CN105314548A - 一种结构梁承载式的内爬塔吊安装及顶升方法及结构 - Google Patents
一种结构梁承载式的内爬塔吊安装及顶升方法及结构 Download PDFInfo
- Publication number
- CN105314548A CN105314548A CN201410361643.9A CN201410361643A CN105314548A CN 105314548 A CN105314548 A CN 105314548A CN 201410361643 A CN201410361643 A CN 201410361643A CN 105314548 A CN105314548 A CN 105314548A
- Authority
- CN
- China
- Prior art keywords
- tower crane
- climbing
- climbing tower
- structural
- steel plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 25
- 230000009194 climbing Effects 0.000 title claims abstract description 13
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 75
- 239000010959 steel Substances 0.000 claims abstract description 75
- 239000004927 clay Substances 0.000 claims description 22
- 239000000203 mixture Substances 0.000 claims description 9
- 230000002787 reinforcement Effects 0.000 claims description 5
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 4
- 239000000463 material Substances 0.000 abstract description 4
- 230000001174 ascending effect Effects 0.000 abstract 1
- 239000010720 hydraulic oil Substances 0.000 abstract 1
- 238000012805 post-processing Methods 0.000 abstract 1
- 238000009434 installation Methods 0.000 description 15
- 238000010276 construction Methods 0.000 description 6
- 238000009408 flooring Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000005266 casting Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000003913 materials processing Methods 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开了一种结构梁承载式的内爬塔吊安装及顶升方法,采用结构核心筒混泥土结构梁作为内爬塔吊的支撑构件,通过在结构核心筒混泥土结构梁上设置H型支撑钢梁,内爬塔吊基座通过高强螺栓固定在H型支撑钢梁,在内爬塔吊上升中采用液压油缸完成对内爬塔吊的顶升,本发明针有效地利用现有结构,无需在电梯井内预埋牛腿或开洞,在结构梁板上进行操作,安全能得到有效的保障;预埋件投入材料少,埋入混凝土结构梁中使用完成后,无需进行后期处理,结构梁进行塔身的承力构件,可根据梁的承载力进行计算,若无法满足要求则可以在梁下顶撑加固,处理方便,塔吊的顶升和H型支撑钢梁的转运均在楼层面上进行,操作更方便快捷,且安全隐患降低。
Description
技术领域
本发明涉及一种结构梁承载式的内爬塔吊安装及顶升方法及结构,属于建筑工程施工技术领域。
背景技术
在一般的内爬塔吊使用中,塔身一般安装在电梯井道内,采用预埋牛腿的方式进行支承,或者在电梯井剪力墙内开洞,安装和顶升操作均在电梯井道内进行,需要搭设辅助操作平台,安全隐患较多,且操作不方便。在塔吊使用完成后,需要对电梯井内的预埋牛腿或孔洞进行后期处理,后续工作繁杂。
发明内容
