CN104480964A - Construction method for local water eruption source of underground damp proofing course - Google Patents

Construction method for local water eruption source of underground damp proofing course Download PDF

Info

Publication number
CN104480964A
CN104480964A CN201410683498.6A CN201410683498A CN104480964A CN 104480964 A CN104480964 A CN 104480964A CN 201410683498 A CN201410683498 A CN 201410683498A CN 104480964 A CN104480964 A CN 104480964A
Authority
CN
China
Prior art keywords
water
concrete
construction method
water source
drainage duct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410683498.6A
Other languages
Chinese (zh)
Other versions
CN104480964B (en
Inventor
廖立波
欧志永
李毅
吕展华
潘伟华
覃森
吕良军
韦元基
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Industry Group Metallurgical Construction Co., Ltd.
Original Assignee
Guangxi Zhuang Autonomous Region Metallurgical Construction Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Zhuang Autonomous Region Metallurgical Construction Co filed Critical Guangxi Zhuang Autonomous Region Metallurgical Construction Co
Priority to CN201410683498.6A priority Critical patent/CN104480964B/en
Publication of CN104480964A publication Critical patent/CN104480964A/en
Application granted granted Critical
Publication of CN104480964B publication Critical patent/CN104480964B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/20Restraining of underground water by damming or interrupting the passage of underground water by displacing the water, e.g. by compressed air
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0006Plastics
    • E02D2300/0007PVC
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • E02D2300/0034Steel; Iron in wire form

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Building Environments (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention provides a construction method for a local water eruption source of an underground damp proofing course. The construction method comprises the steps of 1) prefabricating a fine aggregate concrete block, and embedding a draining guide pipe through the concrete block; 2) finding out the position of the water eruption source, and deepening a small pit in the position; 3) sleeving the lower part of the draining guide pipe with a steel wire ball, then feeding into the deepened small pit together with the concrete block and the draining guide pipe, and paving a steel wire gauze using the position of the water eruption source as the center; 4) extruding, discharging water and normally pouring course concrete to the position to enable water to be naturally erupted from the draining guide pipe and then stop on the concrete layer, wherein the depth of 60 to 90mm is reserved without concrete; 5) enabling the pouring layer of the course to be 200mm higher than the normal water eruption stopping level if the water eruption point is a similar independent column base; 6) maintaining in a normal way, then bending the draining guide pipe in 180 degrees, and binding with an iron wire to close the water source; 7) transferring the draining water guide to the rest part without concrete, and then filling in concrete to cover the draining guide pipe. According to the construction method, the construction process is simple, the damp base layer is at least free of open water, the quality is ensured, the cost is low, the energy is saved, and the environment is protected.

Description

A kind of underground waterproof basic unit local emits water source construction method
Technical field
The present invention relates to a kind of underground waterproof basic unit local and emit water source construction method, for building field.
Background technology
Underground waterproof construction is the problem that enterprise in charge of construction compares concern always, and the construction method of waterproof matrix determines waterproof construction quality to a great extent.And current more situation is, construct by force when there being open fire, its consequence is that waterproofing course does not play waterproof action, when main body waterproof concrete existing defects, there will be Seepage, therefore there is waterproof construction mass defect.Therefore how waterproof matrix solves and locally emits the water source bright water problem of impact elimination to be the significant problem of enterprise in charge of construction in underground waterproof construction.
Summary of the invention
Goal of the invention: the object of the invention be to provide a kind of underground waterproof basic unit local emit water source construction method, be applicable to due to reach be excavated to design elevation time, occur in soil some local upwards outwards emit the situation of water and do not take precipitation measure project.
Technical scheme of the present invention is as follows: a kind of underground waterproof basic unit local emits water source construction method, comprises the steps:
1) prefabricated pea gravel concreten block, by pre-buried for drainage duct through concrete block,
2) find and emit position, water water source and deepen little heatable adobe sleeping platform in this position,
3) steel wire lump is enclosed within drainage duct bottom and puts into the little heatable adobe sleeping platform of intensification together with concrete block and drainage duct, centered by the position that this emits water source, lay gauze wire cloth.
4) adopt extruding to catch up with water normally to water and smash substrate concrete to this position, emit water nature to emerge from drainage duct, and stay in concrete surface, this place stays 60-90mm deeply not water,
5) if emit the similar single column foundation of water spot, basic unit waters the face of smashing and exceeds and normally emit water to cut off the water face 200mm,
6) normal after maintenance 10-15 days by drainage duct double flat iron wire tighten, can water source be closed,
7) drainage duct is put in does not water residue place, fill with concrete and bury drainage duct, complete whole closed water source process.
Described pea gravel concreten block is 80mm × 80mm × 80mm.
Described drainage duct is long 350-400mm, and internal diameter is the PVC transparent flexible pipe of 8mm.
Described drainage duct is pre-buried is that 50mm is stretched out in bottom through concrete block, and 220-270mm is stretched out on top.
The little heatable adobe sleeping platform of described intensification is for adding profound 80mm × wide 80mm × dark 210mm.
Described steel wire lump is enclosed within the 50mm that concrete block is stretched out in drainage duct bottom.
Described laying gauze wire cloth is 1000mm × 1000mm.
Know-why of the present invention is as follows:
Measure is dredged in employing, the water source flowing water pressure that makes to emerge is discharged when large area waterproof matrix concrete normally waters and smashes, water source flowing water pressure of avoiding emerging smashes the also unhardened concrete quality influence of large area waterproof matrix not reaching intensity to newly watering, newly water if do not process smash go back green concrete be very easy to again be separated into independently stone, sand and cement, ensure large area waterproof matrix concrete quality, after closing drainage duct, substrate concrete can bear the water buoyancy of water source flowing water pressure of emerging and the effect of preliminary leak pressure, accomplish base closed water source, reach waterproof matrix at least without the waterproof construction condition of open fire, ensure waterproof quality.
Outstanding advantages of the present invention is:
1, construction technology is simple.This method is identical with common disturbing concrete, and operational method is simple, and operative is convenient.
2, can ensure the quality of products, provide against hidden trouble, reduce cost.Can base closed water source, reach waterproof matrix at least without the waterproof construction condition of open fire, ensure the quality of products.
3, energy-conserving and environment-protective.Material requested can repeat turnover and use, and embodies the feature of energy-conserving and environment-protective.
Accompanying drawing explanation
Fig. 1 is the structural representation that underground waterproof basic unit of the present invention local emits water source construction method.
Fig. 2 is the state diagram after underground waterproof basic unit of the present invention local emits water source construction method to construct.
Be labeled as in figure: drainage duct 1, steel wire lump 2, precast concrete block 3, gauze wire cloth 4, deepen little heatable adobe sleeping platform 5.
Detailed description of the invention
Below by way of accompanying drawing and implementation step, technical scheme of the present invention is further illustrated
Underground waterproof basic unit of the present invention local emits water source construction method, comprises the steps:
1, the C20 pea gravel concreten block 3 of prefabricated 80mm × 80mm × 80mm, be that the PVC transparent flexible pipe of 8mm passes concrete block 3 as drainage duct 1 is pre-buried using long for 350-400mm internal diameter 1.D, 50mm is stretched out in bottom, and 220-270mm is stretched out on top,
2, find the position at the water source emitting water in basement soil, if emit the similar single column foundation position of water spot, this similar single column foundation waterproof matrix thickeies to 130mm, adds the little heatable adobe sleeping platform 5 of the intensification of profound 80mm × wide 80mm × dark 210mm in this position than former design,
3, steel wire lump 2 being enclosed within drainage duct 1 bottom stretches out on the 50mm of concrete block, after packaging, steel wire lump 2 is downward, together with concrete block 3 and pre-buried drainage duct 1, jointly put into and deepen little heatable adobe sleeping platform 5, the gauze wire cloth 4 of 1000mm × 1000mm is laid centered by the position that this emits water source
4, adopt extruding to catch up with the method for water normally to water and smash basement waterproofing substrate concrete, water when smashing to this position, water nature is emitted upwards to emerge more than 40-90mm concrete surface from the long drainage duct 1 of 350-400mm, and stop is present in concrete surface, this intensification little heatable adobe sleeping platform 5 place concrete surface is reserved 60-90mm and is not deeply watered and smash
If 5, emit the similar single column foundation position of water spot, this similar single column foundation waterproof matrix casting and compacting of concrete must exceed water smash before normally emit water to cut off the water 200mm on elevation location,
6, after normal condition maintenance 10-15 days waterproof matrix concrete reach construction requirement intensity, by drainage duct 1 double flat, use iron wire tighten, can water source be closed,
7, be put in by drainage duct and do not water residue place, concrete fills and buries drainage duct, completes whole closed water source process.

