CN105257074A - Water tower - Google Patents

Water tower Download PDF

Info

Publication number
CN105257074A
CN105257074A CN201510712917.9A CN201510712917A CN105257074A CN 105257074 A CN105257074 A CN 105257074A CN 201510712917 A CN201510712917 A CN 201510712917A CN 105257074 A CN105257074 A CN 105257074A
Authority
CN
China
Prior art keywords
water
water tower
tower
sky
rainfall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510712917.9A
Other languages
Chinese (zh)
Inventor
杨竣仁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510712917.9A priority Critical patent/CN105257074A/en
Publication of CN105257074A publication Critical patent/CN105257074A/en
Pending legal-status Critical Current

Links

Landscapes

  • Sewage (AREA)

Abstract

The invention discloses a water tower. A motor, a water pump, a steel plate, screws, a power supply, a reservoir (a water storage tank), a switchboard, a computer, a monitor, a transformer, a circuit special line, cement and sand are mixed and compounded to form concrete, and the concrete is combined with reinforcing steel bars and steel tubes to form a horizon line; the steel tubes, steel tube inserting holes, crosses, and T-bars are assembled to form the water tower; the rain forming function of the water tower is based on the following schematic diagram working principles: a combined type water tower is fully utilized to provide the main function of using the symmetry of air pressure, wind direction and air flow to form a square, so as to enable the rainfall to be accurate; the water pump on the water tower is used to pump water up to the sky; water is just like ferment powder and combines the dual-layer water tower together, so that the rainfall is more accurate and heavier. Based on an investigation on meteorological department statistics, at a height of 100-1500 m of the sky, the rain can form if the sky has clouds; therefore, the water tower pumps water up to change the air pressure intensity; the dual-layer combined type water tower is designed to achieve good rain forming effect and high accuracy; by using the method, the rain forming effect is good, and the rain is heavy.