本发明的目的是:提供一种安装方便、结构牢固的结构梁承载式的内爬塔吊安装及顶升方法及结构,能实现在楼面上快速完成内爬塔吊的安装与顶升工序,以克服现有技术的不足。
本发明的技术方案
一种结构梁承载式的内爬塔吊安装及顶升方法,采用结构核心筒混泥土结构梁作为内爬塔吊的支撑构件,通过在结构核心筒混泥土结构梁上设置H型支撑钢梁,内爬塔吊基座通过高强螺栓固定在H型支撑钢梁,在内爬塔吊上升中采用液压油缸完成对内爬塔吊的顶升,该方法使得所有的安装和顶升操作均在楼面上进行,无需在电梯井道内预埋牛腿,降低安全隐患,工期得到保障,在塔吊顶升施工完成和拆卸之后,无需对预埋件进行后期处理,无需专投入人力进行牛腿的切割处理工作,且直接采用混凝土结构梁进行承载,若所选结构梁原有设计的承载力不满足塔吊的工作需求,可以根据塔吊的参数性能和对承载力的要求进行结构梁配筋和混凝土材料的调整,使其承载力满足塔吊的工作要求,也可以根据实际情况对成型的结构梁进行顶撑加固,其加固方法比较灵活,塔吊安装在核心筒混凝土结构梁上,无需在电梯井道内预埋牛腿和搭设辅助操作平台,也省去了后期的处理工作,H型支撑钢梁可以循环使用,直接在楼层内向上转运,操作方便。
前述的结构梁承载式的内爬塔吊安装及顶升方法中,在结构核心筒混泥土结构梁与H型支撑钢梁设置塔吊预埋件。
前述的结构梁承载式的内爬塔吊安装及顶升方法中,该塔吊预埋件由钢板和带肋钢筋构成,带肋钢筋均匀设置在钢板底部并与钢板上的通孔连接焊牢。
前述的结构梁承载式的内爬塔吊安装及顶升方法中,塔吊预埋件的带肋钢筋与结构核心筒混泥土结构梁的钢筋架焊接,并对塔吊预埋件的水平和钢板标高调整,然后完成结构核心筒混泥土结构梁的混泥土浇筑,该塔吊预埋件的钢板的上表面需露出混凝土面,下表面埋在混凝土内,该塔吊预埋件安装使用之后,可以直接留在楼面内,无需进行后期处理。
一种结构梁承载式的内爬塔吊安装及顶升结构,包括结构核心筒混泥土结构梁,塔吊预埋件与结构核心筒混泥土结构梁内的钢筋架焊接,H型支撑钢梁焊接在塔吊预埋件的钢板上,在H型支撑钢梁的上翼缘板上设有连接孔。
前述的结构梁承载式的内爬塔吊安装及顶升结构中,所述的塔吊预埋件由钢板和带肋钢筋构成,带肋钢筋均匀设置在钢板底部并与钢板上的通孔连接焊牢。
前述的结构梁承载式的内爬塔吊安装及顶升结构中,在H型支撑钢梁下翼缘板上设有连接钢板,在H型支撑钢梁在腹板两侧均布有加强筋板。
由于采用了上述技术方案,与现有技术相比,传统的牛腿支设型内爬塔吊施工技术,从材料加工到安装、顶升施工均需耗费大量人力、材料、工期,同时施工难度大,安全得不到保障,采用本发明一种结构梁承载式内爬塔吊安装及顶升方法及结构,针对超高层建筑内爬塔吊施工难的特点,采用结构梁作为内爬塔吊的支撑构件,有效地利用现有结构,无需在电梯井内预埋牛腿或开洞,避开电梯井道内的操作,在结构梁板上进行操作,安全能得到有效的保障;预埋件投入材料少,埋入混凝土结构梁中使用完成后,无需进行后期处理,结构梁进行塔身的承力构件,可根据梁的承载力进行计算,若无法满足要求则可以在梁下顶撑加固,处理方便,塔吊的顶升和H型支撑钢梁的转运均在楼层面上进行,操作更方便快捷,且安全隐患降低,在顶升过程中塔身的水平度和塔身角度易于得到调整,给操作工人一个安全、方便的操作环境。
附图说明
附图1为本发明中内爬塔吊安装就位主视图;
附图2为本发明中内爬塔吊安装就位侧视图;
附图3为本发明中预埋件结构示意图;
附图4为预埋件的钢板结构示意图;
附图5为本发明中H型支撑钢梁结构示意图;
附图6为本发明中预埋件埋入结构梁示意图。
附图中的标记为:1-结构核心筒混泥土结构梁、2-预埋件、3-H型支撑钢梁、4-钢板、5-连接孔、6-带肋钢筋、7-连接钢板、8-加强筋板、9-内爬塔吊、10-高强螺栓。
具体实施方式
下面结合附图对本发明进一步的详细说明,但不作为对本发明的任何限制。
本发明实施例:一种结构梁承载式的内爬塔吊安装及顶升方法,采用结构核心筒混泥土结构梁作为内爬塔吊的支撑构件,通过在结构核心筒混泥土结构梁上设置H型支撑钢梁,内爬塔吊基座通过高强螺栓固定在H型支撑钢梁,在内爬塔吊上升中采用液压油缸完成对内爬塔吊的顶升。
其中在结构核心筒混泥土结构梁与H型支撑钢梁设置塔吊预埋件,该塔吊预埋件由钢板和带肋钢筋构成,带肋钢筋均匀设置在钢板底部并与钢板上的通孔连接焊牢,塔吊预埋件的带肋钢筋与结构核心筒混泥土结构梁的钢筋架焊接,并对塔吊预埋件的水平和钢板标高调整,然后完成结构核心筒混泥土结构梁的混泥土浇筑。
具体制作过程
1、加工与安装塔吊预埋件
根据工程进度要求,在钢结构加工场地进行塔吊预埋件的加工,按照设计要求将钢板开孔,并将带肋钢筋的端头焊接于开孔钢板的孔洞内,在确定好的塔吊基座的楼层梁板浇筑混凝土前,将塔吊预埋件安装在相应的核心筒混凝土结构梁的钢筋架体内,并进行水平和钢板标高的调整,就位后将塔吊预埋件焊接于梁钢筋架体上进行固定,确保浇筑混凝土的过程中不会导致预埋件的移位。
2、安装H型支撑钢梁
根据塔吊的使用要求,在塔吊安装或顶升前进行H型支撑钢梁的安装。在钢筋加工场地加工完H型钢梁后,在两端翼缘板各焊接一块连接钢板,安装时将钢梁两端的钢板放置在塔吊预埋件上,并与预埋件的钢板焊接。
3、塔吊的安装
H型支撑钢梁安装就位后,通过高强螺栓将塔吊的支撑框与H型钢梁进行连接,即可开始将塔吊安装就位。
4、塔吊的顶升
塔吊顶升时,将基座处的C型框与H型支撑钢梁连接的高强螺栓松开,采用液压油缸进行顶升,钢梁的转运和顶升操作施工均在楼面上进行,安全有保障。
根据上述方法所构建的一种结构梁承载式的内爬塔吊安装及顶升结构,如附图所示,包括结构核心筒混泥土结构梁1,塔吊预埋件2与结构核心筒混泥土结构梁1内的钢筋架焊接,H型支撑钢梁3焊接在塔吊预埋件2的钢板4上,在H型支撑钢梁3的上翼缘板上设有连接孔5。
其中所述的塔吊预埋件2由钢板4和带肋钢筋6构成,带肋钢筋6均匀设置在钢板4底部并与钢板4上的通孔连接焊牢,在H型支撑钢梁3下翼缘板上设有连接钢板7,在H型支撑钢梁4在腹板两侧均布有加强筋板8。
Claims (7)
1.一种结构梁承载式的内爬塔吊安装及顶升方法,其特征在于:
采用结构核心筒混泥土结构梁作为内爬塔吊的支撑构件,通过在结构核心筒混泥土结构梁上设置H型支撑钢梁,内爬塔吊基座通过高强螺栓固定在H型支撑钢梁,在内爬塔吊上升中采用液压油缸完成对内爬塔吊的顶升。
2.根据权利要求1所述的结构梁承载式的内爬塔吊安装及顶升方法,其特征在于:在结构核心筒混泥土结构梁与H型支撑钢梁设置塔吊预埋件。
3.根据权利要求2所述的结构梁承载式的内爬塔吊安装及顶升方法,其特征在于:该塔吊预埋件由钢板和带肋钢筋构成,带肋钢筋均匀设置在钢板底部并与钢板上的通孔连接焊牢。
4.根据权利要求3所述的结构梁承载式的内爬塔吊安装及顶升方法,其特征在于:塔吊预埋件的带肋钢筋与结构核心筒混泥土结构梁的钢筋架焊接,并对塔吊预埋件的水平和钢板标高调整,然后完成结构核心筒混泥土结构梁的混泥土浇筑。
5.一种结构梁承载式的内爬塔吊安装及顶升结构,包括结构核心筒混泥土结构梁(1),其特征在于:塔吊预埋件(2)与结构核心筒混泥土结构梁(1)内的钢筋架焊接,H型支撑钢梁(3)焊接在塔吊预埋件(2)的钢板(4)上,在H型支撑钢梁(3)的上翼缘板上设有连接孔(5)。
6.根据权利要求5所述的结构梁承载式的内爬塔吊安装及顶升结构,其特征在于:所述的塔吊预埋件(2)由钢板(4)和带肋钢筋(6)构成,带肋钢筋(6)均匀设置在钢板(4)底部并与钢板(4)上的通孔连接焊牢。
7.根据权利要求5所述的结构梁承载式的内爬塔吊安装及顶升结构,其特征在于:在H型支撑钢梁(3)下翼缘板上设有连接钢板(7),在H型支撑钢梁(4)在腹板两侧均布有加强筋板(8)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410361643.9A CN105314548A (zh) | 2014-07-28 | 2014-07-28 | 一种结构梁承载式的内爬塔吊安装及顶升方法及结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410361643.9A CN105314548A (zh) | 2014-07-28 | 2014-07-28 | 一种结构梁承载式的内爬塔吊安装及顶升方法及结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105314548A true CN105314548A (zh) | 2016-02-10 |
Family
ID=55242996
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410361643.9A Pending CN105314548A (zh) | 2014-07-28 | 2014-07-28 | 一种结构梁承载式的内爬塔吊安装及顶升方法及结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105314548A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113003444A (zh) * | 2021-03-15 | 2021-06-22 | 湖南文理学院 | 基于穿入撑开式塔式起重机用底盘固定设备 |
CN115043330A (zh) * | 2022-05-24 | 2022-09-13 | 中建三局第一建设工程有限责任公司 | 非核心筒区塔吊内爬框的支撑结构、内爬框架及塔吊 |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2040897U (zh) * | 1988-09-16 | 1989-07-12 | 曲永治 | 一种轻型塔吊 |
DE20016009U1 (de) * | 2000-09-15 | 2001-04-26 | Vetter Fördertechnik GmbH, 57080 Siegen | Befestigung der Säule eines Säulenschwenkkranes auf einem Betonfundament |
US7823348B1 (en) * | 2007-09-20 | 2010-11-02 | Manuel Leiva | Device and method for the support of both steel and precast concrete wall posts for installation |
CN101881029A (zh) * | 2010-05-05 | 2010-11-10 | 陈金生 | 一种可拆卸的塔基 |
CN201722081U (zh) * | 2009-12-29 | 2011-01-26 | 长沙中联重工科技发展股份有限公司 | 塔式起重机顶升油缸和上横梁的连接结构 |
CN201901879U (zh) * | 2010-11-12 | 2011-07-20 | 上海市机械施工有限公司 | 一种用于塔吊固定的非标基础 |
CN202117074U (zh) * | 2011-06-23 | 2012-01-18 | 中冶建工集团有限公司 | 用于塔吊底座定位安装的基座钢结构 |
CN202416339U (zh) * | 2011-10-13 | 2012-09-05 | 南通市常青建筑安装工程有限公司 | 一种塔式起重机固定基础 |
CN203393734U (zh) * | 2013-05-21 | 2014-01-15 | 上海庞源机械租赁股份有限公司 | 一种塔式起重机预埋焊接基础结构 |
CN103866784A (zh) * | 2014-03-28 | 2014-06-18 | 上海绿地建设(集团)有限公司 | 一种可调节式塔吊钢平台基础 |
CN203699727U (zh) * | 2014-01-27 | 2014-07-09 | 徐州建机工程机械有限公司 | 塔机顶升防脱控制装置 |
CN203716169U (zh) * | 2014-01-07 | 2014-07-16 | 东莞市毅新庆江机械制造有限公司 | 便携式塔吊基础预埋模板 |
CN204173804U (zh) * | 2014-07-28 | 2015-02-25 | 中建四局第六建筑工程有限公司 | 一种结构梁承载式的内爬塔吊安装及顶升结构 |
-
2014
- 2014-07-28 CN CN201410361643.9A patent/CN105314548A/zh active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2040897U (zh) * | 1988-09-16 | 1989-07-12 | 曲永治 | 一种轻型塔吊 |
DE20016009U1 (de) * | 2000-09-15 | 2001-04-26 | Vetter Fördertechnik GmbH, 57080 Siegen | Befestigung der Säule eines Säulenschwenkkranes auf einem Betonfundament |
US7823348B1 (en) * | 2007-09-20 | 2010-11-02 | Manuel Leiva | Device and method for the support of both steel and precast concrete wall posts for installation |
CN201722081U (zh) * | 2009-12-29 | 2011-01-26 | 长沙中联重工科技发展股份有限公司 | 塔式起重机顶升油缸和上横梁的连接结构 |
CN101881029A (zh) * | 2010-05-05 | 2010-11-10 | 陈金生 | 一种可拆卸的塔基 |
CN201901879U (zh) * | 2010-11-12 | 2011-07-20 | 上海市机械施工有限公司 | 一种用于塔吊固定的非标基础 |
CN202117074U (zh) * | 2011-06-23 | 2012-01-18 | 中冶建工集团有限公司 | 用于塔吊底座定位安装的基座钢结构 |
CN202416339U (zh) * | 2011-10-13 | 2012-09-05 | 南通市常青建筑安装工程有限公司 | 一种塔式起重机固定基础 |
CN203393734U (zh) * | 2013-05-21 | 2014-01-15 | 上海庞源机械租赁股份有限公司 | 一种塔式起重机预埋焊接基础结构 |
CN203716169U (zh) * | 2014-01-07 | 2014-07-16 | 东莞市毅新庆江机械制造有限公司 | 便携式塔吊基础预埋模板 |
CN203699727U (zh) * | 2014-01-27 | 2014-07-09 | 徐州建机工程机械有限公司 | 塔机顶升防脱控制装置 |
CN103866784A (zh) * | 2014-03-28 | 2014-06-18 | 上海绿地建设(集团)有限公司 | 一种可调节式塔吊钢平台基础 |
CN204173804U (zh) * | 2014-07-28 | 2015-02-25 | 中建四局第六建筑工程有限公司 | 一种结构梁承载式的内爬塔吊安装及顶升结构 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113003444A (zh) * | 2021-03-15 | 2021-06-22 | 湖南文理学院 | 基于穿入撑开式塔式起重机用底盘固定设备 |
CN113003444B (zh) * | 2021-03-15 | 2022-03-25 | 湖南文理学院 | 基于穿入撑开式塔式起重机用底盘固定设备 |
CN115043330A (zh) * | 2022-05-24 | 2022-09-13 | 中建三局第一建设工程有限责任公司 | 非核心筒区塔吊内爬框的支撑结构、内爬框架及塔吊 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108019076B (zh) | 大直径钢筋混凝土筒仓施工方法及用于锥壳施工的装置 | |
CN204054323U (zh) | 钢结构装配式制梁台座 | |
CN103510702B (zh) | 钢管混凝土柱针式混凝土浇筑施工方法 | |
CN102392536B (zh) | 大跨度悬空通廊式模板支撑体系施工方法 | |
CN201614738U (zh) | 一种钢骨混凝土转换梁模板组合支撑装置 | |
CN103104091A (zh) | 滑模整体提升平台及施工方法 | |
CN104088397A (zh) | 一种预制柱及其预制施工方法 | |
CN105586833B (zh) | 劲性骨架钢筋笼整体成型大型现浇薄壁高墩施工方法 | |
CN103790423B (zh) | 大型混凝土粮仓施工方法 | |
CN208965714U (zh) | 一种装配式混凝土预制管廊主体框架结构 | |
CN104264706B (zh) | 外用电梯钢梁基础构造及其施工方法 | |
CN109577553A (zh) | 一种新式装配式结构预制柱构件及梁柱节点施工方法 | |
CN106854941B (zh) | 一种大截面看台斜梁及斜柱的施工方法 | |
CN103866693A (zh) | 一种钢筋混凝土系杆拱桥拱肋的安装方法及吊装辅桥 | |
CN102518300B (zh) | 预埋锥形承载接头式钢结构支座及其施工方法 | |
CN207903788U (zh) | 一种钢柱筒架交替支撑式钢平台与塔吊同步提升装置 | |
CN204173804U (zh) | 一种结构梁承载式的内爬塔吊安装及顶升结构 | |
CN201268921Y (zh) | 钢筋马凳 | |
CN103122691A (zh) | 塔吊标准节支承高空支模钢平台结构及施工方法 | |
CN103485574A (zh) | 一种造粒塔塔顶钢筋混凝土结构施工方法 | |
CN109869153A (zh) | 快速施工竖井衬砌的整体提升悬臂模板装置及施工方法 | |
CN105314548A (zh) | 一种结构梁承载式的内爬塔吊安装及顶升方法及结构 | |
CN102777044A (zh) | 尿素造粒塔钢结构喷淋层吊装方法 | |
CN204163104U (zh) | 外用电梯钢梁基础构造 | |
CN102619335A (zh) | 大高度小型现浇混凝土梁板的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160210 |
|
RJ01 | Rejection of invention patent application after publication |