CN106089217A - Major long tunnel rapid constructing method under complex geological condition - Google Patents

Major long tunnel rapid constructing method under complex geological condition Download PDF

Info

Publication number
CN106089217A
CN106089217A CN201610585922.2A CN201610585922A CN106089217A CN 106089217 A CN106089217 A CN 106089217A CN 201610585922 A CN201610585922 A CN 201610585922A CN 106089217 A CN106089217 A CN 106089217A
Authority
CN
China
Prior art keywords
tunnel
prediction
geological
forecast
advance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610585922.2A
Other languages
Chinese (zh)
Other versions
CN106089217B (en
Inventor
苏春生
梁朋刚
何十美
汤振亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Group Co Ltd, Fifth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201610585922.2A priority Critical patent/CN106089217B/en
Publication of CN106089217A publication Critical patent/CN106089217A/en
Application granted granted Critical
Publication of CN106089217B publication Critical patent/CN106089217B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • E21D9/002Injection methods characterised by the chemical composition used
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Soil Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses major long tunnel rapid constructing method under a kind of complex geological condition, comprise the following steps: step S1, tunnel geology condition is carried out the distance Advance geological prediction and forecast of 30~150 m, and on the basis of distance Advance geological prediction and forecast, tunnel geology condition is carried out the short distance Advance geological prediction and forecast of 5~30m;Step S2, according to Advance geological prediction and forecast situation, use benching tunnelling method that IV b, V grade of country rock are excavated, use full section method that III, IV a level country rock is excavated;Step S3, according to Advance geological prediction and forecast situation, for the predictably launching stress in rich water section tunnel, use different curtain-grouting schemes;After step S4, tunnel excavation, it is monitored geology and preliminary bracing situation, periphery displacement amount, vault sinking amount measuring.The invention has the beneficial effects as follows: constructing tunnel task can be completed safely and fast at Unfavorable Conditions.

Description

Major long tunnel rapid constructing method under complex geological condition
Technical field
The present invention relates to technical field of tunnel construction, specifically, be that under a kind of complex geological condition, major long tunnel is quick Construction method.
Background technology
Along with developing rapidly of China's economic society, the traffic base construction such as highway in China, railway has welcome new development Peak.The most in recent years, along with Midwest great development, the Yangtze River Delta, economic zone, Pearl River Delta and Northeastern rust belt etc. Develop successively, country is newly-built many bigger highways and railway line, Qi Zhonggong, railway tunnel, especially complex geological condition Lower major long tunnel is more, and the major long tunnel construction under complex geological condition there is no set of comprehensive rapid constructing method.
Yichang-Wanzhou Railway is carried out the high risk national I grade of trunk railway in alpine region of new standard, and geological conditions is extremely complex, Tunnel Passing karst strata, fault belt and buried soft rock plasticity location, buried depth is big, rich groundwater, easily sends out in construction Raw gushing water, prominent mud disaster, III grade of country rock 1375m of I line Tunnel Passing, IV grade of country rock 5098m, VI grade of country rock 362m in construction.Ⅰ、 II line entrance section of tunnel buried depth is shallow, and karst corrosion is grown, and difficulty of construction is very big;I threaded list road is at DK267+850~DK269+670 Pass through 1820m to oblique core portion rich water section, this section of stratum is positioned near gold the direction which a grave faces oblique core portion, to tiltedly for ground water reservoir, rich water Location, subsoil water grows very much, complex geologic conditions, wherein, the F2 tomography of 97m to be passed through in this section of construction, easily formed gushing water, Prominent mud and large area landslide, unpredictalbe geological problem is many, and difficulty of construction is big, and tunnel at the maximum buried depth of this hole section is 355m, norm al discharge rate is 7334m3/ d, maximum flooding quantity is 45761m3/d.Easily occur extensive in constructing in above location Propagation in Tunnel Disaster, difficulty of construction is big, and Geological Prediction Technology is required height.
Therefore, how to complete constructing tunnel task safely and fast at Unfavorable Conditions, be that work progress needs weight The problem that point solves.
Summary of the invention
It is an object of the invention to provide major long tunnel rapid constructing method under a kind of complex geological condition, it is possible to the most also Find out the distribution of rock stratum in tunnel perimeter certain limit and front of tunnel heading certain distance relatively accurately, ground is not excavated in front The poor strata of section existence and lithology, tomography or rich water section etc. may bring the hydrogeology of adverse effect to construction operation Situation, is held accurately, is understood and interpretation, and based on this, takes corresponding technical matters measure to carry out science, conjunction Reason, in an orderly manner excavation and supporting operation, thus ensure safety for tunnel engineering, improve working environment, it is to avoid the generation of geological disaster Or reduce its frequency occurred and degree, reduce the economic loss that disaster is brought, accelerating construction progress simultaneously, reduction of erection time, joint The most dominant with recessive construction cost, increase direct or indirect economic benefit.
The present invention is achieved through the following technical solutions:
Major long tunnel rapid constructing method under complex geological condition, comprises the following steps:
Step S1, tunnel geology condition is carried out 30~150m distance Advance geological prediction and forecast, and in distance geology On the basis of prediction, tunnel geology condition is carried out the short distance Advance geological prediction and forecast of 5~30m;
Step S2, according to Advance geological prediction and forecast situation, use benching tunnelling method that IV b, V grade of country rock are excavated, use complete disconnected III, IV a level country rock is excavated by face method;
Step S3, according to Advance geological prediction and forecast situation, for the predictably launching stress in rich water section tunnel, under predictably During water pressure >=3.0MPa, use the curtain-grouting scheme that the fixing collar in the range of the outer 8m of excavation contour line consolidates;Work as 2.0MPa ≤ predictably launching stress < 3.0MPa time, use the curtain note of pre-pouring grout fixing collar consolidation in the range of the outer 5m of excavation contour line Slurry scheme;As 1.0MPa≤predictably launching stress < 2.0MPa, use the pre-reinforcement circle in the range of the outer 3m of excavation contour line The curtain-grouting scheme of consolidation;When predictably launching stress, < during 1.0MPa, using grouting and reinforcing scope is the outer 5m of excavation contour line In the range of tunneling boring radial grouting method;
After step S4, tunnel excavation, geology and preliminary bracing situation, periphery displacement amount, vault sinking amount are monitored Measure, and with Internal force of support structure diagnostic method, the structural stability in rich water section tunnel is commented according to headroom displacement diagnostic method Valency.
Applied geology mechanics principle of the present invention, geophysical probing technique principle, Shallow groundwater resources ripple principle and turn spy Principle verifies tunnel harm geological structure, carries out tunnel geology advanced prediction forecast, in conjunction with benching tunnelling method and full section method, to difference The country rock of grade excavates, and to reduce disturbance to country rock, gives full play to the self-bearing ability of country rock, the row of utilization, stifled, cut former Reason, carrying out the principle of tunnel " to block up in case being combination auxiliary, anti-blocking, limited drainage ", carrying out rich water karst tunnel Guarded drainage injecting treatment, to meet the requirement of environmental protection, simultaneously based on rock mass mechanics theory, application rock mass limiting strain is former Reason, determines tunnel stabilization early warning value, to meet the requirement quickly judging surrounding rock stability in constructing tunnel, and passes through monitoring measurement Data come accurate evaluation country rock or the steady statue of supporting or development trend, guiding construction order, adjust supporting parameter, it is ensured that execute Work safety and construction are smoothed out.
Further, the distance Advance geological prediction and forecast in described step S1, short distance Advance geological prediction and forecast
Specific operation process be:
Step S11, topography and geomorphology supplement exploration, supplement geologic survey;
Step S12, face geologic survey and sketch;
Step S13, the geological conditions using tunnel geological forecast system prediction forecast distance to be 50~150m;
Step S14, the geological conditions using geological radar prediction distance to be 30~50m;
The geological conditions that step S15, employing advance boreholes prediction distance are 30m, uses infrared detecting water prediction The geological conditions that forecast distance is 20m, the geological conditions using 5~8 hole overlength borehole prediction distances to be 5~10m;
Step S16, according to detection information, prediction suggestion and engineering measure suggestion are proposed.
Further, in described step S2, the specific operation process of benching tunnelling method excavation is:
Step S211, advance geologic prediction;
Step S212, advanced tubule or advance anchor bolt supporting;
Step S213, upper half section photoface exploision excavation;
Step S214, for the first time injection 4cm thickness concrete;
Step S215, erection grid steel frame;
Step S216, upper half section combined bolting and shotcrete;
Step S217, lower half section photoface exploision excavation;
Step S218, second time injection 4cm thickness concrete;
Step S219, erection grid steel frame;
Step S2110, lower half section combined bolting and shotcrete.
Further, in described step S2, the specific operation process of full section method excavation is:
Step S221, advance geologic prediction;
Step S222, advanced tubule or advance anchor bolt supporting;
Step S223, full*.face smooth blasting excavate;
Step S224, injection 4cm thickness concrete;
Step S225, erection grid steel frame;
Step S226, combined bolting and shotcrete.
Further, the blasting parameter of described step S223 full*.face smooth blasting excavation is: perimeter shothole spacing E= 50cm, minimum burden W=60cm, periphery hole close coefficient K=E/W=0.83, every cyclic advance is 3.2m, and periphery hole is deep 3.2m, snubber 1.5~3.7m, the deep 3.6m of end eye, blast hole utilization factor is more than 90%, and periphery hole uses the little medicine in Φ=20 Volume, does not couple spaced loading structure, uses V-cut, and blasting sequence is entered by snubber, reliever, periphery hole, end eye order OK.
Further, the blasted material that described step S223 full*.face smooth blasting excavation is used is: select No. 2 rocks Nitrolite or rich water section use emulsion, and powder stick specification is Ф 32 × 200 millimeters and Ф 20 × 200 millimeters two kinds, detonator It is 1~17 section of non-electric ms detonator, first carries out trying quick-fried before construction, and adjust blasting parameter according to the practical situation of country rock.
Further, in described step S3, the specific operation process of curtain-grouting scheme is:
Step S31, slip casting job execution prepare;
Step S32, grouting serous fluid are prepared;
Step S33, inlet well operation;
Step S34, slip casting operation;
Step S35, slip casting effect inspection, evaluate and remedy;
Step S36, abnormal conditions process.
Further, the preparation of described step S32 grouting serous fluid includes: single liquid cement mortar preparation, the double serosity of cement-sodium silicate Preparation, the preparation of TGRM ultra-fine dual liquid type cement-base special-type injecting paste material, wherein the ratio of mud of single liquid cement mortar is 1:0.6~1:1, After first dilute the denseest, if it is desired that cement mortar reduces setting time, the 2 of cement consumption~the accelerator of 3% can be penetrated into;Cement-water glass In the double serosity of glass, the ratio of mud of cement mortar is 1:1~1:1.5, and the concentration of waterglass is 30~40 baume, cement-sodium silicate Volume ratio is 1:0.3~1:1, and penetrates into the 1 of cement consumption~the retarder of 3% as required;TGRM ultra-fine dual liquid type cement The ratio of mud of base Special grouting material is 0.38:1~0.42:1, and gel time is 30 minutes.
Further, the headroom displacement diagnostic method in described step S4 is with tunnel supporting body bit-rate or Displacement Ratio Rate variation tendency is foundation, and when tunnel supporting body bit-rate trends towards 0, Tunneling System is stable;When displacement ratio exceedes When 16 ‰, reinforcement supporting need to be carried out;According to described standard, utilize field monitoring data, draw out tunnel deformation characteristic curve, logical Cross bit-rate or the analysis of displacement ratio, the stability state of country rock is judged.
Further, the Internal force of support structure diagnostic method in described step S4 includes according to anchor pole in tunnel structure system Stress analytic process and the stress analytic process according to gunite concrete.
The present invention compared with prior art, has the following advantages and beneficial effect:
(1) present invention can quickly and relatively accurately find out tunnel perimeter certain limit and front of tunnel heading certain distance The distribution of interior rock stratum, poor strata and lithology, tomography or rich water section etc. that front is not excavated location existence may be to executing Work industrial belt carrys out the hydrological geological conditions of adverse effect, is held accurately, understands and interpretation, and based on this, takes Corresponding technical matters measure carry out science, rationally, excavation and supporting operation in an orderly manner, thus ensure safety for tunnel engineering, change Kind working environment, it is to avoid frequency and the degree that its generation occurs or reduces of geological disaster, reduces the economic loss that disaster is brought, Accelerating construction progress simultaneously, the reduction of erection time, saves dominant and recessive construction cost, increases direct or indirect economic benefit;
(2) present invention distance Advance geological prediction and forecast employed in work progress, short distance Advance geological prediction and forecast side Method, creatively solves multi-solution and the circumscribed shortcoming of advance boreholes checking scope of physical detecting.
Detailed description of the invention
Below in conjunction with embodiment, the present invention is described in further detail, but embodiments of the present invention are not limited to this.
Embodiment:
Major long tunnel rapid constructing method under complex geological condition, comprises the following steps:
Step S1, tunnel geology condition is carried out 30~150m distance Advance geological prediction and forecast, and in distance geology On the basis of prediction, tunnel geology condition is carried out the short distance Advance geological prediction and forecast of 5~30m.
Wherein, the distance Advance geological prediction and forecast in described step S1, the concrete operations of short distance Advance geological prediction and forecast Cheng Wei:
Step S11, topography and geomorphology supplement exploration, supplement geologic survey;
Step S12, face geologic survey and sketch;
Step S13, the geological conditions using tunnel geological forecast system prediction forecast distance to be 50~150m, tunnel Advanced geology prediction system is little to constructing tunnel interference, can carry out in constructing tunnel gap;
Step S14, the geological conditions using geological radar prediction distance to be 30~50m;Geological radar scanning speed Hurry up, easy and simple to handle, lightweight, resolution is high, image is directly perceived, trickle to the distribution reflection of layer structure Rock And Soil, geological radar pair The anomalous reflections such as front of tunnel heading is aqueous, solution cavity, fracture belt are preferable;
The geological conditions that step S15, employing advance boreholes prediction distance are 30m, uses infrared detecting water prediction The geological conditions that forecast distance is 20m, the geological conditions using 5~8 hole overlength borehole prediction distances to be 5~10m, in advance Geotechnical boring comparable reflection intuitively boring formation lithology through position, rock mass completeness, crack degree, solution cavity size And hydraulic pressure height etc. can be surveyed, in can carrying out hole for coal measure strata, coal measures with Gas explosion burns, in order to take suitably to prevent and treat to arrange Executing, prevent and treat coal and gas prominent, compared with geophysical prospecting method, there are not the recurrent many solutions of physical prospecting means in advance boreholes Property, uncertainty;
Step S16, according to detection information, prediction suggestion and engineering measure suggestion are proposed.
In constructing tunnel, introduce tunnel geological forecast system, geological radar, infrared detecting water etc. constructing tunnel is entered Row advance geologic prediction, has the weakness of multi-solution in construction for physical detecting result, sum up and propose with in, Long physical prospecting and advance boreholes are verified as main, and short distance mapping analysis and infrared detecting water are auxiliary, and overlength borehole is confirmed as " the comprehensive three-dimensional advance geologic prediction technology " of " multistage, multi-level, the multi-method " of main contents.
Step S2, according to Advance geological prediction and forecast situation, use benching tunnelling method that IV b, V grade of country rock are excavated, use complete disconnected III, IV a level country rock is excavated by face method.
Wherein, in described step S2, the specific operation process of benching tunnelling method excavation is:
Step S211, advance geologic prediction;
Step S212, advanced tubule or advance anchor bolt supporting;
Step S213, upper half section photoface exploision excavation;
Step S214, for the first time injection 4cm thickness concrete;
Step S215, erection grid steel frame;
Step S216, upper half section combined bolting and shotcrete;
Step S217, lower half section photoface exploision excavation;
Step S218, second time injection 4cm thickness concrete;
Step S219, erection grid steel frame;
Step S2110, lower half section combined bolting and shotcrete.
Further, in described step S2, the specific operation process of full section method excavation is:
Step S221, advance geologic prediction;
Step S222, advanced tubule or advance anchor bolt supporting;
Step S223, full*.face smooth blasting excavate;
Step S224, injection 4cm thickness concrete;
Step S225, erection grid steel frame;
Step S226, combined bolting and shotcrete.
V grade of country rock for fault belt uses three benching tunnelling method excavations, and length of bench is not more than 15m, excavation of topping bar Highly about 3.0m, uses small pit goaf Cut Blasting, periphery manual amendment or artificial pneumatic pick directly to excavate according to country rock situation, people Power transported in hand truck fashion, cyclic advance 0.5~1.0m, second, third bench excavation height is respectively about 3.0m, monolateral excavator Excavation, mechanical tap, artificial wind does finishing, often circulates monolateral excavation length 1.0~about 1.5m;For general location V grade Country rock uses two benching tunnelling method excavations, selects bucket step or benching tunnelling method according to country rock situation, and height general control of topping bar is left at 5m The right side, can carry out mechanical tap;Preferable for globality III grade, IV a level country rock, use full section method excavation, once produce tunnel The design profile in road, and apply preliminary bracing by design requirement in time.
Full tunnel is in addition to Portal Section uses combined bolting and shotcrete monolithic reinforced-concrete lining cutting, and remaining location all uses combined type Lining cutting, preliminary bracing uses the mode that grid steel frame, anchor, net, spray combine.V grade of country rock uses advanced tubule, advance anchor bolt Deng advance support measure, length 3.5m, the lap of splice is not less than 1.5m, the most annularly-distributed puts 25, and secondary lining is that mould builds 30cm (IV Level), the thick C25 plain concrete of 35cm (V grade).
After each excavation circulation completes, first carry out just spraying 4cm thickness C20 concrete, close country rock, apply grid steel immediately Frame, anchor, net, spray supporting, preliminary bracing reserve settlement 7cm, grid steel frame joint uses bolt-connection, base pad channel-section steel, breaks Broken section of employingPer-fore pouring liquid with small pipe pre-reinforcement country rock, general location usesAdvanced grouting rock bolt pre support.
In construction, the driving immediately following face carries out surrouding rock deformation observation, when construction enters to oblique core portion, and initial support Middle the original advanced tubule the most only arranged in arch is extended to more than in the middle part of abutment wall, spacing according to country rock situation adjust to 25cm, and strict control over-excavation, change into both sides, tunnel abutment wall and tunnel vault system anchor boltRadially grouting with small pipe, Length is not less than 3.0m, meanwhile, arranges I-steel bow member in local, tunnel and substitutes grid steel frame, and increase steel arch-shelf spacing arrives 50cm/ Pin, to increase the rigidity of supporting construction, and arranges sufficient amount of blind pipe ejectment water at country rock EXIT POINT, and it is right to strengthen The backfill of the pad in corner, jetting cement, the quality control of substrate cleaning, reduce the construction impact on deformation.
Further, the blasting parameter of described step S223 full*.face smooth blasting excavation is: perimeter shothole spacing E= 50cm, minimum burden W=60cm, periphery hole close coefficient K=E/W=0.83, every cyclic advance is 3.2m, and periphery hole is deep 3.2m, snubber 1.5~3.7m, the deep 3.6m of end eye, blast hole utilization factor is more than 90%, and periphery hole uses the little medicine in Φ=20 Volume, does not couple spaced loading structure, uses V-cut, and blasting sequence is entered by snubber, reliever, periphery hole, end eye order OK.
Purging big gun hole with high-pressure blast before powder charge, medicine string and primer [cartridge] process on request, and the good payment to a porter of dish, fragment number is deposited In case, it is ensured that charging is carried out in order, powder charge burst, packet are carried out, and by regulation tamping stemming, stemming length is not Less than 20cm, strict control periphery hole explosive payload, make dose be uniformly distributed along borehole total length as far as possible, periphery hole preferably uses minor diameter Powder stick and low explosive.Initiation net is multibranch network, to ensure the reliability and the accuracy that detonate, during connection, detonator Can not tie a knot, draw and attenuate and damaged gas leakage, each borehole detonator hop count is identical with hole blasting design, ignites and uses blasting cap, and detonator is with black Adhesive plaster wrapping is being located from cluster detonator more than free end 10cm, after network connects, special messenger is responsible for inspection, accomplish to rise in order Quick-fried, and should make to have during perimeter blasting best free face, periphery hole with section to overbreak detonator time error the smaller the better.
Further, the blasted material that described step S223 full*.face smooth blasting excavation is used is: select No. 2 rocks Nitrolite or rich water section use emulsion, and powder stick specification is Ф 32 × 200 millimeters and Ф 20 × 200 millimeters two kinds, detonator It is 1~17 section of non-electric ms detonator, first carries out trying quick-fried before construction, and adjust blasting parameter according to the practical situation of country rock.
Step S3, according to Advance geological prediction and forecast situation, for the predictably launching stress in rich water section tunnel, under predictably During water pressure >=3.0MPa, use the curtain-grouting scheme that the fixing collar in the range of the outer 8m of excavation contour line consolidates;Work as 2.0MPa ≤ predictably launching stress < 3.0MPa time, use the curtain note of pre-pouring grout fixing collar consolidation in the range of the outer 5m of excavation contour line Slurry scheme;As 1.0MPa≤predictably launching stress < 2.0MPa, use the pre-reinforcement circle in the range of the outer 3m of excavation contour line The curtain-grouting scheme of consolidation;When predictably launching stress, < during 1.0MPa, using grouting and reinforcing scope is the outer 5m of excavation contour line In the range of tunneling boring radial grouting method.
In described step S3, the specific operation process of curtain-grouting scheme is:
Step S31, slip casting job execution prepare;
Step S32, grouting serous fluid are prepared;
Step S33, inlet well operation;
Step S34, slip casting operation;
Step S35, slip casting effect inspection, evaluate and remedy;
Step S36, abnormal conditions process.
The preparation of described step S32 grouting serous fluid includes: single liquid cement mortar preparation, cement-sodium silicate double River Bank Stability, TGRM Ultra-fine dual liquid type cement-base special-type injecting paste material is prepared, and wherein the ratio of mud of single liquid cement mortar is 1:0.6~1:1, the dilutest rear dense, If it is desired that cement mortar setting time reduces, the 2 of cement consumption~the accelerator of 3% can be penetrated into;In the double serosity of cement-sodium silicate The ratio of mud of cement mortar is 1:1~1:1.5, and the concentration of waterglass is 30~40 baume, and the volume ratio of cement-sodium silicate is 1: 0.3~1:1, and penetrate into the 1 of cement consumption~the retarder of 3% as required;TGRM ultra-fine dual liquid type cement-base special-type slip casting The ratio of mud of material is 0.38:1~0.42:1, and gel time is 30 minutes.
When carrying out the inlet well operation of step S33, on face, mark aperture position with red paint according to aperture coordinate Putting and indicate hole number, orifice position is ± 5cm with the allowable deviation of design attitude, and at the bottom of hole, position should be less than 30cm, is put by rig It is placed on the multifunctional hole-drilling stand of designed, designed processing, utilizes rig head and the tail coordinate difference to control vertically and horizontal angle, according to About each orifice angle requirement in design drawing, adjust drilling rod faces upward (bowing) angle and horizontal angle, mobile drill, is marked by drill bit alignment Orifice position, carries out bore operation.
After step S4, tunnel excavation, geology and preliminary bracing situation, periphery displacement amount, vault sinking amount are monitored Measure, and with Internal force of support structure diagnostic method, the structural stability in rich water section tunnel is commented according to headroom displacement diagnostic method Valency.
Headroom displacement diagnostic method in described step S4:
Taking tunnel arch top settlement displacement warning value U is: U=0.015 μ B
In formula: μ is the Poisson's ratio of rock mass in tunnel;B is tunnel span.
Taking both sides, tunnel abutment wall convergence displacement warning value W is: W=0.03 μ H
In formula: μ is the Poisson's ratio of rock mass in tunnel;H is tunnel excavation free height.
Displacement warning value is restrained as foundation, when tunnel carries with tunnel arch top settlement displacement warning value or both sides, tunnel abutment wall When the displacement of body exceedes tunnel arch top settlement displacement warning value or both sides, tunnel abutment wall convergence displacement warning value, reinforcement need to be carried out and prop up Protect, and utilize field monitoring data, draw out tunnel deformation characteristic curve, by bit-rate or the analysis of displacement ratio, The stability state of country rock is judged.
Internal force of support structure diagnostic method in described step S4 includes according to the stress of anchor pole in tunnel structure system Analytic process and the stress analytic process according to gunite concrete.
1) according to the stress of anchor pole in tunnel structure system:
Affected notable position in Karst Tunnel by solution cavity and laid force-measuring anchor stock, the force-bearing situation of actual measurement anchor pole.
[N]≥NActual measurement
&lsqb; N &rsqb; = &sigma; &pi; ( d 2 ) 2
[N]=π dL τ
In formula, [N] is the design tension pull out force of anchor pole, breaks situation by reinforcing bar and situation extracted by reinforcing bar, take little after calculating Value;
NActual measurementActual tension pull out force for anchor pole;
σ is the design tensile strength of steel;
τ is that the shearing strength of mortar and country rock gets the small value;
D is the diameter of anchor pole;
L is rock-bolt length.
As site observation result meets above formula, then surrounding rock supporting system can keep stable;Otherwise, reinforcement supporting need to be carried out.
2) according to the stress of gunite concrete:
In the shotcrete layer of initial support, lay strain gauge, measure the strain in shotcrete layer or answer Power, the strain in actual measurement spray-up or stress.
Draw]≥σActual measurement
Pressure]≥σActual measurement
[ε]≥εActual measurement
In formula, [σDraw] it is the tensile strength of spray-up concrete layer;
Pressure] it is the comprcssive strength of spray-up concrete layer;
σActual measurementObserved strength for spray-up concrete layer;
[ε] is the permission strain of spray-up concrete layer;
εActual measurementActual measurement for spray-up concrete layer strains.
As site observation result meets above formula, then surrounding rock supporting system can keep stable;Otherwise, reinforcement supporting need to be carried out.
The above, be only presently preferred embodiments of the present invention, and the present invention not does any pro forma restriction, every depends on Any simple modification of being made above example according to the technical spirit of the present invention, equivalent variations, each fall within the protection of the present invention Within the scope of.

Claims (10)

1. major long tunnel rapid constructing method under complex geological condition, it is characterised in that comprise the following steps:
Step S1, tunnel geology condition is carried out the distance Advance geological prediction and forecast of 30~150 m, and at distance Geological Prediction On the basis of forecast, tunnel geology condition is carried out the short distance Advance geological prediction and forecast of 5~30m;
Step S2, according to Advance geological prediction and forecast situation, use benching tunnelling method that IV b, V grade of country rock are excavated, use full section method III, IV a level country rock is excavated;
Step S3, according to Advance geological prediction and forecast situation, for the predictably launching stress in rich water section tunnel, when prediction ground water pressure During power >=3.0MPa, use the curtain-grouting scheme that the fixing collar in the range of the outer 8m of excavation contour line consolidates;As 2.0MPa≤pre- During geodetic launching stress < 3.0MPa, use the curtain-grouting side that the pre-pouring grout fixing collar in the range of the outer 5m of excavation contour line consolidates Case;As 1.0MPa≤predictably launching stress < 2.0MPa, use the pre-reinforcement circle consolidation in the range of the outer 3m of excavation contour line Curtain-grouting scheme;When predictably launching stress, < during 1.0MPa, using grouting and reinforcing scope is the outer 5m scope of excavation contour line Interior tunneling boring radial grouting method;
After step S4, tunnel excavation, it is monitored geology and preliminary bracing situation, periphery displacement amount, vault sinking amount measuring, And the structural stability in rich water section tunnel is evaluated with Internal force of support structure diagnostic method according to headroom displacement diagnostic method.
Major long tunnel rapid constructing method under complex geological condition the most according to claim 1, it is characterised in that described step Suddenly the distance Advance geological prediction and forecast in S1, the specific operation process of short distance Advance geological prediction and forecast are:
Step S11, topography and geomorphology supplement exploration, supplement geologic survey;
Step S12, face geologic survey and sketch;
Step S13, the geological conditions using tunnel geological forecast system prediction forecast distance to be 50~150 m;
Step S14, the geological conditions using geological radar prediction distance to be 30~50 m;
The geological conditions that step S15, employing advance boreholes prediction distance are 30m, uses infrared detecting water prediction The geological conditions that distance is 20m, the geological conditions using 5~8 hole overlength borehole prediction distances to be 5~10m;
Step S16, according to detection information, prediction suggestion and engineering measure suggestion are proposed.
Major long tunnel rapid constructing method under complex geological condition the most according to claim 1, it is characterised in that described step In rapid S2, the specific operation process of benching tunnelling method excavation is:
Step S211, advance geologic prediction;
Step S212, advanced tubule or advance anchor bolt supporting;
Step S213, upper half section photoface exploision excavation;
Step S214, for the first time injection 4cm thickness concrete;
Step S215, erection grid steel frame;
Step S216, upper half section combined bolting and shotcrete;
Step S217, lower half section photoface exploision excavation;
Step S218, second time injection 4cm thickness concrete;
Step S219, erection grid steel frame;
Step S2110, lower half section combined bolting and shotcrete.
Major long tunnel rapid constructing method under complex geological condition the most according to claim 1, it is characterised in that described step In rapid S2, the specific operation process of full section method excavation is:
Step S221, advance geologic prediction;
Step S222, advanced tubule or advance anchor bolt supporting;
Step S223, full*.face smooth blasting excavate;
Step S224, injection 4cm thickness concrete;
Step S225, erection grid steel frame;
Step S226, combined bolting and shotcrete.
Major long tunnel rapid constructing method under complex geological condition the most according to claim 4, it is characterised in that described step The blasting parameter of rapid S223 full*.face smooth blasting excavation is: perimeter shothole spacing E=50cm, minimum burden W=60cm, periphery hole Close coefficient K=E/W=0.83, every cyclic advance is 3.2m, the deep 3.2m of periphery hole, snubber 1.5~3.7m, the deep 3.6m of end eye, Blast hole utilization factor is more than 90%, and periphery hole uses Φ=20 small medicine coil, does not couple spaced loading structure, uses V-cut, Blasting sequence is carried out by snubber, reliever, periphery hole, end eye order.
Major long tunnel rapid constructing method under complex geological condition the most according to claim 5, it is characterised in that described step The blasted material that rapid S223 full*.face smooth blasting excavation is used is: select No. 2 rock dynamites or rich water section to use breast Changing explosive, powder stick specification is Ф 32 × 200 millimeters and Ф 20 × 200 millimeters two kinds, and detonator is 1~17 section of non-electric ms detonator, First carry out trying quick-fried before construction, and adjust blasting parameter according to the practical situation of country rock.
7., according to major long tunnel rapid constructing method under the complex geological condition described in any one of claim 1-6, its feature exists In, in described step S3, the specific operation process of curtain-grouting scheme is:
Step S31, slip casting job execution prepare;
Step S32, grouting serous fluid are prepared;
Step S33, inlet well operation;
Step S34, slip casting operation;
Step S35, slip casting effect inspection, evaluate and remedy;
Step S36, abnormal conditions process.
Major long tunnel rapid constructing method under complex geological condition the most according to claim 7, it is characterised in that described step Rapid S32 grouting serous fluid preparation includes: single liquid cement mortar preparation, cement-sodium silicate double River Bank Stability, TGRM ultra-fine dual liquid type cement Base Special grouting material is prepared, and wherein the ratio of mud of single liquid cement mortar is 1:0.6~1:1, the dilutest rear dense, if it is desired that cement mortar Setting time reduces, and can penetrate into the 2 of cement consumption~the accelerator of 3%;The ratio of mud of cement mortar in the double serosity of cement-sodium silicate For 1:1~1:1.5, the concentration of waterglass is 30~40 baume, and the volume ratio of cement-sodium silicate is 1:0.3~1:1, and root According to needing to penetrate into 1~the retarder of 3% of cement consumption;The ratio of mud of TGRM ultra-fine dual liquid type cement-base special-type injecting paste material is 0.38:1~0.42:1, gel time is 30 minutes.
9., according to major long tunnel rapid constructing method under the complex geological condition described in any one of claim 1-6, its feature exists It is with tunnel supporting body bit-rate or displacement ratio variation tendency for depending in, the headroom displacement diagnostic method in described step S4 According to, when tunnel supporting body bit-rate trends towards 0, Tunneling System is stable;When displacement ratio is more than 16 ‰, reinforcement need to be carried out Supporting;According to described standard, utilize field monitoring data, draw out tunnel deformation characteristic curve, by bit-rate or position Move the analysis of ratio, the stability state of country rock is judged.
10., according to major long tunnel rapid constructing method under the complex geological condition described in any one of claim 1-6, its feature exists In, the Internal force of support structure diagnostic method in described step S4 includes according to the stress analytic process of anchor pole in tunnel structure system With the stress analytic process according to gunite concrete.
CN201610585922.2A 2016-07-22 2016-07-22 Major long tunnel rapid constructing method under complex geological condition Active CN106089217B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610585922.2A CN106089217B (en) 2016-07-22 2016-07-22 Major long tunnel rapid constructing method under complex geological condition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610585922.2A CN106089217B (en) 2016-07-22 2016-07-22 Major long tunnel rapid constructing method under complex geological condition

Publications (2)

Publication Number Publication Date
CN106089217A true CN106089217A (en) 2016-11-09
CN106089217B CN106089217B (en) 2018-04-17

Family

ID=57450141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610585922.2A Active CN106089217B (en) 2016-07-22 2016-07-22 Major long tunnel rapid constructing method under complex geological condition

Country Status (1)

Country Link
CN (1) CN106089217B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107620596A (en) * 2017-09-20 2018-01-23 唐伟 A kind of rock tunnel driving method
CN108286920A (en) * 2018-01-31 2018-07-17 中铁二十二局集团第工程有限公司 A kind of implementation of Tunnel Blasting and excavation
CN108510202A (en) * 2018-04-09 2018-09-07 中铁十二局集团第二工程有限公司 The monitoring information management method and managing device of building are worn under hydraulic tunnel
CN109025806A (en) * 2018-07-26 2018-12-18 重庆交通建设(集团)有限责任公司 Intensive living area construction method is worn under shallow-buried sector
CN109723444A (en) * 2019-01-04 2019-05-07 中铁十一局集团第四工程有限公司 A kind of Support System in Soft Rock Tunnels mechanization tunneling boring Rapid Excavation cyclization drill eye blasting construction
CN109736796A (en) * 2019-03-04 2019-05-10 中铁十六局集团有限公司 A kind of intensification blasthole forward probe mechanism and its forecasting procedure
CN112081594A (en) * 2020-08-27 2020-12-15 中铁三局集团广东建设工程有限公司 BIM-based rapid construction method for long and large sandy slate tunnel
CN112832822A (en) * 2021-03-24 2021-05-25 中铁二院重庆勘察设计研究院有限责任公司 Rock mass grouting reinforcement gas prevention and control method for guaranteeing safety of gas outburst tunnel
CN114060043A (en) * 2021-12-01 2022-02-18 中国铁建大桥工程局集团有限公司 Construction method for soil pressure balance shield to penetrate through composite stratum
CN114412476A (en) * 2021-12-28 2022-04-29 中铁二十局集团第二工程有限公司 Tunnel construction method
CN117852887A (en) * 2024-01-11 2024-04-09 铁正检测科技有限公司 Tunnel geological monitoring management system based on big data

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05256099A (en) * 1991-04-24 1993-10-05 Agency Of Ind Science & Technol Joint action monitoring tunneling method
CN101761346A (en) * 2009-12-30 2010-06-30 中铁十二局集团第二工程有限公司 Method for constructing metamorphic rock confined water tunnel
CN102900441A (en) * 2012-09-18 2013-01-30 铁道部经济规划研究院 China tunnel construction method based on complete deformation control of surrounding rocks

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05256099A (en) * 1991-04-24 1993-10-05 Agency Of Ind Science & Technol Joint action monitoring tunneling method
CN101761346A (en) * 2009-12-30 2010-06-30 中铁十二局集团第二工程有限公司 Method for constructing metamorphic rock confined water tunnel
CN102900441A (en) * 2012-09-18 2013-01-30 铁道部经济规划研究院 China tunnel construction method based on complete deformation control of surrounding rocks

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
霍润科等: "隧道施工对黄土松动区内力和位移影响研究", <<岩土力学>> *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107620596A (en) * 2017-09-20 2018-01-23 唐伟 A kind of rock tunnel driving method
CN108286920A (en) * 2018-01-31 2018-07-17 中铁二十二局集团第工程有限公司 A kind of implementation of Tunnel Blasting and excavation
CN108510202A (en) * 2018-04-09 2018-09-07 中铁十二局集团第二工程有限公司 The monitoring information management method and managing device of building are worn under hydraulic tunnel
CN109025806A (en) * 2018-07-26 2018-12-18 重庆交通建设(集团)有限责任公司 Intensive living area construction method is worn under shallow-buried sector
CN109723444A (en) * 2019-01-04 2019-05-07 中铁十一局集团第四工程有限公司 A kind of Support System in Soft Rock Tunnels mechanization tunneling boring Rapid Excavation cyclization drill eye blasting construction
CN109736796A (en) * 2019-03-04 2019-05-10 中铁十六局集团有限公司 A kind of intensification blasthole forward probe mechanism and its forecasting procedure
CN112081594A (en) * 2020-08-27 2020-12-15 中铁三局集团广东建设工程有限公司 BIM-based rapid construction method for long and large sandy slate tunnel
CN112832822A (en) * 2021-03-24 2021-05-25 中铁二院重庆勘察设计研究院有限责任公司 Rock mass grouting reinforcement gas prevention and control method for guaranteeing safety of gas outburst tunnel
CN114060043A (en) * 2021-12-01 2022-02-18 中国铁建大桥工程局集团有限公司 Construction method for soil pressure balance shield to penetrate through composite stratum
CN114412476A (en) * 2021-12-28 2022-04-29 中铁二十局集团第二工程有限公司 Tunnel construction method
CN117852887A (en) * 2024-01-11 2024-04-09 铁正检测科技有限公司 Tunnel geological monitoring management system based on big data

Also Published As

Publication number Publication date
CN106089217B (en) 2018-04-17

Similar Documents

Publication Publication Date Title
CN106089217B (en) Major long tunnel rapid constructing method under complex geological condition
CN102606162B (en) Quick construction method for weak surrounding rock shallowly-buried easily-collapsed area of tunnel
CN106524844B (en) Boulder reconnoitres the construction method with explosion treatment along a kind of shield tunnel
CN101994513B (en) Method for constructing tunnel by finishing full section curtain grouting from upper-half section
CN102287195B (en) Construction method of large-span tunnel passing through rapid transit railway with shallow tunneling process
CN103089275B (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN102071940B (en) Construction method for mine shaft through multilayer goaf
CN104790978B (en) The tunnel ring-shaped base tunnel construction method of small interval crossings on different level
CN102808628B (en) Construction method of passage of large-section tunnel by water diversion fault
CN106837352A (en) Fault belt surrounding rock tunnel construction method
CN106837353A (en) Filling karst tunnel construction treatment method
CN104748632B (en) One chock blasting construction method under water
CN104747194A (en) Three-wire parallel small spacing large section tunnel group construction method
CN104005415B (en) The efficient forming construction method thereof of diaphram wall in light weathered granite
CN106194195A (en) Collapsible Loess District large cross-section tunnel three step is without remaining core soil in advance construction method
CN103334770A (en) Construction method of superhigh water pressure water-affluent crushed zones of long-large counter-slope tunnels
CN104790959B (en) A kind of Shallow-buried Tunnels with Small Spacing ground method for tunnel construction
CN106979012A (en) Hidden conduit pipe Comprehensive Treatment method in shaft of vertical well freezing hole
CN110206547B (en) Method suitable for shaft tunneling and supporting in deep stratum and high-stress area
CN109611103A (en) A method of for boulder group consolidation process outstanding on shield section
CN114233385A (en) Treatment method for mud burst and water burst of inclined shaft
CN112177635A (en) Construction method of step multiple advanced small guide pipe and construction method of overlapped tunnel
CN207111124U (en) The support system in unfavorable geology corrosion funnel area tunnel
CN112576265A (en) Sedimentation control method for old villages penetrated by shield
CN106522981A (en) Support method for tunnel passing through goaf

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant