CN107014043A - Hospital laboratory distributed controll centralized monitoring and controlling shows system - Google Patents

Hospital laboratory distributed controll centralized monitoring and controlling shows system Download PDF

Info

Publication number
CN107014043A
CN107014043A CN201710282919.8A CN201710282919A CN107014043A CN 107014043 A CN107014043 A CN 107014043A CN 201710282919 A CN201710282919 A CN 201710282919A CN 107014043 A CN107014043 A CN 107014043A
Authority
CN
China
Prior art keywords
air
laboratory
switch board
controlling
side plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710282919.8A
Other languages
Chinese (zh)
Inventor
郑敦衍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong green Kang Yuen Mei Environmental Technology Co., Ltd.
Original Assignee
Guangdong Lvkang Air Purification Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Lvkang Air Purification Engineering Co Ltd filed Critical Guangdong Lvkang Air Purification Engineering Co Ltd
Priority to CN201710282919.8A priority Critical patent/CN107014043A/en
Publication of CN107014043A publication Critical patent/CN107014043A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/89Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F12/00Use of energy recovery systems in air conditioning, ventilation or screening
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/28Arrangement or mounting of filters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/30Arrangement or mounting of heat-exchangers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/52Indication arrangements, e.g. displays
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/54Control or safety arrangements characterised by user interfaces or communication using one central controller connected to several sub-controllers

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

A kind of hospital laboratory distributed controll centralized monitoring and controlling shows system, including heating ventilation air-conditioning system, air-supply arrangement, multiple-effect fresh air purification device, air exhausting device and multiple-effect emission-control equipment, it is characterised in that:Described HVAC is connected with HVAC switch board, and HVAC switch board shows that system is connected with laboratory observing and controlling;Described air-supply arrangement and multiple-effect fresh air purification device is connected with air-supply fresh air purifying switch board, and HVAC air cleaning switch board shows that system is connected with laboratory observing and controlling;Described air exhausting device and multiple-effect emission-control equipment is connected with energy-conserving and environment-protective air draft switch board, energy-conserving and environment-protective air draft switch board shows that system is connected with laboratory observing and controlling, each switch board is using the control of independently programmable controller, touch-screen can be connected on the programmable controller in independent control cabinet when debugging, safeguarding, be debugged as a completely self-contained control system.

Description

Hospital laboratory distributed controll centralized monitoring and controlling shows system
Technical field:
It is integrated the present invention relates to the multi-functional multi-parameter distributed controll in laboratory and laboratory centralized monitoring and controlling display function Novel control display technique, and in particular to a kind of hospital laboratory distributed controll centralized monitoring and controlling shows system.
Background technology:
Hospitals at Present laboratory typically all divides many functional compartments, and being divided as pathological analysis laboratory has dyeing Room, biopsy chamber, embedding room, dewatering station, materials room, receiving chamber ... etc., for the sending of each functional compartments in laboratory, air draft, Air quality control and HVAC control require that centralized Control is shown.It is in the past general to be all placed directly in experiment using standard electrical control cubicles The special center control room of chamber interior one, this is for laboratory internal space is limited, particularly old housing reform is made laboratory will It is difficult to accomplish, while there is problems in existing technology:1st, how to realize and put different places, control distinct device Switch board, and lab assistant can easily realize the control of institute functional;2nd, display control screen how is made in laboratory more Plus it is attractive in appearance;3rd, under many switch board states, how to make per the debugging of specific control unit, it is easy to maintenance, in summary in order to solve Above-mentioned technical problem, spy proposes a kind of new technical scheme.
The content of the invention:
The invention aims to overcome the weak point that above-mentioned prior art is present, and provide a kind of hospital laboratory Distributed controll centralized monitoring and controlling shows system.
The technical solution adopted by the present invention is:A kind of hospital laboratory distributed controll centralized monitoring and controlling shows system, including warm Logical air-conditioning system, air-supply arrangement, multiple-effect fresh air purification device, air exhausting device and multiple-effect emission-control equipment, described HVAC are empty Tune is connected with HVAC switch board, and HVAC switch board shows that system is connected with laboratory observing and controlling;Described air-supply arrangement And multiple-effect fresh air purification device is connected with air-supply fresh air purifying switch board, air-supply fresh air purifying switch board is shown with laboratory observing and controlling System is connected;Described air exhausting device and multiple-effect emission-control equipment is connected with energy-conserving and environment-protective air draft switch board, energy-conserving and environment-protective row Wind switch board shows that system is connected with laboratory observing and controlling.
Described HVAC switch board is installed on inside air-conditioner host or inside computer room.
Described air-supply fresh air purifying switch board is installed on inside multiple-effect fresh air purification device or inside computer room.
Described energy-conserving and environment-protective air draft switch board is installed on inside multiple-effect emission-control equipment or inside computer room.
Described main operation observing and controlling shows that system is installed on from anywhere in the convenient control of laboratory internal.
Described laboratory main operation observing and controlling shows that system includes display fixing device, display, controller, described Display is embedded in inside display fixing device, and display is connected with controller by data wire.
Described display fixing device includes control panel, display standing groove, side plate A, thermovent and side plate B, described Control panel on be provided with display standing groove, control panel two ends are connected to side plate A and side plate B, and described side plate A is provided with Thermovent.
Angulation is 90 degree between described side plate A and control panel, formed between described side plate B and control panel Angle is 90 degree.
Described side plate A and the connected mode of control panel be welding or both between be integral type structure, described side plate B Connected mode with control panel be welding or both between be integral type structure.
The beneficial effects of the invention are as follows:1st, the laboratory Energy Saving Control layout that this programme is provided, is applied using Distributed Design Work, can be laid out multiple switch boards in any place for having space of such as balcony or power supply room outside laboratory, pass through switch board Programmable controller show that the mode that communicate of programmable controller of main screen realizes multiparty control layout with control in laboratory Single-point centralized displaying, utilizes the original limited space in laboratory significantly;2nd, each switch board uses Controlled by Programmable Controller And communicated with programmable controller in laboratory, realize centralized displaying control;3rd, aluminium alloy is used to be integrally formed membrane for U-shaped control Handled in panel processed, technique using anode, make control panel overall more smooth and attractive in appearance;4th, each switch board is using independent Controlled by Programmable Controller, can connect touch-screen on the programmable controller in independent control cabinet when debugging, safeguarding, be used as one Individual completely self-contained control system debugging.
Brief description of the drawings:
Fig. 1 is structured flowchart of the present invention.
Fig. 2 is connection diagram of the present invention.
Fig. 3 is inventive display fixing device front view.
Fig. 4 is inventive display fixing device side view.
Fig. 5 is inventive display fixing device top view.
Fig. 6 is inventive display fixing device stereogram.
Embodiment:
Accompanying drawing being given for example only property explanation, it is impossible to be interpreted as the limitation to this patent;It is attached in order to more preferably illustrate the present embodiment Scheme some parts to have omission, zoom in or out, do not represent the size of actual product;To those skilled in the art, Some known features and its explanation may be omitted and will be understood by accompanying drawing.
With reference to each figure, a kind of hospital laboratory distributed controll centralized monitoring and controlling shows system, including heating ventilation air-conditioning system, air-supply Device, multiple-effect fresh air purification device, air exhausting device and multiple-effect emission-control equipment, it is characterised in that:Described HVAC with HVAC switch board is connected, and HVAC switch board shows that system is connected with laboratory observing and controlling;Described air-supply arrangement and many Effect fresh air purification device is connected with air-supply fresh air purifying switch board, and air-supply fresh air purifying switch board shows system with laboratory observing and controlling Connection;Described air exhausting device and multiple-effect emission-control equipment is connected with energy-conserving and environment-protective air draft switch board, energy-conserving and environment-protective air draft control Cabinet processed shows that system is connected with laboratory observing and controlling.
Described HVAC switch board is installed on inside air-conditioner host or inside computer room;HVAC switch board, including Cabinet, the motor being arranged at the top of cabinet, it is installed on motor output shaft, and flabellum I positioned at cabinet inner tip, is installed on It is in lambdoid deflector in cabinet, is respectively arranged at the left radiating fin and right radiating fin and peace of deflector left and right ends Outer radiating fin loaded on cabinet back, heat pipe I is connected to left radiating fin and right radiating fin with the bottom of heat pipe II, its Upper end is all connected to outer radiating fin, the heat pipe I and heat pipe II and outer radiating fin connecting portion higher than its respectively with left radiating The connecting portion of fin and right radiating fin.
Described air-supply fresh air purifying switch board is installed on inside multiple-effect fresh air purification device or inside computer room;Multiple-effect fresh air Purifier includes roughing efficiency air filter, active carbon filter, energetic ion pipe.
Described energy-conserving and environment-protective air draft switch board is installed on inside computer room or inside multiple-effect emission-control equipment;Multiple-effect waste gas Processing unit includes horizontally disposed rectangular frame and several pieces are arranged side by side in framework blade, above and below the framework is divided into Two parts, and blade is located at lower part, framework upper is arranged with a dripping-proof device, and it is mutual that the dripping-proof device includes a row Parallel and opening upwards water legs, the two ends of water leg are fixed on framework, are equipped with above the space between adjacent water leg One water fender, the section of the water fender is not contacted in the V-arrangement that Open Side Down with water leg, and correspondence is completely covered in water fender Two water legs between gap, water leg is fixedly connected with corresponding water fender by several columns.
Described exhaust-gas treatment switch board is installed on inside emission-control equipment;Emission-control equipment includes heat-exchanger rig, It is arranged between outdoor machine of air-conditioner and water tank, heat-exchanger rig includes heating unit and condensing unit, heating unit is against outdoor machine of air-conditioner Exhaust outlet set with absorb outdoor machine of air-conditioner discharge hot-air in heat, condensing unit, which is arranged at water tank, makes the water in water tank Heating;Air filter is configured with heating unit, and heating unit includes a casing, and the side of the casing is hot waste gas import, The hot waste gas import communicates with the exhaust outlet of outdoor machine of air-conditioner and accepts the hot waste gas of the exhaust outlet from outdoor machine of air-conditioner, with the side phase To casing opposite side be cold air outlet, air filter is only configured in the cold air outlet, or air mistake Device configuration is filtered in the cold air outlet and hot waste gas import;Many heat exchanger tubes of Boulez in casing, many heat exchanger tubes are parallel simultaneously It is coupled to inlet tube and outlet, and trend and the hot waste gas import to the direction of the cold air outlet of every heat exchanger tube Vertically.Condensing unit is by many heat exchanger tube parallel connections between inlet tube and outlet, and heating unit passes through with condensing unit Delivery line and return duct connection, are led to the circulation for forming the working media flowed in heat-exchanger rig.
Described laboratory master control display device is installed on laboratory internal.
Described laboratory master control display device includes display fixing device, display, controller and receiver, described Display be embedded in inside display fixing device, display is connected with controller by wire, and controller passes through with receiver Wire is connected.
Described display fixing device includes control panel 1, display standing groove 2, side plate A3, thermovent 4 and side plate B5, Display standing groove 2 is provided with described control panel 1, the two ends of control panel 1 are connected to side plate A3 and side plate B5, described side Plate A3 is provided with thermovent 4.
Angulation is 90 degree, institute between described side plate B5 and control panel 1 between described side plate A3 and control panel 1 Into angle be 90 degree.
Described side plate A3 and the connected mode of control panel 1 be welding or both between be integral type structure, described side The connected mode of plate B5 and control panel 1 be welding or both between be integral type structure.
The laboratory Energy Saving Control layout that this programme is provided, is constructed using Distributed Design, can be outside laboratory such as day Any place for having space such as platform or power supply room is laid out multiple control cabinets, programmable controller and laboratory by control cabinet Interior control main screen communication mode realizes that multiparty control is laid out single-point centralized displaying, and the original limited space in laboratory is utilized significantly; Each switch board communicates using Controlled by Programmable Controller and with programmable controller in laboratory, realizes centralized displaying control System;Use aluminium alloy to be integrally formed membrane for U-shaped control panel, handled in technique using anode, make control panel overall more It is smooth and attractive in appearance;Each switch board, can be in independent control cabinet when debugging, safeguarding using the control of independently programmable controller Touch-screen is connected on programmable controller, is debugged as a completely self-contained control system.
In figure, position relationship being given for example only property explanation is described, it is impossible to be interpreted as the limitation to this patent;Obviously, this hair Bright above-described embodiment is only intended to clearly illustrate example of the present invention, and is not to embodiments of the present invention Limit.For those of ordinary skill in the field, other multi-forms can also be made on the basis of the above description Change or variation.There is no necessity and possibility to exhaust all the enbodiments.It is all the spirit and principles in the present invention it Interior made any modifications, equivalent substitutions and improvements etc., should be included within the protection domain of the claims in the present invention.

Claims (9)

1. a kind of hospital laboratory distributed controll centralized monitoring and controlling display system, including heating ventilation air-conditioning system, air-supply arrangement, multiple-effect are new Ventilating purification apparatus, air exhausting device and multiple-effect emission-control equipment, it is characterised in that:Described HVAC is controlled with HVAC Cabinet is connected, and HVAC switch board shows that system is connected with laboratory observing and controlling;Described air-supply arrangement and multiple-effect fresh air purifying dress Put and be connected with air-supply fresh air purifying switch board, HVAC air cleaning switch board shows that system is connected with laboratory observing and controlling;Described Air exhausting device and multiple-effect emission-control equipment are connected with energy-conserving and environment-protective air draft switch board, energy-conserving and environment-protective air draft switch board and laboratory Observing and controlling shows system connection.
2. hospital laboratory distributed controll centralized monitoring and controlling according to claim 1 shows system, it is characterised in that:Described HVAC switch board is installed on inside air-conditioner host or inside computer room.
3. hospital laboratory distributed controll centralized monitoring and controlling according to claim 1 shows system, it is characterised in that:Described Air-supply fresh air purifying switch board is installed on inside multiple-effect fresh air purification device or inside computer room.
4. hospital laboratory distributed controll centralized monitoring and controlling according to claim 1 shows system, it is characterised in that:Described Energy-conserving and environment-protective air draft switch board is installed on inside multiple-effect emission-control equipment or inside computer room.
5. hospital laboratory distributed controll centralized monitoring and controlling according to claim 1 shows system, it is characterised in that:Described Main operation observing and controlling shows that system is installed on from anywhere in the convenient control of laboratory internal.
6. hospital laboratory distributed controll centralized monitoring and controlling shows system according to claim 1 or 5, it is characterised in that:Institute The laboratory main operation observing and controlling display device stated includes display fixing device, display, controller, and described display is embedded in Inside display fixing device, display is with controller by data cube computation, and controller passes through with each function control case controller Data wire is connected and communicated.
7. hospital laboratory distributed controll centralized monitoring and controlling according to claim 6 shows system, it is characterised in that:Described Display fixing device includes being provided with control panel, display standing groove, side plate A, thermovent and side plate B, described control panel Display standing groove, control panel two ends are connected to side plate A and side plate B, described side plate A are provided with thermovent.
8. hospital laboratory distributed controll centralized monitoring and controlling according to claim 7 shows system, it is characterised in that:Described Angulation is 90 degree between side plate A and control panel, and angulation is 90 degree between described side plate B and control panel.
9. the hospital laboratory distributed controll centralized monitoring and controlling according to claim 7 and 8 shows system, it is characterised in that:Institute It between welding or both is integral type structure that the side plate A and the connected mode of control panel stated, which is, described side plate B and control panel Connected mode be welding or both between be integral type structure.
CN201710282919.8A 2017-04-26 2017-04-26 Hospital laboratory distributed controll centralized monitoring and controlling shows system Pending CN107014043A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710282919.8A CN107014043A (en) 2017-04-26 2017-04-26 Hospital laboratory distributed controll centralized monitoring and controlling shows system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710282919.8A CN107014043A (en) 2017-04-26 2017-04-26 Hospital laboratory distributed controll centralized monitoring and controlling shows system

Publications (1)

Publication Number Publication Date
CN107014043A true CN107014043A (en) 2017-08-04

Family

ID=59447153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710282919.8A Pending CN107014043A (en) 2017-04-26 2017-04-26 Hospital laboratory distributed controll centralized monitoring and controlling shows system

Country Status (1)

Country Link
CN (1) CN107014043A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7966520B2 (en) * 2002-08-30 2011-06-21 Avaya Inc. Software licensing for spare processors
CN202404851U (en) * 2011-11-24 2012-08-29 三通(常州)电子科技有限公司 Liquid crystal display screen mounting box
CN202792388U (en) * 2012-10-07 2013-03-13 日照市佳源空调设备有限责任公司 Ground source heat pump air-conditioning automatic control system for communication base station
CN202915508U (en) * 2012-11-23 2013-05-01 无锡菲兰爱尔空气质量技术有限公司 Air treatment device used for pathology laboratory
CN203909515U (en) * 2014-06-24 2014-10-29 杭州快恒科技有限公司 Intelligent control panel
CN104456820A (en) * 2014-12-10 2015-03-25 安徽金鑫实验设备科技有限公司 Laboratory ventilation system
CN204678598U (en) * 2015-06-04 2015-09-30 江苏日升恒隆科教设备有限公司 Dissecting room air cleaning system
CN204787069U (en) * 2015-06-01 2015-11-18 厦门义旭实验室设备有限公司 Whole regulation and control system of laboratory air
CN106292807A (en) * 2016-09-23 2017-01-04 苏州工业职业技术学院 A kind of Experimental Base purified and monitor that integrates manages platform

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7966520B2 (en) * 2002-08-30 2011-06-21 Avaya Inc. Software licensing for spare processors
CN202404851U (en) * 2011-11-24 2012-08-29 三通(常州)电子科技有限公司 Liquid crystal display screen mounting box
CN202792388U (en) * 2012-10-07 2013-03-13 日照市佳源空调设备有限责任公司 Ground source heat pump air-conditioning automatic control system for communication base station
CN202915508U (en) * 2012-11-23 2013-05-01 无锡菲兰爱尔空气质量技术有限公司 Air treatment device used for pathology laboratory
CN203909515U (en) * 2014-06-24 2014-10-29 杭州快恒科技有限公司 Intelligent control panel
CN104456820A (en) * 2014-12-10 2015-03-25 安徽金鑫实验设备科技有限公司 Laboratory ventilation system
CN204787069U (en) * 2015-06-01 2015-11-18 厦门义旭实验室设备有限公司 Whole regulation and control system of laboratory air
CN204678598U (en) * 2015-06-04 2015-09-30 江苏日升恒隆科教设备有限公司 Dissecting room air cleaning system
CN106292807A (en) * 2016-09-23 2017-01-04 苏州工业职业技术学院 A kind of Experimental Base purified and monitor that integrates manages platform

Similar Documents

Publication Publication Date Title
CN208638880U (en) Unit module and machine room air conditioner thereof
CN209819722U (en) Floor type air conditioner indoor unit and air conditioner
WO2003021155A1 (en) Heat pump type air conditioner with air exchange
CN203757933U (en) Hot and cold partition and evaporative cooling and precision air conditioning linkage type unit machine room air conditioning
CN207065776U (en) A kind of equipment heat exchanger
CN107014043A (en) Hospital laboratory distributed controll centralized monitoring and controlling shows system
FI119128B (en) An air conditioner for an airspace
CN205919419U (en) Go up high precision air conditioning of air -out and parallel air conditioner
CN211650507U (en) Vertical fresh air environment all-in-one machine system
CN212431247U (en) New fan of heat exchange
EP0903545A2 (en) Heating, cooling and ventilating system, and room atmosphere conditioning unit for such a system
CN109302829B (en) Lower air supply type machine room air conditioner
CN209085105U (en) A kind of evaporating type condensing multi-connected air conditioning system
CN211903073U (en) Integrated household comfortable ecological air conditioner indoor unit
CN220689214U (en) Wall-mounted environment all-in-one machine
CN209431565U (en) A kind of operating room clean air conditioner Vertical Rack
CN220489412U (en) Air energy water heater
CN2399649Y (en) Cabinet air processor
CN2639761Y (en) Air supply device of central air conditioning system
CN115751506B (en) Fresh air dehumidifier suitable for low temperature high humidity environment
CN109520185A (en) A kind of throttle control device and air conditioner
CN215892657U (en) A multifunctional two-way flow fresh air system
CN209325960U (en) A kind of Air Conditioning Facilities that assembling type steel structure industrial production workshop uses
CN217876215U (en) Multifunctional full-air processor
CN204084617U (en) Air-treatment end equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180730

Address after: 510000, 1 floor, 24 Spring Street, Dayuan Huang Zhuang South Road, Baiyun District, Guangzhou, Guangdong

Applicant after: Guangdong green Kang Yuen Mei Environmental Technology Co., Ltd.

Address before: 510000 self compiled 28 rooms in A-12 market, No. 28 Tonghe Middle Road, Baiyun District, Guangzhou, Guangdong

Applicant before: GUANGDONG LVKANG AIR PURIFICATION ENGINEERING CO., LTD.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20170804