Claims (7)

1. underground waterproof basic unit local emits a water source construction method, it is characterized in that, comprises the steps:
1) prefabricated pea gravel concreten block, by pre-buried for drainage duct through concrete block,
2) find and emit position, water water source and deepen little heatable adobe sleeping platform in this position,
3) steel wire lump is enclosed within drainage duct bottom and puts into the little heatable adobe sleeping platform of intensification together with concrete block and drainage duct, centered by the position that this emits water source, lay gauze wire cloth,
4) adopt extruding to catch up with water normally to water and smash substrate concrete to this position, emit water nature to emerge from drainage duct, and stay in concrete surface, this place stays 60-90mm deeply not water,
5) if emit the similar single column foundation of water spot, basic unit waters the face of smashing and exceeds and normally emit water to cut off the water face 200mm,
6) normal after maintenance 10-15 days by drainage duct double flat iron wire tighten, can water source be closed,
7) drainage duct is put in does not water residue place, fill with concrete and bury drainage duct, complete whole closed water source process.
2. underground waterproof basic unit according to claim 1 local emits water source construction method, and it is characterized in that, described pea gravel concreten block is 80mm × 80mm × 80mm.
3. underground waterproof basic unit according to claim 1 local emits water source construction method, and it is characterized in that, described drainage duct is long 350-400mm, and internal diameter is the PVC transparent flexible pipe of 8mm.
4. underground waterproof basic unit according to claim 1 local emits water source construction method, it is characterized in that, described drainage duct is pre-buried is that 50mm is stretched out in bottom through concrete block, and 220-270mm is stretched out on top.
5. underground waterproof basic unit according to claim 1 local emits water source construction method, it is characterized in that, the little heatable adobe sleeping platform of described intensification is for adding profound 80mm × wide 80mm × dark 210mm.
6. underground waterproof basic unit according to claim 1 local emits water source construction method, and it is characterized in that, described steel wire lump is enclosed within the 50mm that concrete block is stretched out in drainage duct bottom.
7. underground waterproof basic unit according to claim 1 local emits water source construction method, and it is characterized in that, described laying gauze wire cloth is 1000mm × 1000mm.
CN201410683498.6A 2014-11-24 2014-11-24 A kind of underground waterproof basic unit local emits water source construction method Active CN104480964B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410683498.6A CN104480964B (en) 2014-11-24 2014-11-24 A kind of underground waterproof basic unit local emits water source construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410683498.6A CN104480964B (en) 2014-11-24 2014-11-24 A kind of underground waterproof basic unit local emits water source construction method

Publications (2)

Publication Number Publication Date
CN104480964A true CN104480964A (en) 2015-04-01
CN104480964B CN104480964B (en) 2016-01-06

Family

ID=52755562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410683498.6A Active CN104480964B (en) 2014-11-24 2014-11-24 A kind of underground waterproof basic unit local emits water source construction method

Country Status (1)

Country Link
CN (1) CN104480964B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19935366A1 (en) * 1998-07-29 2000-02-03 Zueblin Ag Foundation pit of floor plate and sidewalls depresses floor plate below sidewall ends and joins these via arched sector of floor plate thickness to resist floor lift via ground-embedded ties.
CN1381651A (en) * 2002-06-10 2002-11-27 王衡 Anchor-spraying concrete for treating water and support
CN102061691A (en) * 2009-11-12 2011-05-18 任再永 Construction method for treating foundation through filling by adopting draining pile tubes
CN201896316U (en) * 2010-12-22 2011-07-13 中国建筑第六工程局有限公司 System for reducing and draining confined water in deep foundation pit of rock foundation
CN202047416U (en) * 2011-03-15 2011-11-23 北京中关村开发建设股份有限公司 Well sealing device of pressure-reducing and dewatering well at elevator well pit
CN102535488A (en) * 2012-03-13 2012-07-04 广东中城建设集团有限公司 Waterproof construction method and system for bottom plate of high-water-level basement
CN103382722A (en) * 2013-07-15 2013-11-06 广西建工集团第三建筑工程有限责任公司 Concrete foundation slab restoring method for preformed water collecting well for higher underground hydraulic pressure
CN203655307U (en) * 2013-12-30 2014-06-18 中铁第四勘察设计院集团有限公司 Waste water pump room in metro tunnel

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19935366A1 (en) * 1998-07-29 2000-02-03 Zueblin Ag Foundation pit of floor plate and sidewalls depresses floor plate below sidewall ends and joins these via arched sector of floor plate thickness to resist floor lift via ground-embedded ties.
CN1381651A (en) * 2002-06-10 2002-11-27 王衡 Anchor-spraying concrete for treating water and support
CN102061691A (en) * 2009-11-12 2011-05-18 任再永 Construction method for treating foundation through filling by adopting draining pile tubes
CN201896316U (en) * 2010-12-22 2011-07-13 中国建筑第六工程局有限公司 System for reducing and draining confined water in deep foundation pit of rock foundation
CN202047416U (en) * 2011-03-15 2011-11-23 北京中关村开发建设股份有限公司 Well sealing device of pressure-reducing and dewatering well at elevator well pit
CN102535488A (en) * 2012-03-13 2012-07-04 广东中城建设集团有限公司 Waterproof construction method and system for bottom plate of high-water-level basement
CN103382722A (en) * 2013-07-15 2013-11-06 广西建工集团第三建筑工程有限责任公司 Concrete foundation slab restoring method for preformed water collecting well for higher underground hydraulic pressure
CN203655307U (en) * 2013-12-30 2014-06-18 中铁第四勘察设计院集团有限公司 Waste water pump room in metro tunnel

Also Published As

Publication number Publication date
CN104480964B (en) 2016-01-06

Similar Documents

Publication Publication Date Title
CN104846841B (en) Anti-floating construction method for basements without uplift piles
CN102797266B (en) Well sealing waterproof construction method for dewatering well
CN204530732U (en) A kind of structure of the precipitation based on basement elevator shaft plash
CN107059903A (en) Bottom plate plugging dewatering well construction method is worn in foundation ditch
CN104711994A (en) Foundation pit deep well rainfall and plugging construction method
CN106759126B (en) Construction method of side slope support drainage channel
CN102776897A (en) Wash apron anti-settling anti-cracking construction method and structure
CN108166517A (en) For the shut-in well method and well-sealing device of superelevation floor height hydraulic pressure dewatering well of deep well
CN107916945A (en) Using the waterproof spray-up structure and its construction method of impervious gunite concrete
CN202730786U (en) Well-sealing waterproof construction structure of dewatering well
CN106812219A (en) Filling wall top stuff up a crack construction method
CN207268004U (en) Toilet leakage protective system
CN102926574A (en) Seepage-proofing method of underwater reservoir and underwater reservoir with seepage-proofing function
CN104652495A (en) Waterproof construction process for joint of inner support upright post of foundation pit and bottom plate
CN107366303A (en) Construction method and retaining wall of the aluminum alloy mould plate as highway gravity retaining wall template
CN203096762U (en) Anti-frost ground beam
CN105735206B (en) The reparation structure and construction method of severe cold area morbid state concrete gravity dam
WO2018214143A1 (en) Construction method for plugging dewatering well having penetrating bottom plate in foundation pit
CN110747861A (en) High-water-level deep foundation pit excavation construction method
CN104480964B (en) A kind of underground waterproof basic unit local emits water source construction method
CN207662389U (en) A kind of sedimentation and deformation observation base point using covered culvert
CN108118711A (en) The anti-crack construction method of volume of concrete foundation
CN107401142B (en) Bank revetment heightening construction method is refuted in active service
CN207003440U (en) Foundation pit spring hole water treatment system
US11598065B2 (en) Method for stabilizing and lifting channel boards by underwater grouting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No. 115 Beiqiao Road, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee after: Guangxi Construction Industry Group Metallurgical Construction Co., Ltd.

Address before: No. 115 Beiqiao Road, Liuzhou City, Guangxi Zhuang Autonomous Region

Patentee before: Guangxi Zhuang Autonomous Region metallurgical construction company