CN105737700A - Pot bottom shaped deep hole smooth bottom smooth blasting construction method applicable to vertical shaft - Google Patents

Pot bottom shaped deep hole smooth bottom smooth blasting construction method applicable to vertical shaft Download PDF

Info

Publication number
CN105737700A
CN105737700A CN201610103986.4A CN201610103986A CN105737700A CN 105737700 A CN105737700 A CN 105737700A CN 201610103986 A CN201610103986 A CN 201610103986A CN 105737700 A CN105737700 A CN 105737700A
Authority
CN
China
Prior art keywords
rock
borehole
hole
vertical shaft
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610103986.4A
Other languages
Chinese (zh)
Inventor
张馨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201610103986.4A priority Critical patent/CN105737700A/en
Publication of CN105737700A publication Critical patent/CN105737700A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D1/00Sinking shafts
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a pot bottom shaped deep hole smooth bottom smooth blasting construction method applicable to a vertical shaft. The construction method comprises the following steps: in the later stage of gangue discharging, that is, bottom clearing, the speed of collecting and discharging slag by a shovel and a rock grab is 4-5 times higher than the speed of collecting and discharging slag on flat base operation surfaces, and is 5-6 times higher than the speed of collecting and discharging slag on uneven working surfaces between which the elevation difference is more than 0.5 m; in water draining, gathering water by an air pick sump in the past is changed into automatically collecting water, and an air pump and a bucket can be directly used for draining water, so that the water draining efficiency is improved greatly, and the overflowing influence is reduced; and in hole drilling of an umbrella driller, no floating debris and broken stones are generated, the hole positioning is fast and accurate, rock powder can be blown out from the shot holes, jamming and wedging of a drilling tool are avoided, and the speed of drilling holes in a full section is higher than of the speed of drilling holes in flat bases or uneven working faces. In hole drilling, automatic water collection is achieved, the rock powder slurry flows into the lower pot bottom and is discharged in the bucket by the air pump, so that the hole sweeping difficulty is reduced, water-gel explosive can be placed at the bottoms of the shot holes smoothly, the phenomenon of interruption of propagation of detonation, which is caused by the fact that a rock powder slurry medium is isolated during the process of propagation of detonation of the explosive, is avoided, and the average utilization ratio of the shot holes can be increased to more than 96%.

Description

One is applied to the vertical shaft deep hole pot bottom type quick-fried construction method of light bottom season
Technical field
The present invention relates to a kind of vertical shaft quick-fried construction technique of rock section light, particularly to one be applied to vertical shaft joint fissure relatively grow, the soft or hard special strata pockety section deep hole pot bottom-shape quick-fried construction technique of light bottom season.
Background technology
To Construction of Silo be frequently encountered by joint fissure relatively grow, soft or hard rock stratum pockety, after explosion, bottom is uneven, and hollow hole not of uniform size even occurs, causes great difficulty to the muck removal clear end;Especially with the deepening of the degree of depth, the infiltration of well side, water outlet run up to shaft bottom work surface, cause trouble to draining in jewel hole process, and in powder charge, broken quarrel entrance borehole causes explosive flame proof, miss-fires, and there is very big security risk during process.
Summary of the invention
The purpose of the present invention is that and overcomes in above-mentioned prior art deficiency joint fissure relatively grown, exists in development blasting construction under soft or hard special strata pockety, and provide one to be applied to the vertical shaft special strata section deep hole pot bottom-shape quick-fried construction technique of light bottom season, this new technique is easy at clear stage end collection quarrel and hydrops, quickening spade and grab greatly the clear end and the speed with air pump, baling, reduce unrestrained water impact, improving umbrella drilling speed and blast hole utilization factor, this construction technology is simple, safe, economic, practical.
The technical scheme is that one is applied to the vertical shaft special strata section deep hole pot bottom-shape quick-fried construction method of light bottom season, it is characterised in that: carry out according to the following step,
1. to there is work surface uneven, that the discrepancy in elevation reaches more than 0.5m, eminence perforating is deepened about 0.2m, eye spacing and eye number and depending on rock stratum hardness and is exceeded area 1~3 eye of increase, increases by 1 powder stick, create substantially smooth work surface through 1~2 big gun during powder charge.In order to implement, pot bottom type deep hole light bottom season is quick-fried to create conditions.
2. silo bottom is cleared up, tunnel pot bottom-shape blasting parameter design table at the bottom of borehole layout drawing, rock section brill light according to rock section, borehole is carried out red circle labelling.
3. on the both sides, wellbore centre hole being inserted with air pick drill, keep flat the 2 long 600mm of specification × high 250mm × wide 300mm lumps of wood, the lumps of wood straightens at the bottom of the boring that footpath is 400mm, high 450mm.Tissue FJD-6 type umbrella bores goes into the well, and the base (height 200mm) that umbrella bores is placed at the bottom of boring, exposed height 110mm.
4. FJD-6 type umbrella bores supporting YGZ-70 type Independent Rotary Rock Drill and makes a call to 3.0~4.5m deep hole according to borehole labelling, will in strict accordance with explosion design parameter table during perforating, outside from the well heart, the bottomed height of from coil to coil borehole gradually steps up, same circle borehole is intended to ensure that bottomed height is identical, creates conditions for forming the bright finish the bottom of a pan.
5. first shaft bottom muddy water it is discharged in well-bucket before powder charge or is discharged in the water tank on hanging scaffold, then with wind, borehole being swept totally, it is ensured that explosive installs to optical fundus and continuous charging.
6. powder charge carries out in strict accordance with explosion design parameter table, and snubber (1~7) adoptsAqueous gels, explosive payload 35kg, detonator segment number 1 section;1st circle reliever (8~17) adoptsAqueous gels, explosive payload 40kg, detonator segment number 3 sections;2nd circle reliever (18~34) adoptsAqueous gels, explosive payload 51kg, detonator segment number 5 sections;Periphery hole (35~72) adoptsAqueous gels, explosive payload 45.6kg, detonator segment number 7 sections;Periphery reliever (73~109) adoptsAqueous gels, explosive payload 22.2kg, detonator segment number 7 sections.On line mode adopts big parallel connection, and firing order is: snubber (1~7)-1 encloses reliever (8~17)-2 and encloses reliever (18~34)-periphery hole (35~72)-periphery reliever (73~109).Snubber adopts reverse continuous charging structure, reliever and periphery hole to adopt forward continuous charging structure.
7., after explosion completes, HZ-6 type center steering grab loader, master is adopted to carry 2JK-3.5/20 type elevator and join 3.0m3Well-bucket, pair carry JK-2.5/20 type elevator and join 2.0m3Well-bucket is cut clearly operation.
Present invention have the advantage that and good effect:
1. going out cash later stage and the clear stage end, be cut with spade and grab loader collection and the speed of muck removal improves 4~5 times than flat work surface, improve 5~6 times than uneven work surface speed more than discrepancy in elevation 0.5m.
2. when draining, original pneumatic pick prop up water nest polywater and change automatic water collecting, directly available air pump and baling into, substantially increase drainage efficiency, decrease the impact of unrestrained water.
3. being easily guaranteed that clear substrate amount, umbrella is drilled in not floating quarrel rubble during perforating, is surely sharp-eyed and accurately, rock dust can blow out in borehole, not bit freezing not stick of tool, and tunneling boring perforating speed improves 20%~40% than flat or uneven work surface.
4. automatic water collecting during perforating, rock dust slurry stream is to the bottom of a pan of lower, well-bucket is entered with air pump, alleviate and sweep a difficulty, aqueous gels are enable successfully to install to bottom borehole, avoiding explosive and produce, because rock dust starches the isolation of medium, the phenomenon that propagation of explosion interrupts in propagation of explosion process, borehole average utilization can bring up to more than 96%.
5. good economy performance, can be greatly reduced construction cost.
Accompanying drawing explanation
Fig. 1 is rock section driving borehole plane of arrangement figure.
Fig. 2 is that rock section driving borehole arranges vertical face figure.
In figure: 1, draw exoculation, the 2, first lap reliever, 3, second circle reliever, 4, periphery hole, 5, periphery reliever, 6, wellbore centre line.
Detailed description of the invention
As shown in Figure 1-2, one be applied to vertical shaft joint fissure relatively grow, the soft or hard special strata pockety section deep hole pot bottom-shape quick-fried construction method of light bottom season, carry out according to the following step: 1. first end foreign material cheated by cleaning vertical shaft, expose bed rock face, hole, to there is work surface uneven, that the discrepancy in elevation reaches more than 0.5m, about 0.2m is deepened in eminence perforating, eye spacing and eye number depending on rock stratum hardness and exceed area 1~3 eye of increase, increase by 1 powder stick during powder charge, create substantially smooth work surface through 1~2 big gun.In order to implement, pot bottom type deep hole light bottom season is quick-fried to create conditions.2. tunnel borehole layout drawing according to Fig. 2 rock section and be accurately positioned borehole position, with red lacquer painting circle.3. on the both sides, wellbore centre hole being inserted with air pick drill, keep flat the 2 long 600mm of specification × high 250mm × wide 300mm lumps of wood, the lumps of wood straightens at the bottom of the boring that footpath is 400mm, high 450mm.Tissue FJD-6 type umbrella bores goes into the well, and the base (height 200mm) that umbrella bores is placed at the bottom of boring, exposed height 110mm.4. bore in pot bottom-shape explosion design table at the bottom of light according to table 1 rock section, the technical parameters such as inclination angle, eye deep, eye distance, bottomed height, use FJD-6 type umbrella to bore supporting YGZ-70 type Independent Rotary Rock Drill and make a call to 3.0~4.5m deep hole according to borehole labelling, will in strict accordance with table 1 borehole blasting design parameter during perforating, outside from the well heart, the bottomed height of from coil to coil borehole gradually steps up, and same circle borehole is intended to ensure that bottomed height is identical, creates conditions for forming the bright finish the bottom of a pan.5. shaft bottom muddy water it is discharged in well-bucket or is discharged in the water tank on hanging scaffold, then with wind, borehole being swept totally, it is ensured that explosive installs to optical fundus and continuous charging.6. according to Fig. 1, big gun hole is numbered.Bore in pot bottom-shape explosion design table at the bottom of light according to table 1 rock section, use diameter of phi 45mm/ Φ 35mm rock aqueous gels, corresponding big gun hole loads design explosive payload, load corresponding detonator, snubber powder charge adopts reverse continuous charging structure, reliever and periphery hole powder charge to adopt forward continuous charging structure.Bore firing order, on line mode in pot bottom-shape explosion design table at the bottom of light according to table 1 rock section and blasting network is set.7., after explosion completes, HZ-6 type center steering grab loader, master is adopted to carry 2JK-3.5/20 type elevator and join 3.0m3Well-bucket, pair carry JK-2.5/20 type elevator and join 2.0m3Well-bucket is cut clearly operation.
Going out cash later stage and the clear stage end, be cut with spade and grab loader collection and the speed of muck removal improves 4~5 times than flat work surface, improve 5~6 times than uneven work surface speed more than discrepancy in elevation 0.5m.
When draining, original pneumatic pick prop up water nest polywater and change automatic water collecting, directly available air pump and baling into, substantially increase drainage efficiency, decrease the impact of unrestrained water.
This method easily ensures clear substrate amount, and umbrella is drilled in not floating quarrel rubble during perforating, is surely sharp-eyed and accurately, rock dust can blow out in borehole, not bit freezing not stick of tool, and tunneling boring perforating speed improves 20%~40% than flat or uneven work surface.
Automatic water collecting during perforating, rock dust slurry stream is to the bottom of a pan of lower, well-bucket is entered with air pump, alleviate and sweep a difficulty, aqueous gels are enable successfully to install to bottom borehole, avoiding explosive and produce, because rock dust starches the isolation of medium, the phenomenon that propagation of explosion interrupts in propagation of explosion process, borehole average utilization can bring up to more than 96%.
Pot bottom-shape Smooth Blasting Prameter Design at the bottom of certain vertical shaft rock section light of table 1
Certain vertical shaft rock section of table 2 bores quick-fried initial condition and demolition effect
Sequence number Title Unit Quantity Sequence number Title Unit Quantity
1 Excavated section 39.6 8 Explosive payload kg 193.8
2 Rock property f 4~8 9 Blast hole utilization factor % 90
3 Water yield m3/h 4.8 10 Every cyclic advance m 2.7
4 Borehole depth m 3.0 11 Often circulation explosion reality rock m3 107
5 Borehole number Individual 109 12 Unit powder consumption kg/m3 1.81
6 Aqueous gels Φ45、Φ35 13 Every meter of amount of consumption of drugs kg/m 71.7
7 Electric cap Millisecond is delayed 14 Often circulation borehole is long m 274.5

Claims (5)

1. one kind is applied to the vertical shaft deep hole pot bottom type quick-fried construction method of light bottom season, it is characterized in that: the method is that one is applied to vertical shaft joint fissure and relatively grows, the soft or hard special strata pockety section deep hole pot bottom-shape quick-fried construction method of light bottom season, carry out according to the following step: 1. first end foreign material cheated by cleaning vertical shaft, expose bed rock face, hole, uneven to existing, the discrepancy in elevation reaches the work surface of more than 0.5m, about 0.2m is deepened in eminence perforating, eye spacing and eye number depending on rock stratum hardness and exceed area 1~3 eye of increase, 1 powder stick is increased during powder charge, substantially smooth work surface is createed through 1~2 big gun;In order to implement, pot bottom type deep hole light bottom season is quick-fried to create conditions;2. tunnel borehole layout drawing according to rock section and be accurately positioned borehole position, with red lacquer painting circle;3. on the both sides, wellbore centre hole being inserted with air pick drill, keep flat the 2 long 600mm of specification × high 250mm × wide 300mm lumps of wood, the lumps of wood straightens at the bottom of the boring that footpath is 400mm, high 450mm;Tissue FJD-6 type umbrella bores goes into the well, and the base (height 200mm) that umbrella bores is placed at the bottom of boring, exposed height 110mm;4. bore in pot bottom-shape explosion design at the bottom of light according to rock section, inclination angle, eye are deep, eye distance, bottomed height technical parameter, use FJD-6 type umbrella to bore supporting YGZ-70 type Independent Rotary Rock Drill and make a call to 3.0~4.5m deep hole according to borehole labelling, will in strict accordance with explosion design parameter during perforating, outside from the well heart, the bottomed height of from coil to coil borehole gradually steps up, and same circle borehole is intended to ensure that bottomed height is identical, creates conditions for forming the bright finish the bottom of a pan;5. shaft bottom muddy water it is discharged in well-bucket or is discharged in the water tank on hanging scaffold, then with wind, borehole being swept totally, it is ensured that explosive installs to optical fundus and continuous charging;6. it is numbered according to big gun hole;Bore in pot bottom-shape explosion design at the bottom of light according to rock section, use diameter of phi 45mm/ Φ 35mm rock aqueous gels, corresponding big gun hole loads design explosive payload, loads corresponding detonator, snubber powder charge adopts reverse continuous charging structure, reliever and periphery hole powder charge to adopt forward continuous charging structure;Bore firing order, on line mode in pot bottom-shape explosion design at the bottom of light according to rock section and blasting network is set;7., after explosion completes, HZ-6 type center steering grab loader, master is adopted to carry 2JK-3.5/20 type elevator and join 3.0m3Well-bucket, pair carry JK-2.5/20 type elevator and join 2.0m3Well-bucket is cut clearly operation.
2. one according to claim 1 is applied to the vertical shaft deep hole pot bottom type quick-fried construction method of light bottom season, it is characterized in that: going out cash later stage and the clear stage end, it is cut with spade and grab loader collection and the speed of muck removal improves 4~5 times than flat work surface, improve 5~6 times than uneven work surface speed more than discrepancy in elevation 0.5m.
3. one according to claim 1 is applied to the vertical shaft deep hole pot bottom type quick-fried construction method of light bottom season, it is characterized in that: when draining, original pneumatic pick prop up water nest polywater and change automatic water collecting, directly available air pump and baling into, substantially increase drainage efficiency, decrease the impact of unrestrained water.
4. one according to claim 1 is applied to the vertical shaft deep hole pot bottom type quick-fried construction method of light bottom season, it is characterized in that: this method easily ensures clear substrate amount, umbrella is drilled in not floating quarrel rubble during perforating, surely it is sharp-eyed and accurately, rock dust can blow out in borehole, not bit freezing not stick of tool, tunneling boring perforating speed improves 20%~40% than flat or uneven work surface.
5. one according to claim 1 is applied to the vertical shaft deep hole pot bottom type quick-fried construction method of light bottom season, it is characterized in that: automatic water collecting during perforating, rock dust slurry stream is to the bottom of a pan of lower, well-bucket is entered with air pump, alleviate and sweep a difficulty, the aqueous gels are enable successfully to install to bottom borehole, it is to avoid explosive produces, because rock dust starches the isolation of medium, the phenomenon that propagation of explosion interrupts in propagation of explosion process, and borehole average utilization can bring up to more than 96%.
CN201610103986.4A 2016-02-25 2016-02-25 Pot bottom shaped deep hole smooth bottom smooth blasting construction method applicable to vertical shaft Pending CN105737700A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610103986.4A CN105737700A (en) 2016-02-25 2016-02-25 Pot bottom shaped deep hole smooth bottom smooth blasting construction method applicable to vertical shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610103986.4A CN105737700A (en) 2016-02-25 2016-02-25 Pot bottom shaped deep hole smooth bottom smooth blasting construction method applicable to vertical shaft

Publications (1)

Publication Number Publication Date
CN105737700A true CN105737700A (en) 2016-07-06

Family

ID=56248513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610103986.4A Pending CN105737700A (en) 2016-02-25 2016-02-25 Pot bottom shaped deep hole smooth bottom smooth blasting construction method applicable to vertical shaft

Country Status (1)

Country Link
CN (1) CN105737700A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106813540A (en) * 2017-01-18 2017-06-09 淮南矿业(集团)有限责任公司 The method of Shaft Freezing rock section deep hole blasting under ultra low temperature state
CN111336881A (en) * 2020-03-06 2020-06-26 中国矿业大学(北京) Thin coal seam half-coal rock roadway medium-length hole smooth blasting method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101832744A (en) * 2010-05-25 2010-09-15 江南水利水电工程公司 Blasting demolishing method
KR20130089061A (en) * 2012-02-01 2013-08-09 주식회사 한화 Method for blasting core center-cut
CN104613831A (en) * 2015-01-19 2015-05-13 中铁十八局集团有限公司 Construction method for additionally forming periphery auxiliary holes in periphery of vertical shaft periphery hole

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101832744A (en) * 2010-05-25 2010-09-15 江南水利水电工程公司 Blasting demolishing method
KR20130089061A (en) * 2012-02-01 2013-08-09 주식회사 한화 Method for blasting core center-cut
CN104613831A (en) * 2015-01-19 2015-05-13 中铁十八局集团有限公司 Construction method for additionally forming periphery auxiliary holes in periphery of vertical shaft periphery hole

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张馨: "竖井施工钻眼***新技术研究和应用", 《石家庄铁路职业技术学院学报》 *
张馨: "锅底形中深孔光底***新技术在立井基岩段施工中的运用", 《焦作工学院学报》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106813540A (en) * 2017-01-18 2017-06-09 淮南矿业(集团)有限责任公司 The method of Shaft Freezing rock section deep hole blasting under ultra low temperature state
CN111336881A (en) * 2020-03-06 2020-06-26 中国矿业大学(北京) Thin coal seam half-coal rock roadway medium-length hole smooth blasting method
CN111336881B (en) * 2020-03-06 2021-05-04 中国矿业大学(北京) Thin coal seam half-coal rock roadway medium-length hole smooth blasting method

Similar Documents

Publication Publication Date Title
CN106121648B (en) Sublevel open stoping chassis route ore drawing subsequent filling mining method
US3379264A (en) Earth boring machine
CN106014473B (en) A kind of cross borehole constrained expansion explosion network permeability-increasing gas drainage method
CN104989404B (en) It is pseudo- in Steeply dipping narrow deposits arteries and veins to tilt ore deposit Medium-long hole mining method
CN110952982B (en) Medium-length hole presplitting blasting mining method for steeply inclined thin-vein to extremely thin-vein ore body
CN110295908B (en) Mining method for gentle dip medium-thickness ore body in fluctuating sectional roadway
CN102182461A (en) Efficient mining method for thick metal ore body in slanting
CN104632221B (en) Liquid carbon dioxide blasting induced caving mining method
CN105952450B (en) A kind of new method of the double stope collaboration exploitations in underground mine underground
CN106223956B (en) Medium-length hole courtyard mining afterwards filling method
CN102635356A (en) Medium-length hole mining method in multiple blasting free faces of high dipping thin veins
CN108625856A (en) A kind of mining methods in the two neighboring one ore removal lane of stope of underground mine
CN105569659A (en) Tunnel hydraulic cutting line oriented blasting roof cutting pressure relief method
CN103742188B (en) Colliery drawing-off gas well and boring method
CN106761745B (en) The outer sublevel open stope method of arteries and veins
CN106640080B (en) Under a kind of deep high stress environment mining methods are arranged from steady gallery shape stope
CN111058847B (en) Continuous large-aperture deep hole blasting mechanized mining method for thick and large ore body
CN104613831A (en) Construction method for additionally forming periphery auxiliary holes in periphery of vertical shaft periphery hole
CN109812268B (en) Panel mechanized upward horizontal layered filling top column directional throwing blasting mining method
CN107975373A (en) A kind of lower continuous digging hard-rock mine method of mechanization of liquid-gas phase transition induction
CN107191191A (en) A kind of rock gangway fast digging technique of the breaking rock gangway anchor driving machine of three hammering blows
CN108625855A (en) Safe and efficient mining methods under a kind of obturation
CN104612692B (en) Formation continuous filling mining method followed by segmentation ore caving polycrystalline substance
CN106150504A (en) Advanced top-cut explosive-force ore-carrying sublevel mining method
CN105737700A (en) Pot bottom shaped deep hole smooth bottom smooth blasting construction method applicable to vertical shaft

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160706

RJ01 Rejection of invention patent application after publication