Description

Water tower
I designs the strange wound that one is named as " water tower " now, and it can transform low-carbon (LC), and the atmosphere-air of purification China, it can beautify the happy life required for the mankind, brings additional credit to large nature.I just water tower is played a role and method for designing is described below:
One, the material outside water tower:
(1) cement, sand, reinforcing bar, steel pipe.Steel pipe external packing insulation materials, plastic plate, special steel i.e. cross head, T-bar head.Circuit special line, radar inductor, water jet.
(2) material in water tower: motor, water pump, steel plate, screw, power supply, reservoir (storage tank), switchboard, computer, watch-dog, transformer, circuit special line.
(3) water tower external structure and material: after the synthesis of cement, sand, (concrete) forms flatly horizontal line after being combined with reinforcing bar, steel pipe.Imitate building exterior decoration, steel pipe and steel pipe jack, steel pipe and cross, after T-bar assembling, form the profile of water tower.
(4) the inner structure material of water tower: motor and water pump and water pipe be connected with reservoir (reservoir) be energized after water outlet can send into last layer.Switchboard be connected with motor can allocate electric current frequency division stablize, switchboard is combined with computer, can see after watch-dog is connected with computer and draw water main through process from reservoir to reservoir, watch-dog and transformer and circuit private line access, ensure the special stable supply of power supply.
(5) water tower hierarchy: every Rotating fields has different difference, and first floor is different with other layer, motor, water pump, steel plate, screw, power supply, reservoir (reservoir).The second layer, third layer, the 4th layer, layer 5 only has reservoir, and water tower inner structure total above 2. in the middle of all material.
(6) steel pipe external packing insulation materials prevents from playing protection water tower in the middle of it rains can not obtain safety by the impact of getting an electric shock, conduct electricity.
(7) will repair elevator in water tower, People's Bank of China's platform joint ladder, do closed, in order to avoid people has acrophobia.The necessary device sight line safety plastic plate to external world of surrounding of water tower, plastic plate can play the safety of protection staff.
(8) water tower all material requires novelly just to have produced, and do not have iron rust, steel pipe is inside and outside must be zinc-plated, each steel pipe junction, and installing insulating body wanted by joint, whether the close inspection of water tower all iron and steel parts is firm, and each iron parts are necessary zinc-plated.
(9) steel plate is in water tower every layer fixing all interior finish material the explanation 2..
(10) radar inductor be contained in that the top of water tower is top respectively, intermediate layer and five edge positions, radar inductor shields to aerospace industry, particularly do not affect by flight in the middle of aircraft flight, and promote the safety of aircraft.
(11) material in water tower outside material and water tower: motor, water pump, power supply, reservoir (reservoir), switchboard, computer, watch-dog, transformer, circuit special line, steel plate, cross head, T-bar head, water jet.Cement, sand, reinforcing bar, steel pipe, special steel all to be seen that in the middle of practicality producer dispatches from the factory and have been illustrated just describing one by one, just can grasp its feature and technology.
Two, water tower can be sky rainfall functional schematic operating principle, and they make full use of associativity water tower.Major function be utilize air pressure wind direction air-flow be symmetrically formed square, make precipitation accurate, utilize water tower charging pump that water is extracted into sky, the at this moment effect of water be exactly as yeast powder multiple water tower to combining, more accurately, rainwater is larger in rainfall.
Three, the function of water tower:
Device motor, water pump, water pipe, reservoir (reservoir), circuit inside and outside water tower, their function is exactly the water in reservoir, in layer be extracted into the top of water tower until sky, water is extracted into sky can play and expand with heat and contract with cold, after shrinkage, water will form cloud, form steam, water tower is utilized constantly to continue to draw water, which forms the pressure of a kind of wind-force, wind sound, air-flow, cloud absorbs sky cloud as the function of thunder and lightning class, forces cloud rainfall.Sky is very vast, also more wide, and sky is exactly the ocean of boundless water, cloud is exactly the front photograph of steam, physically says: the orderly movement of electric charge resistive conductor, pressure just forms electricity, utilizes many combination water tower pumping ways, it just forms rainwater, steam very soon.
Investigate meteorological department's statistics through me: 100 meters to 1,500 meters it have cloud in vain and can rain, so the water utilizing water tower to pump up, its function is just the pressure of air pressure.So I have selected the highest 700 meters and builds water tower, and enrich to reach rainy effect, accuracy is high, and I devises multilayer many associativities water tower, utilizes this method, rains good especially, also large especially.In order to explain why water tower can be it rains, in the middle of real life, 1. in the middle of usual steamed bun, observing at ordinary times on house glass and having the globule toward dirty.2. I between arranging one four thorough be device glasshouse, inside I pours water into a pot, fire is placed below pot, so at this moment, keep flame enrichment, which type of miracle will be there is inside glass room? why does is this when we see that glass is covered with a lot of droplet stream and gets off? because be cold air outside glass.8. again by experiment in the middle of we can see natural feature and its Formation rule, the effect of [water] water that water tower group pumps up just equal steamed bun before [yeast powder] be also steam, utilize above three kinds to test crystallization technique, technical ability, skill analysis; 4. through my investigation, water pump manufacturers instructions is given information, the flow techniques analysis of water pump lift and pumping for water pump, and every platform pump head can reach 200 meters to 500 meters, and so I have selected pump head 300 meters.
Four, comprehensively prove:
Data are provided according to meteorological department, the data on flows of water pump lift and water pump is provided according to water pump producer again, the experiment seen according to me more again and the imagination expected, the comprehensive demonstration of experiment: stand and build water tower, water tower is from height to surface layer and the ground of water tower and should being worth: 700 meters, can stand and build water tower, 3 meters, water tower ground, water tower is pentagon.
Five, water tower on the effect method of it rains and water tower in the distance of water tower, the size of water tower, my supposition design: water tower spacing distance ten to two ten kilometers build one proper.And becoming square is a combination, above, I talks multilayer many groups, associativity water tower, and that is four water towers are a combination, and first combination water tower is interior combination, and after first combination, outer ring adds a combination water tower again on multilayer many associativities water tower.Water tower is set up according to landform, physical features, the size of water tower, I is designed to: the top diameter 400 meters respectively of the height of water tower diameter, water tower, water tower, high 700 meters, top 12 meters × 12 meters × pentagon, specifically: water tower diameter 400 meters, water tower is the highest to be connected ground and should be worth 700 meters, and the top side 12 meters × 12 meters of water tower becomes pentagon.
I thinks the first design: water tower is combined into water tower with steel pipe, cross head, the processing of T-bar head, if in Long-Time Service process, and there is no the second design, second design utilizes hydraulic foldable system building water tower proper, in the middle of reality is suitable for, safety effect is played to state aviation cause, main self safety effect is played to water tower.
Six, on basis with good conditionsi water tower as internet the whole nation each provincial and territorial, in the Changjiang river, the Sources of the Yellow River i.e. upstream dig pipe trench and hide steel pipe and plastic pipe along water source, reserve the delivery port position building water tower, arrange automatic type hydraulic foldable system water tower, make Beijing, Henan, Shanxi, Shaanxi, Gansu etc. economize to rain and be very easy to continuous like this building, and the position that also will reserve the hydraulic foldable system lifting water tower at the mouth of a river is installed and to become arranged in squares best.
Accompanying drawing illustrates:
Fig. 1 is sand figure;
Fig. 2 is cement figure;
Fig. 3 is reinforcement drawing
Fig. 4 is steel pipe figure;
Fig. 5 is steel pipe external packing insulation materials figure;
Fig. 6 is steel pipe cross figure;
Fig. 7 is steel pipe cross and steel pipe isolator cover figure;
Fig. 8 is water tower steel pipe triangle jack figure;
Fig. 9 is contact pin figure;
Figure 10 is jack figure;
Figure 11 is the outer reservoir figure of tower;
Figure 12 is water pipe figure;
Figure 13 is suction pump, submersible pump figure;
Figure 14 is high-tension electricity line chart;
Figure 15 is switchboard figure;
Figure 16 is computer monitor figure;
Figure 17 is transformer figure;
Figure 18 is radar inductor figure;
Figure 19 is water jet: the water conversion process pumped up by the function of water tower, and becomes steam.
Figure 20 is steel plate figure;
Figure 21 is plastic plate figure;
Figure 22 is sidewalk, staircase, elevator figure;
Figure 23 is water storage box figure; Water storage box: be 1. contained in the second layer, three layers, four layers, five layers; 2. long 6 meters × wide 6 meters × high 6 meters of water tank, is made up of the galvanized steel plain sheet of 3 cm thicks; 3. inner wall device tailormadepiston plate, prevents scale from corroding casing;
Figure 24 is absolute altitude figure;
Figure 25 is each steel pipe figure turned round of water tower column;
Figure 26 is hexagon-headed bolt figure;
Figure 27 is water tower elevation.Illustrate: 1. water tower height overall is 700 meters, five layers (floor height 140 meters), every layer of bottom surface is regular pentagon; 2. bottom inscribed circle diameter is 400 meters, 306 meters, limit; 3. top layer inscribed circle diameter is 12 meters, and the length of side is 9 meters; 4. the characteristic of expanding with heat and contract with cold of steel pipe when building tower, will be considered; 5. there is special high-pressure electric wire outside tower, cause in tower.
Figure 28 is water tower top floor plan view;
Figure 29 is water tower ground plan;
Figure 30 is water tower elevation;
Figure 31 is the every layer plane arrangement diagram of water tower, illustrates: 1. electric current is caused the transformer in tower by the high-voltage line outside tower, then uses electric unit.
Figure 32 is associativity water tower figure, associativity water tower operating principle: 1. its major function be utilize air pressure, wind direction, air-flow be symmetrically formed square, make that precipitation is accurate, amount of precipitation is large.
Figure 33 is multiple combined water tower figure, combined water tower operating principle: 1. its major function be utilize air pressure, wind direction, air-flow be symmetrically formed square (combined water tower), make precipitation more accurate, amount of precipitation is larger; 2. utilize the pump handle water on water tower upwards to take out and be just equivalent to yeast powder; 3. multiple water tower combination together, sky precipitation is a hundred percent sure; 4. water tower spacing is 10-20 kilometer.

