problems, the invention provides a kind of ground retrofilling mine arrangement of mining area device:It is described Some space mechanisms 1 are arranged in the mine exploiting field, and the space mechanism includes:First studding and the second studding;Described One studding is fixedly installed in the mine exploiting field;Second studding is fixedly installed in the mine exploiting field, and described first An accommodation space is formed between studding and second studding;The rolling mechanism is arranged among the accommodation space;It is described First tunnel is arranged in the accommodation space;Described detour is arranged in the accommodation space, the first end that detours Connected with first tunnel, described detour is set around the rolling mechanism.
Further, the rolling mechanism includes:Drop shaft, it is arranged among the space mechanism.
Further, the rolling mechanism is not less than 3.5m with described the distance between detour.
Further, present invention ground retrofilling mine arrangement of mining area device also includes:Set between some space mechanisms The first stope and the second stope are equipped with, described detour is arranged on the side of first stope.
Based on identical inventive concept, the present invention, which also provides a kind of ground retrofilling mine arrangement of mining area method, includes following step Suddenly:Some space mechanisms are arranged in the mine exploiting field, the first studding and the space mechanism of the space mechanism An accommodation space is formed between second studding;Rolling mechanism is arranged among the accommodation space;To detour, it is described to be arranged on In accommodation space, described detour is set around the rolling mechanism;It is described accommodating that first tunnel and the second tunnel, which are arranged on, In space;The first end that detours is connected with first tunnel, the second end connects with second tunnel.
Further, the rolling mechanism includes:Drop shaft, it is arranged among the space mechanism.
Further, the rolling mechanism is not less than 3.5m with described the distance between detour.
Further, present invention ground retrofilling mine arrangement of mining area method also includes:Set between some space mechanisms The first stope and the second stope are equipped with, described detour is arranged on the side of first stope.
The one or more technical schemes provided in the embodiment of the present application, have at least the following technical effects or advantages:
Due to some space mechanisms are arranged in the exploiting field of mine, shape between the first studding and the second studding of space mechanism Into an accommodation space, rolling mechanism is arranged among accommodation space, is arranged on detouring in accommodation space, is detoured around rolling Mechanism is set, and it is in accommodation space that the first tunnel and the second tunnel, which are arranged on, and the first end that will detour connects with the first tunnel, the Two ends connect with the second tunnel, by the design method that rolling mechanism is placed in the middle, tunnel occupies side, maximally utilise between reserving Post, cancel the safety pillar of rolling mechanism side, on the premise of drop shaft safety and stability is ensured, improve the ore resource rate of extraction, So efficiently solve in the prior art drop shaft with Stope safty apart from too small, it is necessary to set up safety pillar with ensure drop shaft pacify Stable technical problem entirely.
Brief description of the drawings
Fig. 1 is the structural representation of ground provided in an embodiment of the present invention retrofilling mine arrangement of mining area device.
Embodiment
Referring to Fig. 1, a kind of ground retrofilling mine provided in an embodiment of the present invention arrangement of mining area device includes:Some interval machines Structure 1, rolling mechanism 2, the first tunnel 4, detour 3 and second tunnel 5.
Some space mechanisms 1 are arranged in the mine exploiting field, and the space mechanism includes:First studding 1-1 and Second studding 1-2;The first studding 1-1 is fixedly installed in the mine exploiting field;The second studding 1-2 is fixedly installed on In the mine exploiting field, an accommodation space is formed between the first studding 1-1 and the second studding 1-2.
The rolling mechanism 2 is arranged among the accommodation space.
First tunnel 4 is arranged in the accommodation space.
Described detour 3 is arranged in the accommodation space, and 3 first ends that detour connect with first tunnel 4, described Detour and 3 set around the rolling mechanism 2.
Second tunnel 5 is arranged in the accommodation space, second tunnel 5 with it is described detour 3 the second end connect It is logical.
The application embodiment due to some space mechanisms are arranged in the exploiting field of mine, space mechanism first between An accommodation space is formed between post and the second studding of space mechanism, rolling mechanism is arranged among accommodation space, will be detoured It is arranged in accommodation space, detours and set around rolling mechanism, the first tunnel and the second tunnel, which are arranged on, is in accommodation space, The first end that will detour connects with the first tunnel, and the second end connects with the second tunnel, by the way that rolling mechanism is placed in the middle, tunnel occupies setting for side Meter mode, maximally utilise reserved studding, cancel the safety pillar of rolling mechanism side, ensure drop shaft safety and stability Under the premise of, the ore resource rate of extraction is improved, so, efficiently solving drop shaft and Stope safty in the prior art, must apart from too small Safety pillar must be set up to ensure the technical problem of drop shaft safety and stability.
