CN105297958A - Wall device - Google Patents

Wall device Download PDF

Info

Publication number
CN105297958A
CN105297958A CN201510742774.6A CN201510742774A CN105297958A CN 105297958 A CN105297958 A CN 105297958A CN 201510742774 A CN201510742774 A CN 201510742774A CN 105297958 A CN105297958 A CN 105297958A
Authority
CN
China
Prior art keywords
main
turning
cement layer
foam cement
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510742774.6A
Other languages
Chinese (zh)
Inventor
李宝红
张卫增
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU ALOYA RENOXBELL ALUMINIUM CO Ltd
Original Assignee
GUANGZHOU ALOYA RENOXBELL ALUMINIUM CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU ALOYA RENOXBELL ALUMINIUM CO Ltd filed Critical GUANGZHOU ALOYA RENOXBELL ALUMINIUM CO Ltd
Priority to CN201510742774.6A priority Critical patent/CN105297958A/en
Publication of CN105297958A publication Critical patent/CN105297958A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses a wall device which comprises a main wall body. The main wall body comprises a main foaming cement layer, a first main honeycomb plate and a second main honeycomb plate, wherein the first main honeycomb plate and the second main honeycomb plate are symmetrically arranged on the two sides of the main foaming cement layer and can be fixedly connected with the main foaming cement layer, and main penetrating holes for line tubes to be embedded are formed in the main foaming cement layer. In the wall device, due to the fact that the main penetrating holes are formed in the main foaming cement layer, the line tubes can be arranged in the main penetrating holes when a worker performs line tube embedding, and the situation that the worker damages the wall body to perform line tube embedding can be avoided. Therefore, the wall device damage brought by the line tube embedding can be decreased by means of the wall device.

Description

Wall apparatus
Technical field
The present invention relates to indoor wall processing technique field, particularly a kind of wall apparatus.
Background technology
Indoor wall device is made up of wall-building brick usually, and it is formed by cement mortar overall processing.After wall apparatus machines, wall apparatus is indivisible entirety.
When spool buried underground by needs in wall apparatus, first on wall apparatus, carry out cutter wall, then in wall apparatus, bury spool underground, after spool has been buried underground, secondary decoration is carried out to part destroyed on wall apparatus.
But, due to when wall apparatus buries spool underground, need staff on wall apparatus, dig out the position of installing spool, wall apparatus is damaged.
Therefore, how reducing and bury the destruction of spool to wall apparatus underground, is those skilled in the art's technical problems urgently to be resolved hurrily.
Summary of the invention
The object of this invention is to provide a kind of wall apparatus, bury the destruction of spool to wall apparatus underground to reduce.
For achieving the above object, the invention provides a kind of wall apparatus, comprise main wall body, described main wall body comprises main foam cement layer and is symmetricly set on described main foam cement layer both sides, and the first main cellular board that can be fixedly connected with described main foam cement layer and the second main cellular board, be provided with the main through hole for burying spool underground in described main foam cement layer.
Preferably, described main through hole comprises longitudinally main through hole and laterally main through hole, and the main through hole of described transverse direction is communicated with the main through hole of described longitudinal direction, and the main through hole of described transverse direction and the main through hole of described longitudinal direction are two.
Preferably, described first main cellular board and described second main cellular board are all buckled by main spring and are fixed with described main foam cement layer, and the side of described main foam cement layer is provided with the main installing plate that two ends are buckled with described main spring respectively and described main foam cement layer is fixing.
Preferably, be provided with main steel anchor in described main foam cement layer, described main steel anchor one end is fixedly connected with described main installing plate, and the other end is main arc-shaped curvature portion, and fixes with described main foam cement layer.
Preferably, described main wall body is multiple, is connected between adjacent two described main wall bodies by lock bolt.
Preferably, also comprise half-cell body of wall, described half-cell body of wall comprises half foam cement layer and is symmetricly set on described half foam cement layer both sides, and the first half cellular boards that can be fixedly connected with described half foam cement layer and the second half cellular boards, be provided with the half horizontal through hole for burying spool underground in described half foam cement layer.
Preferably, described the first half cellular boards and described the second half cellular boards are all fixed by half snak link and described half foam cement layer, the side of described half foam cement layer is provided with half installing plate fixed with described half snak link and described half foam cement layer respectively at two ends, half steel anchor is provided with in described half foam cement layer, described half steel anchor one end is fixedly connected with described half installing plate, the other end is half arc-shaped curvature portion, and fixes with described half foam cement layer.
Preferably, also comprise turning body of wall, described turning body of wall comprises turning foam cement layer and is arranged on adjacent two side of described turning foam cement layer, and the first turning cellular board that can be fixedly connected with described turning foam cement layer and the second turning cellular board, the turning through hole for burying spool underground is provided with in the foam cement layer of described turning, described turning through hole comprises longitudinal turning through hole and lateral corner through hole, described lateral corner through hole is communicated with described longitudinal turning through hole, and described lateral corner through hole and described longitudinal turning through hole are two.
Preferably, described first turning cellular board and described second turning cellular board are all fixed by turning snak link and described turning foam cement layer, and the side of described turning foam cement layer is provided with the turning installing plate fixed with described turning snak link and described turning foam cement layer respectively at two ends.
Preferably, be provided with turning steel anchor in the foam cement layer of described turning, steel anchor one end, described turning is fixedly connected with described turning installing plate, and the other end is turning arc-shaped curvature portion, and fixes with described turning foam cement layer.
In technique scheme, wall apparatus provided by the invention comprises main wall body, wherein, main wall body comprises main foam cement layer and is symmetricly set on main foam cement layer both sides, and the first main cellular board that can be fixedly connected with main foam cement layer and the second main cellular board, be provided with the main through hole for burying spool underground in main foam cement layer.When spool buried underground by needs, directly spool is arranged in main through hole.
Known by foregoing description, in wall apparatus provided by the invention, owing to being provided with main through hole in main foam cement layer, staff is when burying spool underground, directly spool can be arranged in main through hole, the situation avoiding the damaged body of wall of staff to carry out spool burying underground, therefore, wall apparatus provided by the invention can reduce buries the destruction of spool to wall apparatus underground.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
The structural representation of the main wall body that Fig. 1 provides for the embodiment of the present invention;
The top view of the main wall body that Fig. 2 provides for the embodiment of the present invention;
The structural representation of the half-cell body of wall that Fig. 3 provides for the embodiment of the present invention;
