BE1017368A5 - Process for forming a retaining wall and a retaining wall formed in accordance with such a process. - Google Patents

Process for forming a retaining wall and a retaining wall formed in accordance with such a process. Download PDF

Info

Publication number
BE1017368A5
BE1017368A5 BE2006/0566A BE200600566A BE1017368A5 BE 1017368 A5 BE1017368 A5 BE 1017368A5 BE 2006/0566 A BE2006/0566 A BE 2006/0566A BE 200600566 A BE200600566 A BE 200600566A BE 1017368 A5 BE1017368 A5 BE 1017368A5
Authority
BE
Belgium
Prior art keywords
wall parts
primary
wall
ground
forming
Prior art date
Application number
BE2006/0566A
Other languages
Dutch (nl)
Inventor
Gerdi Vankeirsbilck
Original Assignee
Olivier Ind Nv
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Olivier Ind Nv filed Critical Olivier Ind Nv
Priority to BE2006/0566A priority Critical patent/BE1017368A5/en
Priority to EP20070120394 priority patent/EP1925748A2/en
Application granted granted Critical
Publication of BE1017368A5 publication Critical patent/BE1017368A5/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

Deze uitvinding betreft enerzijds een werkwijze voor het vormen van een in de grond gevormde wand omvattende primaire (1) en secundaire (2) wanddelen. Anderzijds betreft deze uitvinding een volgens dergelijke werkwijze gevormde wand. De werkwijze volgens deze uitvinding omvat de volgende stappen: - het vormen van minstens twee op een tussenafstand van elkaar gelegen primaire wanddelen (1), al dan niet met bewapening - het vormen van de secundaire wanddelen (2) door het mechanisch losmaken van de grond en deze losgemaakte grond te vermengen met een uithardend bindmiddel, zoals bijvoorbeeld cement;This invention relates on the one hand to a method for forming a wall formed in the ground comprising primary (1) and secondary (2) wall parts. On the other hand, this invention relates to a wall formed by such a method. The method according to the present invention comprises the following steps: - forming at least two primary wall parts (1) spaced apart, whether or not with reinforcement - forming the secondary wall parts (2) by mechanically loosening the ground and mixing this loosened soil with a hardening binder, such as cement;

Description

WERKWIJZE VOOR HET VORMEN VAN EEN KEERWAND EN EEN VOLGENS DERGELIJKE WERKWIJZE GEVORMDE KEERWANDProcess for forming a retaining wall and a retaining wall formed according to such a process

Deze uitvinding betreft enerzijds een werkwijze voor het vormen van een in de grond gevormde wand omvattende primaire en secundaire wanddelen. Anderzijds betreft deze uitvinding een volgens dergelijke werkwijze gevormde wand.This invention relates on the one hand to a method for forming a wall formed in the ground comprising primary and secondary wall parts. On the other hand, this invention relates to a wall formed by such a method.

Dergelijke wanden kunnen dienst doen als grondkering en/of als scherm, bijvoorbeeld als waterscherm of als afbakening van stortplaatsen en dergelijke. De aanleg van deze wand is bijvoorbeeld noodzakelijk wanneer een bouwput gevormd wordt, zoals bijvoorbeeld bij de aanleg van een ondergrondse parking, om de wanden van de bouwput te stabiliseren. Dit om te verhinderen dat de grond verzakt in de omgeving van de bouwput waardoor de stabiliteit van gebouwen of constructies op naastliggende terreinen in gevaar kan komen.Such walls can serve as a barrier and / or as a screen, for example as a water screen or as a delimitation of landfills and the like. The construction of this wall is, for example, necessary when a building pit is formed, such as, for example, during the construction of an underground parking lot, to stabilize the walls of the building pit. This is to prevent the soil from sinking in the vicinity of the construction pit, which could jeopardize the stability of buildings or structures on adjacent sites.

In de meeste toepassingen wordt het vormen van een dergelijke grondkerende wand aangeduid met de term “beschoeien”.In most applications, forming such an earth retaining wall is referred to by the term "puddle".

Het is gekend om in de grond zogenaamde palenwanden te vormen. Daarbij worden afzonderlijke palen gevormd door eerst een opening te boren in de grond en vervolgens deze opening op te vullen met beton of een ander uithardend product of mengsel.It is known to form so-called pile walls in the ground. Individual piles are thereby formed by first drilling an opening in the ground and then filling this opening with concrete or another curing product or mixture.

Eerst zal men op de lijn waar de wand moet gevormd worden een reeks primaire palen op regelmatige tussenafstanden van elkaar verwijderd naast elkaar plaatsen. Bij het vormen van de primaire palen wordt een wapening voorzien in het beton. Vervolgens zal men tussen elk paar primaire palen een aantal (minstens één) secundaire palen plaatsen. De secundaire palen worden gevormd uit beton zonder wapening.First, on the line where the wall is to be formed, a series of primary piles will be placed next to each other at regular intervals apart. When the primary piles are formed, reinforcement is provided in the concrete. A number of (at least one) secondary piles will then be placed between each pair of primary piles. The secondary posts are formed from concrete without reinforcement.

Bij het vormen van de secundaire palen kan men ervoor kiezen om een gedeelte van de primaire palen weg te nemen. De secundaire palen kunnen echter ook rakend aan de primaire palen uitgevoerd worden. Men heeft het respectievelijk over Secans en Tangens palenwanden.When forming the secondary piles, one can choose to remove part of the primary piles. However, the secondary piles can also be made touching the primary piles. They talk about Secans and Tangens pole walls respectively.

De belangrijkste nadelen van deze gekende werkwijze zijn de volgende: er moet veel grond afgevoerd worden; er is veel beton nodig waardoor er op de werf een voortdurende aanvoer van beton vereist is. Op bouwwerven gelegen in centra met een grote verkeersdrukte is het op en af rijden van beton-mixers problematisch; - het vormen van dergelijke palenwand verloopt traag.The main disadvantages of this known method are the following: a lot of soil must be removed; a lot of concrete is needed, which means that a continuous supply of concrete is required on site. On construction sites located in centers with a high traffic volume, driving on and off concrete mixers is problematic; - the formation of such a pile wall is slow.

Een alternatief voor de hierboven beschreven palenwanden uit beton is de zogenaamde soil-mix palenwand. Dergelijke palenwand wordt beschreven in de Europese octrooipublicatie EP 1 418 277. Bij het vormen van dergelijke wanden wordt tijdens het uitboren van elke paal een mengsel van grond en een bindmiddel, zoals bijvoorbeeld cement, gevormd, en dit mengsel wordt in de booropening gelaten om de paal te vormen.An alternative to the above-described concrete pile walls is the so-called soil-mix pile wall. Such a pile wall is described in the European patent publication EP 1 418 277. In the formation of such walls, a mixture of soil and a binder, such as for example cement, is formed during the drilling out of each pile, and this mixture is left in the drill hole around the to form a pole.

Door op dergelijke wijze keerwanden te vormen vermindert de hoeveelheid af te voeren grond, terwijl er ook geen beton moet aangevoerd worden. Een groot nadeel is echter dat de kwaliteit (stevigheid) van een dergelijke wand nooit dezelfde kan zijn als de kwaliteit van een palenwand uit beton.By forming retaining walls in such a way, the amount of soil to be discharged decreases, while no concrete has to be supplied either. However, a major disadvantage is that the quality (firmness) of such a wall can never be the same as the quality of a concrete wall.

Een ander gekend alternatief is het vormen van een wand gebruik makend van een Soil-mix-diepwandfrees of een gelijkaardige menginrichting. Hierbij wordt er ook een mengsel gemaakt van grond (aarde) en een bindmiddel, zoals bijvoorbeeld cement, om er de wand mee te vormen, maar hier wordt gebruik gemaakt van een inrichting die ineens grotere wanddelen kan vormen. In plaats van het boren van een opening met een cirkelvormige sectie wordt er een opening gemaakt met een hoofdzakelijk rechthoekige sectie. Ook bij deze werkwijze worden eerst primaire wanddelen gemaakt, en vervolgens worden tussen deze primaire wanddelen secundaire wanddelen aangebracht.Another known alternative is forming a wall using a Soil-mix deep-wall cutter or a similar mixer. A mixture of soil (earth) and a binder, such as cement, is also made to form the wall with it, but use is made here of a device that can suddenly form larger wall parts. Instead of drilling an opening with a circular section, an opening is made with a substantially rectangular section. In this method too, primary wall parts are first made, and then secondary wall parts are arranged between these primary wall parts.

Het nadeel van deze werkwijze is echter ook dat de stevigheid van de gevormde wand te wensen overlaat. De met grond gemengde cement kan immers onmogelijk een stevige wand opleveren als de betonnen palenwanden, zodat er bijkomend verankerd of gestut dient te worden.However, the disadvantage of this method is that the strength of the wall formed leaves something to be desired. After all, the cement mixed with soil cannot possibly provide a solid wall like the concrete pile walls, so that additional anchoring or propping up is required.

Het doel van deze uitvinding is een werkwijze te verschaffen waarmee het mogelijk wordt een wand te vormen waarmee de bovengenoemde nadelen van de stand van de techniek worden opgelost. Het doel van de uitvinding is in het bijzonder een werkwijze te verschaffen waarmee een stevige wand kan gevormd worden, waarbij het minder noodzakelijk is om bijkomend te verankeren en/of te stutten ten opzichte van de bestaande systemen.The object of this invention is to provide a method with which it is possible to form a wall with which the aforementioned disadvantages of the prior art are solved. The object of the invention is in particular to provide a method with which a solid wall can be formed, wherein it is less necessary to additionally anchor and / or support with respect to the existing systems.