The structure of rolling mechanism is discussed in detail.
The rolling mechanism includes:Drop shaft 2-1.
The drop shaft 2-1 is fixedly installed among the accommodation space.
The rolling mechanism 2 the distance between 3 be not less than 3.5m with described detour, in the premise for meeting scraper and running Under, the length to detour can be reduced as far as possible.
Ground of the invention retrofilling mine arrangement of mining area device also includes:First stope 6 and the second stope 7.
The first stope 6 and the second stope 7 are provided between some space mechanisms 1.First stope 6 is second-order Section stope, second stope 7 is first stage stope.3 sides for being arranged on first stope 6 of detouring, avoid institute State the bursting work of the second stope 7 to it is described detour 3 disturbing influence, to greatest extent ensure wear arteries and veins tunnel safety.
Based on identical inventive concept, the present invention also provides a kind of ground retrofilling mine arrangement of mining area method following steps:
Step 1, some space mechanisms 1 are arranged in the mine exploiting field, the first studding 1-1 of the space mechanism with An accommodation space is formed between second studding 1-2 of the space mechanism.
Step 2, rolling mechanism 2 is arranged among the accommodation space.
Step 3, it will detour and 3 be arranged in the accommodation space, described detour 3 is set around the rolling mechanism 2.
Step 4, it is in the accommodation space the first tunnel 4 and the second tunnel 5 to be arranged on.
Step 5,3 first ends that detour are connected with first tunnel 4, the second end connects with second tunnel 5.
The structure of rolling mechanism is discussed in detail.
The rolling mechanism includes:Drop shaft 2-1.
The drop shaft 2-1 is fixedly installed among the space mechanism 1.
The rolling mechanism 2 the distance between 3 be not less than 3.5m with described detour, in the premise for meeting scraper and running Under, the length to detour can be reduced as far as possible.
Ground of the invention retrofilling mine arrangement of mining area device also includes:First stope 6 and the second stope 7.
The first stope 6 and the second stope 7 are provided between some space mechanisms 1.First stope 6 is second-order Section stope, second stope 7 is first stage stope.3 sides for being arranged on first stope 6 of detouring, avoid institute State the bursting work of the second stope 7 to it is described detour 3 disturbing influence, to greatest extent ensure wear arteries and veins tunnel safety.
In order to become apparent from the embodiment of the present invention, introduced below from the application method of the embodiment of the present invention.
Ma Chengtiekuang each digs up mine the stage length of service 5 years, and haulage level and drop shaft system service are in corresponding mining Stage, the length of service 15 years, and Chuan Mai tunnels are only served in panel corresponding in the mining stage, the length of service is much smaller than drop shaft The length of service.
According to drop shaft and the difference of tunnel seeervice cycle, change the space arrangement between drop shaft and Chuan Mai tunnels, will Drop shaft 2-1 is arranged among panel 18m the first studding 1-1 and the second studding 1-2, and drop shaft 2-1 edges are away from the second studding 1-2 edges Safe distance is promoted to 7.25m, and rolling ore amount is ten thousand tons of 300-400 in the drop shaft 2-1 seeervice cycles, according to drop shaft 2-1 diameters The rate of wear calculates less than the t of 8mm/ ten thousand, and drop shaft 2-1 greatest wears amount is 3.2m, and remaining safe distance is 4.05m, it is ensured that is slipped Safety and stability in the well 2-1 seeervice cycles.
After drop shaft 2-1 is arranged in the first studding 1-1 and the second studding 1-2 centres, will detour 3 is arranged in space mechanism 1, Detour and 3 be arranged at drop shaft 2-1, it is in space mechanism 1 that the first tunnel 4 and the second tunnel 5, which are arranged on, and will detour 3 first ends Connected with the first tunnel 4, the second end connects with the second tunnel 5, i.e., Chuan Mai tunnels are arranged in drop shaft 2-1 using detouring by the way of 3 Side, meet scraper operation on the premise of, design detour 3 with drop shaft 2-1 edges minimum range be 3.5m, as far as possible reduction detour 3 length.
Meanwhile the first stope 6 and the second stope 7 are provided between some space mechanisms 1, the first stope 6 is second stage Stope, the second stope 7 are first stage stope, 3 sides for being arranged on the first stope 6 of detouring, avoid the bursting work of the second stope 7 To detour 3 disturbing influence, ensure to wear arteries and veins tunnel safety to greatest extent, drop shaft 2-1 and arteries and veins gateway layout method worn by optimizing, Maximally utilise reserved studding, cancel the safety pillar of drop shaft 2-1 sides, improve the ore resource rate of extraction 0.7%.
It should be noted last that above embodiment is merely illustrative of the technical solution of the present invention and unrestricted, Although the present invention is described in detail with reference to example, it will be understood by those within the art that, can be to the present invention Technical scheme modify or equivalent substitution, without departing from the spirit and scope of technical solution of the present invention, it all should cover Among scope of the presently claimed invention.

Claims (8)

1. a kind of ground retrofilling mine arrangement of mining area device, it is characterised in that including:
Some space mechanisms (1), are arranged in the mine exploiting field, the space mechanism includes:First studding (1-1), set In the mine exploiting field;Second studding (1-2), it is arranged in the mine exploiting field, first studding (1-1) and described the An accommodation space is formed between two studdings (1-2);
Rolling mechanism (2), is arranged among the accommodation space;
First tunnel (4), is arranged in the accommodation space;
Detour (3), be arranged in the accommodation space, (3) first end that detours connects with first tunnel (4), described (3) are detoured around the rolling mechanism (2) setting;
Second tunnel (5), is arranged in the accommodation space, and second tunnel (5) connects with second end for detouring (3) It is logical.
2. ground according to claim 1 retrofilling mine arrangement of mining area device, it is characterised in that rolling mechanism bag Include:
Drop shaft (2-1), it is arranged among the space mechanism (1).
3. ground according to claim 1 retrofilling mine arrangement of mining area device, it is characterised in that:
The rolling mechanism (2) is not less than 3.5m with described detour the distance between (3).
4. ground according to claim 1 retrofilling mine arrangement of mining area device, it is characterised in that described ground retrofilling mine Arrangement of mining area device also includes:
The first stope (6) and the second stope (7) are provided between some space mechanisms (1), detour (3) are arranged on institute State the side of the first stope (6).
5. a kind of ground retrofilling mine arrangement of mining area method, based on the ground retrofilling mine arrangement of mining area dress described in claim 1 Put, it is characterised in that described ground retrofilling mine arrangement of mining area method comprises the following steps:
Some space mechanisms (1) are arranged in the mine exploiting field, the first studding (1-1) of the space mechanism (1) and institute State and an accommodation space is formed between the second studding (1-2) of space mechanism (1), the rolling mechanism (2) is arranged on described accommodating Among space;
Rolling mechanism (2) is arranged among the accommodation space;
To detour (3) be arranged in the accommodation space, it is described detour (3) around the rolling mechanism (2) set;
It is in the accommodation space that first tunnel (4) and the second tunnel (5), which are arranged on,;
(3) first end that detours is connected with first tunnel (4), the second end connects with second tunnel (5).
6. ground according to claim 5 retrofilling mine arrangement of mining area method, it is characterised in that rolling mechanism bag Include:
Drop shaft (2-1), it is arranged among the space mechanism (1).
7. ground according to claim 5 retrofilling mine arrangement of mining area method, it is characterised in that:
The rolling mechanism (2) is not less than 3.5m with described detour the distance between (3).
8. ground according to claim 5 retrofilling mine arrangement of mining area method, it is characterised in that described ground retrofilling mine Arrangement of mining area method also includes:
The first stope (6) and the second stope (7) are provided between some space mechanisms (1), detour (3) are arranged on institute State the side of the first stope (6).
CN201710889798.3A 2017-09-27 2017-09-27 A kind of ground retrofilling mine arrangement of mining area device and method Active CN107620608B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710889798.3A CN107620608B (en) 2017-09-27 2017-09-27 A kind of ground retrofilling mine arrangement of mining area device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710889798.3A CN107620608B (en) 2017-09-27 2017-09-27 A kind of ground retrofilling mine arrangement of mining area device and method

Publications (2)

Publication Number Publication Date
CN107620608A true CN107620608A (en) 2018-01-23
CN107620608B CN107620608B (en) 2019-04-23

Family

ID=61091015

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710889798.3A Active CN107620608B (en) 2017-09-27 2017-09-27 A kind of ground retrofilling mine arrangement of mining area device and method

Country Status (1)

Country Link
CN (1) CN107620608B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109681268A (en) * 2019-01-29 2019-04-26 福州大学 It is a kind of for simulating the laboratory experiment method of Underground Metallic Mines stope filling process

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU646920B2 (en) * 1992-01-29 1994-03-10 Achievement Holdings Pty. Ltd. A tripod
CN101818643A (en) * 2010-05-18 2010-09-01 中南大学 Stepped non-pillar continuous filling mining method for deep well super high large breaking ore body panel
CN103422886A (en) * 2013-08-14 2013-12-04 中国神华能源股份有限公司 Artificial retaining dam for coal mine distributed underground reservoir and damming method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU646920B2 (en) * 1992-01-29 1994-03-10 Achievement Holdings Pty. Ltd. A tripod
CN101818643A (en) * 2010-05-18 2010-09-01 中南大学 Stepped non-pillar continuous filling mining method for deep well super high large breaking ore body panel
CN103422886A (en) * 2013-08-14 2013-12-04 中国神华能源股份有限公司 Artificial retaining dam for coal mine distributed underground reservoir and damming method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李雨波等: "中深孔分段分期充填采矿在大梁矿业的应用", 《采矿技术》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109681268A (en) * 2019-01-29 2019-04-26 福州大学 It is a kind of for simulating the laboratory experiment method of Underground Metallic Mines stope filling process
CN109681268B (en) * 2019-01-29 2020-04-10 福州大学 Indoor experiment method for simulating filling process of metal underground mine stope

Also Published As

Publication number Publication date
CN107620608B (en) 2019-04-23

Similar Documents

Publication Publication Date Title
CN103557002B (en) A kind of mechanized concentrates drop shaft filling-up method
RU2685359C1 (en) Method of constructing network priority gas migration paths, as well as gas discharge and extraction
CN104533416B (en) Pole big thick ore body massive mechanical non-pillar sublevel caving mining methods
US10989051B2 (en) Multi-section non-pillar staggered protected roadway for deep inclined thick coal seam and method for coal pillar filling between sections
CN106761912B (en) It is a kind of be suitable for unstable formation efficiently on to route slicing and filling mining methods
CN103967494B (en) A kind of shallow-hole shrinkage afterwards filling mining methods
CN101956556B (en) Roof and bottom pillar-free stage upward continuous filling and mining method
CN105863641B (en) Medium-thickness gentle-inclination broken ore body chamber column type upward horizontal layered filling mining method
CN102352769A (en) Integrated mining method for commonly mining coal and gas of high mine
CN105240046B (en) Drill hole layout method for gas extraction during primary mining and stoping of large mining height fully-mechanized face
CN103206215B (en) Precontrol top upward access cut-and-filling stopping method
CN106761756B (en) A kind of stope structure for Upward slicing all-tailing cemented filling method
CN1982649A (en) Mining method
CN110984989B (en) Mining method of steeply inclined medium-thickness ore body
CN103104259A (en) Inclination fragmentation ore body segment top board reconstruction middle-deep hole ore break down filling mining method
CN103953344A (en) Downward drift layered cemented filling mining method
CN109915197A (en) A kind of method that rock gangway km directional long borehole substitution middle part bottom pumping rock gangway is taken out at bottom
CN106194188A (en) The quick-fried power of scraper collaborative carrying puppet tilts room and pillar stoping
CN106761750B (en) Slot type recovery method is built in the longwell plane milling of half-edge coal seam longitudinal direction
CN104153807A (en) Method for filling lower slice old working roadway when thick coal seam slicing working face passes through lower slice old working roadway
CN107620608A (en) A kind of ground retrofilling mine arrangement of mining area device and method
CN105240012A (en) F-type section coal-mining method allowing commingled mining of coal pillars
CN207111086U (en) A kind of bottom ore structure of megastage open stope afterwards filling mining method
CN104612692A (en) Following-forming continuous-filling mining method for segmented ore-caving bottom structure
RU2209972C2 (en) Method of mining of jointly occurring steep thin ore bodies in stable and medium-stable rocks

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant