CN105110775B - A kind of Corhart Zac-block is anti-cold to split production method - Google Patents

A kind of Corhart Zac-block is anti-cold to split production method Download PDF

Info

Publication number
CN105110775B
CN105110775B CN201510602215.5A CN201510602215A CN105110775B CN 105110775 B CN105110775 B CN 105110775B CN 201510602215 A CN201510602215 A CN 201510602215A CN 105110775 B CN105110775 B CN 105110775B
Authority
CN
China
Prior art keywords
electric arc
minutes
arc furnaces
oxygen blast
corhart zac
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510602215.5A
Other languages
Chinese (zh)
Other versions
CN105110775A (en
Inventor
龙沾卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Yuandong Refractory Co Ltd
Original Assignee
Zhengzhou Yuandong Refractory Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Yuandong Refractory Co Ltd filed Critical Zhengzhou Yuandong Refractory Co Ltd
Priority to CN201510602215.5A priority Critical patent/CN105110775B/en
Publication of CN105110775A publication Critical patent/CN105110775A/en
Application granted granted Critical
Publication of CN105110775B publication Critical patent/CN105110775B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Compositions Of Oxide Ceramics (AREA)

Abstract

Production method is split the present invention relates to a kind of Corhart Zac-block is anti-cold, and the problem of can effectively solving Corhart Zac-block cold crack, technical scheme is to comprise the following steps:(1)Installation mold(2)The Corhart Zac-block raw material prepared is added into electric arc furnaces in two times, each feeding quantity is the half of raw material gross weight, shakeout after feeding for the first time, open electric arc furnaces, melted, ten minutes second charging in interval, the three-phase arc voltage of electric arc furnaces each of three electrodes is 205 210V, melt after 80 90 minutes, power-off stops fusing, oxygen blast 3 minutes, oxygen blast flow is 15m3/h, then proceed to fusing, the three-phase arc voltage of electric arc furnaces each of three electrodes is 205 210V, after fusing 10 minutes, power-off stops fusing, oxygen blast 3 minutes, oxygen blast flow is 15m3/ h, produce the casting liquid melted, casting liquid temperature degree now reaches more than 2000 DEG C;(3)Cast molding, production method of the present invention is simple, and burn-off rate is fast, and casting liquid viscosity is low, and cast temperature is high, effectively reduces cold crack.

