CN104807721A - 预应力混凝土现浇梁预应力管道压浆密实度综合检测方法 - Google Patents
预应力混凝土现浇梁预应力管道压浆密实度综合检测方法 Download PDFInfo
- Publication number
- CN104807721A CN104807721A CN201510094202.1A CN201510094202A CN104807721A CN 104807721 A CN104807721 A CN 104807721A CN 201510094202 A CN201510094202 A CN 201510094202A CN 104807721 A CN104807721 A CN 104807721A
- Authority
- CN
- China
- Prior art keywords
- cavity
- pipeline
- steel strand
- strand wires
- cast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 20
- 238000011065 in-situ storage Methods 0.000 title claims abstract description 9
- 239000011513 prestressed concrete Substances 0.000 title claims abstract description 9
- 238000012360 testing method Methods 0.000 claims abstract description 15
- 238000001514 detection method Methods 0.000 claims abstract description 13
- 238000004088 simulation Methods 0.000 claims abstract description 8
- 230000000694 effects Effects 0.000 claims abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 18
- 239000010959 steel Substances 0.000 claims description 18
- 239000002002 slurry Substances 0.000 claims description 15
- 238000005086 pumping Methods 0.000 claims description 13
- 238000012856 packing Methods 0.000 claims description 12
- 230000003014 reinforcing effect Effects 0.000 claims description 12
- 238000007689 inspection Methods 0.000 claims description 7
- 239000004567 concrete Substances 0.000 claims description 6
- 238000005553 drilling Methods 0.000 claims description 6
- 239000000463 material Substances 0.000 claims description 6
- 238000005259 measurement Methods 0.000 claims description 6
- 238000013461 design Methods 0.000 claims description 4
- 238000004364 calculation method Methods 0.000 claims description 3
- 229910003460 diamond Inorganic materials 0.000 claims description 3
- 239000010432 diamond Substances 0.000 claims description 3
- 238000002360 preparation method Methods 0.000 claims description 3
- 210000001364 upper extremity Anatomy 0.000 claims description 3
- 238000000338 in vitro Methods 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 238000004513 sizing Methods 0.000 description 1
- 238000002604 ultrasonography Methods 0.000 description 1
Landscapes
- Analysing Materials By The Use Of Radiation (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510094202.1A CN104807721B (zh) | 2015-03-03 | 2015-03-03 | 预应力混凝土现浇梁预应力管道压浆密实度综合检测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510094202.1A CN104807721B (zh) | 2015-03-03 | 2015-03-03 | 预应力混凝土现浇梁预应力管道压浆密实度综合检测方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104807721A true CN104807721A (zh) | 2015-07-29 |
CN104807721B CN104807721B (zh) | 2016-09-21 |
Family
ID=53692741
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510094202.1A Active CN104807721B (zh) | 2015-03-03 | 2015-03-03 | 预应力混凝土现浇梁预应力管道压浆密实度综合检测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104807721B (zh) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105929108A (zh) * | 2016-04-12 | 2016-09-07 | 浙江省交通工程建设集团有限公司 | 预应力孔道压浆质量检测方法 |
CN106124622A (zh) * | 2016-06-12 | 2016-11-16 | 中国十七冶集团有限公司 | 一种基于声波散射技术的预应力孔道密实度综合评价方法 |
CN106869033A (zh) * | 2017-03-09 | 2017-06-20 | 中铁十九局集团有限公司 | 大型混凝土箱梁预应力管道压浆密实度控制方法 |
CN108104474A (zh) * | 2018-01-05 | 2018-06-01 | 广州华土建筑工程技术有限公司 | 一种采用钢结构和cgm料的高压灌浆施工方法 |
CN108562593A (zh) * | 2018-04-26 | 2018-09-21 | 中国建筑股份有限公司 | 钢筋套筒灌浆料的饱满度检验方法 |
CN108982535A (zh) * | 2018-08-01 | 2018-12-11 | 昆山市建设工程质量检测中心 | 基于内窥镜三维尺寸测量技术的套筒灌浆饱满度检测方法 |
CN109342265A (zh) * | 2018-11-05 | 2019-02-15 | 中交三航局第三工程有限公司 | 装配式竖向构件中注浆导管内灌浆质量检测装置 |
CN110261481A (zh) * | 2019-07-26 | 2019-09-20 | 招商局重庆公路工程检测中心有限公司 | 点压式采集装置 |
CN110907463A (zh) * | 2019-12-16 | 2020-03-24 | 中铁建工集团有限公司 | 基于内窥镜的劲性梁柱节点混凝土浇筑密实度监控方法 |
CN112345736A (zh) * | 2020-09-28 | 2021-02-09 | 中铁二十四局集团浙江工程有限公司 | 一种桥梁预应力管道压浆密实度的智能检测方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002055172A (ja) * | 2000-08-08 | 2002-02-20 | Ohbayashi Corp | 地盤内空洞の調査方法 |
CN101413245A (zh) * | 2008-10-30 | 2009-04-22 | 合肥工业大学 | 混凝土地基板板底脱空处理方法和处理设备 |
CN102818852A (zh) * | 2011-06-10 | 2012-12-12 | 杭州海儿科技有限公司 | 一种桥梁预应力孔道灌浆密实度测试方法及*** |
CN102944608A (zh) * | 2012-11-26 | 2013-02-27 | 河海大学常州校区 | 波纹管孔道注浆密实度超声检查的装置及方法 |
-
2015
- 2015-03-03 CN CN201510094202.1A patent/CN104807721B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002055172A (ja) * | 2000-08-08 | 2002-02-20 | Ohbayashi Corp | 地盤内空洞の調査方法 |
CN101413245A (zh) * | 2008-10-30 | 2009-04-22 | 合肥工业大学 | 混凝土地基板板底脱空处理方法和处理设备 |
CN102818852A (zh) * | 2011-06-10 | 2012-12-12 | 杭州海儿科技有限公司 | 一种桥梁预应力孔道灌浆密实度测试方法及*** |
CN102944608A (zh) * | 2012-11-26 | 2013-02-27 | 河海大学常州校区 | 波纹管孔道注浆密实度超声检查的装置及方法 |
Non-Patent Citations (2)
Title |
---|
徐建达等: "预应力管道压浆质量无损检测技术综述", 《第十四届全国混凝土及预应力混凝土分会学术会议论文》, 31 December 2007 (2007-12-31), pages 214 - 216 * |
魏永高等: "预应力混凝土梁孔道压浆质量无损检测技术研究", 《市政技术》, vol. 28, no. 6, 30 June 2010 (2010-06-30) * |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105929108B (zh) * | 2016-04-12 | 2019-01-22 | 浙江交工集团股份有限公司 | 预应力孔道压浆质量检测方法 |
CN105929108A (zh) * | 2016-04-12 | 2016-09-07 | 浙江省交通工程建设集团有限公司 | 预应力孔道压浆质量检测方法 |
CN106124622A (zh) * | 2016-06-12 | 2016-11-16 | 中国十七冶集团有限公司 | 一种基于声波散射技术的预应力孔道密实度综合评价方法 |
CN106124622B (zh) * | 2016-06-12 | 2019-01-22 | 中国十七冶集团有限公司 | 一种基于声波散射技术的预应力孔道密实度综合评价方法 |
CN106869033A (zh) * | 2017-03-09 | 2017-06-20 | 中铁十九局集团有限公司 | 大型混凝土箱梁预应力管道压浆密实度控制方法 |
CN108104474A (zh) * | 2018-01-05 | 2018-06-01 | 广州华土建筑工程技术有限公司 | 一种采用钢结构和cgm料的高压灌浆施工方法 |
CN108562593A (zh) * | 2018-04-26 | 2018-09-21 | 中国建筑股份有限公司 | 钢筋套筒灌浆料的饱满度检验方法 |
CN108982535A (zh) * | 2018-08-01 | 2018-12-11 | 昆山市建设工程质量检测中心 | 基于内窥镜三维尺寸测量技术的套筒灌浆饱满度检测方法 |
CN108982535B (zh) * | 2018-08-01 | 2019-03-19 | 昆山市建设工程质量检测中心 | 基于内窥镜三维尺寸测量技术的套筒灌浆饱满度检测方法 |
CN109342265A (zh) * | 2018-11-05 | 2019-02-15 | 中交三航局第三工程有限公司 | 装配式竖向构件中注浆导管内灌浆质量检测装置 |
CN110261481A (zh) * | 2019-07-26 | 2019-09-20 | 招商局重庆公路工程检测中心有限公司 | 点压式采集装置 |
CN110261481B (zh) * | 2019-07-26 | 2023-12-12 | 招商局重庆公路工程检测中心有限公司 | 点压式采集装置 |
CN110907463A (zh) * | 2019-12-16 | 2020-03-24 | 中铁建工集团有限公司 | 基于内窥镜的劲性梁柱节点混凝土浇筑密实度监控方法 |
CN110907463B (zh) * | 2019-12-16 | 2022-05-20 | 中铁建工集团有限公司 | 基于内窥镜的劲性梁柱节点混凝土浇筑密实度监控方法 |
