CN106948397A CN201710280057.5A CN201710280057A CN106948397A CN 106948397 A CN106948397 A CN 106948397A CN 201710280057 A CN201710280057 A CN 201710280057A CN 106948397 A CN106948397 A CN 106948397A
Authority
CN
China
Prior art keywords
wall
tooth
construction member
annular
annular construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710280057.5A
Other languages
Chinese (zh)
Inventor
王晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710280057.5A priority Critical patent/CN106948397A/en
Publication of CN106948397A publication Critical patent/CN106948397A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/02Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
    • E02F5/08Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with digging wheels turning round an axis

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

A kind of antiseepage wall equipment, the course of work of the antiseepage wall equipment is:The working method for connecting wall with above-mentioned manufacture concrete interposing manufactures multiple concrete interposings and connects wall, one, interval soil cement inserts the length for connecting wall between the adjacent concrete interposing of each two connects wall, manufacture a soil cement respectively in the length at each interval and insert even wall, the plug of the company's of inserting wall is injected the notch of another company's of inserting wall, produce concrete interposing and connect wall and the slotting even cut-pff wall of wall phase interfix even of soil cement.

Description

Antiseepage wall equipment
Technical field
The present invention relates to a kind of antiseepage wall equipment, a kind of particularly a kind of antiseepage by multiple unit cut-pff wall phase interfix even Wall equipment.
Background technology
The cut-pff wall of other cut-pff wall device fabrications is all the form that is connected by tack into wall.
The content of the invention
The invention provides a kind of a kind of antiseepage wall equipment by multiple unit cut-pff wall phase interfix even.
The present invention is achieved through the following technical solutions:
One kind inserts even antiseepage wall equipment, and the structure of its equipment includes:Auger spindle lower end is fixed with a beam arm;
The upper end of the first fishplate bar is fixed in the left end bottom of beam arm, and the centre of the first link arm is fixed in the lower end of the first fishplate bar, on 3rd link arm of first link arm in portion, the second link arm of left part and right part is common by the second annular construction member and the 6th annular construction member Fixed, the outer ring of the second annular construction member is cased with first annular component, and the inner ring of first annular component is fixed with the first tooth set, first The outer ring of annular construction member fixes multiple first and stirs tooth;The outer ring of 6th annular construction member is cased with the 5th annular construction member, the 5th annular structure The inner ring of part is fixed with the 3rd tooth set, and the outer ring of the 5th annular construction member fixes multiple first and stirs tooth;Second annular construction member and The bottom of six annular construction members, which is fixed, to be fixed with first semicircle cover, the first semicircle cover before the first engine, the first engine Hold and first gear is fixed on the first shaft part, first gear and the first tooth set are engaged, fixed on first the first shaft part of engine rear end 3rd gear, the 3rd gear and the set engagement of the 3rd tooth;
The upper end of the second fishplate bar is fixed in the right-hand member bottom of beam arm, and the centre of the 4th link arm is fixed in the lower end of the second fishplate bar, on 6th link arm of the 4th link arm in portion, the 5th link arm of left part and right part is common by fourth annular component and the 8th annular construction member Fixed, the outer ring of fourth annular component is cased with the 3rd annular construction member, and the inner ring of the 3rd annular construction member is fixed with the second tooth set, the 3rd The outer ring of annular construction member fixes multiple second and stirs tooth;The outer ring of 8th annular construction member is cased with the 7th annular construction member, the 7th annular structure The inner ring of part is fixed with the 4th tooth set, and the outer ring of the 7th annular construction member fixes multiple second and stirs tooth;Fourth annular component and The bottom of eight annular construction members, which is fixed, to be fixed with second semicircle cover, the second semicircle cover before the second engine, the second engine Hold and second gear is fixed on the second shaft part, second gear and the second tooth set are engaged, fixed on second the second shaft part of engine rear end 4th gear, the 4th gear and the set engagement of the 4th tooth.
The invention has the advantages that:
The present invention can produce concrete interposing and connect wall and the slotting even cut-pff wall of wall phase interfix even of soil cement.
Brief description of the drawings
The present invention is further illustrated below in conjunction with the accompanying drawings:
Fig. 1 is front view of the invention;
Fig. 2 is rearview of the invention;
Fig. 3 is Fig. 1 A-A views;
Fig. 4 is Fig. 1 B-B views;
Fig. 5 is Fig. 1 C-C views;
Fig. 6 connects wall for concrete interposing and soil cement inserts the even plan of wall phase interfix even.
In figure:1st, auger spindle, 2, beam arm, the 3, first fishplate bar, the 4, second fishplate bar, 5, first annular component, the 6, second annular structure Part, the 7, the 3rd annular construction member, 8, fourth annular component, 9, first stirs tooth, and 10, second stirs tooth, the 11, first link arm, and 12, second connects Arm, the 13, the 3rd link arm, the 14, the 4th link arm, the 15, the 5th link arm, the 16, the 6th link arm, the 21, first semicircle cover, the 22, second semicircle Cover, the 23, first shaft part, the 24, second shaft part, 25, first gear, 26, second gear, the 27, the 5th annular construction member, the 28, the 6th ring Shape component, the 29, the 7th annular construction member, the 30, the 8th annular construction member, the 31, the 3rd gear, the 32, the 4th gear, the 33, first tooth set, 34th, the 3rd tooth set, the 35, first engine, the 36, second tooth set, the 37, the 4th tooth set, the 38, second engine, the 39, the 7th link arm.
Embodiment
Accompanying drawing is a kind of specific embodiment of the invention, and the structure that the embodiment inserts even antiseepage wall equipment includes:Under auger spindle 1 End is fixed with a beam arm 2;
The upper end of the first fishplate bar 3 is fixed in the left end bottom of beam arm, and the centre of the first link arm 11 is fixed in the lower end of the first fishplate bar, 3rd link arm 13 of first link arm on top, the second link arm 12 of left part and right part is common by the second annular construction member 6 and the 6th Annular construction member 28 is fixed, and the outer ring of the second annular construction member is cased with first annular component 5, and the inner ring of first annular component is fixed with One tooth set 33, the outer ring of first annular component fixes multiple first and stirs tooth 9;The outer ring of 6th annular construction member is cased with the 5th annular structure Part 27, the inner ring of the 5th annular construction member is fixed with the 3rd tooth set 34, and the outer ring of the 5th annular construction member fixes multiple first and stirs tooth;The The bottom of second ring component and the 6th annular construction member fix be fixed with first semicircle cover 21, the first semicircle cover first move First gear 25, first gear and the set engagement of the first tooth are fixed on power machine 35, first the first shaft part of engine front end 23, first moves The 3rd gear 31, the 3rd gear and the set engagement of the 3rd tooth are fixed on the first shaft part of power machine rear end;
The upper end of the second fishplate bar 4 is fixed in the right-hand member bottom of beam arm, and the centre of the 4th link arm 14 is fixed in the lower end of the second fishplate bar, 6th link arm 16 of the 4th link arm on top, the 5th link arm 15 of left part and right part is common by fourth annular component 8 and the 8th Annular construction member 30 is fixed, and the outer ring of fourth annular component is cased with the 3rd annular construction member 7, and the inner ring of the 3rd annular construction member is fixed with Two teeth set 36, the outer ring of the 3rd annular construction member fixes multiple second and stirs tooth 10;The outer ring of 8th annular construction member 30 is cased with the 7th ring Shape component 29, the inner ring of the 7th annular construction member is fixed with the 4th tooth set 37, and the outer ring of the 7th annular construction member is fixed multiple second and stirred Tooth 10;The bottom of fourth annular component and the 8th annular construction member is fixed fixed in second semicircle cover 22, the second semicircle cover Have and second gear 26 is fixed on the second engine 38, second the second shaft part of engine front end 24, second gear and the second tooth set are nibbled Close, the 4th gear 32, the 4th gear and the set engagement of the 4th tooth are fixed on second the second shaft part of engine rear end;
It is connected and fixed between 3rd link arm and the 5th link arm by the 7th link arm;
The antiseepage wall equipment is provided with liquid injection apparatus.
The cut-pff wall device fabrication concrete interposing connects the course of work of wall:Auger spindle provides pressure during drilling, and first moves Power machine drives first gear and the 3rd gear to rotate forward, and first annular component is driven from there through the first tooth set, the 3rd tooth set Rotated forward with the 5th annular construction member, multiple first on first annular component stir on tooth and the 5th annular construction member multiple One, which stirs tooth, is rotating forward the water that sprays liquid injection apparatus and native mix into mud;Second engine drive second gear and 4th gear is rotated backward, reverse from there through the second tooth set, the 4th tooth set the 3rd annular construction member of driving and the 7th annular construction member Rotate, multiple second on the 3rd annular construction member stir on tooth and the 7th annular construction member multiple second stir tooth rotate backward by The water and soil mix of liquid injection apparatus injection are into mud;Mud flows out from hole, and antiseepage wall equipment produces one in drilling The hole that end is notch, one end is plug, casting concrete, it is that notch, one end are that plug concrete interposing connects to produce one section of one end Wall.
The cut-pff wall device fabrication soil cement inserts the course of work of even wall:Auger spindle provides pressure during drilling, and first moves Power machine drives first gear and the 3rd gear to rotate forward, and first annular component is driven from there through the first tooth set, the 3rd tooth set Rotated forward with the 5th annular construction member, multiple first on first annular component stir on tooth and the 5th annular construction member multiple One, which stirs tooth, is rotating forward the cement mortar that sprays liquid injection apparatus and native mix into soil cement;Second engine driving second Gear and the 4th gear are rotated backward, from there through the second tooth set, the 4th tooth set the 3rd annular construction member of driving and the 7th annular structure Part is rotated backward, and what multiple second on the 3rd annular construction member were stirred on tooth and the 7th annular construction member multiple second stirs tooth reverse The cement mortar for spraying liquid injection apparatus and soil mix are rotated into soil cement;Antiseepage wall equipment produces one end in drilling Even wall is inserted in notch, one end for the soil cement of plug.
The cut-pff wall device fabrication concrete interposing connects wall and the slotting course of work of even wall phase interfix even of soil cement is:Use State manufacture concrete interposing and connect the working method of wall and manufacture multiple concrete interposings and connect wall, the adjacent concrete interposing of each two connects between wall One, interval soil cement inserts the length of even wall, manufactures a soil cement respectively in the length at each interval and inserts even wall, makes one The plug of the company's of inserting wall injects the notch of another company's of inserting wall, produces concrete interposing and connects wall and soil cement and inserts even wall phase interfix even Cut-pff wall.

Claims (1)

1. a kind of antiseepage wall equipment, its structure includes:Auger spindle(1)Lower end is fixed with a beam arm(2);
The first fishplate bar is fixed in the left end bottom of beam arm(3)Upper end, the first link arm is fixed in the lower end of the first fishplate bar(11)'s Centre, first link arm on top, the second link arm of left part(12)And the 3rd link arm of right part(13)Jointly by the second annular structure Part(6)With the 6th annular construction member(28)Fixed, the outer ring of the second annular construction member is cased with first annular component(5), first annular structure The inner ring of part is fixed with the first tooth set(33), the outer ring of first annular component fixes multiple first and stirs tooth(9);6th annular construction member Outer ring be cased with the 5th annular construction member(27), the inner ring of the 5th annular construction member is fixed with the 3rd tooth set(34), the 5th annular construction member Outer ring fix and multiple first stir tooth;First semicircle cover is fixed in the bottom of second annular construction member and the 6th annular construction member (21), the first engine is fixed with the first semicircle cover(35), first the first shaft part of engine front end(23)On fix the first tooth Wheel(25), first gear and the first tooth to cover and fix the 3rd gear on engagement, first the first shaft part of engine rear end(31), the 3rd tooth Wheel and the 3rd tooth cover engagement;
The second fishplate bar is fixed in the right-hand member bottom of beam arm(4)Upper end, the 4th link arm is fixed in the lower end of the second fishplate bar(14)'s Centre, the 4th link arm on top, the 5th link arm of left part(15)And the 6th link arm of right part(16)Jointly by fourth annular structure Part(8)With the 8th annular construction member(30)Fixed, the outer ring of fourth annular component is cased with the 3rd annular construction member(7), the 3rd annular structure The inner ring of part is fixed with the second tooth set(36), the outer ring of the 3rd annular construction member fixes multiple second and stirs tooth(10);8th annular structure Part(30)Outer ring be cased with the 7th annular construction member(29), the inner ring of the 7th annular construction member is fixed with the 4th tooth set(37), the 7th ring The outer ring of shape component fixes multiple second and stirs tooth(10);The bottom of fourth annular component and the 8th annular construction member fixes one Two semicircle covers(22), the second engine is fixed with the second semicircle cover(38), second the second shaft part of engine front end(24)It is upper solid Determine second gear(26), second gear and the second tooth to cover and fix the 4th gear on engagement, second the second shaft part of engine rear end (32), the 4th gear and the 4th tooth set are engaged;It is characterized in that:
The cut-pff wall device fabrication concrete interposing connects the course of work of wall:Auger spindle provides pressure during drilling, the first engine Driving first gear and the 3rd gear are rotated forward, and first annular component and the are driven from there through the first tooth set, the 3rd tooth set Five annular construction members are rotated forward, and what multiple first on first annular component were stirred on tooth and the 5th annular construction member multiple first stirs Tooth is rotating forward the water that sprays liquid injection apparatus and native mix into mud;Second engine drives second gear and the 4th Gear is rotated backward, and is rotated backward from there through the second tooth set, the 4th tooth set the 3rd annular construction member of driving with the 7th annular construction member, Multiple second on 3rd annular construction member stir on tooth and the 7th annular construction member multiple second stir tooth and rotating backward liquid The water and soil mix of injection apparatus injection are into mud;Mud flows out from hole, and antiseepage wall equipment produces one end in drilling and is Notch, the hole that one end is plug, casting concrete, it is that notch, one end are that plug concrete interposing connects wall to produce one section of one end;
The cut-pff wall device fabrication soil cement inserts the course of work of even wall:Auger spindle provides pressure during drilling, the first engine Driving first gear and the 3rd gear are rotated forward, and first annular component and the are driven from there through the first tooth set, the 3rd tooth set Five annular construction members are rotated forward, and what multiple first on first annular component were stirred on tooth and the 5th annular construction member multiple first stirs Tooth is rotating forward the cement mortar that sprays liquid injection apparatus and native mix into soil cement;Second engine drives second gear Rotated backward with the 4th gear, it is anti-from there through the second tooth set, the 4th tooth set the 3rd annular construction member of driving and the 7th annular construction member To rotation, multiple second on the 3rd annular construction member stir on tooth and the 7th annular construction member multiple second stir tooth and rotating backward The cement mortar that liquid injection apparatus is sprayed and native mix are into soil cement;Antiseepage wall equipment produces one end for groove in drilling Even wall is inserted in mouth, one end for the soil cement of plug;
The cut-pff wall device fabrication concrete interposing connects wall and the slotting course of work of even wall phase interfix even of soil cement is:Use above-mentioned system Make concrete interposing and connect the working method of wall and manufacture multiple concrete interposings and connect wall, the adjacent concrete interposing of each two connects interval between wall One soil cement inserts the length of even wall, manufactures a soil cement respectively in the length at each interval and inserts even wall, makes the company of inserting The plug of wall injects the notch of another company's of inserting wall, produces concrete interposing and connects wall and the slotting even antiseepage of wall phase interfix even of soil cement Wall.
CN201710280057.5A 2017-04-26 2017-04-26 Antiseepage wall equipment Withdrawn CN106948397A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710280057.5A CN106948397A (en) 2017-04-26 2017-04-26 Antiseepage wall equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710280057.5A CN106948397A (en) 2017-04-26 2017-04-26 Antiseepage wall equipment

Publications (1)

Publication Number Publication Date
CN106948397A true CN106948397A (en) 2017-07-14

Family

ID=59476765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710280057.5A Withdrawn CN106948397A (en) 2017-04-26 2017-04-26 Antiseepage wall equipment

Country Status (1)

Country Link
CN (1) CN106948397A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09156549A (en) * 1995-12-12 1997-06-17 Babcock Hitachi Kk Crawler type magnetic travelling device
CN104452856A (en) * 2014-12-05 2015-03-25 刘玉秋 U-shaped drill
CN105862812A (en) * 2016-04-23 2016-08-17 刘兰花 Rectangular pile and H-shaped pile opening inserting device
CN105887836A (en) * 2016-04-23 2016-08-24 刘兰花 Equal-width pile and H-shaped pile buckling device
CN106088190A (en) * 2016-08-27 2016-11-09 魏新蕾 Abnormity groover

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09156549A (en) * 1995-12-12 1997-06-17 Babcock Hitachi Kk Crawler type magnetic travelling device
CN104452856A (en) * 2014-12-05 2015-03-25 刘玉秋 U-shaped drill
CN105862812A (en) * 2016-04-23 2016-08-17 刘兰花 Rectangular pile and H-shaped pile opening inserting device
CN105887836A (en) * 2016-04-23 2016-08-24 刘兰花 Equal-width pile and H-shaped pile buckling device
CN106088190A (en) * 2016-08-27 2016-11-09 魏新蕾 Abnormity groover

Similar Documents

Publication Publication Date Title
CN105735273A (en) Device for manufacturing pile walls with triangular piles in inserted connection with cross piles
CN106088076A (en) Concavo-convex connect button rig
CN106948397A (en) Antiseepage wall equipment
CN106284325A (en) Connect buckle pile production machinery
CN106088077A (en) Connect button Y shape rig
CN106049486A (en) Joint V-shaped drilling and stirring machine
CN106088075A (en) Grafting V-arrangement bores and stirs machine
CN106193024A (en) Concavo-convex joint rig
CN106193021A (en) Concavo-convex interlocking rig
CN106065620A (en) Plug together V-arrangement brill and stir machine
CN106088078A (en) Snap-in Y shape rig
CN105696580A (en) Regular octagonal pile and rectangular pile Y-shaped inserting and buckling wall forming device
CN106284301A (en) Fasten engineering equipment
CN106223311A (en) Interlocking stake production machinery
CN106120780A (en) Snap close stake production machinery
CN105696579A (en) Regular octagonal pile and rectangular pile Y-shaped opening inserting wall forming device
CN105696585A (en) Jointing device for octagonal piles and n-shaped piles
CN106223310A (en) Occlusion engineering equipment
CN106284323A (en) A kind of implementation of combination stake
CN106284322A (en) A kind of implementation engaging stake
CN106088072A (en) Snap-in V-arrangement bores and stirs machine
CN105064350B (en) A kind of usage of six prism agitation drillers
CN105696586A (en) Buckling device for octagonal piles and n-shaped piles
CN106065619A (en) Snap-in V-arrangement rig
CN106193020A (en) Engage engineering equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20170714

WW01 Invention patent application withdrawn after publication