Claims (3)

1. water tower, water tower profile is formed after imitating building exterior decoration steel pipe jack, special steel cross head, T-bar head group dress, its function i.e. motor, water pump, water pipe be connected with reservoir (reservoir) be energized after water outlet can send into last layer, until sky, ensure the special stable supply of power supply simultaneously, water is extracted into sky, and the effect of water is exactly equal yeast powder.
2. under the condition of such environment, a water tower impossible allow sky rainfall, only has and multiple water tower is combined, and rainfall water is just profitable, rainfall water more greatly, more sure.That is the skill of rainfall water physically says that the orderly movement of electric charge, resistance, conductor, pressure just forms the basis in the principle of electricity.
Utilize many combination water tower pumping ways, add the crystallization of experiment, again according to pump working principle, the comprehensive analysis that pump head is 300 meters, Here it is water tower is the function of sky rainfall water.
3. on basis with good conditionsi water tower in the Yellow River, the Sources of the Yangtze River build and as internet, dig pipe trench in each provincial and territorial of the whole nation hide steel pipe and arrange automatic type hydraulic foldable system water tower, make Beijing, Henan, Shanxi, Shaanxi, Gansu etc. economize to rain and be very easy to continuous like this building, and the position that also will reserve the hydraulic foldable system lifting water tower at the mouth of a river is installed and to become arranged in squares best.
CN201510712917.9A 2015-10-20 2015-10-20 Water tower Pending CN105257074A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510712917.9A CN105257074A (en) 2015-10-20 2015-10-20 Water tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510712917.9A CN105257074A (en) 2015-10-20 2015-10-20 Water tower

Publications (1)

Publication Number Publication Date
CN105257074A true CN105257074A (en) 2016-01-20

Family

ID=55096973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510712917.9A Pending CN105257074A (en) 2015-10-20 2015-10-20 Water tower

Country Status (1)

Country Link
CN (1) CN105257074A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108386055A (en) * 2018-03-02 2018-08-10 深圳市玖品空气净化科技有限公司 A kind of communication steel tower that there is water removal and mend rust function
CN111852167A (en) * 2020-06-22 2020-10-30 杨竣仁 Water tower

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5241797A (en) * 1992-11-09 1993-09-07 John Cliff Elevated water tank floor and construction thereof
CN103291115A (en) * 2011-11-23 2013-09-11 杨竣仁 Water tower
CN105298206A (en) * 2015-10-07 2016-02-03 杨竣仁 Center water-expansion water tower
CN106245981A (en) * 2015-06-10 2016-12-21 杨竣仁 Water tower

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5241797A (en) * 1992-11-09 1993-09-07 John Cliff Elevated water tank floor and construction thereof
CN103291115A (en) * 2011-11-23 2013-09-11 杨竣仁 Water tower
CN106245981A (en) * 2015-06-10 2016-12-21 杨竣仁 Water tower
CN105298206A (en) * 2015-10-07 2016-02-03 杨竣仁 Center water-expansion water tower

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108386055A (en) * 2018-03-02 2018-08-10 深圳市玖品空气净化科技有限公司 A kind of communication steel tower that there is water removal and mend rust function
CN111852167A (en) * 2020-06-22 2020-10-30 杨竣仁 Water tower

Similar Documents

Publication Publication Date Title
CN106245981A (en) Water tower
ITSA20100005U1 (en) MULTI-SIDE SURFACE POLYFUNCTION TOWEL ALBERIFORM COVERAGE WITH LEAVES FOR RAINWATER RECOVERY, IN ECO-SUSTAINABLE MATERIALS WITH POSSIBILITY OF MULTIPLE INSTALLATIONS.
CN105257074A (en) Water tower
CN103291115A (en) Water tower
CN205529848U (en) Integrative multi -functional shelter bridge attachment device of scene
CN105298206A (en) Center water-expansion water tower
CN105371814B (en) A kind of dwelling unit type and balcony area measuring method
CN109610869A (en) A kind of transformation of useless chimney
Jull et al. Architecture and urbanism of Arctic cities: Case study of Resolute Bay and Norilsk
CN109386159A (en) Water tower
CN202248277U (en) Anti-seismic, cold-proof and heat-insulation rapidly-movable house
Guo et al. Numerical simulation of 23 June 2016 Yancheng City EF4 tornadic supercell and analysis of lightning activity
CN202405670U (en) Outdoor transformer substation
Li et al. Pressure distributions on prism-shaped buildings in experimentally simulated downburst
CN103541497A (en) Method for manufacturing high-rigidity pressure-bearing bending-resistant rod piece
CN206421586U (en) Urban transportation indicates system
Agharabi et al. Optimal location of microturbines in low-rise building blocks for sustainable wind energy utilization (case study: Qazvin city)
CN111852167A (en) Water tower
CN205027361U (en) Infrared laser plumb -line awl
Fang et al. Numerical investigation of the wind environment around tall buildings in a central business district
Xu et al. Evaluation on cultural heritage resources of Gubeikou fort in Beijing
Alberta Home-grown solutions
CN103161325B (en) Solar energy wind tower power generation construction
Shang et al. Research on the Planning and Construction of National Industrial Metrology Center Park:--Taking Shandong Province as an Example
CN113846723A (en) Method for changing natural environment and water tower used by the method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160120

WD01 Invention patent application deemed withdrawn after publication