CN112345736A (zh) * | 2020-09-28 | 2021-02-09 | 中铁二十四局集团浙江工程有限公司 | 一种桥梁预应力管道压浆密实度的智能检测方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104807721B (zh) | 2016-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104807721B (zh) | 预应力混凝土现浇梁预应力管道压浆密实度综合检测方法 | |
Liu et al. | Experimental investigation of the effects of heterogeneity and geostress difference on the 3D growth and distribution of hydrofracturing cracks in unconventional reservoir rocks | |
Zhao et al. | In-situ stress measurements and regional stress field assessment of the Beishan area, China | |
Wang et al. | Macro-meso failure behavior of pre-flawed hollow-cylinder granite under multi-level cyclic loads: insights from acoustic emission and post-test CT scanning | |
KR100959193B1 (ko) | 시공 중 터널에 대한 실시간, 정량적 안정성 평가판단방법및 그 장치 | |
CN103293560B (zh) | 一种采动三向应力场的测试方法 | |
CN104532886B (zh) | 一种灌注桩桩底沉渣和桩端地基检测装置和方法 | |
CN204401664U (zh) | 一种灌注桩桩底沉渣和桩端地基检测装置 | |
Liberatore et al. | Static penetration test for historical masonry mortar | |
CN101581701A (zh) | 一种地表注浆效果检测的方法 | |
Sobala et al. | Role to be played by independent geotechnical supervision in the foundation for bridge construction | |
CN205538580U (zh) | 裂隙介质***渗透张量室内测定装置 | |
Karlovsek et al. | Investigation of voids and cavities in bored tunnels using GPR | |
WO2020228574A1 (zh) | 一种隧道地质条件协同预测方法 | |
Zhou et al. | Optimization analysis of settlement parameters for postgrouting piles in loess area of Shaanxi, China | |
Sienko et al. | Application of distributed optical fibre sensor for strain and temperature monitoring within continuous flight auger columns | |
EVALUATE | Automatic measurement of drilling parameters to evaluate the mechanical properties of soils | |
CN110794039B (zh) | 利用岩体波速计算帷幕灌浆岩体裂隙充填率的方法 | |
CN115627746B (zh) | 一种基于原位测试的承压水地层基坑抗突涌安全评估方法 | |
Liu et al. | Structural response of existed metro tunnels to adjacent large-section pipe jacking construction | |
Kvartsberg et al. | Hydrogeological characterisation and stochastic modelling of a hydraulically conductive fracture system affected by grouting: A case study of horizontal circular drifts | |
Guayacán-Carrillo et al. | Impact of size excavation on time-dependent behavior of drifts excavated at the Meuse/Haute-Marne URL | |
Zhou et al. | A coupled experimental and numerical simulation of concrete joints' behaviors in tunnel support using concrete specimens | |
Munir | Development of correlation between rock classification system and modulus of deformation | |
CN111898244A (zh) | 一种线状工程勘察阶段岩爆风险评估方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
OL01 | Intention to license declared | ||
OL01 | Intention to license declared | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240708 Address after: No. B-5, Dongfang Garden, Dayang Street, Linhai City, Taizhou City, Zhejiang Province 317000 Patentee after: Chen Yuhao Country or region after: China Address before: 317000 East Garden B-5, Zhangyang Road, Dayang Street, Linhai City, Taizhou City, Zhejiang Province Patentee before: Chen Xigui Country or region before: China Patentee before: Chen Yuhao Patentee before: Liu Meiping |