The top view of the Slab element body of wall that Fig. 4 provides for the embodiment of the present invention;
The topology view of the turning body of wall that Fig. 5 provides for the embodiment of the present invention;
The top view of the turning body of wall that Fig. 6 provides for the embodiment of the present invention;
The top view of the wall apparatus that Fig. 7 provides for the embodiment of the present invention;
The assembly drawing of the wall apparatus that Fig. 8 provides for the embodiment of the present invention;
The assembly drawing of the another kind of wall apparatus that Fig. 9 provides for the embodiment of the present invention.
Wherein in Fig. 1-9: 1, main wall body; 1-1, main foam cement layer; 1-2, the first main cellular board; 1-3, main steel anchor; 1-4, main installing plate; 1-5, main spring are buckled; 1-6, laterally main through hole; 1-7, longitudinally main through hole; 1-8, main installing hole; 1-9, the second main cellular board;
2, half-cell body of wall; 2-1, half foam cement layer; 2-2, the first half cellular boards; 2-3, half steel anchor; 2-4, half installing plate; 2-5, half snak link; 2-6, half horizontal through hole; 2-7, the second half cellular boards; 2-8, half installing hole;
3, turning body of wall; 3-1, turning foam cement layer; 3-2, the first turning cellular board; 3-3, turning steel anchor; 3-4, turning installing plate; 3-5, turning snak link; 3-6, lateral corner through hole; 3-7, longitudinal turning through hole; 3-8, turning installing hole; 3-9, the second turning cellular board;
4, circulating water pipe; 5, lock bolt.
Detailed description of the invention
Core of the present invention is to provide a kind of wall apparatus, buries the destruction of spool to wall apparatus underground to reduce.
Technical scheme of the present invention is understood better in order to make those skilled in the art, below in conjunction with the accompanying drawing in the embodiment of the present invention, technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
Please refer to Fig. 1 to Fig. 9, in a kind of detailed description of the invention, wall apparatus provided by the invention comprises main wall body 1, wherein, main wall body 1 is equivalent to standard block cavity, main wall body 1 comprises main foam cement layer 1-1 and is symmetricly set on main foam cement layer 1-1 both sides, and the first main cellular board 1-2 that can be fixedly connected with main foam cement layer 1-1 and the second main cellular board 1-9, wherein the first main cellular board 1-2 and the second main cellular board 1-9 can directly be fixed on main foam cement layer 1-1.The main through hole for burying spool underground is provided with in main foam cement layer 1-1, wherein, main through hole can be an independent hole, can for leading to indoor thermal hole in main through hole, except facilitating various power line within the walls except cabling, the more important thing is, can water circulating pipe be worn in wall apparatus, such as, circulating water pipe 4, the interior temperature realizing various season regulates, and reaches the function integration of body of wall, decoration, energy-conservation, cabling.
When spool buried underground by needs, directly spool is arranged in main through hole.
Known by foregoing description, in the wall apparatus that the specific embodiment of the invention provides, owing to being provided with main through hole in main foam cement layer 1-1, staff is when burying spool underground, directly spool can be arranged in main through hole, the situation avoiding the damaged body of wall of staff to carry out spool burying underground, therefore, wall apparatus provided by the invention can reduce buries the destruction of spool to wall apparatus underground.
Preferably, main through hole comprises longitudinally main through hole 1-7 and laterally main through hole 1-6, wherein laterally main through hole 1-6 is communicated with longitudinal main through hole 1-7, and laterally main through hole 1-6 and longitudinal main through hole 1-7 is two, concrete, two main through hole 1-7 of longitudinal direction are arranged in parallel, and two main through hole 1-6 of transverse direction are arranged in parallel.By arranging two main through hole 1-7 of transverse direction main through hole 1-6 and two longitudinal direction, be convenient to realize wiring and water circulation pipe layout simultaneously, guiding and who are followed simultaneously and badly put into different main through holes, avoid one of them to overhaul, avoid the situation of interference mutually, improve the safety in utilization of wall apparatus simultaneously.
More preferred, first main cellular board 1-2 and the second main cellular board 1-9 all buckles 1-5 by main spring and main foam cement layer 1-1 fixes, and the side of main foam cement layer 1-1 is provided with two ends and buckles the fixing main installing plate 1-4 of 1-5 and main foam cement layer 1-1 respectively with main spring.Outermost layer uses the mode of snak link to install for the first main cellular board 1-2 of decorating and the second main cellular board 1-9, after installation, every part cellular board can use special tool to carry out independent disassembling, except facilitating the inspection and maintenance of various cabling, pipeline, for decorating first main cellular board 1-2 and the second main cellular board 1-9 personalization are spliced and exchange old for new also fast very convenient.Wherein, preferably, longitudinal main through hole 1-7 and laterally main through hole 1-6 are all parallel to the first main cellular board 1-2 and the second main cellular board 1-9 arranges, for the ease of burying spool underground, preferably, main through hole also comprises length direction along the installation through hole arranged perpendicular to the first main cellular board 1-2 and the second main cellular board 1-9 direction, the two ends of wherein installing through hole respectively cellular board 1-2 main with first and the second main cellular board 1-9 are connected, through hole is installed all be communicated with horizontal main through hole 1-6 with longitudinal main through hole 1-7, by arranging installation through hole, be convenient to staff further to arrange spool, circuit can directly be drawn by installation through hole.
In order to extend the application life of main wall body 1, preferably, be provided with main steel anchor 1-3 in main foam cement layer 1-1, main steel anchor 1-3 one end is fixedly connected with main installing plate 1-4, and the other end is main arc-shaped curvature portion, and fixes with main foam cement layer 1-1.In order to reduce the labour intensity of staff, preferably, main installing plate 1-4 and main steel anchor 1-3 is integral type structure.Concrete, in order to improve bonding strength, preferably, main installing plate 1-4 mates with main foam cement layer 1-1 side, and on each main installing plate 1-4, setting is provided with four main steel anchor 1-3, and four main steel anchor 1-3 lines form square.
Concrete, main wall body 1 is multiple, is connected between adjacent two main wall bodies 1 by lock bolt 5.Preferably, locked by M8 bolt and nut between two main wall bodies 1.When main foam cement being fixed with main installing plate 1-4, preferably, main installing plate 1-4 is provided with the main installing hole 1-8 for installing lock bolt 5, so that staff installs lock bolt 5.By arranging lock bolt 5, realizing main wall body 1 and removably connecting.
Further, this wall apparatus also comprises half-cell body of wall 2, half-cell body of wall 2 comprises half foam cement layer 2-1 and is symmetricly set on half foam cement layer 2-1 both sides, and the first half cellular board 2-2 that can be fixedly connected with half foam cement layer 2-1 and the second half cellular board 2-7, the half horizontal through hole 2-6 for burying spool underground is provided with in half foam cement layer 2-1, wherein, half horizontal through hole 2-6 can be communicated with horizontal main through hole 1-6.By arranging half-cell body of wall 2, be convenient to wall element Heterogeneous Permutation.
Preferably, the first half cellular board 2-2 and the second half cellular board 2-7 are all fixed by half snak link 2-5 and half foam cement layer 2-1, the side of half foam cement layer 2-1 is provided with the half installing plate 2-4 fixed with half snak link 2-5 and half foam cement layer 2-1 respectively at two ends, install for the ease of half-cell cavity 2 and main wall body 1, preferably, half installing plate 2-4 is provided with the half installing hole 2-8 connected by lock bolt for main installing plate 1-4, half steel anchor 2-3 is provided with in half foam cement layer 2-1, half steel anchor 2-3 one end is fixedly connected with half installing plate 2-4, the other end is half arc-shaped curvature portion, and fix with half foam cement layer 2-1.In order to reduce the labour intensity of staff, preferably, half installing plate 2-4 and half steel anchor 2-3 is integral type structure.Concrete, in order to improve bonding strength, preferably, half installing plate 2-4 mates with half foam cement layer 2-1 side, and on each half installing plate 2-4, setting is provided with four and half steel anchor 2-3, and four and half steel anchor 2-3 lines form square.By arranging half installing plate 2-4 and half steel anchor 2-3, improve the bulk strength of half-cell body of wall 2, extending the application life of half-cell cavity.
Further, this wall apparatus also comprises turning body of wall 3, wherein, turning body of wall 3 comprises turning foam cement layer 3-1 and is arranged on adjacent two sides of turning foam cement layer 3-1, and the first turning cellular board 3-2 that can be fixedly connected with turning foam cement layer 3-1 and the second turning cellular board 3-9, the turning through hole for burying spool underground is provided with in the foam cement layer 3-1 of turning, turning through hole comprises longitudinal turning through hole 3-7 and lateral corner through hole 3-6, lateral corner through hole 3-6 is communicated with longitudinal turning through hole 3-7, when turning body of wall 3 is installed with main wall body 1, longitudinal turning through hole 3-7 is communicated with longitudinal main through hole 1-7, lateral corner through hole 3-6 is communicated with horizontal main through hole 1-6, and lateral corner through hole 3-6 and longitudinal turning through hole 3-7 is two.When turning body of wall 3 and main wall body 1 are installed by staff, turning body of wall 3 is not provided with the first turning cellular board 3-2 and the second cellular board 3-9 both sides, turning are installed with two main wall bodies 1 respectively, the first turning cellular board 3-2 and the second turning cellular board 3-9 is connected with the first main cellular board 1-2 and the second main cellular board 1-9.By turning body of wall 3, be convenient to staff and arrange body of wall corner.
Preferably, first turning cellular board 3-2 and the second turning cellular board 3-9 is all fixed by turning snak link 3-5 and turning foam cement layer 3-1, and the side of turning foam cement layer 3-1 is provided with the turning installing plate 3-4 fixed with turning snak link 3-5 and turning foam cement layer 3-1 respectively at two ends.By arranging turning snak link 3-5, be convenient to staff's dismounting first turning cellular board 3-2 and the second turning cellular board 3-9.
More preferred, turning steel anchor 3-3 is provided with in the foam cement layer 3-1 of turning, steel anchor 3-3 one end, turning is fixedly connected with turning installing plate 3-4, the other end is turning arc-shaped curvature portion, and fix with turning foam cement layer 3-1, install for the ease of turning body of wall 3 and main wall body 1, preferably, turning installing plate 3-4 is provided with turning installing hole 3-8.In order to reduce the labour intensity of staff, preferably, turning installing plate 3-4 and turning steel anchor 3-3 is integral type structure.Concrete, in order to improve bonding strength, preferably, turning installing plate 3-4 mates with foam cement layer 3-1 side, turning, and on each turning installing plate 3-4, setting is provided with four turning steel anchor 3-3, and four turning steel anchor 3-3 lines form square.
In this manual, each embodiment adopts the mode of going forward one by one to describe, and what each embodiment stressed is the difference with other embodiments, between each embodiment identical similar portion mutually see.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field are realized or uses the present invention.To be apparent for those skilled in the art to the multiple amendment of these embodiments, General Principle as defined herein can without departing from the spirit or scope of the present invention, realize in other embodiments.Therefore, the present invention can not be restricted to these embodiments shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (10)

1. a wall apparatus, it is characterized in that, comprise main wall body (1), described main wall body (1) comprises main foam cement layer (1-1) and is symmetricly set on described main foam cement layer (1-1) both sides, and the first main cellular board (1-2) that can be fixedly connected with described main foam cement layer (1-1) and the second main cellular board (1-9), be provided with the main through hole for burying spool underground in described main foam cement layer (1-1).
2. wall apparatus according to claim 1, it is characterized in that, described main through hole comprises longitudinally main through hole (1-7) and laterally main through hole (1-6), the main through hole of described transverse direction (1-6) is communicated with the main through hole of described longitudinal direction (1-7), and the main through hole of described transverse direction (1-6) and the main through hole of described longitudinal direction (1-7) are two.
3. wall apparatus according to claim 1, it is characterized in that, described first main cellular board (1-2) and described second main cellular board (1-9) all buckle (1-5) and described main foam cement layer (1-1) fixing by main spring, and the side of described main foam cement layer (1-1) is provided with two ends and buckles (1-5) and the fixing main installing plate (1-4) of described main foam cement layer (1-1) respectively with described main spring.
4. wall apparatus according to claim 3, it is characterized in that, main steel anchor (1-3) is provided with in described main foam cement layer (1-1), described main steel anchor (1-3) one end is fixedly connected with described main installing plate (1-4), the other end is main arc-shaped curvature portion, and fixes with described main foam cement layer (1-1).
5. the wall apparatus according to any one of claim 1-4, is characterized in that, described main wall body (1), for multiple, is connected by lock bolt (5) between adjacent two described main wall bodies (1).
6. wall apparatus according to claim 1, it is characterized in that, also comprise half-cell body of wall (2), described half-cell body of wall (2) comprises half foam cement layer (2-1) and is symmetricly set on described half foam cement layer (2-1) both sides, and the first half cellular boards (2-2) that can be fixedly connected with described half foam cement layer (2-1) and the second half cellular boards (2-7), be provided with the half horizontal through hole (2-6) for burying spool underground in described half foam cement layer (2-1).
7. wall apparatus according to claim 6, it is characterized in that, described the first half cellular boards (2-2) and described the second half cellular boards (2-7) are all fixed by half snak link (2-5) and described half foam cement layer (2-1), the side of described half foam cement layer (2-1) be provided with two ends respectively with described half snak link (2-5) and fixing half installing plate (2-4) of described half foam cement layer (2-1), half steel anchor (2-3) is provided with in described half foam cement layer (2-1), described half steel anchor (2-3) one end is fixedly connected with described half installing plate (2-4), the other end is half arc-shaped curvature portion, and fix with described half foam cement layer (2-1).
8. wall apparatus according to claim 1, it is characterized in that, also comprise turning body of wall (3), described turning body of wall (3) comprises turning foam cement layer (3-1) and is arranged on adjacent two sides of described turning foam cement layer (3-1), and the first turning cellular board (3-2) that can be fixedly connected with described turning foam cement layer (3-1) and the second turning cellular board (3-9), the turning through hole for burying spool underground is provided with in described turning foam cement layer (3-1), described turning through hole comprises longitudinal turning through hole (3-7) and lateral corner through hole (3-6), described lateral corner through hole (3-6) is communicated with described longitudinal turning through hole (3-7), and described lateral corner through hole (3-6) and described longitudinal turning through hole (3-7) are two.
9. wall apparatus according to claim 8, it is characterized in that, described first turning cellular board (3-2) and described second turning cellular board (3-9) are all fixed by turning snak link (3-5) and described turning foam cement layer (3-1), the side of described turning foam cement layer (3-1) be provided with two ends respectively with described turning snak link (3-5) and the fixing turning installing plate (3-4) of described turning foam cement layer (3-1).
10. wall apparatus according to claim 9, it is characterized in that, turning steel anchor (3-3) is provided with in described turning foam cement layer (3-1), described turning steel anchor (3-3) one end is fixedly connected with described turning installing plate (3-4), the other end is turning arc-shaped curvature portion, and fixes with described turning foam cement layer (3-1).
CN201510742774.6A 2015-11-03 2015-11-03 Wall device Pending CN105297958A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510742774.6A CN105297958A (en) 2015-11-03 2015-11-03 Wall device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510742774.6A CN105297958A (en) 2015-11-03 2015-11-03 Wall device

Publications (1)

Publication Number Publication Date
CN105297958A true CN105297958A (en) 2016-02-03

Family

ID=55195709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510742774.6A Pending CN105297958A (en) 2015-11-03 2015-11-03 Wall device

Country Status (1)

Country Link
CN (1) CN105297958A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01207561A (en) * 1988-02-10 1989-08-21 Sawata Kenzaishiya:Kk Finishing of building wall surface
CN2773218Y (en) * 2005-03-02 2006-04-19 王继亮 Lightweight energy-saving precast wallboard
CN201047132Y (en) * 2007-02-13 2008-04-16 冯葆纯 Prefabricated wallboard of load bearing heat preserving hollow
CN202131701U (en) * 2011-06-20 2012-02-01 张贵听 Multifunctional hollow brick
CN202809868U (en) * 2012-09-12 2013-03-20 万华节能科技集团股份有限公司 Thermal-insulation composite board of wall
CN202899503U (en) * 2012-10-23 2013-04-24 常州华光建材科技有限公司 Cast-in-place composite foam insulation plate system
CN204001577U (en) * 2014-06-09 2014-12-10 来安县佳美建材有限公司 Marble honeycomb board mounting structure
CN204098420U (en) * 2014-09-28 2015-01-14 富阳荣烨实业有限公司 A kind of dry-hung plate wall surface decoration system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01207561A (en) * 1988-02-10 1989-08-21 Sawata Kenzaishiya:Kk Finishing of building wall surface
CN2773218Y (en) * 2005-03-02 2006-04-19 王继亮 Lightweight energy-saving precast wallboard
CN201047132Y (en) * 2007-02-13 2008-04-16 冯葆纯 Prefabricated wallboard of load bearing heat preserving hollow
CN202131701U (en) * 2011-06-20 2012-02-01 张贵听 Multifunctional hollow brick
CN202809868U (en) * 2012-09-12 2013-03-20 万华节能科技集团股份有限公司 Thermal-insulation composite board of wall
CN202899503U (en) * 2012-10-23 2013-04-24 常州华光建材科技有限公司 Cast-in-place composite foam insulation plate system
CN204001577U (en) * 2014-06-09 2014-12-10 来安县佳美建材有限公司 Marble honeycomb board mounting structure
CN204098420U (en) * 2014-09-28 2015-01-14 富阳荣烨实业有限公司 A kind of dry-hung plate wall surface decoration system

Similar Documents

Publication Publication Date Title
WO2017031627A1 (en) Assembled building structure, wallboard installation hanger, and assembled building construction method
CN109339287A (en) Wall connecting component is embedded in a kind of assembling type steel structure system
CN106049537A (en) Comprehensive pipe gallery embedded part fixing device and fixing method thereof
CN111878115B (en) Cavity assembly type tunnel inverted arch and construction method
CN105756089A (en) Transverse laminated connection type single compartment precast multiple-compartment assembled comprehensive pipe gallery
CN104294771A (en) Square prefabricated reinforced concrete culvert
CN203787920U (en) Composite material cable trench
CN105297958A (en) Wall device
CN103276840B (en) Nuclear power plant composite floor slab module and construction method thereof
KR20090108195A (en) Joint board and expansion board for an installation of heat-pipe, combination thereof and heating system using the same
CN103958821B (en) For installing the method and apparatus of Energy Chain
CN102733614A (en) Method for constructing room module of nuclear power plant
CN210224845U (en) Water-reserved electric comprehensive wire slot structure
KR20120088423A (en) Supporting apparatus for additional facilities in underground tunnel and construction method using the same
CN204645358U (en) Template and floor
CN110748039B (en) Assembled shear wall with constraint edge node modules
CN108487493A (en) Wall apparatus
CN205622175U (en) Bus slot
KR20100010500U (en) Elbow tray for connecting cable tray
CN203270852U (en) Light-weight high-strength heat-insulation concreted rowlock wall
CN205444624U (en) Suspended ceiling's mounting structure
JP2009089562A (en) Parallel clevis
CN202509642U (en) Energy-saving insulated plate convenient to install
CN217176372U (en) Prevent fire door in utility tunnel and fix subassembly and utility tunnel in advance
CN111980257B (en) High-strength concrete pouring floor and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Baohong

Inventor after: Zhang Weizeng

Inventor after: Wang Hong

Inventor before: Li Baohong

Inventor before: Zhang Weizeng

CB03 Change of inventor or designer information
RJ01 Rejection of invention patent application after publication

Application publication date: 20160203

RJ01 Rejection of invention patent application after publication