CN106948397A - Antiseepage wall equipment - Google Patents
Antiseepage wall equipment Download PDFInfo
- Publication number
- CN106948397A CN106948397A CN201710280057.5A CN201710280057A CN106948397A CN 106948397 A CN106948397 A CN 106948397A CN 201710280057 A CN201710280057 A CN 201710280057A CN 106948397 A CN106948397 A CN 106948397A
- Authority
- CN
- China
- Prior art keywords
- wall
- tooth
- construction member
- annular
- annular construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F5/00—Dredgers or soil-shifting machines for special purposes
- E02F5/02—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
- E02F5/08—Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with digging wheels turning round an axis
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Earth Drilling (AREA)
Abstract
A kind of antiseepage wall equipment, the course of work of the antiseepage wall equipment is:The working method for connecting wall with above-mentioned manufacture concrete interposing manufactures multiple concrete interposings and connects wall, one, interval soil cement inserts the length for connecting wall between the adjacent concrete interposing of each two connects wall, manufacture a soil cement respectively in the length at each interval and insert even wall, the plug of the company's of inserting wall is injected the notch of another company's of inserting wall, produce concrete interposing and connect wall and the slotting even cut-pff wall of wall phase interfix even of soil cement.
Description
Technical field
The present invention relates to a kind of antiseepage wall equipment, a kind of particularly a kind of antiseepage by multiple unit cut-pff wall phase interfix even
Wall equipment.
Background technology
The cut-pff wall of other cut-pff wall device fabrications is all the form that is connected by tack into wall.
The content of the invention
The invention provides a kind of a kind of antiseepage wall equipment by multiple unit cut-pff wall phase interfix even.
The present invention is achieved through the following technical solutions:
One kind inserts even antiseepage wall equipment, and the structure of its equipment includes:Auger spindle lower end is fixed with a beam arm;
The upper end of the first fishplate bar is fixed in the left end bottom of beam arm, and the centre of the first link arm is fixed in the lower end of the first fishplate bar, on
3rd link arm of first link arm in portion, the second link arm of left part and right part is common by the second annular construction member and the 6th annular construction member
Fixed, the outer ring of the second annular construction member is cased with first annular component, and the inner ring of first annular component is fixed with the first tooth set, first
The outer ring of annular construction member fixes multiple first and stirs tooth;The outer ring of 6th annular construction member is cased with the 5th annular construction member, the 5th annular structure
The inner ring of part is fixed with the 3rd tooth set, and the outer ring of the 5th annular construction member fixes multiple first and stirs tooth;Second annular construction member and
The bottom of six annular construction members, which is fixed, to be fixed with first semicircle cover, the first semicircle cover before the first engine, the first engine
Hold and first gear is fixed on the first shaft part, first gear and the first tooth set are engaged, fixed on first the first shaft part of engine rear end
3rd gear, the 3rd gear and the set engagement of the 3rd tooth;
The upper end of the second fishplate bar is fixed in the right-hand member bottom of beam arm, and the centre of the 4th link arm is fixed in the lower end of the second fishplate bar, on
6th link arm of the 4th link arm in portion, the 5th link arm of left part and right part is common by fourth annular component and the 8th annular construction member
Fixed, the outer ring of fourth annular component is cased with the 3rd annular construction member, and the inner ring of the 3rd annular construction member is fixed with the second tooth set, the 3rd
The outer ring of annular construction member fixes multiple second and stirs tooth;The outer ring of 8th annular construction member is cased with the 7th annular construction member, the 7th annular structure
The inner ring of part is fixed with the 4th tooth set, and the outer ring of the 7th annular construction member fixes multiple second and stirs tooth;Fourth annular component and
The bottom of eight annular construction members, which is fixed, to be fixed with second semicircle cover, the second semicircle cover before the second engine, the second engine
Hold and second gear is fixed on the second shaft part, second gear and the second tooth set are engaged, fixed on second the second shaft part of engine rear end
4th gear, the 4th gear and the set engagement of the 4th tooth.
The invention has the advantages that:
The present invention can produce concrete interposing and connect wall and the slotting even cut-pff wall of wall phase interfix even of soil cement.
Brief description of the drawings
The present invention is further illustrated below in conjunction with the accompanying drawings:
Fig. 1 is front view of the invention;
Fig. 2 is rearview of the invention;
Fig. 3 is Fig. 1 A-A views;
Fig. 4 is Fig. 1 B-B views;
Fig. 5 is Fig. 1 C-C views;
Fig. 6 connects wall for concrete interposing and soil cement inserts the even plan of wall phase interfix even.
In figure:1st, auger spindle, 2, beam arm, the 3, first fishplate bar, the 4, second fishplate bar, 5, first annular component, the 6, second annular structure
Part, the 7, the 3rd annular construction member, 8, fourth annular component, 9, first stirs tooth, and 10, second stirs tooth, the 11, first link arm, and 12, second connects
Arm, the 13, the 3rd link arm, the 14, the 4th link arm, the 15, the 5th link arm, the 16, the 6th link arm, the 21, first semicircle cover, the 22, second semicircle
Cover, the 23, first shaft part, the 24, second shaft part, 25, first gear, 26, second gear, the 27, the 5th annular construction member, the 28, the 6th ring
Shape component, the 29, the 7th annular construction member, the 30, the 8th annular construction member, the 31, the 3rd gear, the 32, the 4th gear, the 33, first tooth set,
34th, the 3rd tooth set, the 35, first engine, the 36, second tooth set, the 37, the 4th tooth set, the 38, second engine, the 39, the 7th link arm.
Embodiment
Accompanying drawing is a kind of specific embodiment of the invention, and the structure that the embodiment inserts even antiseepage wall equipment includes:Under auger spindle 1
End is fixed with a beam arm 2;
The upper end of the first fishplate bar 3 is fixed in the left end bottom of beam arm, and the centre of the first link arm 11 is fixed in the lower end of the first fishplate bar,
3rd link arm 13 of first link arm on top, the second link arm 12 of left part and right part is common by the second annular construction member 6 and the 6th
Annular construction member 28 is fixed, and the outer ring of the second annular construction member is cased with first annular component 5, and the inner ring of first annular component is fixed with
One tooth set 33, the outer ring of first annular component fixes multiple first and stirs tooth 9;The outer ring of 6th annular construction member is cased with the 5th annular structure
Part 27, the inner ring of the 5th annular construction member is fixed with the 3rd tooth set 34, and the outer ring of the 5th annular construction member fixes multiple first and stirs tooth;The
The bottom of second ring component and the 6th annular construction member fix be fixed with first semicircle cover 21, the first semicircle cover first move
First gear 25, first gear and the set engagement of the first tooth are fixed on power machine 35, first the first shaft part of engine front end 23, first moves
The 3rd gear 31, the 3rd gear and the set engagement of the 3rd tooth are fixed on the first shaft part of power machine rear end;
The upper end of the second fishplate bar 4 is fixed in the right-hand member bottom of beam arm, and the centre of the 4th link arm 14 is fixed in the lower end of the second fishplate bar,
6th link arm 16 of the 4th link arm on top, the 5th link arm 15 of left part and right part is common by fourth annular component 8 and the 8th
Annular construction member 30 is fixed, and the outer ring of fourth annular component is cased with the 3rd annular construction member 7, and the inner ring of the 3rd annular construction member is fixed with
Two teeth set 36, the outer ring of the 3rd annular construction member fixes multiple second and stirs tooth 10;The outer ring of 8th annular construction member 30 is cased with the 7th ring
Shape component 29, the inner ring of the 7th annular construction member is fixed with the 4th tooth set 37, and the outer ring of the 7th annular construction member is fixed multiple second and stirred
Tooth 10;The bottom of fourth annular component and the 8th annular construction member is fixed fixed in second semicircle cover 22, the second semicircle cover
Have and second gear 26 is fixed on the second engine 38, second the second shaft part of engine front end 24, second gear and the second tooth set are nibbled
Close, the 4th gear 32, the 4th gear and the set engagement of the 4th tooth are fixed on second the second shaft part of engine rear end;
It is connected and fixed between 3rd link arm and the 5th link arm by the 7th link arm;
The antiseepage wall equipment is provided with liquid injection apparatus.
The cut-pff wall device fabrication concrete interposing connects the course of work of wall:Auger spindle provides pressure during drilling, and first moves
Power machine drives first gear and the 3rd gear to rotate forward, and first annular component is driven from there through the first tooth set, the 3rd tooth set
Rotated forward with the 5th annular construction member, multiple first on first annular component stir on tooth and the 5th annular construction member multiple
One, which stirs tooth, is rotating forward the water that sprays liquid injection apparatus and native mix into mud;Second engine drive second gear and
4th gear is rotated backward, reverse from there through the second tooth set, the 4th tooth set the 3rd annular construction member of driving and the 7th annular construction member
Rotate, multiple second on the 3rd annular construction member stir on tooth and the 7th annular construction member multiple second stir tooth rotate backward by
The water and soil mix of liquid injection apparatus injection are into mud;Mud flows out from hole, and antiseepage wall equipment produces one in drilling
The hole that end is notch, one end is plug, casting concrete, it is that notch, one end are that plug concrete interposing connects to produce one section of one end
Wall.
The cut-pff wall device fabrication soil cement inserts the course of work of even wall:Auger spindle provides pressure during drilling, and first moves
Power machine drives first gear and the 3rd gear to rotate forward, and first annular component is driven from there through the first tooth set, the 3rd tooth set
Rotated forward with the 5th annular construction member, multiple first on first annular component stir on tooth and the 5th annular construction member multiple
One, which stirs tooth, is rotating forward the cement mortar that sprays liquid injection apparatus and native mix into soil cement;Second engine driving second
Gear and the 4th gear are rotated backward, from there through the second tooth set, the 4th tooth set the 3rd annular construction member of driving and the 7th annular structure
Part is rotated backward, and what multiple second on the 3rd annular construction member were stirred on tooth and the 7th annular construction member multiple second stirs tooth reverse
The cement mortar for spraying liquid injection apparatus and soil mix are rotated into soil cement;Antiseepage wall equipment produces one end in drilling
Even wall is inserted in notch, one end for the soil cement of plug.
The cut-pff wall device fabrication concrete interposing connects wall and the slotting course of work of even wall phase interfix even of soil cement is:Use
State manufacture concrete interposing and connect the working method of wall and manufacture multiple concrete interposings and connect wall, the adjacent concrete interposing of each two connects between wall
One, interval soil cement inserts the length of even wall, manufactures a soil cement respectively in the length at each interval and inserts even wall, makes one
The plug of the company's of inserting wall injects the notch of another company's of inserting wall, produces concrete interposing and connects wall and soil cement and inserts even wall phase interfix even
Cut-pff wall.
Claims (1)
1. a kind of antiseepage wall equipment, its structure includes:Auger spindle(1)Lower end is fixed with a beam arm(2);
The first fishplate bar is fixed in the left end bottom of beam arm(3)Upper end, the first link arm is fixed in the lower end of the first fishplate bar(11)'s
Centre, first link arm on top, the second link arm of left part(12)And the 3rd link arm of right part(13)Jointly by the second annular structure
Part(6)With the 6th annular construction member(28)Fixed, the outer ring of the second annular construction member is cased with first annular component(5), first annular structure
The inner ring of part is fixed with the first tooth set(33), the outer ring of first annular component fixes multiple first and stirs tooth(9);6th annular construction member
Outer ring be cased with the 5th annular construction member(27), the inner ring of the 5th annular construction member is fixed with the 3rd tooth set(34), the 5th annular construction member
Outer ring fix and multiple first stir tooth;First semicircle cover is fixed in the bottom of second annular construction member and the 6th annular construction member
(21), the first engine is fixed with the first semicircle cover(35), first the first shaft part of engine front end(23)On fix the first tooth
Wheel(25), first gear and the first tooth to cover and fix the 3rd gear on engagement, first the first shaft part of engine rear end(31), the 3rd tooth
Wheel and the 3rd tooth cover engagement;
The second fishplate bar is fixed in the right-hand member bottom of beam arm(4)Upper end, the 4th link arm is fixed in the lower end of the second fishplate bar(14)'s
Centre, the 4th link arm on top, the 5th link arm of left part(15)And the 6th link arm of right part(16)Jointly by fourth annular structure
Part(8)With the 8th annular construction member(30)Fixed, the outer ring of fourth annular component is cased with the 3rd annular construction member(7), the 3rd annular structure
The inner ring of part is fixed with the second tooth set(36), the outer ring of the 3rd annular construction member fixes multiple second and stirs tooth(10);8th annular structure
Part(30)Outer ring be cased with the 7th annular construction member(29), the inner ring of the 7th annular construction member is fixed with the 4th tooth set(37), the 7th ring
The outer ring of shape component fixes multiple second and stirs tooth(10);The bottom of fourth annular component and the 8th annular construction member fixes one
Two semicircle covers(22), the second engine is fixed with the second semicircle cover(38), second the second shaft part of engine front end(24)It is upper solid
Determine second gear(26), second gear and the second tooth to cover and fix the 4th gear on engagement, second the second shaft part of engine rear end
(32), the 4th gear and the 4th tooth set are engaged;It is characterized in that:
The cut-pff wall device fabrication concrete interposing connects the course of work of wall:Auger spindle provides pressure during drilling, the first engine
Driving first gear and the 3rd gear are rotated forward, and first annular component and the are driven from there through the first tooth set, the 3rd tooth set
Five annular construction members are rotated forward, and what multiple first on first annular component were stirred on tooth and the 5th annular construction member multiple first stirs
Tooth is rotating forward the water that sprays liquid injection apparatus and native mix into mud;Second engine drives second gear and the 4th
Gear is rotated backward, and is rotated backward from there through the second tooth set, the 4th tooth set the 3rd annular construction member of driving with the 7th annular construction member,
Multiple second on 3rd annular construction member stir on tooth and the 7th annular construction member multiple second stir tooth and rotating backward liquid
The water and soil mix of injection apparatus injection are into mud;Mud flows out from hole, and antiseepage wall equipment produces one end in drilling and is
Notch, the hole that one end is plug, casting concrete, it is that notch, one end are that plug concrete interposing connects wall to produce one section of one end;
The cut-pff wall device fabrication soil cement inserts the course of work of even wall:Auger spindle provides pressure during drilling, the first engine
Driving first gear and the 3rd gear are rotated forward, and first annular component and the are driven from there through the first tooth set, the 3rd tooth set
Five annular construction members are rotated forward, and what multiple first on first annular component were stirred on tooth and the 5th annular construction member multiple first stirs
Tooth is rotating forward the cement mortar that sprays liquid injection apparatus and native mix into soil cement;Second engine drives second gear
Rotated backward with the 4th gear, it is anti-from there through the second tooth set, the 4th tooth set the 3rd annular construction member of driving and the 7th annular construction member
To rotation, multiple second on the 3rd annular construction member stir on tooth and the 7th annular construction member multiple second stir tooth and rotating backward
The cement mortar that liquid injection apparatus is sprayed and native mix are into soil cement;Antiseepage wall equipment produces one end for groove in drilling
Even wall is inserted in mouth, one end for the soil cement of plug;
The cut-pff wall device fabrication concrete interposing connects wall and the slotting course of work of even wall phase interfix even of soil cement is:Use above-mentioned system
Make concrete interposing and connect the working method of wall and manufacture multiple concrete interposings and connect wall, the adjacent concrete interposing of each two connects interval between wall
One soil cement inserts the length of even wall, manufactures a soil cement respectively in the length at each interval and inserts even wall, makes the company of inserting
The plug of wall injects the notch of another company's of inserting wall, produces concrete interposing and connects wall and the slotting even antiseepage of wall phase interfix even of soil cement
Wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710280057.5A CN106948397A (en) | 2017-04-26 | 2017-04-26 | Antiseepage wall equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710280057.5A CN106948397A (en) | 2017-04-26 | 2017-04-26 | Antiseepage wall equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106948397A true CN106948397A (en) | 2017-07-14 |
Family
ID=59476765
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710280057.5A Withdrawn CN106948397A (en) | 2017-04-26 | 2017-04-26 | Antiseepage wall equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106948397A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09156549A (en) * | 1995-12-12 | 1997-06-17 | Babcock Hitachi Kk | Crawler type magnetic travelling device |
CN104452856A (en) * | 2014-12-05 | 2015-03-25 | 刘玉秋 | U-shaped drill |
CN105862812A (en) * | 2016-04-23 | 2016-08-17 | 刘兰花 | Rectangular pile and H-shaped pile opening inserting device |
CN105887836A (en) * | 2016-04-23 | 2016-08-24 | 刘兰花 | Equal-width pile and H-shaped pile buckling device |
CN106088190A (en) * | 2016-08-27 | 2016-11-09 | 魏新蕾 | Abnormity groover |
-
2017
- 2017-04-26 CN CN201710280057.5A patent/CN106948397A/en not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09156549A (en) * | 1995-12-12 | 1997-06-17 | Babcock Hitachi Kk | Crawler type magnetic travelling device |
CN104452856A (en) * | 2014-12-05 | 2015-03-25 | 刘玉秋 | U-shaped drill |
CN105862812A (en) * | 2016-04-23 | 2016-08-17 | 刘兰花 | Rectangular pile and H-shaped pile opening inserting device |
CN105887836A (en) * | 2016-04-23 | 2016-08-24 | 刘兰花 | Equal-width pile and H-shaped pile buckling device |
CN106088190A (en) * | 2016-08-27 | 2016-11-09 | 魏新蕾 | Abnormity groover |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105735273A (en) | Device for manufacturing pile walls with triangular piles in inserted connection with cross piles | |
CN106088076A (en) | Concavo-convex connect button rig | |
CN106948397A (en) | Antiseepage wall equipment | |
CN106284325A (en) | Connect buckle pile production machinery | |
CN106088077A (en) | Connect button Y shape rig | |
CN106049486A (en) | Joint V-shaped drilling and stirring machine | |
CN106088075A (en) | Grafting V-arrangement bores and stirs machine | |
CN106193024A (en) | Concavo-convex joint rig | |
CN106193021A (en) | Concavo-convex interlocking rig | |
CN106065620A (en) | Plug together V-arrangement brill and stir machine | |
CN106088078A (en) | Snap-in Y shape rig | |
CN105696580A (en) | Regular octagonal pile and rectangular pile Y-shaped inserting and buckling wall forming device | |
CN106284301A (en) | Fasten engineering equipment | |
CN106223311A (en) | Interlocking stake production machinery | |
CN106120780A (en) | Snap close stake production machinery | |
CN105696579A (en) | Regular octagonal pile and rectangular pile Y-shaped opening inserting wall forming device | |
CN105696585A (en) | Jointing device for octagonal piles and n-shaped piles | |
CN106223310A (en) | Occlusion engineering equipment | |
CN106284323A (en) | A kind of implementation of combination stake | |
CN106284322A (en) | A kind of implementation engaging stake | |
CN106088072A (en) | Snap-in V-arrangement bores and stirs machine | |
CN105064350B (en) | A kind of usage of six prism agitation drillers | |
CN105696586A (en) | Buckling device for octagonal piles and n-shaped piles | |
CN106065619A (en) | Snap-in V-arrangement rig | |
CN106193020A (en) | Engage engineering equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20170714 |
|
WW01 | Invention patent application withdrawn after publication |