Het doel van de uitvinding wordt bereikt door te voorzien in een werkwijze voor het vormen van een in de grond gevormde wand omvattende primaire wanddelen en secundaire wanddelen, waarbij de genoemde werkwijze de volgende stappen omvat: het vormen van minstens twee op een tussenafstand van elkaar gelegen primaire wanddelen door het boren van een cirkelvormige ruimte in de grond en vervolgens deze vrijgekomen ruimte op te vullen met beton; het vormen van de secundaire wanddelen door het mechanisch losmaken van de grond en deze losgemaakte grond te vermengen met een uithardend bindmiddel; zodat de primaire en secundaire wanddelen de genoemde wand vormen. De werkwijze dient niet noodzakelijk uitgevoerd worden overeenkomstig de opgegeven volgorde. De in de grond gevormde wand kan eveneens gevormd worden door de opgegeven volgorde om te keren.The object of the invention is achieved by providing a method for forming a wall formed in the ground comprising primary wall parts and secondary wall parts, wherein said method comprises the following steps: forming at least two spaced apart primary wall sections by drilling a circular space in the ground and then filling this vacant space with concrete; forming the secondary wall parts by mechanically loosening the soil and mixing said loosened soil with a curing binder; so that the primary and secondary wall parts form the said wall. The method does not necessarily have to be carried out in accordance with the specified order. The wall formed in the ground can also be formed by reversing the specified order.

Deze werkwijze heeft het voordeel dat de in de grond gevormde wanden veel sneller gevormd kunnen worden dan de tot op heden gekende wanden, in het bijzonder ten opzichte van de palenwanden. Deze werkwijze heeft het bijkomend voordeel dat de aan - en afvoer van beton beperkt blijft, bovendien dienen dergelijk gevormde wanden minder gestut en/of verankerd te worden.This method has the advantage that the walls formed in the ground can be formed much faster than the previously known walls, in particular with respect to the pile walls. This method has the additional advantage that the supply and removal of concrete remains limited, moreover such shaped walls need to be propped up and / or anchored less.

Volgens een voorkeurdragende werkwijze overeenkomstig de uitvinding hebben de genoemde primaire wanddelen een hoofdzakelijk cirkelvormige dwarsdoorsnede. In het bijzonder hebben de genoemde secundaire wanddelen een hoofdzakelijk rechthoekige dwarsdoorsnede.According to a preferred method according to the invention, said primary wall parts have a substantially circular cross-section. In particular, said secondary wall parts have a substantially rectangular cross section.

Bij voorkeur omvatten de primaire en/of de secundaire wanddelen wapeningselementen. Meestal wordt gebruik gemaakt van traditionele wapeningsprofielen, een H-profiel of een wapeningskorf als wapeningselementen.The primary and / or secondary wall parts preferably comprise reinforcement elements. Traditional reinforcement profiles, an H-profile or a reinforcement basket are usually used as reinforcement elements.

Volgens een bijzondere werkwijze overeenkomstig de uitvinding strekken de primaire wanddelen zich uit tot een diepte nagenoeg gelijk aan de diepte van de secundaire wanddelen.According to a special method according to the invention, the primary wall parts extend to a depth substantially equal to the depth of the secondary wall parts.

Volgens een andere voordelige werkwijze overeenkomstig de uitvinding strekken de secundaire wanddelen zich uit tot op een kleinere diepte dan de diepte van de primaire wanddelen. De diepte van de secundaire wanddelen zal bepaald worden door de grondwaterstand en/of de diepte van de grondkering. Deze manier van werken laat toe om de wand te berekenen en uit te voeren als een soort Berlinerwand. Een Berlinerwand is een damwandconstructie, opgebouwd uit stalen profielen die met een regelmatige tussenafstand door middel van heien of trillen ingebracht worden. Tussen de profielen worden ofwel stalen schotten geplaatst ofwel tijdens het uitgraven houten of betonnen schotten geschoven.According to another advantageous method according to the invention, the secondary wall parts extend to a smaller depth than the depth of the primary wall parts. The depth of the secondary wall sections will be determined by the groundwater level and / or the depth of the flood defense. This way of working makes it possible to calculate the wall and to implement it as a sort of Berliner wall. A Berliner wall is a sheet pile construction, constructed from steel profiles that are inserted at regular intervals by pile driving or vibrating. Steel partitions are placed between the profiles or wooden or concrete partitions are pushed during the excavation.

Bij een meer bijzondere werkwijze overeenkomstig de uitvinding omvatten de primaire en secundaire wanddelen koppelmiddelen om tegen elkaar aansluitende wanddelen met elkaar te verbinden. Bij voorkeur omvatten de genoemde koppelmiddelen eerste en tweede complementaire koppelmiddelen, waarbij de eerste koppelmiddelen één of meerdere uitsparingen omvatten en waarbij de tweede koppelmiddelen een in elke uitsparing passend uitsteeksel omvatten. Op deze manier wordt de onderlinge verankering van de primaire en secundaire wanddelen verbeterd en wordt een waterdichte keerwand bekomen. Verder omvatten de primaire wanddelen in een voorkeurswerkwijze een grondanker.In a more special method according to the invention, the primary and secondary wall parts comprise coupling means for connecting wall parts connecting against each other. Preferably said coupling means comprise first and second complementary coupling means, wherein the first coupling means comprise one or more recesses and wherein the second coupling means comprise a protrusion fitting into each recess. In this way the mutual anchoring of the primary and secondary wall parts is improved and a watertight retaining wall is obtained. Furthermore, in a preferred method, the primary wall parts comprise a ground anchor.

Volgens een voorkeurswerkwijze wordt de inrichting voor het vormen van de secundaire wanddelen zodanig uitgevoerd dat de uitsparingen, voorzien in bijvoorbeeld de primaire wanddelen, aangebracht worden tijdens het vormen van de secundaire wanddelen.According to a preferred method, the device for forming the secondary wall parts is designed such that the recesses, for example provided in the primary wall parts, are provided during the forming of the secondary wall parts.

Een ander onderwerp van deze uitvinding betreft een in de grond gevormde wand omvattende primaire wanddelen en secundaire wanddelen waarbij de gevormde wand minstens twee op een tussenafstand van elkaar gelegen primaire wanddelen uit beton omvat en waarbij de secundaire wanddelen bestaan uit mechanisch losgemaakte grond vermengd met een uithardend bindmiddel. In het bijzonder is de genoemde wand overeenkomstig de uitvinding vervaardigd volgens de hierboven beschreven werkwijze. Bij dergelijk gevormde wanden worden de krachten die door de grond op de wand worden uitgeoefend grotendeels opgenomen door de primaire wanddelen. Deze primaire wanddelen bieden voldoende stevigheid om deze krachten op te nemen.Another subject of this invention relates to a wall formed in the ground comprising primary wall parts and secondary wall parts, wherein the wall formed comprises at least two primary wall parts made of concrete spaced apart and wherein the secondary wall parts consist of mechanically detached soil mixed with a hardening binder. In particular, the said wall according to the invention is manufactured according to the method described above. With such shaped walls, the forces exerted by the soil on the wall are largely absorbed by the primary wall parts. These primary wall parts offer sufficient strength to absorb these forces.

In de hierna volgende beschrijving wordt met verwijzing naar de hierbij gevoegde tekeningen een gedetailleerde beschrijving gegeven van een aantal mogelijke werkwijzen voor het vormen van een keerwand volgens deze uitvinding, enkel met de bedoeling de kenmerken van de uitvinding te verduidelijken en aan te vullen. Deze beschrijving kan dus geenszins geïnterpreteerd worden als een beperking van de in de conclusies gedefinieerde beschermingsomvang voor deze uitvinding.In the following description, with reference to the accompanying drawings, a detailed description is given of a number of possible methods for forming a retaining wall according to the present invention, solely for the purpose of clarifying and supplementing the features of the invention. This description can therefore in no way be interpreted as a limitation of the scope of protection defined in the claims for this invention.

In deze gedetailleerde beschrijving wordt door middel van referentiecijfers verwezen naar de hierbij gevoegde tekeningen, waarbij: - figuur 1 en 2 voorstelling zijn van een wand gevormd volgens de werkwijze overeenkomstig de uitvinding; - figuur 3 een voorstelling is van een wand gevormd volgens de werkwijze overeenkomstig de uitvinding waarbij de secundaire wanddelen zich uitstrekken tot op een kleinere diepte dan de primaire wanddelen; - figuur 4 een voorstelling is van een eerste werkwijze overeenkomstig de uitvinding; - figuur 5 een voorstelling is van een tweede werkwijze overeenkomstig de uitvinding.In this detailed description reference is made to the accompanying drawings by reference numerals, wherein: - figures 1 and 2 represent a wall formed according to the method according to the invention; figure 3 is a representation of a wall formed according to the method according to the invention wherein the secondary wall parts extend to a smaller depth than the primary wall parts; figure 4 is a representation of a first method according to the invention; figure 5 is a representation of a second method according to the invention.

Deze uitvinding heeft betrekking op een nieuwe werkwijze voor het vormen van een in de grond gevormde wand omvattende primaire wanddelen (1) en secundaire wanddelen (2), waarbij de genoemde werkwijze de volgende stappen omvat: het vormen van minstens twee op een tussenafstand van elkaar gelegen primaire wanddelen (1), al dan niet met bewapening, door het boren van een cirkelvormige ruimte in de grond en vervolgens deze vrijgekomen ruimte op te vullen met beton; het vormen van de secundaire wanddelen (2) door het mechanisch losmaken van de grond en deze losgemaakte grond te vermengen met een uithardend bindmiddel, zoals bijvoorbeeld cement, kalk of gekende chemische uithardingsmiddelen; zodat de primaire (1) en secundaire wanddelen (2) de genoemde wand vormen. Een dergelijk wand wordt voorgesteld op figuren 1 en 2.This invention relates to a new method for forming a wall formed in the ground comprising primary wall parts (1) and secondary wall parts (2), wherein said method comprises the following steps: forming at least two at a distance from each other located primary wall parts (1), with or without reinforcement, by drilling a circular space in the ground and then filling this released space with concrete; forming the secondary wall parts (2) by mechanically loosening the soil and mixing this loosened soil with a curing binder, such as for example cement, lime or known chemical curing agents; so that the primary (1) and secondary wall parts (2) form the said wall. Such a wall is represented in figures 1 and 2.

De primaire wanddelen (1) hebben een hoofdzakelijk cirkelvormige dwarsdoorsnede en worden op een regelmatige tussenafstand van bijvoorbeeld 1 tot 3 meter naast elkaar gevormd volgens de gekende technieken. Dergelijke primaire zijn bij voorkeur uit beton vervaardigd. Gangbare diameters voor de primaire wanddelen (1) zijn gelegen tussen 30 cm en 1 meter.The primary wall parts (1) have a substantially circular cross section and are formed at a regular distance of, for example, 1 to 3 meters next to each other according to the known techniques. Such primary ones are preferably made from concrete. Common diameters for the primary wall parts (1) are between 30 cm and 1 meter.

De secundaire wanddelen (2) hebben een hoofdzakelijke rechthoekige dwarsdoorsnede met een lengte gelegen tussen 1 en 3 meter en een dikte van 40 a 50 cm.The secondary wall parts (2) have a substantially rectangular cross-section with a length between 1 and 3 meters and a thickness of 40 to 50 cm.

Bij een wand overeenkomstig de uitvinding worden de krachten die door de grond op de wand worden uitgeoefend grotendeels opgenomen door de primaire wanddelen (1). Deze primaire wanddelen (1) bieden voldoende stevigheid om deze krachten te weerstaan.In a wall according to the invention, the forces exerted by the ground on the wall are largely absorbed by the primary wall parts (1). These primary wall parts (1) offer sufficient strength to withstand these forces.

Door de relatief grote afstand tussen de primaire wanddelen (1), en doordat de (secundaire) wand tussen deze wanddelen wordt gevormd door middel van een soil-mix-diepwandffees of een gelijkaardige menginrichting, kan een dergelijke wand veel sneller gevormd worden dan de bestaande palenwanden die volledig uit beton vervaardigd zijn. Bovendien blijft de aan - en afvoer van grond bij deze werkwijze volgens de uitvinding beperkt.Due to the relatively large distance between the primary wall parts (1), and because the (secondary) wall between these wall parts is formed by means of a soil-mix deep-walled fence or a similar mixing device, such a wall can be formed much faster than the existing one pole walls made entirely from concrete. Moreover, the supply and removal of soil with this method according to the invention remains limited.

Overeenkomstig deze uitvinding kan men ofwel eerst de primaire wanddelen (1) vormen en daarna de secundaire wanddelen (2) ertussen plaatsen (hierna werkwijze 1 genoemd), ofwel eerst de secundaire wanddelen (2) vervaardigen en daarna de primaire wanddelen (1) ertussen vormen (hierna werkwijze 2 genoemd).According to this invention, one can either first form the primary wall parts (1) and then place the secondary wall parts (2) in between (hereinafter referred to as method 1), or first manufacture the secondary wall parts (2) and then form the primary wall parts (1) between them (hereinafter referred to as method 2).

In een bijzonder uitvoeringsvorm en zoals voorgesteld op figuur 3, kunnen de tussenliggende secundaire wanddelen (2) zich uitstrekken tot op een kleinere diepte dan de primaire wanddelen (1). Men kan de wand eigenlijk berekenen en uitvoeren als een soort Berlinerwand. De diepte van de tussenliggende wanddelen (2) is afhankelijk van de grondwaterstand en/of de diepte van de grondkering, enz....In a special embodiment and as represented in figure 3, the intermediate secondary wall parts (2) can extend to a smaller depth than the primary wall parts (1). The wall can actually be calculated and executed as a sort of Berliner wall. The depth of the intermediate wall parts (2) is dependent on the groundwater level and / or the depth of the flood defense, etc. ....

In een andere bijzondere uitvoeringsvorm en zoals voorgesteld op figuur 2 omvatten de primaire (1) en secundaire (2) wanddelen koppelmiddelen (4) volgens het principe tand/groef, om tegen elkaar aansluitende wanddelen met elkaar te verbinden. Hiertoe worden bijvoorbeeld groeven of inkepingen in de primaire wanddelen (1) gevormd, en bekomen de op deze wanddelen (1) aansluitende secundaire wanddelen (2) een complementaire vorm die in deze groeven of inkepingen ingrijpt. Op deze manier wordt de onderlinge verankering van de primaire (1) en secundaire wanddelen (2) verbeterd en wordt een waterdichte keerwand bekomen.In another special embodiment and as represented in Figure 2, the primary (1) and secondary (2) wall parts comprise coupling means (4) according to the principle of tongue / groove, for connecting wall parts connecting against each other. For this purpose, for example, grooves or notches are formed in the primary wall parts (1), and the secondary wall parts (2) connecting to these wall parts (1) obtain a complementary shape which engages in these grooves or notches. In this way the mutual anchoring of the primary (1) and secondary wall parts (2) is improved and a watertight retaining wall is obtained.

Het spreekt voor zich dat er zo nodig bijkomende koppelmiddelen kunnen voorzien worden om de stabiliteit van de grond te verbeteren. Daarbij kan bijvoorbeeld een grondanker doorheen de primaire wanddelen (1) met wapening voorzien worden of er kan bijkomend gestut worden ter hoogte van deze primaire wanddelen (1).It goes without saying that additional coupling means can be provided if necessary to improve the stability of the soil. In this case, for example, a ground anchor can be provided through the primary wall parts (1) with reinforcement or additional support can be provided at the level of these primary wall parts (1).

In hetgeen volgt worden de twee alternatieve werkwijzen omschreven. Daarbij wordt verwezen naar figuur 4 en 5.The following describes the two alternative methods. Reference is made to figures 4 and 5.

Werkwijze 1 (zie figuur 4)Method 1 (see figure 4)

Al of niet verhuisde primaire wanddelen (1) worden op een afstand in de grond geboord met de nodige bewapening (Fig. 4a). Dit gebeurt de eerste dag van de werken. De dag nadien worden de tussenstukken in de grond opgevuld door met een Soilmixdiepwandffees of gelijkaardige menginrichtingen in de grond te brengen door frezen of boren, de grond te vermengen met cement en zo een secundair wanddeel (2) te vormen (Fig. 4b). Al of niet snijdend in de primaire wanddelen (1) er naast. De primaire wanddelen (1) doen tevens dienst om de frees te geleiden in de grond zodat vooraf geen extra geleide balk gestort moet worden, (dit in tegenstelling tot werkwijze 2)Primary wall sections (1), whether or not moved, are drilled into the ground at a distance with the necessary reinforcement (Fig. 4a). This happens the first day of work. The next day, the spacers in the ground are filled by inserting into the ground with a Soilmix deep wall cutter or similar mixing devices by milling or drilling, mixing the soil with cement and thus forming a secondary wall part (2) (Fig. 4b). Whether or not cutting in the primary wall parts (1) next to it. The primary wall parts (1) also serve to guide the cutter into the ground so that no additional guided beam has to be cast in advance (this in contrast to method 2)

De secundaire wanddelen (2) kunnen al of niet gewapend worden. Afhankelijk van de druk die de wand dient op te nemen.The secondary wall parts (2) may or may not be reinforced. Depending on the pressure that the wall must absorb.

Werkwijze 2 (zie figuur 5)Method 2 (see figure 5)

Met vaste tussenafstanden (diameter van de primaire wanddelen of kleiner) worden eerst secundaire wanddelen (2) met een Soilmixfrees of gelijkaardige menginrichting in de grond gevormd (Fig. 5a). Al of niet gewapend.At fixed intervals (diameter of the primary wall parts or smaller), secondary wall parts (2) are first formed in the ground with a Soilmix cutter or similar mixer (Fig. 5a). Armed or not.

Eerst moeten geleide balken gegoten worden om de frees in de juiste positie naar beneden te laten gaan. Tussen de in de grond gevormde secundaire wanddelen (2) worden, meestal de volgende dag, al of niet verhuisde primaire wanddelen (1) in de grond geboord (Fig. 5b), zodat elk wanddeel (1) in de tussenruimte tussen twee secundaire wanddelen (2) wordt geplaatst. Men kan de primaire wanddelen (1) al of niet laten snijden in de reeds in de grond gevormde wanddelen (2), afhankelijk van het feit of enkel de gronddruk moet weerstaan worden, of zowel de gronddruk als waterdruk moet opgevangen worden door de keerwand. De primaire wanddelen (1) zullen meestal gewapend zijn omdat deze de meeste krachten zullen moeten opvangen.First, guided beams must be cast to lower the cutter in the correct position. Between the secondary wall parts (2) formed in the ground, primary wall parts (1), whether or not moved, are drilled into the ground (Fig. 5b), so that each wall part (1) in the space between two secondary wall parts (2) is placed. The primary wall parts (1) may or may not be cut into the wall parts (2) already formed in the ground, depending on whether only the ground pressure must be resisted, or both the ground pressure and water pressure must be absorbed by the retaining wall. The primary wall parts (1) will usually be reinforced because they will have to absorb the most forces.

Door de combinatie van in de grond gevormde primaire wanddelen (1) en de techniek met de Soilmixfrees of gelijkaardige menginrichtingen bekomt men een zeer stabiele wand. Het systeem is zeer flexibel. De primaire wanddelen (1) kunnen aangepast worden in lengte en diameter en voorzien worden van de nodige wapening. Ook de tussenafstanden kunnen variëren. Ook de secundaire wanddelen (2) kunnen in breedte en diepte aangepast worden aan de omstandigheden. Met de Soilmixfrees kan men de secundaire wanddelen (2) tot op eender welke diepte aanbrengen. De uitvoering gebeurt zeer snel en de grondafvoer blijft zeer beperkt.A very stable wall is obtained by the combination of primary wall parts (1) formed in the ground and the technique with the Soilmix cutter or similar mixing devices. The system is very flexible. The primary wall parts (1) can be adjusted in length and diameter and provided with the necessary reinforcement. The spacing distances can also vary. The secondary wall parts (2) can also be adjusted in width and depth to the circumstances. With the Soilmix cutter, the secondary wall parts (2) can be applied to any depth. The execution is very fast and the soil drainage remains very limited.

Claims (11)

1. Werkwijze voor het vormen van een in de grond gevormde wand omvattende primaire wanddelen (1) en secundaire wanddelen (2), met het kenmerk dat de genoemde werkwijze de volgende stappen omvat: het vormen van minstens twee op een tussenafstand van elkaar gelegen primaire wanddelen (1) door het boren van een cirkelvormige ruimte in de grond en vervolgens deze vrijgekomen ruimte op te vullen met beton; het vormen van de secundaire wanddelen (2) door het mechanisch losmaken van de grond en deze losgemaakte grond te vermengen met een uithardend bindmiddel; zodat de primaire (1) en secundaire wanddelen (2) de genoemde wand vormen.Method for forming a wall formed in the ground comprising primary wall parts (1) and secondary wall parts (2), characterized in that the said method comprises the following steps: forming at least two primary primary spaced apart wall parts (1) by drilling a circular space in the ground and then filling this released space with concrete; forming the secondary wall parts (2) by mechanically loosening the soil and mixing this loosened soil with a curing binder; so that the primary (1) and secondary wall parts (2) form the said wall. 2. Werkwijze volgens conclusie 1, met het kenmerk dat de genoemde primaire wanddelen (1) een hoofdzakelijk cirkelvormige dwarsdoorsnede hebben.Method according to claim 1, characterized in that said primary wall parts (1) have a substantially circular cross-section. 3. Werkwijze volgens conclusie 1 of 2, met het kenmerk dat de genoemde secundaire wanddelen (2) een hoofdzakelijk rechthoekige dwarsdoorsnede hebben.Method according to claim 1 or 2, characterized in that said secondary wall parts (2) have a substantially rectangular cross-section. 4. Werkwijze volgens één van de voorgaande conclusies, met het kenmerk dat de primaire (1) en/of de secundaire (2) wanddelen wapeningselementen (3) omvatten.Method according to one of the preceding claims, characterized in that the primary (1) and / or the secondary (2) wall parts comprise reinforcement elements (3). 5. Werkwijze volgens één van de voorgaande conclusies, met het kenmerk dat de primaire wanddelen (1) zich uitstrekken tot een diepte nagenoeg gelijk aan de diepte van de secundaire (2) wanddelen.Method according to one of the preceding claims, characterized in that the primary wall parts (1) extend to a depth substantially equal to the depth of the secondary (2) wall parts. 6. Werkwijze volgens één van de conclusies 1 t/m 4, met het kenmerk dat de secundaire wanddelen (2) zich uitstrekken tot op een kleinere diepte dan de diepte van de primaire wanddelen (1).Method according to one of claims 1 to 4, characterized in that the secondary wall parts (2) extend to a depth smaller than the depth of the primary wall parts (1). 7. Werkwijze volgens één van de voorgaande conclusies, met het kenmerk dat de primaire (1) en secundaire (2) wanddelen koppelmiddelen (4) omvatten om tegen elkaar aansluitende wanddelen met elkaar te verbinden.Method according to one of the preceding claims, characterized in that the primary (1) and secondary (2) wall parts comprise coupling means (4) for connecting wall parts connecting against each other. 8. Werkwijze volgens conclusie 7, met het kenmerk dat de genoemde koppelmiddelen (4) eerste en tweede complementaire koppelmiddelen omvatten waarbij de eerste koppelmiddelen één of meerdere uitsparingen omvatten en waarbij de tweede koppelmiddelen een in elke uitsparing passend uitsteeksel omvatten.Method according to claim 7, characterized in that said coupling means (4) comprise first and second complementary coupling means, wherein the first coupling means comprise one or more recesses and wherein the second coupling means comprise a protrusion fitting into each recess. 9. Werkwijze volgens één van de voorgaande conclusies, met het kenmerk dat de primaire wanddelen (1) een grondanker omvatten.Method according to one of the preceding claims, characterized in that the primary wall parts (1) comprise a ground anchor. 10. Een in de grond gevormde wand omvattende primaire wanddelen (1) en secundaire wanddelen (2), met het kenmerk dat de gevormde wand minstens twee op een tussenafstand van elkaar gelegen primaire wanddelen (1) uit beton omvat en dat de secundaire wanddelen (2) bestaan uit mechanisch losgemaakte grond vermengd met een uithardend bindmiddel.10. A wall formed in the ground comprising primary wall parts (1) and secondary wall parts (2), characterized in that the wall formed comprises at least two primary wall parts (1) of concrete spaced apart and that the secondary wall parts ( 2) consist of mechanically loosened soil mixed with a hardening binder. 11. Een in de grond gevormde wand volgens conclusie 10, met het kenmerk dat de gevormde wand vervaardigd is volgens één der conclusies 1 t/m 9.A wall formed in the ground according to claim 10, characterized in that the formed wall is manufactured according to one of claims 1 to 9.
BE2006/0566A 2006-11-22 2006-11-22 Process for forming a retaining wall and a retaining wall formed in accordance with such a process. BE1017368A5 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
BE2006/0566A BE1017368A5 (en) 2006-11-22 2006-11-22 Process for forming a retaining wall and a retaining wall formed in accordance with such a process.
EP20070120394 EP1925748A2 (en) 2006-11-22 2007-11-09 Method for forming a retaining wall, and a retaining wall formed by such a method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
BE200600566 2006-11-22
BE2006/0566A BE1017368A5 (en) 2006-11-22 2006-11-22 Process for forming a retaining wall and a retaining wall formed in accordance with such a process.

Publications (1)

Publication Number Publication Date
BE1017368A5 true BE1017368A5 (en) 2008-07-01

Family

ID=37964705

Family Applications (1)

Application Number Title Priority Date Filing Date
BE2006/0566A BE1017368A5 (en) 2006-11-22 2006-11-22 Process for forming a retaining wall and a retaining wall formed in accordance with such a process.

Country Status (2)

Country Link
EP (1) EP1925748A2 (en)
BE (1) BE1017368A5 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3429126A (en) * 1966-01-21 1969-02-25 Gino Wey Method of producing a continuous bore pile wall
JPS58189414A (en) * 1982-04-10 1983-11-05 Masato Ohori Construction of sheathing wall
JPS6065824A (en) * 1983-09-22 1985-04-15 Asuku Kenkyusho:Kk Method of constructing landslide protection wall having newel pile
US4537536A (en) * 1983-10-18 1985-08-27 The Shimizu Construction Co., Ltd. Process and apparatus of constructing a water tight underground pile wall
EP0667417A1 (en) * 1994-02-08 1995-08-16 Rudolf G. Hofinger Method for sealing an impervious barrier in soil
US6241426B1 (en) * 1999-05-25 2001-06-05 Aerial Industrial, Inc. Method for forming an interconnected underground structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3429126A (en) * 1966-01-21 1969-02-25 Gino Wey Method of producing a continuous bore pile wall
JPS58189414A (en) * 1982-04-10 1983-11-05 Masato Ohori Construction of sheathing wall
JPS6065824A (en) * 1983-09-22 1985-04-15 Asuku Kenkyusho:Kk Method of constructing landslide protection wall having newel pile
US4537536A (en) * 1983-10-18 1985-08-27 The Shimizu Construction Co., Ltd. Process and apparatus of constructing a water tight underground pile wall
EP0667417A1 (en) * 1994-02-08 1995-08-16 Rudolf G. Hofinger Method for sealing an impervious barrier in soil
US6241426B1 (en) * 1999-05-25 2001-06-05 Aerial Industrial, Inc. Method for forming an interconnected underground structure

Also Published As

Publication number Publication date
EP1925748A2 (en) 2008-05-28

Similar Documents

Publication Publication Date Title
US20220106879A1 (en) Construction method for entering shallow-buried multi-arch tunnel under water-rich geological conditions
CN103572755A (en) Prestressed concrete precast pile
EA037484B1 (en) Retaining wall method of precast block to prevent landslide
KR101901392B1 (en) A Micropile and Retaining Wall Method by using Micropile
KR101149895B1 (en) Reinforcement block for pillar of tunnel
CN104196017A (en) Method for preventing lava zone hole punching/drilling cast-in-place pile mud leakage and hole collapse
KR20200124949A (en) Anchor Tension way sheathing structure and sheathing method of construction
CN110424372A (en) Along road interval method in a row remove obstacles after construct diaphram wall construction method
KR100869764B1 (en) Earth of building land-side protection wall structure
KR20090080230A (en) The grouting structure of tunnel and tunnel construction method using the same
BE1017368A5 (en) Process for forming a retaining wall and a retaining wall formed in accordance with such a process.
RU2539473C1 (en) Method to build section of technological timber road
CN207987961U (en) A kind of rockmass high slope anchor pole and earth-retaining wall composite construction
KR102497458B1 (en) Cip Retaining Reinforcing Structure and Method Constructing the Same
KR102511387B1 (en) Connecting structure of reinforced wall and constructing method thereof
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
US4056154A (en) Squaring off and reaming tool for deep elongated trench excavations
KR102150531B1 (en) Retaining wall structure using vertical underground insert and its construction method
JP2006070689A (en) Construction method of retaining wall block structure
KR20110034831A (en) Method for non excavated excavating construction using steel pipe and steel pipe with hole
JP5360657B2 (en) Retaining wall made of precast concrete
KR102625776B1 (en) Construction method of CIP retaining wall with improved water protection and ground subsidence prevention function
KR20150109121A (en) Concrete pile utilizing wasted tire and the slope stabilizing structure thereof
KR102184081B1 (en) Construction method for perforating goround bore using inverse casing
KR102285192B1 (en) A Eco-friendly retain wall structure

Legal Events

Date Code Title Description
RE Patent lapsed

Effective date: 20131130