Description

A kind of Corhart Zac-block is anti-cold to split production method
Technical field
The present invention relates to Corhart Zac-block technical field, particularly a kind of Corhart Zac-block is anti-cold to split production method.
Background technology
Zirconia-corundum refractory brick is mainly used in glass furnace, and current glass industry production capacity surplus, enterprise operation is difficult.Glass The upgrading of glass quality, the increase of glass kind and eliminate high consumption low energy operation mode be only glass enterprise at present base oneself upon it Road.
The upgrading of glass enterprise has the strict demand of quality, the quality of zirconia-corundum refractory brick to zirconia-corundum refractory brick Defect can directly affect the quality of glassware, also contribute to the service life of glass furnace.The presentation product of zirconia-corundum refractory brick Whether matter typically refers to the crackle of product beyond using standard,(Other presentation qualities also have the color of product surface, stomata etc. Deng).
The crackle of zirconia-corundum refractory brick is distinguished from major class fire check and cold crack, and slight cold crack is disguised very strong, But endanger very big, potential safety hazard when being glass furnace operation.Such as zirconia-corundum refractory brick is used for the flow liquid of glass furnace Hole, all glass metals will pass through dog-hole.Dog-hole front arch is not found if there is disguised very strong cold crack, It will cave at any time, force glass furnace out of service, construction again is reprocessed, and direct economic loss wants hundreds of thousands at least Member.
The time that cold crack shows in brick face is different, and some cold cracks are just showed in the firm outlet of brick, some cold cracks Just show after processing, it is very trickle.Also have several after processing days, can just show after Shi Jitian, or even January.This It is caused by brick internal stress is not discharged fully.It is hidden in the implosion that the stress not discharged in brick forms brick, one Trickle cold crack will be gradually shown on brick face in fixing time.It is more fearful when glass furnace is used, cause at any time Kiln accident occurs.The defective proportion of cold crack in production typically has 3%-5%, how to eliminate Corhart Zac-block cold cracking Line is those skilled in the art's concern.
The content of the invention
For above-mentioned situation, to overcome the defect of prior art, the purpose of the present invention is just to provide a kind of AZS Brick is anti-cold to split production method, the problem of can effectively solving Corhart Zac-block cold crack.
The technical scheme that the present invention is solved, which is that a kind of Corhart Zac-block is anti-cold, splits production method, it is characterised in that bag Include following steps:
(1)Installation mold
Mould includes brick body sand mold and mounted in the upper rising head sand mold of brick body sand casting mouthful, and mould is put into incubator It is interior, insulation material is filled between the outer wall of mould and the inwall of incubator, the thickness of insulation material is more than 250mm;
(2)Fusing
The Corhart Zac-block raw material prepared is added into electric arc furnaces in two times, each feeding quantity is the one of raw material gross weight Half, shakeout after feeding for the first time, open electric arc furnaces, melted, be spaced ten minutes second charging, electric arc furnaces each of three electrodes Three-phase arc voltage is 205-210V, after melting 80-90 minutes, and power-off stops fusing, oxygen blast 3 minutes, and oxygen blast flow is 15m3/h, so Continue to melt afterwards, the three-phase arc voltage of electric arc furnaces each of three electrodes is 205-210V, and after melting 10 minutes, power-off stops fusing, oxygen blast 3 Minute, oxygen blast flow is 15m3/ h, produces the casting liquid melted, casting liquid temperature degree now reaches more than 2000 DEG C;
(3)Cast molding
The casting liquid melted is poured into mould, casting rate >=28kg/s is gradually annealed to 60 DEG C after the completion of casting Take out below.
Described step(2)In Corhart Zac-block raw material be by the raw material of percentage by weight meter:Alundum (Al2O3) (Al2O2)49-52%, silica(SiO2)14-16%, sodium oxide molybdena(Na2O)1.2-1.4%, zirconium oxide(ZrO2)31-35% and oxygen Change titanium(ZrO2)0.23-0.27% is well mixed what is be made;
Described step(1)In insulation material be granularity 3-5mm silica heat-insulating material;
Described step(2)In electric arc furnaces input current be 3500-4000A, input voltage is 280V-300V;
Described step(2)In the diameter of each of three electrodes of electric arc furnaces be 202mm, electric arc furnaces is commercially available prod(It is existing There is technology), such as electric arc furnaces for 5 tons, the 10 tons models that Xi'an Lan Hai metallurgical equipments Co., Ltd produces.
Production method of the present invention is simple, and burn-off rate is fast, and casting liquid viscosity is low, and cast temperature is high, effectively reduces cold Crackle, long product lifecycle is the innovation in Corhart Zac-block production method.
Brief description of the drawings
The structure sectional view of Fig. 1 incubators of the present invention and mould.
Embodiment
The embodiment of the present invention is described in further detail below in conjunction with drawings and examples.
As shown in figure 1, the Corhart Zac-block is anti-cold to split production method, comprise the following steps:
(1)Installation mold
Mould includes brick body sand mold(1)With the rising head sand mold in brick body sand casting mouthful(2), mould is put into guarantor Incubator(4)It is interior, fill insulation material between the outer wall of mould and the inwall of incubator(3), the thickness of insulation material is 300mm; Described insulation material is combined siliceous building thermal insulation material for granularity 3-5mm AX-800;
(2)Fusing
The Corhart Zac-block raw material prepared is added into electric arc furnaces in two times, each feeding quantity is the one of raw material gross weight Half, shakeout after feeding for the first time, open electric arc furnaces, melted, be spaced ten minutes second charging, electric arc furnaces each of three electrodes Three-phase arc voltage is 208V, after melting 85 minutes, and power-off stops fusing, and oxygen blast 3 minutes, oxygen blast flow is 15m3/h, is then proceeded to Fusing, the three-phase arc voltage of electric arc furnaces each of three electrodes is 210V, and after melting 10 minutes, power-off stops fusing, oxygen blast 3 minutes, oxygen blast Flow is 15m3/ h, produces the casting liquid 5 melted, casting liquid temperature degree now reaches more than 2000 DEG C;
Described Corhart Zac-block raw material is by the raw material of percentage by weight meter:Alundum (Al2O3)(Al2O2)50.45%、 Silica(SiO2)15%th, sodium oxide molybdena(Na2O)1.3%th, zirconium oxide(ZrO2)33% and titanium oxide(ZrO2)0.25% is well mixed It is made;
The input current of described electric arc furnaces is 3500-4000A, and input voltage is 280V-300V;Described electric arc furnaces The diameter of each of three electrodes is 202mm;
(3)Cast molding
The casting liquid melted is poured into mould, casting rate >=28kg/s is gradually annealed to 60 DEG C after the completion of casting Take out below.
The present invention makes casting liquid temperature degree be maintained at more than 2000 DEG C, guarantor by the three-phase arc voltage in electric arc furnaces each of three electrodes Casting liquid temperature degree, so as to ensure that the viscosity of casting liquid, makes casting liquid in liquid all the time more than 1780 DEG C in card casting cycle State is kept for the sufficiently long time, and complete release is easy in the release of stress in the liquid state, it is ensured that the thorough root of cold crack of control product Remove, so as to effectively eliminate the cold crack of Corhart Zac-block, through actually should, the electric smelting zirconium produced using the inventive method is firm Beautiful brick cold crack occurrence rate declines 3-5%, is almost completely eliminated, compared with prior art, and the present invention has advantages below:
1st, cold crack occurrence rate declines 3-5%, it is assumed that have 10000 tons of production capacity every year, then can reduce waste product 100 Ton is to 300 tons, and price per ton is according to 20000 yuan of calculating, then exactly reduce 2,000,000 yuan to 600 yuan ten thousand of loss, economic benefit Significantly;
2nd, due to having prevented cold crack, the safe operation of glass furnace has reliable guarantee, it is to avoid fused cast refractories this The glass furnace accident that defect is caused.

Claims (5)

1. a kind of Corhart Zac-block is anti-cold to split production method, it is characterised in that comprise the following steps:
(1) installation mold
Mould includes brick body sand mold (1) and the rising head sand mold (2) in brick body sand casting mouthful, and mould is put into incubator (4) in, insulation material (3) is filled between the outer wall of mould and the inwall of incubator, the thickness of insulation material is more than 250mm;
(2) melt
The Corhart Zac-block raw material prepared is added into electric arc furnaces in two times, each feeding quantity is the half of raw material gross weight, Shakeout after feeding for the first time, open electric arc furnaces, melted, be spaced ten minutes second charging, the three of electric arc furnaces each of three electrodes Phase arc voltage is 205-210V, after melting 80-90 minutes, and power-off stops fusing, oxygen blast 3 minutes, and oxygen blast flow is 15m3/ h, then Continue to melt, the three-phase arc voltage of electric arc furnaces each of three electrodes is 205-210V, and after melting 10 minutes, power-off stops fusing, 3 points of oxygen blast Clock, oxygen blast flow is 15m3/ h, produces the casting liquid melted;
(3) cast molding
The casting liquid melted is poured into mould, casting rate >=28kg/s is gradually annealed to less than 60 DEG C after the completion of casting Taking-up;
Corhart Zac-block raw material in described step (2) is by the raw material of percentage by weight meter:Alundum (Al2O3) (Al2O3) 49-52%, silica (SiO2) 14-16%, sodium oxide molybdena (Na2O) 1.2-1.4%, zirconium oxide (ZrO2) 31-35% and oxidation Titanium (TiO2) 0.23-0.27% is well mixed is made.
2. Corhart Zac-block according to claim 1 is anti-cold to split production method, it is characterised in that described step (1) In insulation material be granularity 3-5mm silica heat-insulating material.
3. Corhart Zac-block according to claim 1 is anti-cold to split production method, it is characterised in that described step (2) In electric arc furnaces input current be 3500-4000A, input voltage is 280V-300V.
4. Corhart Zac-block according to claim 1 is anti-cold to split production method, it is characterised in that described step (2) In the diameter of each of three electrodes of electric arc furnaces be 202mm.
5. Corhart Zac-block according to claim 1 is anti-cold to split production method, it is characterised in that comprise the following steps:
(1) installation mold
Mould includes brick body sand mold (1) and the rising head sand mold (2) in brick body sand casting mouthful, and mould is put into incubator (4) in, insulation material (3) is filled between the outer wall of mould and the inwall of incubator, the thickness of insulation material is 300mm;It is described Insulation material be granularity 3-5mm silica heat-insulating material;
(2) melt
The Corhart Zac-block raw material prepared is added into electric arc furnaces in two times, each feeding quantity is the half of raw material gross weight, Shakeout after feeding for the first time, open electric arc furnaces, melted, be spaced ten minutes second charging, the three of electric arc furnaces each of three electrodes Phase arc voltage is 208V, after melting 85 minutes, and power-off stops fusing, oxygen blast 3 minutes, and oxygen blast flow is 15m3/ h, then proceedes to melt Change, the three-phase arc voltage of electric arc furnaces each of three electrodes is 210V, and after melting 10 minutes, power-off stops fusing, oxygen blast 3 minutes, oxygen blast stream Measure as 15m3/ h, produces the casting liquid melted;
Described Corhart Zac-block raw material is by the raw material of percentage by weight meter:Alundum (Al2O3) (Al2O2) 50.45%, dioxy SiClx (SiO2) 15%, sodium oxide molybdena (Na2O) 1.3%, zirconium oxide (ZrO2) 33% and titanium oxide (ZrO2) 0.25% be well mixed It is made;
The input current of described electric arc furnaces is 3500-4000A, and input voltage is 280V-300V;Three of described electric arc furnaces The diameter of electrode is 202mm;
(3) cast molding
The casting liquid melted is poured into mould, casting rate >=28kg/s is gradually annealed to less than 60 DEG C after the completion of casting Taking-up.
CN201510602215.5A 2015-09-21 2015-09-21 A kind of Corhart Zac-block is anti-cold to split production method Active CN105110775B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510602215.5A CN105110775B (en) 2015-09-21 2015-09-21 A kind of Corhart Zac-block is anti-cold to split production method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510602215.5A CN105110775B (en) 2015-09-21 2015-09-21 A kind of Corhart Zac-block is anti-cold to split production method

Publications (2)

Publication Number Publication Date
CN105110775A CN105110775A (en) 2015-12-02
CN105110775B true CN105110775B (en) 2017-07-25

Family

ID=54658942

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510602215.5A Active CN105110775B (en) 2015-09-21 2015-09-21 A kind of Corhart Zac-block is anti-cold to split production method

Country Status (1)

Country Link
CN (1) CN105110775B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107266089A (en) * 2017-06-27 2017-10-20 江苏徐耐新材料科技股份有限公司 A kind of production method of the AZS of anti-deformation
CN107759237A (en) * 2017-10-12 2018-03-06 徐州东鹏工具制造有限公司 A kind of hot-working method of AZS
CN108046799A (en) * 2018-01-03 2018-05-18 河南省豫华电熔科技有限公司 A kind of production technology with capacitance method production fused alumina zirconia ball
CN113400446A (en) * 2021-06-10 2021-09-17 安徽中材新材料科技有限公司 Preparation method of composite sand mold for casting fused AZS pool wall bricks
CN114635070B (en) * 2022-02-21 2022-08-30 杭州永磁集团有限公司 Preparation method of high-toughness alnico magnetic steel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1322696A (en) * 2001-07-03 2001-11-21 郑州东方企业(集团)股份有限公司 Zircon corundum product produced by mixing high-purity material and secondary cast material and its production process
CN1418833A (en) * 2001-11-14 2003-05-21 郑州振中电熔锆业有限公司 Founding casting non-oxidate containing plate shape material compound zirconium boule refractory brick and production method thereof
CN1483701A (en) * 2003-05-09 2004-03-24 郑州大学 Method for preparing alumine base electric fused zirconium corundum
CN1693275A (en) * 2005-05-16 2005-11-09 侯松发 Process for producing electric smelting zirconium corundum 33#, 36#, 41# products by secondary casting
CN102731122A (en) * 2012-07-12 2012-10-17 郑州远东耐火材料有限公司 Production method of electro-fused zirconia-corundum bowl brick

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1322696A (en) * 2001-07-03 2001-11-21 郑州东方企业(集团)股份有限公司 Zircon corundum product produced by mixing high-purity material and secondary cast material and its production process
CN1418833A (en) * 2001-11-14 2003-05-21 郑州振中电熔锆业有限公司 Founding casting non-oxidate containing plate shape material compound zirconium boule refractory brick and production method thereof
CN1483701A (en) * 2003-05-09 2004-03-24 郑州大学 Method for preparing alumine base electric fused zirconium corundum
CN1693275A (en) * 2005-05-16 2005-11-09 侯松发 Process for producing electric smelting zirconium corundum 33#, 36#, 41# products by secondary casting
CN102731122A (en) * 2012-07-12 2012-10-17 郑州远东耐火材料有限公司 Production method of electro-fused zirconia-corundum bowl brick

Also Published As

Publication number Publication date
CN105110775A (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CN105110775B (en) A kind of Corhart Zac-block is anti-cold to split production method
US10252939B2 (en) High-hardness transparent glass ceramic and preparation method therefore
CN102503476B (en) Production method of electric smelting zircon corundum brick
JP6002283B2 (en) Refractory with high zirconia content
CN104926328A (en) Fused zirconia corundum low-seepage brick production method
KR20140000668A (en) High zirconia refractory product
JP6140686B2 (en) High zirconia electroformed refractory
CN102746012B (en) Castable for major iron runner of blast furnace larger than 2500m<3>
CN104402469A (en) Electric furnace top central area furnace cover and preparation method thereof
CN104446545A (en) Fusing refractory material damper block and preparation method thereof
CN103803994B (en) Small blast furnace main iron runner castable
CN103319186B (en) Aluminum melting furnace cast refractory material and preparation method thereof
CN101215180B (en) Method for producing AZS electric melting refractory materials by natural mineral raw materials
KR20140043140A (en) Refractory block and glass-melting furnace
JP6140687B2 (en) High zirconia electroformed refractory
CN107266089A (en) A kind of production method of the AZS of anti-deformation
CN103319187B (en) Crack-resistant fused-aluminum refractory castable and preparation method therefor
CN102731122B (en) Production method of electro-fused zirconia-corundum bowl brick
CN103771890A (en) Method for producing alumina-zirconia-silica (AZS) fused cast alumina zirconia octagonal drum grid
CN115636677B (en) Tin bath top cover brick for float glass production and preparation method thereof
CN101747067A (en) Glass kiln heat accumulation chamber cone brick
CN105750482B (en) For the coating without shrinkage cavity fused cast refractories insulated feeder
CN107759237A (en) A kind of hot-working method of AZS
CN205347249U (en) A insulation can for producing electrically fused brick
CN103803996B (en) Large blast furnace main iron runner castable

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant