CN104196071A - Hydraulic balance trenching machine - Google Patents

Hydraulic balance trenching machine Download PDF

Info

Publication number
CN104196071A
CN104196071A CN201410440963.3A CN201410440963A CN104196071A CN 104196071 A CN104196071 A CN 104196071A CN 201410440963 A CN201410440963 A CN 201410440963A CN 104196071 A CN104196071 A CN 104196071A
Authority
CN
China
Prior art keywords
fixed
square
transverse slat
square bar
shaped pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410440963.3A
Other languages
Chinese (zh)
Other versions
CN104196071B (en
Inventor
张永忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU HAIXUN INDUSTRY GROUP SHARE Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410440963.3A priority Critical patent/CN104196071B/en
Publication of CN104196071A publication Critical patent/CN104196071A/en
Application granted granted Critical
Publication of CN104196071B publication Critical patent/CN104196071B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Chutes (AREA)

Abstract

Provided is a hydraulic balance trenching machine. A middle column is arranged on the upper portion of the hydraulic balance trenching machine. A first square rod is fixedly arranged on the rear portion of the hollow column, and the left end of the first square rod is fixed on a first steel tube. A first square sleeve is arranged on the left side of the first square rod in a sleeved mode, and a first stand column is fixedly arranged below the first square sleeve. The lower end of the first stand column is fixed on a first cross plate, and the first cross plate is fixed at the left end of a first U-shaped tube. The right side of the first square rod is sleeved with a fourth square sleeve, and a fourth stand column is fixedly arranged below the fourth square sleeve. The lower end of the fourth stand column is fixed on a fourth cross plate, and the fourth cross plate is fixed at the right end of the first U-shaped tube. A second square rod is fixedly arranged on the front side of the middle column, and the right end of the second square rod is fixed on a second steel tube. The right side of the second square rod is sleeved with a second square sleeve, a second stand column is fixedly arranged below the second square sleeve, and a second cross plate is fixed at the lower end of the second stand column. The second cross plate is fixed at the right end of a second U-shaped tube, and the left side of the second square rod is sleeved with a third square sleeve. A third stand column is fixedly arranged below the third square sleeve, the lower end of the third stand column is fixed on a third cross plate, and the third cross plate is fixed at the left end of the second U-shaped tube.

Description

Hydro-cushion groover
Technical field
The present invention relates to a kind of groover, particularly the working hydro-cushion groover of a kind of reservoir, river course dam body or Foundation Anti-seepage.
Background technology
Always there is inefficiency in traditional groover, can not be continuous when work, and the shortcomings such as the expense height of building equipment.
Summary of the invention
The present invention has overcome the shortcoming of above groover, and a kind of efficient hydro-cushion groover is provided.
The present invention is achieved through the following technical solutions:
A kind of hydro-cushion groover, the groover left side is provided with the first steel pipe, and the first steel pipe lower end is connected with the first sebific duct, the first sebific duct lower end is connected in the first U-shaped pipe left end, the right is provided with the second steel pipe, and the second steel pipe lower end is connected with the second sebific duct, and the second sebific duct lower end is connected in the second U-shaped pipe right-hand member; Groover middle and upper part is provided with center pillar, center pillar back is fixed with the first square bar, the first square bar left end is fixed on the first steel pipe, and the first square bar left side cover has the first square set, and the first square set is fixed with first stop post below, the first transverse slat is fixed in first stop post lower end, the first transverse slat is fixed on the left end of the first U-shaped pipe, and first square bar the right cover has four directions cover, and four directions cover is fixed with the 4th station post below, the 4th transverse slat is fixed at the 4th post lower end, station, and the 4th transverse slat is fixed on the right-hand member of the first U-shaped pipe; Center pillar front is fixed with the second square bar, the second square bar right-hand member is fixed on the second steel pipe, second square bar the right cover has the second square set, the second square set is fixed with second station post below, and the second transverse slat is fixed in second station post lower end, and the second transverse slat is fixed on the right-hand member of the second U-shaped pipe, the second square bar left side cover has third party to overlap, third party overlaps and is fixed with below the 3rd station post, and the 3rd transverse slat is fixed in the 3rd post lower end, station, and the 3rd transverse slat is fixed on the left end of the second U-shaped pipe; The first U-shaped pipe, the second U-shaped pipe are the bend pipe that is shaped as U-shaped, and its underpart is evenly equipped with several sharpeners, between every two adjacent sharpeners, a water nozzle are installed.
The present invention has following feature:
The present invention forms relative motion grooving by the first U-shaped pipe and the second U-shaped pipe, and grooving body refuse is carried the outer grooving of groove outside by current, and grooving efficiency is high.
Brief description of the drawings
Below in conjunction with accompanying drawing, the present invention is further illustrated:
Fig. 1 is structural representation of the present invention;
Fig. 2 is A-A sectional view of Fig. 1;
Fig. 3 is B-B sectional view of Fig. 1;
Fig. 4 is C-C sectional view of Fig. 1.
In figure: 1, the first steel pipe, 2, the second steel pipe, 3, the first sebific duct, 4, the second sebific duct, 5, the first square set, 6, the second square set, 7, third party's cover, 8, four directions cover, 9, the first hydraulic stem, 10, the second hydraulic stem, 11, the first hydraulic top, 12, the second hydraulic top, 13, center pillar, 14, first stop post, 15, second station post, 16, the 3rd station post, 17, the 4th station post, 18, the first transverse slat, 19, the second transverse slat, 20, the 3rd transverse slat, 21, the 4th transverse slat, 22, the first U-shaped pipe, 23, the second U-shaped pipe, 24, sharpener, 25, water nozzle, 26, the first square bar, 27, the second square bar.
Detailed description of the invention
Accompanying drawing is a kind of specific embodiment of the present invention, this embodiment groover left side is provided with the first steel pipe 1, the first steel pipe lower end is connected with the first sebific duct 3, the first sebific duct lower end is connected in the first U-shaped pipe 22 left ends, the right is provided with the second steel pipe 2, the second steel pipe lower end is connected with the second sebific duct 4, the second sebific duct lower ends and is connected in the second U-shaped pipe 23 right-hand members; Groover middle and upper part is provided with center pillar 13, center pillar back is fixed with the first square bar 26, the first square bar left end is fixed on the first steel pipe, the first square bar left side cover has the first square set 5, the first square set is fixed with first stop post 14 below, the first transverse slat 18 is fixed in first stop post lower end, the first transverse slat is fixed on the left end of the first U-shaped pipe, first square bar the right cover has four directions cover 8, four directions cover is fixed with the 4th station post 17 below, the right-hand member of the first U-shaped pipe is fixed on the 4th transverse slat 21, the four transverse slats and is fixed at the 4th post lower end, station; Center pillar front is fixed with the second square bar 27, the second square bar right-hand member is fixed on the second steel pipe, second square bar the right cover has the second square set 6, the second square set is fixed with second station post 15 below, and the second transverse slat 19, the second transverse slats are fixed on and are fixed on the right-hand member of the second U-shaped pipe in second station post lower end, the second square bar left side cover has third party to overlap 7, third party overlaps the left end that is fixed with below the 3rd station post 16, the three post lower ends, station and is fixed on the 3rd transverse slat 20, the three transverse slats and is fixed on the second U-shaped pipe; The first U-shaped pipe, the second U-shaped pipe are the bend pipe that is shaped as U-shaped, and its underpart is evenly equipped with several sharpeners 24, between every two adjacent sharpeners, a water nozzle are installed.
The first hydraulic top is articulated with the posterior end of center pillar, and the second hydraulic top is articulated with the front lower end of center pillar.
When the present invention works, the first hydraulic top, the second hydraulic top are by its hydraulic stem synchronization telescope of controller control, thus, the first hydraulic top drives the first U-shaped pipe to be enclosed within on the first square bar and to be slided by the first square set and four directions, the second hydraulic top drives the second U-shaped pipe to be enclosed within on the second square bar and to be slided by the second square set and third party, so, the first U-shaped pipe and the second U-shaped pipe form relative motion, and sharpener is grooving at the volley; Meanwhile, one current enter the first sebific duct through the first steel pipe and enter the first U-shaped pipe, another strand of current enter the second sebific duct through the second steel pipe and enter the second U-shaped pipe, spray from water nozzle, taking body refuse overflows outside groove, after mud pit displacement, be pressed into the first steel pipe and the second steel pipe by slush pump, so circulation.

Claims (1)

1. a hydro-cushion groover, the groover left side is provided with the first steel pipe (1), the first steel pipe lower end is connected with the first sebific duct (3), the first sebific duct lower end is connected in the first U-shaped pipe (22) left end, the right is provided with the second steel pipe (2), the second steel pipe lower end is connected with the second sebific duct (4), and the second sebific duct lower end is connected in the second U-shaped pipe (23) right-hand member, it is characterized in that: groover middle and upper part is provided with center pillar (13), center pillar back is fixed with the first square bar (26), the first square bar left end is fixed on the first steel pipe, the first square bar left side cover has the first square set (5), the first square set is fixed with first stop post (14) below, the first transverse slat (18) is fixed in first stop post lower end, the first transverse slat is fixed on the left end of the first U-shaped pipe, first square bar the right cover has four directions cover (8), four directions cover is fixed with the 4th station post (17) below, the 4th transverse slat (21) is fixed at the 4th post lower end, station, the 4th transverse slat is fixed on the right-hand member of the first U-shaped pipe, center pillar front is fixed with the second square bar (27), the second square bar right-hand member is fixed on the second steel pipe, second square bar the right cover has the second square set (6), the second square set is fixed with second station post (15) below, the second transverse slat (19) is fixed in second station post lower end, the second transverse slat is fixed on the right-hand member of the second U-shaped pipe, the second square bar left side cover has third party to overlap (7), third party overlaps and is fixed with below the 3rd station post (16), the 3rd transverse slat (20) is fixed at the 3rd post lower end, station, and the 3rd transverse slat is fixed on the left end of the second U-shaped pipe.
CN201410440963.3A 2014-09-02 2014-09-02 Hydro-cushion chute forming machine Active CN104196071B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410440963.3A CN104196071B (en) 2014-09-02 2014-09-02 Hydro-cushion chute forming machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410440963.3A CN104196071B (en) 2014-09-02 2014-09-02 Hydro-cushion chute forming machine

Publications (2)

Publication Number Publication Date
CN104196071A true CN104196071A (en) 2014-12-10
CN104196071B CN104196071B (en) 2016-06-29

Family

ID=52081422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410440963.3A Active CN104196071B (en) 2014-09-02 2014-09-02 Hydro-cushion chute forming machine

Country Status (1)

Country Link
CN (1) CN104196071B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2261325A1 (en) * 1971-12-21 1974-02-21 Bos & Kalis Baggermaatsch EQUIPMENT AND PROCEDURES FOR LOOSENING SOLID SOIL OR OTHER MATERIAL
CN102677716A (en) * 2012-05-30 2012-09-19 张永忠 Movable arm trenching machine
CN203022041U (en) * 2012-12-28 2013-06-26 张璐 Double-helical trenching machine
CN203247631U (en) * 2013-05-27 2013-10-23 张璐 Hydraulic drive trenching machine
CN204023659U (en) * 2014-09-02 2014-12-17 张永忠 Hydro-cushion groover

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2261325A1 (en) * 1971-12-21 1974-02-21 Bos & Kalis Baggermaatsch EQUIPMENT AND PROCEDURES FOR LOOSENING SOLID SOIL OR OTHER MATERIAL
CN102677716A (en) * 2012-05-30 2012-09-19 张永忠 Movable arm trenching machine
CN203022041U (en) * 2012-12-28 2013-06-26 张璐 Double-helical trenching machine
CN203247631U (en) * 2013-05-27 2013-10-23 张璐 Hydraulic drive trenching machine
CN204023659U (en) * 2014-09-02 2014-12-17 张永忠 Hydro-cushion groover

Also Published As

Publication number Publication date
CN104196071B (en) 2016-06-29

Similar Documents

Publication Publication Date Title
CN101736768B (en) Pull rod aqueduct-making machine
CN105442825A (en) Ball-grinding type roller shift device for constructing wall surface arc-shaped slope base
CN102168443A (en) Double-crank-am impact trenching machine
CN204023659U (en) Hydro-cushion groover
CN207582543U (en) A kind of garden layout furrow making dveice
CN204510097U (en) hinged guardrail
CN203049652U (en) Chain type trenching machine
CN104196071A (en) Hydraulic balance trenching machine
CN204401992U (en) A kind of support frame for building
CN203247631U (en) Hydraulic drive trenching machine
CN102168444A (en) Four-tool-arm slotting machine
CN202125396U (en) Water wheel capable of generating electricity and irrigating
CN101748738A (en) Three-claw groove making machine
CN205312970U (en) Novel single interface doublestage props apical organ
CN203403812U (en) Rectangular hole boring machine
CN203783084U (en) Wall painting machine
CN210368959U (en) Side pile device structure of static pressure pile machine
CN205296780U (en) A wheel stone roller formula rolling device for constructing wall arc base of slope
CN203098460U (en) Sea water desalination energy recovery pressurization water cylinder
CN202381102U (en) Simple drill and blast construction trolley
CN205224552U (en) A ball grinds formula roller and moves device for constructing wall arc base of slope
CN104526843A (en) Forming machine for fast splicing modules of concrete water channels
CN206220584U (en) Lifting swimming pool
CN201883695U (en) Spherical net rack vertical jacking equipment
CN204382457U (en) Concrete water tank automatic moulding machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160530

Address after: 266427 Qingdao District, Shandong City, Huangdao province Lingshan Wei Street Office

Applicant after: Zong Qi

Address before: 276800 Shandong province Rizhao City No. 277 Ji'nan Road, Belvedere Garden

Applicant before: Zhang Yongzhong

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170810

Address after: 226000, Donghai Avenue (East) No. 18, Chengdong Town, Haian economic and Technological Development Zone, Nantong, Jiangsu

Patentee after: JIANGSU TIANHENG NANO SCIENCE AND TECHNOLOGY CO., LTD.

Address before: 266427 Qingdao District, Shandong City, Huangdao province Lingshan Wei Street Office

Patentee before: Zong Qi

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190912

Address after: 226600 Nantong, Haian, east of the town of East China Sea Road (East), No. 18, No.

Patentee after: Jiangsu Haixun Industry Group Share Co., Ltd.

Address before: 226000 Donghai Road (East) 18, Chengdong Town, Haian economic and Technological Development Zone, Nantong, Jiangsu

Patentee before: JIANGSU TIANHENG NANO SCIENCE AND TECHNOLOGY CO., LTD.